PROYECTO:
ESTUDIOS DE ASFALTO DE LAS VAS; POALO - SAN RAFAEL-LUZ DE
AMRICA - MRQUEZ DE MANENZA - POAL, MACA CENTRO MACA
ATPULO - ACHUPALLAPAMBA, MACA UGSHALOMA - LLAMA AN,
CURVA
DE
MACA-MACA
MILINPUNGO
MACA
CHUQUIRALOMA,
INFORME DE GENERAL
Abril del 2015
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
NDICE
CAPITULO I..................................................................................................... 8
MEMORIA DESCRIPTIVA...................................................................................8
1.1. PROYECTO................................................................................................ 8
1.2. ANTECEDENTES........................................................................................ 8
1.3 PLANTEAMIENTO DEL PROBLEMA.............................................................9
12
12
1.4 JUSTICACIN.......................................................................................... 13
1.5 ALCANCE................................................................................................. 14
1.6 UBICACIN GENERAL DEL PROYECTO..................................................14
UBICACIN GENERAL DEL PROYECTO...............................................................15
1.7
25
29
39
Sistema de Drenaje..........................................................................44
1.16. Alcantarillas....................................................................................... 45
1.17. Sealizacin......................................................................................... 50
1.18. Velocidad de Circulacin Actual..........................................................51
1.19. Calidad del Servicio............................................................................. 51
1.20. Trfico Actual....................................................................................... 52
1.21. Pendientes Actuales de las Vas...........................................................53
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
CAPITULO II.................................................................................................. 54
MARCO TEORICO........................................................................................... 54
2.1 ANTECEDENTES INVESTIGATIVOS............................................................54
2.2 FUNDACIN FILOSOFICA..........................................................................56
2.3.
FUNDAMENTACIN LEGAL....................................................................56
2.4.
2.4.1.
Vas Primarias
2.4.3.
Vas Secundarias 60
2.4.4.
2.4.5.
2.5.
59
60
EL TERRENO......................................................................................... 63
2.5.1.
La Topografa
63
ANLISIS DE TRFICO..........................................................................64
2.7.1.
2.7.2.
65
2.7.4.
2.8.
Volumen de Trfico
66
VELOCIDAD DE DISEO.......................................................................67
69
EL PERALTE.......................................................................................... 70
2.9.1.
2.9.2.
2.9.3.
2.9.4.
70
71
72
2.10.
2.11.
SOBREANCHO................................................................................... 73
2.12.
2.13.
2.14.
PENDIENTE LONGITUDINAL...............................................................79
2.15.
CURVAS VERTICALES.........................................................................81
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
SECCIN TRANSVERSAL...................................................................83
2.17.
2.18.
TALUDES........................................................................................... 87
2.19.
DRENAJE........................................................................................... 89
90
PAVIMENTO....................................................................................... 91
109
HIPTESIS....................................................................................... 111
ENFOQUE INVESTIGATIVO..................................................................112
3.2.
TIPOS DE INVESTIGACIN..................................................................113
3.2.1.
Investigacin de Campo
113
3.2.2.
Investigacin Documental
114
3.2.3.
3.3.
NIVELES DE INVESTIGACIN..............................................................114
3.4.
POBLACIN Y MUESTRA.....................................................................114
3.5.
3.6.
PROCESAMIENTO Y ANLISIS.............................................................116
VAS EN ESTUDIO..............................................................................117
4.2.
4.3.1.
Investigaciones de suelos
4.3.2.
4.3.3.
Tlf: 0998118389
146
MAIL: c_villacs1961@hotmail.com
4.3.4.
Materiales Encontrados150
151
159
4.4.1.
4.4.2.
4.4.3.
4.4.4.
165
175
184
189
190
190
191
192
195
MAIL: c_villacs1961@hotmail.com
196
206
207
206
MAIL: c_villacs1961@hotmail.com
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
CAPITULO I
MEMORIA DESCRIPTIVA
1.1. PROYECTO
ESTUDIOS DE ASFALTO DE LAS VAS; POALO - SAN RAFAEL-LUZ
DE AMRICA - MRQUEZ DE MAENZA - POAL, MACA CENTRO
MACA ATPULO - ACHUPALLAPAMBA, MACA UGSHALOMA LLAMA AN, CURVA DE MACA-MACA MILINPUNGO - MACA
CHUQUIRALOMA, ENTRADA DE MARISCAL SUCRE-PILLIGSILLI LIMITE CON SANTA ROSA, PARROQUIA SAN JOS DE POALO,
CANTN LATACUNGA PROVINCIA DE COTOPAXI.
1.2. ANTECEDENTES
El Gobierno Autnomo Descentralizado Parroquial San Jos de Poal,
desarrolla proyectos de vialidad los cuales van enfocados a satisfacer
las necesidades bsicas de desarrollo en el sector rural, mediante la
implementacin de proyectos viales, los cuales proporcionaran una
mejor calidad de vida a los beneficiarios, reactivando la zona de
influencia social y econmicamente.
En tal virtud, se contratara los servicios de consultora , para obtener
los Estudios Definitivos para el mejoramiento de Vas; POALO - SAN
RAFAEL-LUZ DE AMRICA - MRQUEZ DE MANENZA - POAL, MACA
CENTRO MACA ATPULO - ACHUPALLAPAMBA, MACA UGSHALOMA LLAMA
AN,
CURVA
DE
MACA-MACA
MILINPUNGO
MACA
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
tecnologas
que
han
dado
lugar
caractersticas sealadas.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
obras
con
las
MAIL: c_villacs1961@hotmail.com
10
MAIL: c_villacs1961@hotmail.com
11
de los caminos en
MAIL: c_villacs1961@hotmail.com
12
ah
nace
nuestro
descontento
malestar,
obligndonos
involucrarnos en este proyecto con una gran ilusin y cuyo fin no es otro
que el evaluar el estado actual de la vas y rectificarlas de acuerdo a las
normas tcnicas que exige el Ministerio de Transporte y obras Pblicas,
para las vas de nuestro pas.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
13
en el manual y especificaciones
del Ministerio de
MAIL: c_villacs1961@hotmail.com
14
MAIL: c_villacs1961@hotmail.com
15
MAIL: c_villacs1961@hotmail.com
16
UBICACIN PROVINCIAL
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
17
UBICACIN PARROQUIAL
MAIL: c_villacs1961@hotmail.com
18
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
19
COORDENADAS UTM
ABSCISA
X
Y
0+000,00
758686,74
9901991,55
1+320,05
758529,29
9900754,2
PUNTO
INICIO
FINAL
COTA
2930
3025
TRAMO 1B.
PUNTO
INICIO
FINAL
PUNTO
INICIO
FINAL
PUNTO
INICIO
FINAL
TRAMO 5.
PUNTO
INICIO
FINAL
Tlf: 0998118389
COTA
3695
3670
MAIL: c_villacs1961@hotmail.com
20
MAIL: c_villacs1961@hotmail.com
21
la capacidad
portante,
ondulado-montaoso.
Geomtricamente tiene malas caractersticas con trayectos en los que
las gradientes, radios de curvatura y tangentes se apartan de los
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
22
mnimos requeridos; en
todo
todo
cunetas, razn por la cual por efecto de las aguas lluvias existe
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
23
la capacidad
portante,
plano-ondulado.
Geomtricamente
MAIL: c_villacs1961@hotmail.com
24
Poal-San Rafael.
Sector Marquez de Maenza
El tramo Nro. 4 que va desde la Curva de Maca hasta
Ugshaloma, une los sectores antes sealados y tiene una longitud de
1+173.11 Km y est trazado en sentido NOR-OESTE en relacin a la
Parroquia.
En cuanto a los conflictos que se presenta para una buena circulacin
vehicular, es la falta de una seccin transversal apropiada para el cruce
de los vehiculos, tiene entre 5 y 7 metros de ancho, el material de la
calzada es de tierra, notandose irregularidades y baches en algunos
sectores por efecto de las lluvias, asentado sobre una subrasante que
no posee ningn tipo de estudio de suelos para determinar
la
todo
cunetas, razn por la cual por efecto de las aguas lluvias existe
socavacin y orosin lateral hasta encontrar una alcantarilla o paso de
agua.
Este tramo une los siguientes sectores:
Curva de Maca(Llamaan)
Ugshaloma
El tramo Nro. 5 que va desde la Curva de Maca-Milimpugo
-Chuquiraloma, une los sectores antes sealados y tiene una longitud
de 4+865.84 Km y est trazado en sentido NOR-OESTE en relacin a la
Parroquia. En cuanto a los conflictos que se presenta para una buena
circulacin vehicular, es la falta de una seccin transversal apropiada
para el cruce de los vehiculos, tiene entre 5 y 10 metros de ancho,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
25
la capacidad
MAIL: c_villacs1961@hotmail.com
26
Tratamiento
Superficial
Bituminoso,
deteriorado
por
falta
de
mantenimiento, existe todo tipo de fisuras hasta los vaches que son los
ms grandes ya que al final del tramo a partir de la abscisa 2+617.25
tiene lastre en una parte y en otra tierra, material que provoca
levantamiento de polvo en ciertas pocas, causando enfermedades a
los que circulan por este sector. Capas de material asentado sobre una
subrasante que no posee ningn tipo de estudio de suelos para
determinar
la capacidad
portante,
plano-ondulado.
Geomtricamente amerita rectificacin de pendientes longitudinales y
transversales, radios de curvatura y tangentes por cuanto se apartan de
los mnimos requeridos; en todo su recorrido no cuenta con cunetas,
razn por la cual por efecto de las aguas lluvias se ha profundizado el
perfilado de cunetas, formando crcavas laterales que van erosionando
los pies de los pequeos taludes en la parte de ascenso al Barrio
Pilligsilli, Tiene alcantarillas con tubos de cemento en la parte baja pero
tapadas por falta de mantenimiento, causando problemas en la solucin
del drenaje por lo que se recomendar el cambio de las mismas por
alcantarillas de armico.
Este tramo une los siguientes sectores:
Mariscal Sucre
Pilligsilli
Lmite con Santa Rosa
MAIL: c_villacs1961@hotmail.com
27
MAENZA
TRAMO
TRAMO No.
No. 3
3=
= Abs.
Abs. 0+000.00
0+000.00
1+061.19
1+061.19
TRAMO
TRAMO No.
No. 1A
1A =
= Abs.
Abs.
0+000.00
0+000.00 1+320.05
1+320.05
Estacin San
Rafael-Mrquez
de Maenza
Estacin Luz de
Amrica Centro
y Luz de Amrica
Estacin Luz
de Amrica
Norte
TRAMO
TRAMO No.
No. 2
2=
= Abs.
Abs.
0+000.00 0+656.88
0+000.00
0+656.88
TRAMO
TRAMO No.1B
No.1B =
= Abs.
Abs.
0+000.00-0+820.27
0+000.00-0+820.27
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
28
TRAMO
TRAMO No.5
No.5 =
= Abs.
Abs. 0+000.000+000.000+4+865.84
0+4+865.84
TRAMO
TRAMO No.4
No.4 =
= Abs.
Abs. 0+000.00
0+000.00
0+1+173.11
0+1+173.11
Estacin Curva de
Maca-Ugsaloma
Estacin Curva
de MacaMilipungo
Chuquiraloma
TRAMO 6: VIA DESDE EMPATE CON CAMINO ASFALTADO ENTRE POALOTlf: 0998118389
MAIL: c_villacs1961@hotmail.com
29
Estacin
Mariscal Sucre-
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
30
Tlf: 0998118389
Descripcin
Este tramo identificado para este
estudio como 1A inicia en el
Centro de la Parroquia San Jos de
Poal en un punto de coordenadas
9901991.55 Norte, 758686,74 Este
y se desarrolla
por un terreno
plano-ondulado, escarpado hacia
arriba con pendiente bastante
pronunciada para llegar al Barrio
Luz de Amrica, requiere mejorar
la rasante y redisear el proyecto
vertical y horizontal, aumentar la
seccin transversal, incluyendo
cunetas o recolectores de agua
para solucionar el drenaje.
Tiene una pendiente promedio
mnima de 054% y una pendiente
mxima de 12.41%. En este tramo
cruza una tubera de agua de
material PVC de 4 pug., a la cual
se pondr especial inters durante
la construccin y si por adecuar la
estructura de la va de acuerdo al
diseo provoca destruccin, se
rehabilitar inmediatamente con
material
nuevo
que
se
presupuestar en el estudio. Hace
interseccin con un camino en la
abscisa
0+622,81;
no
tiene
cunetas, sus taludes oscila entre
1-6 metros de altura en la subida
al barrio Luz de Amrica.
Como material de la Capa de
Rodadura tiene lastre, volumen
que ser cuantificable para utilizar
en las capas de la estructura.
Se llega al Barrio Luz de Amrica
con una longitud de 1+320.05 Km
y el tramo que cruza el centro es
MAIL: c_villacs1961@hotmail.com
31
El tramo: Nro. 2 desde el Centro del Barrio Luz de AmricaLimite Parroquia 11 de Noviembre (camino asfaltado)
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
32
Kilometraje
Descripcin
KM
Este tramo inicia en el centro del
barrio Luz de Amrica, en el
punto
de
coordenadas
9900735.14 Norte, 758515.61
Este, implantado en el sentido
CARLOS ESTUARDO VILLACS JCOME
INGENIERO CIVIL Y MAGISTER EN VIASTERRESTRES
JOSE POALO
Norte-Sur GAD.
en PARROQUIAL
una SAN
topografa
CONSULTOR
plana. En cuanto al ancho de la
seccin transversal actual de la
va oscila entre 8 y 9 metros,
mismo que quedar regulado con
0+000KM0+656.88
un ancho uniforme con la
implantacin de este proyecto. La
va tiene una longitud de Km0 +
656.88 m. conformada con una
estructura actual de subrasante,
una capa granular calificada
como subbase clase 3 que sera
utilizado en la estructura que
resulte del diseo en este
estudio, su estado es bueno con
la problemtica que en pocas de
verano aparece levantamientos
de polvo que afecta a la salud de
los pobladores.
La
superficie
de
rodadura
presenta ondulaciones por efecto
del trfico, no tiene cunetas, a los
bordes tiene zanjas de cabuyos
que posiblemente afecten para
completar la seccin de va
propuesta en este estudio o para
construir bordillos y aceras en los
sitios que amerite.
En este tramo existe tubera de
dimetro 4 pulgadas que conduce
agua para riego por aspersin,
colocada a una altura de 0.70 m.
aproximadamente la cual de ser
afectada al colocar la estructura
de la va ser reemplazada o
reconstruida por la Constructora
que
realice
los
trabajos
considerando la cantidad de
inversin que conste en el
presupuesto.
Tambin se localiza un sifn de
agua,
cuyos
tanques
de
comunicacin estn al filo del
camino, tambin a considerarse
caso de ser afectados.
En la abscisa Km 0+656.88, hace
interseccin con un camino en el
costado derecho, llegando luego
a la parte final, interseccin con
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
33
el camino asfaltado
de la
parroquia 11 de Noviembre en el
punto
de
coordenadas
9900173.41 Norte, 758802.07
Este
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
34
Kilometraje
KM 1+061.19
Descripcin
Este tramo tiene una longitud de
Km1+061.19 metros, tiene su
punto de inicio en Poal (San
Rafael)
en
el
Punto
de
coordenadas 9902013.88 Norte,
CARLOS ESTUARDO VILLACS JCOME
INGENIERO CIVIL Y MAGISTER EN VIASTERRESTRES
PARROQUIAL
SAN JOSE POALO
757805.91 GAD.
Este,
avanza
en
CONSULTOR
sentido
Sur-Norte,
hace
interseccin con un camino que
va hasta el centro de la ciudad,
llega
hasta el sitio cuatro
esquinas donde hace interseccin
con otras vas, tiene una seccin
transversal actual de 5 y 8
metros que necesita ser ampliada
para el cruce normal de los
vehculos, est implantado en
una topografa plana hasta el Km
0+549.61 metros con pendientes
longitudinales pequeas y a partir
de esta abscisa hasta el final del
tramo es escarpado hacia arriba
con una pendiente muy fuerte del
18,17% que sale fuera de las
normas del MTOP, a la cual se
realizar leves rectificaciones en
el diseo, toda vez que si
profundizamos hasta la pendiente
mxima de la norma, el barrio
quedar sobre nivel.
El material de la calzada es
lastre, que en pocas de verano
por la circulacin de los vehculos
levanta polvo que afecta a la
salud de los habitantes del
sector, no tiene cunetas laterales
por lo que en la pendiente fuerte
existe socavaciones laterales, en
este tramo los taludes oscilan
entre 0 a 3 metros, se puede
apreciar que el material del talud
es cangagua y que necesita la
inclinacin adecuada para evitar
derrumbes
En la parte final, est construido
un sifn por donde circula agua
de regado, cuyos tanques de
comunicacin estn al borde del
camino, reemplazable en caso de
ser afectado por la seccin
transversal de la va.
Finalmente el tramo termina en el
sector denominado Mrquez de
Maenza
en
el
Punto
de
Coordenadas 9901776.36 Norte,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
757805.91 Este 35
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
Descripcin
Este tramo inicia en el sitio
denominado
Llamaan
en
la
interseccin del camino que conduce
a los sectores Atpulo, Maca Grande
en un punto de coordenadas
9900791.14 Norte, 753115.09 Este.
El tramo tiene una longitud de
KM1+173.11, est implantado en
una
topografa
ondulada
con
pendientes
longitudinales,
enmarcadas dentro de las normas de
diseo, necesitando sin embargo
una pequea rectificacin tanto en
planta como en perfil.
El ancho de la seccin transversal
oscila entre 5 y 8 metros, debiendo
con este proyecto tener uniformidad
en la seccin con sus respectivas
pendientes de bombeo, no tiene
cunetas
laterales,
existiendo
problemas en la evacuacin del agua
superficial, lo que ha provocado
problemas a la capa de rodadura.
La va tiene algunas alcantarillas,
tapadas en su mayor parte por falta
de mantenimiento. Por la nueva
seccin transversal que se propone
en este estudio, es necesario
aumentar las longitudes hasta tener
el ancho requerido.
En cuanto a la estructura de la va
actual, est conformado por la
subrasante y sobre ella una capa de
tierra que al momento se encuentra
en psimas condiciones por lo que la
propuesta de una nueva estructura
es la necesaria para que cumpla con
las exigencias actuales en base al
trfico, suelos y otros parmetros.
Los taludes de este tramo son
relativamente pequeos por lo que
no hay problemas de deslizamientos.
En lo referente al diseo geomtrico,
tiene un trazado con tangentes y
curvas que no cumplen con las
normas existentes, fallas que se
corregir en la propuesta de este
36
estudio.
Tlf: 0998118389
Descripcin
Este
tramo
inicia
en
el
sitio
denominado Curva de Maca, haciendo
interseccin con la va Latacunga-La
Mana en el punto de coordenadas
9900615.38 Norte, 753037.24 Este,
tiene una longitud de Km4+865.84
metros hasta la escuela ubicada en el
sector Chuquiraloma.
El ancho de la va oscila entre 5 y 10
metros, necesitando uniformizar el
ancho a 10 metros, propuesto en este
proyecto y considerando la ordenanza
del GAD Municipal de Latacunga.
En cuanto a la conformacin de la
estructura actual, est conformado por
una subrasante y sobre ella un
empedrado que por la falta del drenaje
superficial
est
en
psimas
condiciones.
En el margen izquierdo en sentido
Curva de Maca-Chuquiraloma, tiene un
tramo de cunetas de 1+850.13 Km de
longitud, construidas por el GAD
Provincial de Cotopaxi, implantadas sin
considerar proyecto de futuro, es decir
no se ha considerado una seccin
transversal apropiada para que la va
tenga doble circulacin.
El resto de la va no tiene cunetas por
lo que hay problemas en la evacuacin
del agua superficial, problemtica que
ha
deteriorado
el
empedrado,
originando surcos y baches que
dificultan al trnsito vehicular, ms
acompaado el lodo en pocas de
lluvias el problema es mayor.
La va tiene alcantarillas, tapadas en su
mayor
parte
por
falta
de
mantenimiento. Por la nueva seccin
transversal que se propone en este
estudio, es necesario aumentar las
longitudes hasta tener el ancho
requerido. Su estado es regular, son de
rmico de dimetro 0.90 metros, se
reparar algunas y otras sern
cambiadas con el nuevo dimetro que
MAIL: c_villacs1961@hotmail.com
37
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
38
Kilometraje
Km3+118.03
Descripcin
Curva
de
Maca-Maca
Milinpungo
Maca
de
Latacunga
la
Parroquia
Provincia
de
caractersticas de diseo
San
Jos
Cotopaxi
de
Poal
para
Cantn
mejorar
las
socio-econmicas de la poblacin.
vas, la infraestructura
existente,
los
servicios
con
que
caractersticas geomtricas.
Realizar el estudio Socio-econmico TIR, VAN, B/C .
Determinar el TPDA (Trfico Promedio Diario Anual).
Estudiar los problemas de drenaje.
Realizar los estudios de suelos de la vas, determinar la
calidad de las subrasantes en los sitios identificados en el
proyecto.
Disear el espesor del pavimento para la rehabilitacin de las
Vas en estudio.
Preparar los Diseos Definitivos y todos los documentos
necesarios para el proceso de contratacin, previo a la
ejecucin de su rehabilitacin, elevando su estndar de servicio
a un camino vecinal clase IV, que permita mejorar las
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
40
MAIL: c_villacs1961@hotmail.com
41
El perfil transversal nos sirve para tomar la forma altimtrica del terreno
a lo largo de una franja de nivelacin. El perfil transversal tiene por
objeto presentar, la posicin que tiene la obra proyectada (perfil tipo)
respecto del terreno y a partir de esta informacin, determinar la
cubicacin del movimiento de tierra, ya sea en forma grfica o analtica.
Entonces los perfiles transversales que tienen las vas motivo de este
estudio son variables, no tienen una seccin uniforme, carecen de
espesores de las capas estructurales de soporte, ancho adecuado para
el cruce vehicular, bombeo adecuado para el drenaje, cunetas, etc.
Estas falencias se cubrira con el mejoramiento de las vas, aplicando la
seccin tipo resultante del estudio en cada una.
El perfil transversal se precisa para determinar zonas donde el agua no
pueda desaguar a pesar de la pendiente de la calzada
En resumen las vias de este estudio tiene perfiles transversales
variables, notndose claramente la falta de pendiente transversal
adecuada para el escurrimiento de las aguas lluvias, permitiendo el
estancamiento del agua, afectando al usuario por el riesgo de ocasionar
accidentes debido a la falta de control del vehculo. Estas fallas son
notorias
en
estas
carreteras,
provocadas
por
el
trfico
las
MAIL: c_villacs1961@hotmail.com
42
se pueden notar
MAIL: c_villacs1961@hotmail.com
43
El Trnsito,
El Clima,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
44
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
45
nmero
de
alcantarillas
ser
incrementado
para
solucionar
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
46
1.16. Alcantarillas
En razn de que la evaluacin hidrolgica- hidrulica del cruce sobre
varias quebradas, determinan que las secciones son suficientes,
aumentado la seccin con la colocacin de alcantarillas metlicas y
mejorando las curvas de acceso para entrar dentro de los parmetros
geomtricos para el tipo de carretera clase IV. Se han previsto
actividades de mantenimiento, limpieza del cauce y construccin de
cajas y cabezales.
En los cuadros que se indica ms adelante se indica la existencia o no
de alcantarillas a lo largo de toda la vas, las cuales por su estado actual
o
porque
no
abastecen
los
caudales
producidos,
se
colocarn
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
47
TRAMO 1B.
ABSCISA
0+939.97
DETALLE
OBSERVACIONES
No existen alcantarillas
El tramo: Nro. 2 desde el Centro del Barrio Luz de AmricaLimite Parroquia 11 de Noviembre (camino asfaltado)
No existen alcantarillas.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
48
4
5
6
7
ABSCISA
0+012.00
0+375.00
0+630.00
0+630.00
0+760.00
1+100.15
1+616.82
3+018.24
Tlf: 0998118389
DETALLE
OBSERVACIONES
MAIL: c_villacs1961@hotmail.com
Estado Regular
Estado Malo
49
ABSCISA
0+120,00
Tanque de Agua
Potable
0+240,00
0+340,00
DETALLE
Entrada: d= 1.00 ;
1.30*1.00
Salida: Alas de 1.30
1.30
Grande; (1.55*1.25)
(0.80*0.80)
Entrada: d= 1.00 ;
1.30*1.00
Entrada
Salida
0+743,39
Entrada: d= 1.00 ;
1.30*1.00
Salida
0+992,73
Entrada: d= 0.70 ;
1.30*1.00
Salida: Alas de 1.90;
1+369,68
Entrada: d= 0.90 ;
1.10*1.20
Salida: Alas de 1.90;
1+973,23
Entrada: d= 0.90 ;
1.10*1.20
Salida: Alas de 1.90;
2+055,09
Entrada: d= 0.90 ;
1.10*1.20
Salida: Alas de 1.90;
2+2180,00
Entrada: d= 1.00 ;
1.10*1.20
Salida: Alas de 0.90;
10
2+367,76
Entrada:
Salida: Alas de 0.80;
11
3+235,85
Entrada:d=0.
Salida: Alas de 1.90;
12
3+417,27
Entrada:d=0.
Salida: Alas de 1.90;
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
50
13
14
4+080,00
Entrada:d=0.90
Alcantarilla Tapada
Estado Regular
4+379,74
Alcantarilla Tapada
Salida: Alas de 1.40; Muro 3.00
15
4+573,87
Falta de
mantenimiento
Falta de
mantenimiento
Falta de
mantenimiento
Estado Regular
Estado Regular
Entrada:cajon 1.20*1.00
Salida: Alas de 1.40; Muro 3.00
16
Tlf: 0998118389
4+824,39
MAIL: c_villacs1961@hotmail.com
51
4
5
6
7
ABSCISA
0+012.00
0+375.00
0+630.00
0+630.00
DETALLE
OBSERVACIONES
0+760.00
1+100.15
1+616.82
3+018.24
Estado Regular
Estado Malo
1.17. Sealizacin
La vas actuales no tienen ninguna sealizacin, por lo que en el diseo
se dar una atencin especial a este aspecto, complementando la
sealizacin
vial
de
seguridad
tradicionales,
con
sealizacin
las
oportunidades
que
brinda
la
zona
y,
adems,
en la actualidad se da vital
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
52
Va
Barrio
Luz
de
America-Lmite
con
la
Parroquia
11
de
por
la
misma
Busetas
vehculos
escolares,
livianos,
etc.
transporte
debiendo
pesado
incorporar
MAIL: c_villacs1961@hotmail.com
53
con 6 o ms ruedas)
En definitiva
en estas
vas de comunicacin
circulan vehculos
de camionetas
MAIL: c_villacs1961@hotmail.com
54
Va
Barrio
Luz
de
America-Lmite
con
la
Parroquia
11
de
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
55
CAPITULO II
MARCO TEORICO
2.1 ANTECEDENTES INVESTIGATIVOS
Los caminos aparecen sobre la tierra cuando el hombre resuelve vivir en
comunidad y tiene la obligacin de satisfacer las necesidades,
inicindose desde los senderos peatonales, luego caminos de herradura
para dar inicio al comercio entre ncleos humanos. Posteriormente con
el invento de la rueda, surge el carruaje, nacindose el camino
carrozable.
Segn Herdoto el primer camino de piedra fue construido 3.000 aos
antes de Cristo, por Cheop, para la construccin de la gran pirmide.
Se dice que los romanos son los precursores de la Ingeniera Civil en
materia de Caminos, construyendo la red ms completa de caminos de
acuerdo a las necesidades, bsicamente con fines militares, el trazado
segua
la
lnea
recta
sin
importar
la
topografa
del
terreno,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
56
el
sistema
de
terrestre.
El automotor
con
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
57
ser
un
proceso
de
ejercicio
del
MAIL: c_villacs1961@hotmail.com
58
completos
para
aperturas,
mejoramiento
MAIL: c_villacs1961@hotmail.com
59
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
60
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
61
2.4.1.
Red Vial Estatal del Ecuador
La Red Vial Estatal est constituida por todas las vas administradas por
el Ministerio de Transporte y Obras Pblicas (anteriormente Ministerio
de Obras Pblicas y Comunicaciones) como nica entidad responsable
del manejo y control, conforme a normas del Decreto Ejecutivo 860,
publicado en el Registro Oficial No. 186 del 18 de Octubre del 2000 y
la Ley especial de Descentralizacin del Estado y de Particin Social.
La Red Vial Estatal est integrada por las vas primarias y secundarias.
El conjunto de vas primarias y secundarias son los caminos principales
que registran el mayor trfico vehicular, intercomunican a las capitales
de provincia, cabeceras de cantn, los puertos de frontera internacional
con o sin aduana y los grandes y medianos centros de actividad
econmica. La longitud total de la Red Vial Estatal (incluyendo vas
primarias y secundarias) es de aproximadamente 8672.10 km.
2.4.2.
Vas Primarias
La vas primarias, o corredores arteriales, comprenden rutas que
conectan cruces de frontera, puertos, y capitales de provincia formando
una malla estratgica. Su trfico proviene de las vas secundarias (vas
colectoras), debe poseer una alta movilidad, accesibilidad controlada, y
estndares geomtricos adecuados. En total existen 12 vas primarias
en Ecuador con aproximadamente un 66% de la longitud total de la Red
Vial Estatal.
Las vas primarias reciben, adems de un nombre propio, un cdigo
compuesto por la letra E, un numeral de uno a tres dgitos, y en
algunos casos una letra indicando rutas alternas (A, B, C, etc.).
Una va primaria es considerada una troncal si tiene direccin norte-sur.
El numeral de las troncales es de dos dgitos (excepto la Troncal Insular)
e impar. Las troncales se numeran incrementalmente desde el oeste
hacia el este. Del mismo modo, una va primaria es catalogada como
transversal si se extiende en sentido este-oeste. El numeral de las
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
62
desde
el
norte
hacia
el
sur.
Aparte
de
su
2.4.3.
Vas Secundarias
Las vas secundarias, o vas colectoras incluyen rutas que tienen como
funcin recolectar el trfico de una zona rural o urbana para conducirlo
a las vas primarias (corredores arteriales). En total existen 42 vas
secundarias en Ecuador con aproximadamente un 33% de la longitud
total de la Red Vial Estatal.
Las vas secundarias reciben un nombre propio compuesto por las
ciudades o localidades que conectan. Adems del nombre propio, las
vas secundarias reciben un cdigo compuesto por la letra E, un
numeral de dos o tres dgitos, y en algunos casos una letra indicando
rutas alternas (A, B, C, etc.). El numeral de una va secundaria puede
ser
impar
par
para
orientaciones
norte-sur
este-oeste,
MAIL: c_villacs1961@hotmail.com
63
2.4.5.
Red Vial Cantonal
La Red Vial Cantonal es el conjunto de vas urbanas e interparroquiales
administradas por cada uno de los Consejos Municipales. Esta red est
integrada por las vas terciarias y caminos vecinales. Las vas terciarias
conectan cabeceras de parroquias y zonas de produccin con los
caminos de la Red Vial Nacional y caminos vecinales, de un reducido
trfico.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
64
Organismo Administrador
Descripcin
Corredores arteriales
Caminos de mediana
jerarqua. funcional que
conectan capitales de
Provincia.
Caminos de acceso a
corredores arteriales.
Pasos laterales
Arteriales urbanas.
Consejos Provinciales
Cantones
Vas urbanas
Inter parroquiales
II Tipo A
III Tipo
B
IV Tipo
Tlf: 0998118389
Ancho
de
Carpeta
7.3
Tipo de Carretera
Ancho
Espald
n
1.5
Pendiente
Transversal
Pendiente
Espaldn
15-20
4.0
7.306.50
6.506.00
Asfalto
1.5
20
4.0
Tratamiento
Bituminoso,Empedrado
0.5
20
4.0
6.505.50
Grava Tritutada
30
Asfalto
Hormigon
MAIL: c_villacs1961@hotmail.com
65
V
Vecinal
5.504.00
Tierra
Compactada,Grava
30-40
2.5. EL TERRENO
2.5.1.
La Topografa
La topografa es un factor principal de la localizacin fsica de las vas,
pues afecta su alineamiento horizontal, sus pendientes, sus distancias
de visibilidad y sus secciones transversales. Desde el punto de vista de
la topografa, se clasifican los terrenos en cuatro categoras, que son:
1.-
Terreno
Ondulado.
Se
caracteriza
por
tener
pendientes
MAIL: c_villacs1961@hotmail.com
66
estudio,
estn
enmarcado
en
Carreteras
clase
IV
cuyas
100-300 TPDA
Recomendable
Absoluta
LL
LL
80
60
50
60
35
25
210
110
75
110
30
20
110
70
55
70
35
25
480
290
210
290
150
110
28
12
12
24
13
10
13
12
0.50%
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
67
trfico.
2.7.1.
Volumen de Trfico
En el estudio del volumen del trnsito se deben tener en cuenta varios
conceptos, a saber:
MAIL: c_villacs1961@hotmail.com
68
Proyeccin
del
trnsito.
Las
carreteras
nuevas
los
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
69
2.7.3.
Volumen de Hora Pico
Es el volumen de trnsito que circula por una carretera en la hora de
trnsito ms intenso, presenta variaciones considerables en las
diferentes horas del da y ao.
2.7.4.
Volumen Horario de Diseo (VHD)
Es el volumen horario que se utiliza para disear, es decir para
comparar con la capacidad de la carretera en estudio.
declives
muy
anchos,
favorables,
las
elevarn
cuales,
el
salvo
costo
de
que
midan
construccin
MAIL: c_villacs1961@hotmail.com
70
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
71
Tlf: 0998118389
Categor
TPDA
a de la
esperad
va
Relieve ondulado
Relieve
montaoso
Reco
Absolu
Recomen
Absolu
Recome
Absolu
ta
60
n.
60
ta
35
m.
50
ta
25
100-
d.
80
300
100-
80
60
60
35
50
25
300
100-
80
60
60
35
50
25
5E
300
100-
80
60
60
35
50
25
300
<100
60
50
50
35
40
25
4E
<100
60
50
50
35
40
25
MAIL: c_villacs1961@hotmail.com
72
de Diseo
en Km./h
Volumen de
Trnsito Bajo
Volumen de
Volumen de
Trnsito
Trnsito Alto
Intermedio
25
30
40
50
60
70
80
24
28
37
46
55
63
71
23
27
35
44
51
59
66
22
26
34
42
48
53
57
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
73
2.9. EL PERALTE
Consiste en elevar en las curvas, el borde exterior de las vas una
cantidad, para que permita que una componente del vehculo se
oponga a la fuerza centrfuga (Fc) evitando de esta manera que el
vehculo desve radialmente su trayectoria hacia fuera.
Generalidades
Si se considera de una manera simplificada, las fuerzas que actan
sobre un vehculo que se desplaza en una trayectoria curva horizontal,
se observa que la nica fuerza que se opone al desplazamiento lateral
del vehculo es la fuerza de rozamiento que se desarrolla entre el
neumtico y el pavimento. La fuerza de rozamiento no es suficiente
para impedir el desplazamiento transversal. Por ello para evitar que los
vehculos se salgan de su trayectoria es necesario que los componentes
normales a la calzada sean siempre del mismo sentido y se suman
contribuyendo a la estabilidad del vehculo, en tanto que las
componentes paralelas a la calzada son de sentido opuesto y su
relacin puede hacer variar los efectos que se sienten en el vehculo.
2.9.1.
Peralte a Partir del Deslizamiento
Una curva que no presenta peralte provoca el deslizamiento hacia fuera
de la va y resulta inadecuado porque limita la velocidad en las curvas.
Por otra parte, ha quedado comprobado que cuando mayor sea el
peralte asignado a una curva que cruza a la izquierda, mayor es la
dificultad de maniobrar en la zona de transicin.
2.9.2.
Formas de Realizar el Peralte
Existen cuatro mtodos diferentes para la asignacin del peralte a las
distintas curvas que se encuentran en un proyecto.
El peralte se hace directamente proporcional al radio de la curva,
correspondiendo el valor del radio mnimo, al valor mximo del peralte.
La variacin del coeficiente de rozamiento mantiene tambin una
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
74
MAIL: c_villacs1961@hotmail.com
75
MAIL: c_villacs1961@hotmail.com
76
e = Peralte
V = Velocidad de diseo
ft = Coeficiente de friccin
R = Radio de curvatura
30
40
50
60
70
80
Km./h
Coeficiente de Friccin
0.17
0.1
0.16
0.1
0.1
0.1
(f)
MAIL: c_villacs1961@hotmail.com
77
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
78
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
79
Fuente: MTOP2003.
MAIL: c_villacs1961@hotmail.com
80
d2 = Vc2 / 254 f
V c = Velocidad del vehculo (Km. /h).
f = Coeficiente de friccin. El coeficiente de friccin
para pavimento
segundo.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
81
MAIL: c_villacs1961@hotmail.com
82
Velocid
Velocidad
Velocidad
Mnima Distancia de
ad de
de
del
Visibilidad para el
Diseo
Circulaci
Vehculo
Rebasamiento
(Km./h)
n Asumida
Rebasante
(Km./h)
(Km./h)
(m)
Calcula
Redondea
da
270
40
35
51
da
268.00
50
44
60
345.00
345
60
51
67
412.00
415
70
59
75
488.0
490
80
66
82
0
563.0
565
0
Fuente: Normas de diseo geomtrico de carreteras MTOP2003.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
83
Tlf: 0998118389
Catego
TPDA
ra de
espera
la va
do
7
6
5
5E
4
4E
100-300
100-300
100-300
100-300
<100
<100
MAIL: c_villacs1961@hotmail.com
do
6
6
6
6
6
6
84
oso
8
8
8
8
8
8
no
6
6
6
6
6
6
do
8
8
8
8
8
8
oso
12
12
12
12
14
14
Altura (m.s.n.m)
de la Va
< 1000
Pend.
Long.
(%)
7
6
5
5E
4
4E
10
10
10
12
10
12
(m)
1000-2000
Pend.
Long.
(%)
750
750
1000
1000
9
9
10
11
10
11
(m)
750
750
1000
1000
2000-3000
Pend.
Long.
(%)
8
8
9
10
9
10
(m)
750
750
1000
1000
3000-3500
Pend.
Long.
(%)
7
7
8
9
8
9
(m)
3500-4000
Pend.
Long.
(%)
1000
1000
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
85
6
6
7
8
7
8
(m)
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
86
Distancia de
Diseo
Visibilidad para
(Km./h)
Parada "S"
Coeficiente K = S2 / 426
(m)
Calculado
Redondeado
40
40
3.76
50
55
7.10
60
70
11.50
12
70
90
19.01
19
80
110
28.40
28
2.15.2.
Curvas Verticales Cncavas
Considera que el faro del vehculo que se divisa en la carretera a 0,60
metros. Se expresa as:
L = A S2 / 122 + 3,5 S
K = S2 / 122 + 3,5 S
L=KA
En donde:
L = Longitud de la curva vertical (m).
A = Diferencia algbrica de las gradientes (%).
S = Distancia de visibilidad para parada (m).
Coeficiente K =
Parada
S2/122+3.5S
MAIL: c_villacs1961@hotmail.com
87
(Km/h)
Tlf: 0998118389
S (m)
Calculad
Redondead
40
40
6.11
50
55
9.62
10
60
70
13.35
13
70
90
18.54
19
80
110
23.87
24
MAIL: c_villacs1961@hotmail.com
88
3,60 m.,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
89
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
90
TPDA
Ancho de la Calzada
Ancho de los
Ancho de los
de la Va
Esperado
(m)
Carriles
Espaldones
(m)
(m)
Absoluta
7
6
5
5E
4
4E
Tlf: 0998118389
100-300
100-300
100-300
100-300
<100
<100
MAIL: c_villacs1961@hotmail.com
6.00
6.00
6.00
6.00
4.00
4.00
3.00
3.00
3.00
3.00
2.00
2.00
91
0.60
0.60
Tipo de
Tipo de terreno
carretera
30
Carretera
principal
40
50
60
70
80
- Plano
de
90
100
110
120
7.3
7.3
7.3
7.3
- Ondulado
7.3
7.3
7.3
7.3
7.3
dos calzadas
- Montaoso
7.3
7.3
7.3
7.3
7.3
Carretera
- Plano
7.3
7.3
7.3
7.3
- Ondulado
7.3
7.3
7.3
7.3
7.3
una calzada
- Montaoso
7.3
7.3
7.3
Carretera
- Plano
7.0
7.3
7.3
7.3
secundaria
- Ondulado
7.0
7.0
7.3
7.3
7.3
- Montaoso
6.6
7.0
7.0
7.0
- Plano
5.0
6.0
6.6
6.6
principal
de
Carretera
terciaria
Tlf: 0998118389
- Ondulado
5.0
5.0
6.0
- Montaoso
5.0
5.0
6.0
MAIL: c_villacs1961@hotmail.com
92
Bombeo
(%)
Muy Buena
Buena
Regular a mala
2
2a3
2a4
de
Bombeo (%)
Pavimento Superior 2
2,5
Tratamiento
Superficial
2,5
2,5 3,0
Afirmado
Precipitacin
< 500 mm/ao - >500
mm/ao
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
93
Ondulado
Montaoso
0.00 1.20
6a1
6a1
4a1
1.20 3.00
4a1
4a1
3a1
3.00 4.50
3a1
3a1
2,5 a 1
4.50 6.00
2a1
2a1
2a1
(m)
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
94
2.19. DRENAJE
Uno de los elementos que causa mayores problemas a los caminos es el
agua, pues en general disminuye la resistencia de los suelos,
presentndose as fallas en terraplenes, cortes y superficies de
rodamiento. Lo anterior obliga a construir el drenaje de tal forma que el
agua se aleje a la mayor brevedad posible de la obra. En consecuencia,
podra decirse que un buen drenaje es el alma de los caminos.
El drenaje artificial es el conjunto de obras que sirven para captar,
conducir y alejar del camino el agua que puede causar problemas.
Este tipo de drenaje es de particular importancia para los caminos de
poco trnsito que no cuentan con una superficie de rodamiento
impermeable ni cunetas revestidas, y en los cuales los materiales estn
ms expuestos al
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
95
estn
Cantidad de precipitacin
Tipo de precipitacin
Tamao de la cuenca
Declive superficial
Condiciones de saturacin
MAIL: c_villacs1961@hotmail.com
96
se
considera
longitudinal
transversal.
El
drenaje
longitudinal tiene por objeto captar los escurrimientos para evitar que
lleguen al camino o permanezcan en l, causando desperfectos; a este
tipo de drenaje pertenecen las cunetas, contra cunetas, bordillos y
canales de encausamiento
El drenaje transversal es el que cruza de un lado a otro del camino y
puede ser drenaje mayor o menor. El drenaje mayor requiere obras con
un claro superior a 6 metros. A
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
97
2.20.1.
Caractersticas de los Materiales Ptreos
Los materiales ptreos para construir carpetas asflticas son suelos
inertes, provenientes de playones de ros o arroyos, de depsitos
naturales denominados minas o de rocas, los cuales, por lo general,
requieren cribado y triturado para utilizarse. Para este proyecto se
dispone de un yacimiento o mina de material ptreo: SAN JOAQUN 2
(Cd. 5972).
UBICACIN:
Provincia: Cotopaxi
Cantn: Latacunga
Parroquia: Mulal
Coordenadas UTM: 769300-9923400
Representante Legal.- Sr. Fernndez Acosta Luis Wladimir, Titular del
rea Minera SAN JOAQUN 2 (Cd. 5972).
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
98
Tcnicas
de
explotacin:
Mediante
equipo
mecnico
como
estimado:
Indeterminado,
por
ser
renovable.
Las
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
99
RESOLUCIN MINERA
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
100
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
101
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
102
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
103
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
104
LICENCIA AMBIENTAL
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
105
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
106
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
107
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
108
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
109
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
110
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
111
RUC DEL
REPRESENTANTE
LEGAL
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
112
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
113
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
114
2.20.2.
Propiedades de una Mezcla Asfltica
Una mezcla asfltica debe desarrollar ciertas propiedades para que su
comportamiento en la obra sea satisfactorio, debiendo cumplir con las
siguientes propiedades, que se enumeran a continuacin en orden de
importancia:
Estabilidad
Durabilidad
Resistencia a la fatiga
Resistencia al deslizamiento
Trabajabilidad
Flexibilidad
Impermeabilidad
Estabilidad
propiedades menos
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
115
Resistencia a la Fatiga
Esta propiedad junto con la estabilidad y la durabilidad se considera
como de gran importancia en una mezcla asfltica, ya que ellas se
corresponden con su habilidad para soportar las deflexiones repetidas
causadas por el paso de los vehculos. Si la fatiga que por lo general se
manifiesta como una piel de cocodrilo sucede antes de que alcance la
vida de diseo, esto es una seal de que el pavimento ha recibido un
mayor nmero de cargas en un menor tiempo que el estimado en el
proyecto de la estructura de diseo.
Resistencia al Deslizamiento
Es la
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
116
asentamientos
diferenciales
en
un
terrapln
ocurren
la demanda de trfico
vehicular de las vas que unen los sectores de la parroquia San Jos de
Poal y mejorar las condiciones sociales de la Poblacin.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
117
CAPITULO III
METODOLOGA
3.1. ENFOQUE INVESTIGATIVO
Es una contribucin didctica al desarrollo de estos procesos propios de
la investigacin cientfica.
La
metodologa
de
investigacin
cientfica
es
un
cuerpo
de
ideas-construir
nuevos,
modelos
tericos,
procesos
de
MAIL: c_villacs1961@hotmail.com
118
Investigacin del TPDA que circula por las vas motivo de este
Estudio
perfiles transversales.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
119
vas.
Hidrolgicos-Hidrulicos
3.2.2.
Investigacin Documental
De la orto foto provincial se obtiene planos de ubicacin y auxiliares
para realizar los levantamientos topogrficos, identificar vas y realizar
evaluaciones de afectaciones, analizar cuencas y quebradas, barrios y
otros detalles necesarios.
Las Cartas Geogrficas editadas por el Instituto Geogrfico Militar, til
para determinar el rea de aportacin de las precipitaciones de lluvias
y con esto realizar el diseo hidrulico de cada una de las obras como
son alcantarillas, cunetas laterales, drenajes y subdrenajes.
3.2.3.
Investigacin de Laboratorio
Para determinar el comportamiento del suelo con los ensayos de
compresibilidad estabilidad, permeabilidad, plasticidad y ensayo de
CBR de las sub-rasantes y todas las capas que tienen las vas actuales.
3.3. NIVELES DE INVESTIGACIN
Los niveles de investigacin que se utilizarn sern:
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
120
suelos, una por cada 500 metros a una profundidad promedio de 1.50
m.
levantamiento
topogrfico
se
lo
realiz
por
el
mtodo
de
MAIL: c_villacs1961@hotmail.com
121
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
122
CAPITULO IV
ANALISIS E INTERPRETACIN DE RESULTADOS
4.1. VAS EN ESTUDIO
Realizados los trabajos de campo en todos los tramos de vas de este
estudio, tales
como:
las vas,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
123
natural, compactacin y
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
124
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
125
31.98
7.79m
39.77
30.00m
2928.40
54.77
30.00m
12
-3.39%
-0.96%
2927.63
2927.48
DISTANCE:
69.77
32.50m
102.27
40.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
LOW POINT LOCATION:
122.27
40.00m
22
-0.96%
0.86%
123.43
2926.98
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
PVT
2928.14
2927.17
2927.07
2927.15
DISTANCE:
142.27
118.82m
261.09
60.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
291.09
60.00m
46
0.86%
2.16%
2928.42
2929.07
DISTANCE:
321.09
77.10m
398.19
100.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
448.19
100.00m
2931.82
DISTANCE:
PVC
PVT
DISTANCE:
PVC
Tlf: 0998118389
2928.17
2930.74
MAIL: c_villacs1961@hotmail.com
126
**********************************************
**************** Sta 0+000.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Offset
Roadway
0+000.00
1 9902009.83 758694.95
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-5.93
-5.40
Elev: 2929.77 2930.12
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
5.74
Elev: 2930.12 2929.89
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
-5.93
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
0.00
Elev: 2929.77 2930.12 2930.09 2929.91 2929.86 2929.71 2929.51 2929.59
Slope:
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
Offset:
3.90
3.90
3.90
3.90
3.90
5.40
5.74
Elev: 2929.51 2929.71 2929.86 2929.91 2930.09 2930.12 2929.89
Slope:
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Offset
Roadway
0+010.00
1 9902000.98 758690.30
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.78
-5.40
Elev: 2928.80 2929.72
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
5.59
Elev: 2929.72 2929.60
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
-6.78
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
0.00
Elev: 2928.80 2929.72 2929.69 2929.51 2929.46 2929.31 2929.11 2929.19
Slope:
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
Offset:
3.90
3.90
3.90
3.90
3.90
5.40
5.59
Elev: 2929.11 2929.31 2929.46 2929.51 2929.69 2929.72 2929.60
Slope:
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
127
Lo dems se encuentra en el
respectivo informe
PROJECT: ATO\SA.CALCLDO\FINALES\POALO CALLE A\POALO calle A RASANTE-SOB-PER.pro
-------------------------------------------------------------------------------Earthwork Report
----------------------------------------------Road Job: Dis calle A
SURFACES
Avg End-Area
Inc Volume
Acm Volume
Station
Cut
Fill Unsuit.
Cut
Fill Unsuit.
Total
Cut
Fill Unsuit.
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
0+000.00:1
2.77
0.92
0.00
0+010.00:1
3.34
1.22
0.00
30.57
10.67
0.00
19.90
30.57
10.67
0.00
0+020.00:1
2.65
1.49
0.00
29.97
13.55
0.00
16.41
60.54
24.22
0.00
0+030.00:1
2.25
2.21
0.00
24.51
18.50
0.00
6.01
85.05
42.72
0.00
0+040.00:1
2.33
1.49
0.00
22.90
18.53
0.00
4.36
107.94
61.26
0.00
0+050.00:1
3.12
1.18
0.00
27.25
13.38
0.00
13.87
135.19
74.64
0.00
0+060.00:1
2.47
2.03
0.00
27.93
16.14
0.00
11.79
163.12
90.78
0.00
0+070.00:1
2.95
1.64
0.00
27.06
18.37
0.00
8.70
190.18
109.14
0.00
0+080.00:1
2.75
1.83
0.00
28.47
17.34
0.00
11.14
218.65
126.48
0.00
0+090.00:1
2.59
1.32
0.00
26.71
15.76
0.00
10.94
245.36
142.25
0.00
0+100.00:1
3.62
1.98
0.00
31.06
16.50
0.00
14.56
276.42
158.74
0.00
0+110.00:1
4.64
1.62
0.00
41.30
17.96
0.00
23.33
317.71
176.71
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
128
Acm Tot
m3
19.90
36.31
42.32
46.69
60.55
72.34
81.04
92.17
103.12
117.68
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
129
3022.64
DISTANCE:
61.45
27.31m
88.76
30.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
HIGH POINT LOCATION:
103.76
30.00m
14
1.27%
-0.85%
106.68
3023.18
DISTANCE:
PVC
PVT
3022.99
3023.10
3023.05
DISTANCE:
118.76
24.59m
143.35
50.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
168.35
50.00m
14
-0.85%
-4.39%
3022.63
3021.53
DISTANCE:
193.35
40.78m
234.12
50.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
LOW POINT LOCATION:
PVT
DISTANCE:
PVC
DISTANCE:
259.12
50.00m
8
-4.39%
1.58%
270.91
284.12
89.41m
373.53
60.00m
3018.64
DISTANCE:
PVC
PVT
DISTANCE:
PVC
Tlf: 0998118389
3022.84
3019.74
3018.93
3019.03
3020.44
MAIL: c_villacs1961@hotmail.com
130
Lateral de Replanteo
informe
LATERALES PARA REPLANTEO Y CONSTRUCCION
PROJECT: PATO\SA.CALCLDO\FINALES\POALO CALLE B\POALO calle B RASAN-SOB-PER.pro
-------------------------------------------------------------------------------Roadway Report
----------------------------------------------Road Job: DIS B
Roadway : DIS B
**********************************************
**************** Sta 0+000.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
Roadway
0+000.00
1 9900674.64
East
758440.45
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.59
-5.40
Elev: 3022.12 3022.91
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
6.41
Elev: 3022.91 3022.24
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
Slope:
-6.59
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
3022.12 3022.91 3022.88 3022.70 3022.65 3022.50 3022.30
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
6.41
3022.30 3022.50 3022.65 3022.70 3022.88 3022.91 3022.24
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
0.00
3022.38
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
Roadway
0+010.00
1 9900667.20
East
758433.77
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.27
-5.40
Elev: 3022.26 3022.84
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
6.42
Elev: 3022.84 3022.17
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
Slope:
-6.27
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
3022.26 3022.84 3022.81 3022.63 3022.58 3022.43 3022.23
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
6.42
3022.23 3022.43 3022.58 3022.63 3022.81 3022.84 3022.17
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
0.00
3022.31
131
Station
0+010.00:1
0+020.00:1
0+030.00:1
0+040.00:1
0+050.00:1
0+060.00:1
0+070.00:1
0+080.00:1
0+090.00:1
0+100.00:1
0+110.00:1
0+120.00:1
0+130.00:1
0+140.00:1
0+150.00:1
0+160.00:1
0+170.00:1
0+180.00:1
0+190.00:1
0+200.00:1
0+210.00:1
0+220.00:1
0+230.00:1
0+240.00:1
0+250.00:1
0+260.00:1
0+270.00:1
0+280.00:1
0+290.00:1
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
132
Acm Tot
m3
-39.97
-79.20
-112.95
-136.97
-154.37
-170.31
-187.69
-207.09
-236.49
-277.48
-321.35
-360.61
-388.45
-402.22
-413.99
-429.67
-446.33
-462.60
-480.73
-499.62
-512.72
-534.91
-574.06
-613.18
-650.70
-709.49
-771.43
-805.44
-823.70
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Tlf: 0998118389
10.00m
MAIL: c_villacs1961@hotmail.com
133
3024.18
DISTANCE:
164.27
45.38m
209.65
50.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
234.65
50.00m
13
-3.54%
-7.26%
3021.69
3019.87
DISTANCE:
259.65
27.44m
287.09
40.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
307.09
40.00m
16
-7.26%
-4.70%
3016.43
327.09
71.03m
398.12
50.00m
3015.49
423.12
50.00m
28
-4.70%
-6.51%
3010.97
448.12
56.49m
504.61
40.00m
3009.34
524.61
40.00m
29
3004.37
DISTANCE:
PVC
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
Tlf: 0998118389
3022.57
3017.88
3012.15
3005.67
MAIL: c_villacs1961@hotmail.com
134
**********************************************
**************** Sta 0+000.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
Roadway
0+000.00
1 9900736.59
East
758520.81
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.14
-5.40
Elev: 3023.87 3024.36
Slope:
1.50
Right Tie: Corte Cut only
Offset:
5.40
5.44
Elev: 3024.36 3024.42
Slope:
0.67
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
Slope:
-6.14
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
3023.87 3024.36 3024.33 3024.15 3024.10 3023.95 3023.75
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
5.44
3023.75 3023.95 3024.10 3024.15 3024.33 3024.36 3024.42
-2.00
Vert
Vert
Vert
Vert
2.00
1.50
0.00
3023.83
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
Roadway
0+010.00
1 9900727.09
East
758523.92
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-5.85
-5.40
Elev: 3024.12 3024.42
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
5.45
Elev: 3024.42 3024.39
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
-5.85
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
3024.12 3024.42 3024.39 3024.21 3024.16 3024.01 3023.81
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
5.45
3023.81 3024.01 3024.16 3024.21 3024.39 3024.42 3024.39
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
0.00
3023.89
135
Station
0+010.00:1
0+020.00:1
0+030.00:1
0+040.00:1
0+050.00:1
0+060.00:1
0+070.00:1
0+080.00:1
0+090.00:1
0+100.00:1
0+110.00:1
0+120.00:1
0+130.00:1
0+140.00:1
0+150.00:1
0+160.00:1
0+170.00:1
0+180.00:1
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
136
Acm Tot
m3
28.12
58.35
89.05
111.63
134.00
161.06
190.08
220.04
243.60
257.12
263.77
267.74
268.25
265.31
266.66
275.90
299.07
341.40
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
-------------------------------------------------------------------------------STATION
DESCRIPTION
NORTH
EAST
ELEV
CURVE DATA
BEARING
DISTANCE
-------------------------------------------------------------------------------INVERSE PLINE
PLINE POINT
0+000.00
281 43'59.47"
PC
9902009.83
758694.95
57.46m
0+057.46
9902021.52
758638.69
9902024.89
758622.47
PI LOCATION:
RADIUS:
100.00m
DELTA:
18 48'47.54"
RIGHT
DEG OF CURVATURE:
11 27'32.96"
ARC DEFINITION
ARC LENGTH:
32.84m
CHORD LENGTH:
32.69m
CHORD BEARING:
291 08'23.24"
TANGENT LENGTH:
16.57m
MIDDLE ORDINATE:
1.34m
EXTERNAL:
1.36m
PT
0+090.30
300 32'47.01"
PC
9902033.31
758608.21
30.20m
0+120.49
9902048.65
758582.20
9902061.50
758560.42
PI LOCATION:
RADIUS:
500.00m
DELTA:
5 47'22.23"
RIGHT
DEG OF CURVATURE:
2 17'30.59"
ARC DEFINITION
ARC LENGTH:
50.52m
CHORD LENGTH:
50.50m
CHORD BEARING:
303 26'28.12"
TANGENT LENGTH:
25.28m
MIDDLE ORDINATE:
0.64m
EXTERNAL:
0.64m
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
137
66.89
58.54m
125.43
30.00m
2931.34
140.43
30.00m
28
1.35%
2.44%
2932.33
2932.70
DISTANCE:
155.43
33.36m
188.79
30.00m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
203.79
30.00m
37
2.44%
1.62%
2933.88
218.79
53.97m
272.76
50.00m
2934.12
297.76
50.00m
133
1.62%
2.00%
2935.41
322.76
226.80m
549.56
120.00m
2935.91
609.56
120.00m
7
2941.64
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
Tlf: 0998118389
2932.13
2933.51
2935.00
2940.44
MAIL: c_villacs1961@hotmail.com
138
East
758694.95
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.51
-5.40
Elev: 2929.83 2930.57
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
6.89
Elev: 2930.57 2929.58
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
Slope:
-6.51
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
2929.83 2930.57 2930.54 2930.36 2930.31 2930.16 2929.96
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
6.89
2929.96 2930.16 2930.31 2930.36 2930.54 2930.57 2929.58
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
0.00
2930.04
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
Roadway
0+010.00
1 9902011.87
East
758685.16
Offset
0.00
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: Relleno Fill only
Offset:
-6.18
-5.40
Elev: 2930.18 2930.70
Slope:
1.50
Right Tie: Relleno Fill only
Offset:
5.40
6.81
Elev: 2930.70 2929.77
Slope:
-1.50
SUBGRADE INFORMATION
Offset:
Elev:
Slope:
Offset:
Elev:
Slope:
-6.18
-5.40
-3.90
-3.90
-3.90
-3.90
-3.90
2930.18 2930.70 2930.67 2930.49 2930.44 2930.29 2930.09
0.67
-2.00
Vert
Vert
Vert
Vert
2.00
3.90
3.90
3.90
3.90
3.90
5.40
6.81
2930.09 2930.29 2930.44 2930.49 2930.67 2930.70 2929.77
-2.00
Vert
Vert
Vert
Vert
2.00 -0.67
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
0.00
2930.17
139
Station
0+010.00:1
0+020.00:1
0+030.00:1
0+040.00:1
0+050.00:1
0+060.00:1
0+070.00:1
0+080.00:1
0+090.00:1
0+100.00:1
0+110.00:1
0+120.00:1
0+130.00:1
0+140.00:1
0+150.00:1
0+160.00:1
0+170.00:1
0+180.00:1
0+190.00:1
0+200.00:1
0+210.00:1
0+220.00:1
0+230.00:1
0+240.00:1
0+250.00:1
0+260.00:1
0+270.00:1
0+280.00:1
0+290.00:1
0+300.00:1
0+310.00:1
0.00
0.01
0.58
1.49
2.52
2.62
1.45
1.94
2.41
3.31
4.01
3.00
1.48
0.18
1.13
3.88
4.35
4.08
2.88
2.22
2.04
1.55
1.33
0.96
2.20
1.81
1.38
1.71
2.23
2.06
1.37
Tlf: 0998118389
4.34
3.35
2.10
2.28
5.13
3.91
5.94
6.30
5.97
4.82
0.44
0.15
1.78
5.24
1.64
1.61
1.02
0.69
0.51
0.65
0.99
1.99
3.14
2.14
3.07
4.90
6.11
6.13
5.38
4.56
5.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SURFACES
Inc Volume
Cut
Fill Unsuit.
Total
Cut
m3
m3
m3
m3
m3
0+000.00:1
0.01
3.77
0.00
0.03
40.57
0.00
-40.54
0.03
0.04
38.42
0.00
-38.38
0.07
2.94
27.22
0.00
-24.28
3.01
10.37
21.88
0.00
-11.51
13.38
20.09
37.06
0.00
-16.97
33.47
25.72
45.00
0.00
-19.27
59.19
20.27
49.29
0.00
-29.03
79.46
16.84
62.57
0.00
-45.73
96.30
21.65
62.75
0.00
-41.10
117.95
28.62
53.96
0.00
-25.34
146.57
36.63
26.32
0.00
10.30
183.19
35.07
2.97
0.00
32.10
218.27
22.44
9.60
0.00
12.84
240.70
8.32
35.02
0.00
-26.70
249.02
6.54
34.37
0.00
-27.83
255.56
25.10
16.18
0.00
8.92
280.67
41.20
13.04
0.00
28.16
321.86
42.14
8.54
0.00
33.60
364.00
34.79
5.98
0.00
28.81
398.80
25.47
5.82
0.00
19.66
424.27
21.27
8.20
0.00
13.07
445.54
17.91
14.86
0.00
3.04
463.45
14.30
25.42
0.00
-11.11
477.75
11.38
26.08
0.00
-14.71
489.13
15.72
25.69
0.00
-9.97
504.85
19.96
39.29
0.00
-19.33
524.80
15.92
54.99
0.00
-39.07
540.72
15.44
61.24
0.00
-45.80
556.16
19.68
57.55
0.00
-37.87
575.85
21.44
49.69
0.00
-28.25
597.29
17.30
46.96
0.00
-29.66
614.59
MAIL: c_villacs1961@hotmail.com
Acm Volume
Fill Unsuit.
m3
m3
40.57
78.99
106.21
128.09
165.15
210.15
259.44
322.01
384.76
438.72
465.04
468.01
477.61
512.62
546.99
563.18
576.21
584.75
590.73
596.55
604.76
619.62
645.04
671.12
696.81
736.09
791.08
852.32
909.87
959.56
1006.52
140
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Acm Tot
m3
-40.54
-78.92
-103.20
-114.71
-131.68
-150.95
-179.98
-225.71
-266.81
-292.15
-281.84
-249.74
-236.90
-263.60
-291.43
-282.51
-254.35
-220.75
-191.94
-172.28
-159.21
-156.17
-167.28
-181.99
-191.96
-211.29
-250.36
-296.16
-334.03
-362.28
-391.94
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
141
3697.664
DISTANCE:
62.031
33.232m
95.263
50.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
120.263
50.000m
11
-0.71%
-5.16%
3697.248
3695.957
DISTANCE:
145.263
31.583m
176.846
40.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
196.846
40.000m
7
-5.16%
-10.60%
3693.294
3691.175
DISTANCE:
216.846
28.755m
245.601
40.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
265.601
40.000m
14
-10.60%
-7.70%
3686.010
285.601
22.931m
308.532
30.000m
3684.469
323.532
30.000m
8
-7.70%
-3.72%
3681.547
DISTANCE:
PVC
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
Tlf: 0998118389
3697.426
3694.327
3688.129
3682.702
MAIL: c_villacs1961@hotmail.com
142
Offset
0.000
Skew
0 00'00.00"
Fill only
-4.421
-3.600
3696.313 3696.724
2.00
Fill only
3.600
4.239
3696.724 3696.404
-2.00
SUBGRADE INFORMATION
Offset:
-4.421
-4.329
0.000
4.239
4.239
Elev: 3696.313 3696.359 3696.446 3696.361 3696.404
Slope:
0.50
2.00
-2.00
Vert
**********************************************
**************** Sta 0+010.000 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Roadway
0+010.000
19900796.968 753110.489
TIE INFORMATION
Left Tie: FILL
Offset:
Elev:
Slope:
Right Tie: FILL
Offset:
Elev:
Slope:
Offset
0.000
Skew
0 00'00.00"
Fill only
-3.722
-3.600
3696.903 3696.964
2.00
Fill only
3.600
4.837
3696.964 3696.346
-2.00
SUBGRADE INFORMATION
Offset:
-3.722
-3.722
-3.722
0.000
4.329
4.837
Elev: 3696.903 3696.812 3696.612 3696.686 3696.600 3696.346
Slope:
Vert
Vert
2.00
-2.00 -0.50
**********************************************
**************** Sta 0+020.000 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Roadway
0+020.000
19900806.274 753114.150
TIE INFORMATION
Left Tie: CUT Cut only
Offset:
-5.823
Tlf: 0998118389
Offset
0.000
Skew
0 00'00.00"
-5.000
MAIL: c_villacs1961@hotmail.com
143
Station
0+010.000:1
0+020.000:1
0+030.000:1
0+040.000:1
0+050.000:1
0+060.000:1
0+070.000:1
0+080.000:1
0+090.000:1
0+100.000:1
0+110.000:1
0+120.000:1
0+130.000:1
0+140.000:1
0+150.000:1
0+160.000:1
0+170.000:1
0+180.000:1
0+190.000:1
0+200.000:1
0+210.000:1
0+220.000:1
0+230.000:1
0+240.000:1
0+250.000:1
0+260.000:1
0+270.000:1
0+280.000:1
0+290.000:1
0+300.000:1
0+310.000:1
0.11
5.23
2.48
0.05
6.97
0.05
0.03
4.55
3.94
10.81
2.85
3.01
1.66
0.00
0.00
0.03
1.33
5.63
9.65
7.70
9.15
6.65
3.90
6.43
5.30
2.11
3.63
5.74
3.18
2.26
6.38
Tlf: 0998118389
2.38
3.30
5.21
7.59
1.69
5.51
2.92
3.49
1.47
1.06
0.79
0.94
2.61
4.11
5.63
3.50
1.19
0.93
0.37
0.08
0.01
0.00
0.07
0.00
0.00
0.25
0.97
0.68
0.74
1.11
0.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SURFACES
Inc Volume
Cut
Fill Unsuit.
Total
Cut
m3
m3
m3
m3
m3
0+000.000:1
0.09
1.14
0.00
0.99
17.60
0.00
-16.61
0.99
26.67
28.43
0.00
-1.76
27.65
38.53
42.57
0.00
-4.04
66.19
12.77
63.84
0.00
-51.07
78.96
37.80
46.19
0.00
-8.39
116.75
37.58
34.17
0.00
3.41
154.33
0.41
42.07
0.00
-41.66
154.74
21.56
32.85
0.00
-11.29
176.30
38.27
26.07
0.00
12.20
214.57
73.71
12.68
0.00
61.03
288.28
68.28
9.26
0.00
59.02
356.56
29.28
8.65
0.00
20.63
385.84
23.36
17.73
0.00
5.63
409.20
8.32
33.58
0.00
-25.26
417.52
0.00
48.71
0.00
-48.71
417.52
0.14
45.68
0.00
-45.54
417.66
6.49
24.11
0.00
-17.62
424.15
33.32
10.79
0.00
22.53
457.46
73.34
6.67
0.00
66.67
530.80
83.26
2.32
0.00
80.94
614.06
80.90
0.44
0.00
80.46
694.96
78.21
0.05
0.00
78.16
773.18
52.74
0.33
0.00
52.40
825.91
51.64
0.33
0.00
51.30
877.55
58.64
0.01
0.00
58.63
936.19
37.03
1.25
0.00
35.78
973.22
28.66
6.09
0.00
22.57 1001.88
46.83
8.28
0.00
38.55 1048.71
44.58
7.13
0.00
37.45 1093.29
27.17
9.27
0.00
17.90 1120.47
43.21
9.47
0.00
33.74 1163.67
MAIL: c_villacs1961@hotmail.com
Acm Volume
Fill Unsuit.
m3
m3
17.60
46.03
88.60
152.44
198.63
232.80
274.87
307.72
333.79
346.46
355.72
364.38
382.11
415.69
464.40
510.08
534.19
544.98
551.64
553.96
554.40
554.45
554.79
555.12
555.12
556.37
562.46
570.74
577.87
587.15
596.62
144
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Acm Tot
m3
-16.61
-18.37
-22.41
-73.49
-81.88
-78.47
-120.13
-131.42
-119.22
-58.19
0.84
21.47
27.09
1.83
-46.89
-92.43
-110.04
-87.51
-20.84
60.10
140.56
218.72
271.13
322.43
381.07
416.85
439.42
477.97
515.42
533.32
567.06
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
145
81.085
71.855m
152.939
40.000m
3722.447
172.939
40.000m
20
6.05%
8.03%
3728.002
192.939
69.101m
262.040
40.000m
3729.608
282.040
40.000m
155
8.03%
7.77%
3736.765
3738.319
DISTANCE:
302.040
59.000m
361.040
50.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
386.040
50.000m
45
7.77%
8.89%
3744.850
411.040
141.644m
552.684
50.000m
3747.073
577.684
50.000m
23
8.89%
6.69%
3761.889
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
DISTANCE:
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
Tlf: 0998118389
3726.792
3735.158
3742.906
3759.666
MAIL: c_villacs1961@hotmail.com
146
Laterales de Replanteo
TRAMO
respectivo informe
PROJECT: ATO\SA.CALCLDO\FINALES\MACA MILINPUNGO\MACA MILINPUN rasante FINAL.pro
-------------------------------------------------------------------------------Roadway Report
----------------------------------------------Road Job: MACA MILINPUN
Roadway : MACA MILINPUN
**********************************************
**************** Sta 0+000.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Roadway
0+000.00
19900616.218 753024.729
Offset
0.000
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: CUT Cut only
Offset:
-5.124
-5.000
Elev: 3716.637 3716.388
Slope:
-0.50
Right Tie: FILL Fill only
Offset:
5.000
5.403
Elev: 3716.457 3716.256
Slope:
-2.00
SUBGRADE INFORMATION
Offset:
-5.124
-5.000
-4.600
-4.600
-4.329
0.000
4.400
4.400
Elev: 3716.637 3716.388 3716.388 3715.888 3716.024 3716.110 3716.022 3716.057
Slope:
-2.00
Horiz
Vert
0.50
2.00
-2.00
Vert
Offset:
4.600
4.600
5.000
5.403
Elev: 3715.957 3716.457 3716.457 3716.256
Slope: -0.50
Vert
Horiz -0.50
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Roadway
0+010.00
19900626.110 753026.189
Offset
0.000
Skew
0 00'00.00"
TIE INFORMATION
Left Tie: CUT Cut only
Offset:
-5.084
-5.000
Elev: 3717.311 3717.143
Slope:
-0.50
Right Tie: FILL Fill only
Offset:
3.600
4.218
Elev: 3717.373 3717.064
Slope:
-2.00
SUBGRADE INFORMATION
Offset:
-5.084
-5.000
-4.600
-4.600
-4.240
0.000
4.218
4.218
Elev: 3717.311 3717.143 3717.143 3716.643 3716.824 3716.908 3716.824 3717.024
Slope:
-2.00
Horiz
Vert
0.50
2.00
-2.00
Vert
Offset:
4.218
Elev: 3717.064
Slope:
Vert
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
147
Station
0+010.00:1
0+020.00:1
0+030.00:1
0+040.00:1
0+050.00:1
0+060.00:1
0+070.00:1
0+080.00:1
0+090.00:1
0+100.00:1
0+110.00:1
0+120.00:1
0+130.00:1
0+140.00:1
0+150.00:1
0+160.00:1
0+170.00:1
0+180.00:1
0+190.00:1
0+200.00:1
0+210.00:1
0+220.00:1
0+230.00:1
0+240.00:1
0+250.00:1
0+260.00:1
0+270.00:1
0+280.00:1
2.50
6.75
25.13
26.19
26.99
22.10
10.85
8.72
14.19
15.08
9.39
3.24
10.44
16.52
15.03
15.51
11.74
11.81
12.05
13.56
13.59
12.36
8.02
3.37
3.75
5.22
6.85
7.47
Tlf: 0998118389
0.00
0.08
0.04
0.00
0.00
0.00
0.00
0.02
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SURFACES
Inc Volume
Cut
Fill Unsuit.
Total
Cut
m3
m3
m3
m3
m3
0+000.00:1
4.14
0.07
0.00
33.23
0.36
0.00
32.87
33.23
44.21
0.41
0.00
43.80
77.44
141.94
0.65
0.00
141.29
219.38
227.53
0.22
0.00
227.31
446.91
237.73
0.02
0.00
237.70
684.64
244.10
0.04
0.00
244.06
928.73
164.74
0.01
0.00
164.73 1093.47
98.07
0.08
0.00
97.99 1191.54
119.99
0.11
0.00
119.88 1311.54
151.91
0.03
0.00
151.88 1463.45
122.39
0.00
0.00
122.39 1585.84
63.16
0.00
0.00
63.16 1649.00
68.40
0.00
0.00
68.40 1717.40
128.09
0.00
0.00
128.09 1845.49
149.26
0.00
0.00
149.25 1994.75
151.46
0.01
0.00
151.45 2146.21
136.25
0.01
0.00
136.24 2282.46
117.72
0.01
0.00
117.71 2400.18
119.29
0.01
0.00
119.28 2519.47
128.04
0.00
0.00
128.04 2647.52
135.75
0.00
0.00
135.75 2783.26
129.76
0.00
0.00
129.76 2913.03
102.22
0.00
0.00
102.22 3015.24
56.94
0.19
0.00
56.75 3072.18
35.59
0.39
0.00
35.20 3107.77
44.85
0.20
0.00
44.66 3152.62
60.35
0.00
0.00
60.35 3212.98
71.62
0.00
0.00
71.62 3284.60
MAIL: c_villacs1961@hotmail.com
Acm Volume
Fill Unsuit.
m3
m3
0.36
0.77
1.42
1.65
1.67
1.71
1.72
1.80
1.91
1.95
1.95
1.95
1.95
1.95
1.95
1.97
1.98
1.99
2.00
2.00
2.00
2.00
2.00
2.19
2.58
2.78
2.78
2.78
148
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Acm Tot
m3
32.87
76.67
217.95
445.26
682.97
927.03
1091.75
1189.75
1309.62
1461.50
1583.89
1647.06
1715.46
1843.55
1992.80
2144.24
2280.49
2398.19
2517.47
2645.51
2781.26
2911.02
3013.24
3069.99
3105.19
3149.85
3210.20
3281.82
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
149
2932.230
DISTANCE:
552.011
83.988m
635.999
50.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
LOW POINT LOCATION:
660.999
50.000m
18
-0.72%
2.12%
648.621
2931.448
DISTANCE:
PVC
PVT
2931.627
2931.582
2931.979
DISTANCE:
685.999
72.411m
758.411
50.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
783.411
50.000m
33
2.12%
0.61%
2934.049
2934.201
DISTANCE:
808.411
74.277m
882.688
50.000m
VERTICAL CURVE
PVI LOCATION:
CURVE LENGTH:
K FACTOR:
GRADE IN:
GRADE OUT:
HIGH POINT LOCATION:
907.688
50.000m
32
0.61%
-0.93%
902.382
2934.803
DISTANCE:
PVC
PVT
DISTANCE:
PVC
PVT
DISTANCE:
PVC
DISTANCE:
Tlf: 0998118389
932.688
64.075m
996.763
50.000m
2933.518
2934.651
2934.711
2934.570
2933.971
MAIL: c_villacs1961@hotmail.com
150
Offset
0.000
Skew
0 00'00.00"
Fill only
-5.563
-5.400
2925.970 2926.051
2.00
Fill only
5.400
6.138
2926.051 2925.683
-2.00
SUBGRADE INFORMATION
Offset:
-5.563
-5.400
-3.900
-3.900
-3.900
-3.900
-3.900
0.000
Elev: 2925.970 2926.051 2926.021 2925.841 2925.791 2925.641 2925.441 2925.519
Slope:
0.50
-2.00
Vert
Vert
Vert
Vert
2.00
Offset:
3.900
3.900
3.900
3.900
3.900
5.400
6.138
Elev: 2925.441 2925.641 2925.791 2925.841 2926.021 2926.051 2925.683
Slope:
-2.00
Vert
Vert
Vert
Vert
2.00 -0.50
**********************************************
**************** Sta 0+010.00 : Seg 1 ******************
ALIGNMENT INFORMATION
Station Seg
North
East
Roadway
0+010.00
19903100.198 758637.145
TIE INFORMATION
Left Tie: FILL
Offset:
Elev:
Slope:
Right Tie: FILL
Offset:
Elev:
Slope:
Offset
0.000
Skew
0 00'00.00"
Fill only
-6.174
-5.400
2925.746 2926.133
2.00
Fill only
5.400
6.762
2926.133 2925.451
-2.00
SUBGRADE INFORMATION
Offset:
-6.174
-5.400
-3.900
-3.900
-3.900
-3.900
-3.900
0.000
Elev: 2925.746 2926.133 2926.103 2925.923 2925.873 2925.723 2925.523 2925.601
Slope:
0.50
-2.00
Vert
Vert
Vert
Vert
2.00
Offset:
3.900
3.900
3.900
3.900
3.900
5.400
6.762
Elev: 2925.523 2925.723 2925.873 2925.923 2926.103 2926.133 2925.451
Slope:
-2.00
Vert
Vert
Vert
Vert
2.00 -0.50
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
151
Avg End-Area
Cut
Fill
m2
m2
3.28
0.69
1.61
1.50
3.51
0.63
3.35
1.03
3.54
1.30
3.44
0.83
3.34
1.16
3.19
1.18
3.05
1.16
3.10
0.98
3.41
1.13
3.59
0.33
3.44
0.33
2.86
0.94
3.00
0.64
3.09
0.34
3.06
0.39
2.78
0.49
3.43
0.74
3.86
0.55
4.02
0.47
3.16
0.11
2.54
0.05
2.18
0.38
5.20
0.00
5.91
0.00
6.42
0.00
6.19
0.13
Tlf: 0998118389
Unsuit.
m2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cut
m3
24.46
25.58
34.30
34.45
34.90
33.92
32.66
31.22
30.78
32.54
34.96
35.13
31.50
29.29
30.42
30.72
29.17
31.03
36.46
39.39
35.86
28.49
23.61
36.92
55.55
61.66
63.05
Inc Volume
Fill Unsuit.
m3
m3
10.98
10.65
8.30
11.64
10.61
9.92
11.70
11.71
10.70
10.56
7.33
3.31
6.36
7.92
4.91
3.65
4.39
6.16
6.46
5.08
2.86
0.77
2.15
1.91
0.00
0.00
0.67
MAIL: c_villacs1961@hotmail.com
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
m3
Cut
m3
13.47
14.93
26.00
22.81
24.29
24.00
20.96
19.51
20.08
21.98
27.64
31.83
25.13
21.36
25.51
27.07
24.78
24.86
30.00
34.31
33.00
27.73
21.47
35.02
55.55
61.66
62.38
24.46
50.04
84.34
118.79
153.69
187.61
220.27
251.49
282.27
314.81
349.77
384.90
416.40
445.68
476.11
506.83
536.00
567.03
603.49
642.88
678.75
707.24
730.85
767.78
823.33
884.99
948.04
Acm Volume
Fill Unsuit.
m3
m3
10.98
21.63
29.93
41.57
52.18
62.10
73.80
85.52
96.22
106.78
114.11
117.41
123.78
131.70
136.61
140.26
144.65
150.82
157.28
162.36
165.22
165.99
168.14
170.04
170.04
170.04
170.72
152
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Acm Tot
m3
13.47
28.40
54.41
77.22
101.51
125.51
146.47
165.97
186.05
208.03
235.66
267.49
292.62
313.99
339.50
366.57
391.35
416.21
446.21
480.52
513.52
541.25
562.72
597.73
653.28
714.94
777.32
Curve
Corr
%
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
de
suelos
y materiales,
para
la
rehabilitacin ,
los
recorridos
inspecciones
de
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
153
4.3.2.
Estado de la Vas
Luego del estudio efectuado se puede observar que la va en los
actuales momentos est compuesta de la siguiente manera:
Cuadro N 19
TRAMO Nro. 1: SAN RAFAEL- LUZ DE AMERICA EMPATE BARRIO
LA UNION
Ubicacin
0+000
0+500
1+000
1+500
Capa de
LASTRADO
LASTRADO
LASTRADO
LASTRADO
rodadura
20%
20%
20%
20%
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
Sub-rasante
Cuadro N 20
TRAMO Nro. 2: CENTRO LUZ DE AMERICA-LIM. PARROQ. 11 DE
NOVIEMBRE (CAMINO ASFALTADO)
Ubicacin
0+000
0+250
Capa de
LASTRADO
LASTRADO
LASTRADO
LASTRADO
rodadura
NUEVO
NUEVO
NUEVO
NUEVO
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
Sub-rasante
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
0+350
154
0+500
Cuadro N 21
TRAMO 3: POALO-MARQUZ DE MAENZA
Ubicacin
0+000
0+500
1+000
Capa de
LASTRADO
LASTRADO
LASTRADO
rodadura
20%
20%
20%
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
Sub-rasante
Cuadro N 22
TRAMO Nro. 4: CURVA DE MACA-UGSHALOMA
Ubicacin
0+000
Capa de
0+500
EMPEDRAD EMPEDRAD
rodadura
Sub-rasante
1+000
1+500
EMPEDRAD
EMPEDRAD
O 95%
O 95%
O 95%
O 95%
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
Cuadro N 23
TRAMO Nro. 5: CURVA DE MACA- MILIPUNGO-CHUQUIRALOMA.
Ubicacin
Capa de
rodadura
Sub-rasante
Tlf: 0998118389
0+000
0+500
1+000
1+500
2+500
O 95%
O 95%
O 95%
O 95%
DE BAJO
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
CBR
MAIL: c_villacs1961@hotmail.com
155
Ubicacin
3+000
Capa de
3+500
4+000
4+500
5+000
rodadura
Sub-rasante
O 95%
O 95%
O 95%
O 95%
O 95%
DE BAJO
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
CBR
Cuadro N 24
TRAMO Nro. 6: MARISCAL SUCRE-PILLIGSILLI- SANTA ROSA
Ubicacin
0+000
0+500
1+000
1+500
2+500
Capa de
DTSB
rodadura
95%
DTSB
95%
DTSB
DTSB
DTSB
95%
95%
95%
EN BUEN
EN BUEN
EN BUEN
EN BUEN
EN BUEN
ESTADO
ESTADO
ESTADO
ESTADO
ESTADO
DE BAJO
DE BAJO
DE BAJO
DE BAJO
DE BAJO
CBR
CBR
CBR
CBR
CBR
Ubicacin
3+000
3+500
Capa de
NO HAY
NO HAY
NO HAY
NO HAY
DE BAJO
DE BAJO
CBR
CBR
SUB-BASE
Sub-rasante
rodadura
SUB-BASE
Sub-rasante
4.3.3.
Propsito de la Investigacin
La investigacin de las reas correspondientes a las vas se realiz con
el objeto de definir la capacidad portante del suelo (CBR), y poder
recomendar el tipo y profundidad de las cimentaciones del suelo para
las nuevas estructuras de las vas.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
156
4.3.4.
Materiales Encontrados
Uno de los propsitos de la investigacin es determinar cmo se
encuentra la va al momento de realizar los estudios, en el grafico 1
esta resumido como se encontr la va en el estudio, a continuacin
iremos detallando calle por calle y evaluando lo encontrado.
2+14 km y se
0+656 Km y se encuentra
que
su
estado
est
en
un
95%
daado
luego
MAIL: c_villacs1961@hotmail.com
157
caf a caf oscuro, con presencia del nivel fretico a 1,50 altamente
hmedo y poco densa
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
158
Humedad
ndice de
CLASIFICACIO
C.B.R %
MUESTRA
natural
plasticidad (%)
N SUCS
DPC
#
0+000
0+500
(%)
21
19
NP
NP
1+000
1+500
23
22
NP
NP
0,50
SM
SM
1,50
SM
SM
SM
SM
SM
SM
LAB
5,59 6,1
5,75 7,0
7
7,2
8,1
4,75
5,24
Humedad
ndice de
CLASIFICACION
C.B.R %
natural (%)
plasticidad (%)
SUCS
DPC
#
0+000
24
NP
0,50
SM
1,50
SM
LAB
6,7 11,
0+250
21
NP
SM
SM
7
7,0
0+350
26
NP
SM
SM
8
6,7
0
11,
0+500
22
NP
SM
SM
2
6,9
5
10,
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
159
1
11,
TRAMO
Humedad
ndice de
CLASIFICACION
C.B.R %
MUESTRA
natural (%)
plasticidad (%)
SUCS
DPC
#
0+000
28
NP
0,50
SM
1,50
SM
0+500
21
NP
SM
SM
6,37
3
8,
1+000
20
NP
SM
SM
5,59
1
6,
5,1
4
8,
1+200
24
NP
SM
SM
LAB
4,86
8,
Humedad
ndice de
CLASIFICACION
C.B.R %
natural (%)
plasticidad (%)
SUCS
DPC
0+000
28
NP
0+500
29
12
0,50
SM
1,50
SM
CL
SC
LAB
5,14
8,
4,6
8
6,
1+000
21
NP
ML
ML
4,16
3
6,
1+500
24
NP
ML
ML
4,12
1
6,
9
Humedad
ndice de
CLASIFICACIO
C.B.R %
natural
plasticidad (%)
N SUCS
DPC
0+000
0+500
1+000
1+500
2+000
(%)
25
27
24
20
27
Tlf: 0998118389
5
NP
NP
NP
NP
MAIL: c_villacs1961@hotmail.com
0,50
ML
ML
ML
ML
ML
1,50
ML-CL
ML
ML
SM
SM
160
LAB
5,01 6,2
5,79 6,7
5,8
6,8
5,66 8,4
5,13 6,1
2+500
3+000
3+500
4+000
4+500
5+000
23
32
20
24
25
24
4
8
9
NP
NP
NP
ML-CL
GC
GC
SM
SM
SM
ML
GC
GC
SM
SM
SM
5,79
5,52
4,92
5,18
6,32
6,42
7,6
7,5
7,4
7,6
9,4
9,5
6
Humedad
ndice de
CLASIFICACION
C.B.R %
natural (%)
plasticidad (%)
SUCS
DPC
0+000
25
NP
0+500
28
NP
0,50
ML
1,50
SM
ML
SM
LAB
5,07
8,
5,44
3
7,
1+000
23
NP
ML
ML
5,19
8
6,
1+500
29
NP
ML
ML
5,4
9
6,
2+000
24
5,29
6
6,
6,83
1
7,
2+500
20
NP
ML-CL
ML
ML
ML
3+000
29
NP
SM
SM
5,15
7
7,
3+500
20
NP
SM
SM
4,9
9
6,
1
C.B.R %
161
RA #
1
2
3
4
KM
KM
KM
KM
UNION
0+000
0+500
1+000
1+500
DPC
LAB
5,59
5,75
4,75
5,24
6,1
7,07
7,20
8,70
Cuadro N 32
MUEST
TRAMO
RA #
Nro.
AMERICA
CENTRO
LUZ DE
EMPATE
LIM.
C.B.R %
DPC
LAB
PARROQUIAL 11 DE NOVIEMBRE
(CAMINO ASFALTADO)
KM 0+000
KM 0+250
KM 0+350
KM 0+500
1
2
3
4
6,77
7,08
6,72
6,97
11,10
11,00
11,50
10,90
Cuadro N 33
MUEST
TRAMO 3: POALO-MARQUZ DE
RA #
MAENZA
1
2
3
4
Cuadro N 34
MUEST
RA #
1
2
Tlf: 0998118389
0+000
0+500
1+000
1+500
RA #
1
2
3
4
Cuadro N 35
MUEST
KM
KM
KM
KM
UGSHALOMA
KM 0+000
KM 0+500
KM 1+000
KM 1+500
DPC
C.B.R %
LAB
5,1
5,59
6,37
4,86
8,40
6,40
8,10
8,40
C.B.R %
DPC
LAB
5,14
4,60
4,16
4,12
8,80
6,30
6,10
6,90
C.B.R %
DPC
LAB
5,01
5,79
162
6,20
6,70
3
4
5
6
7
8
9
10
11
KM
KM
KM
KM
KM
KM
KM
KM
KM
1+000
1+500
2+000
2+500
3+000
3+500
4+000
4+500
5+00
5,80
5,66
5,13
5,79
5,52
4,92
5,18
6,32
6,42
6,80
8,40
6,10
7,60
7,50
7,40
7,60
9,40
9,56
Cuadro N 36
MUEST
RA #
C.B.R %
DPC
LAB
1
2
3
4
5
6
7
8
KM
KM
KM
KM
KM
KM
KM
KM
0+000
0+500
1+000
1+500
2+000
2+500
3+000
3+500
5,07
5,44
5,19
5,40
5,29
6,83
5,15
4,90
8,30
7,80
6,90
6,60
6,10
7,70
7,90
6,10
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
163
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
164
4.3.6.1 Anexo Tipo del Registro de Campo. Lo dems se encuentra en el respectivo informe
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
165
En el tramo que est en el sector Mariscal Sucre se encuentra con una capa
de rodadura de doble tratamiento superficial bituminoso (DTSB) en un 95%
de deterioro luego hay una capa granular que corresponde a una base
clase 4 y dependiendo del clculo estructural esa capa de material debera
ser escarificada y compactada al 100% para luego colocar la nueva
estructura calculada.
Recomendacin general:
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
166
4.4. TRFICO
El trfico en un camino representa un factor importante que incide en el
resultado final del costo de la estructura del pavimento, generalmente
se realizan conteos y proyecciones estadsticas basadas en datos y
tasas de crecimiento vehicular a fin de disponer de una informacin
tcnica y segura de cmo ser el comportamiento del trfico en los
caminos ya rehabilitados.
De manera general se deben ejecutar todas las acciones tendientes a
obtener datos apegados a la realidad del trabajo a realizar y de la
importancia que los caminos tienen en relacin con los centros de
desarrollo de la zona.
La carga y el volumen de trfico juegan un rol importante en el diseo
estructural del pavimento; la carga y el nmero de repeticiones se
analizan cuidadosamente, a fin de terminar el espesor de la estructura
del pavimento. El espesor ser uno para cuando el nmero de
repeticiones y carga es menor y otro para cuando estos factores son
mayores, por lo que siempre se deben tener datos y proyecciones de
trfico realista y confiable.
El trfico mixto de un camino debe ser convertido en repeticiones de un
eje equivalente simple de 18.180 libras. Para realizar esta conversin
se han usado los factores equivalentes desarrollados por la AASHTO: el
factor de equivalencia de un eje simple de 30.000 libras es 10.03, lo
que significa que este eje causa daos 10 veces mayores que un solo
eje simple de 18.180 libras o tambin que son necesarias 10
repeticiones de este eje para igualar los efectos causados por una sola
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
167
Livianos,
Buses,
4.4.3.
Carreteras del Proyecto
La carreteras de la Parroquia San Jos de Poal son caminos de gran
importancia dentro de la red vial de la Parroquia, sirve para que los
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
168
MAIL: c_villacs1961@hotmail.com
169
de
trnsito
de
los
das
ordinarios
respecto
los
Estacin 1 en Poal, sector San Rafael, se contabilizo los vehculos tanto de ingreso y
salida.
Estacin 3 en el Sector cuatros esquinas, se registra tambin vehculos de
entrada y salida.
2.-
Va
Barrio
Luz
de Amrica-Lmite con
la
parroquia
11
de
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
170
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
171
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
172
TPDAActual
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
173
Cuadro N 39
SAN RAFAEL
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
174
Cuadro N 41
LIMITE BARRIO LA UNION
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
175
Cuadro Nro 42 . El tramo: Nro. 2 desde el Centro del Barrio Luz de AmricaLimite Parroquia 11 de Noviembre (camino asfaltado).
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
176
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
177
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
178
Cuadro Nro. 45: El tramo Nro. 4 que va desde la Curva de Maca hasta Ugshaloma.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
179
Chuquiraloma
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
180
Cuadro Nro. 47: El tramo 6 desde el sector Mariscal Sucre (Empate con la
Carretera a Saquisil)-Pilligsilli-hasta lmite con Santa Rosa.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
181
MAIL: c_villacs1961@hotmail.com
182
factor
de
distribucin
por
carril
que
para
el
estudio
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
183
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
184
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
185
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
186
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
187
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
188
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
189
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
190
Cuadro N 48
MAIL: c_villacs1961@hotmail.com
191
parmetros
necesarios
para
la
Confiabilidad
Desviacin Standard
Mdulo de la subrasante
Prdida de serviciabilidad
Cuadro N 49
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
192
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
193
CAPITULO V
PROPUESTA
5.1 ESTUDIO DE TOPOGRAFA, TRAZADO Y DISEO GEOMTRICO
5.1.2 Levantamientos Topogrficos
Para
el
desarrollo
levantamientos
del
estudio
definitivo
se
realizaron
los
existentes, con una faja topogrfica de 30 metros a cada lado del eje y
un polgono base que permite determinar las condiciones geomtricas
actuales de las vas.
cada tramo.
Los
planos
topogrficos
muestran
adems
la ubicacin de las
una
Estacin Total,
con
mediciones
mediante
prismas
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
194
datos
muestran
obtenidos
en
planos
de
sobre
los
levantamientos
topogrficos
se
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
195
los
vinculados
con
la
seguridad
exigible
los
ser
mejoradas
por
cuanto
los
de
Diseo
Geomtrico
de
vas
para
el
tipo
de
va
de
Clase
IV
(CV7)
MAIL: c_villacs1961@hotmail.com
que
corresponde
196
caminos
vecinales
con
un
volumen
proyectado a 20 aos.
Para el diseo de la va, en la Fase I de los estudios se defini la
velocidad de diseo, se establecieron los alineamientos horizontal y
vertical del trazado, as como la definicin de la seccin tpica del
camino, esto de conformidad con el Manual de Diseo de Vas
MTOP2003001-E y las Normas de Diseo Geomtrico de Vas - 2003 del
MTOP2003.
Se
ha
establecido
la
velocidad
de
diseo
en
funcin
de
las
caractersticas del terreno, en el caso actual se trata de terreno planoondulado-montaoso, y del volumen de trfico que en este caso se
determina por la clase de camino, va tipo IV como ya se ha
mencionado.
HASTA
Poal(San
Rafael-Luz de
Amrica)
Barrio la
Unin(Lmite
Parroquia 11 de
Noviembre)
Parroquia 11 de
Noviembre(Camino
Asfaltado)
Barrio Mrquez de
Maenza
Ugshaloma
Barrio Luz de
Amrica
Poal(San
Rafael)
Curva de
Maca(Llamaan
)
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
VELOCIDAD DE DISEO
KM/h
60
60
60
60
197
Curva de MacaMilimpungoChuquiraloma)
Mariscal Sucre
MilimpungoChuquiraloma)
60
Pilligsilli-Lmite con
Santa rosa
60
horizontales,
entre
circulares
espirales
con
sus
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
198
La longitud
MAIL: c_villacs1961@hotmail.com
199
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
200
0,40
pendiente
transversal
del
camino
se
estable
en
2%
por
un
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
201
sobreanchos
tienen
7.20 m
Ancho de carril
3.60 m
Espaldn
0.40 m.
Bombeo
2%
1.00 m
Carpeta asfltica
0.05 m
Subbase granular
0.20 m
Base Granular
0.15 m.
Talud de corte
Talud de relleno
Revestimiento:
Seccin Tpica 2
Calzada
7.80 m
Ancho de carril
3.90 m
Bombeo
Tlf: 0998118389
2%
MAIL: c_villacs1961@hotmail.com
202
Carpeta asfltica
0.05 m
Subbase Granular
0.20 m
Base Granular
0.15 m.
Talud de corte
Talud de relleno
vehculo
antes
de
llegar
l. Esta
distancia
debe
ser
distancia
mnima
absoluta
mnima
de
parada
de 25
metros
aproximadamente,
conforme
la
normativa
vigente
MAIL: c_villacs1961@hotmail.com
203
vez
define
los
espesores del
sistema
de
El material de
colocar
la
estructura
del pavimento.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
204
capacidad
portante,
relacin
esfuerzo
deformacin,
Tomando en cuenta que las zonas circundantes a estas vas han tenido
un desarrollo
MAIL: c_villacs1961@hotmail.com
205
Mr (psi) = 1500*C.B.R.
Mr(psi) = 3000*C.B.R
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
206
MAIL: c_villacs1961@hotmail.com
207
sentido Sur-Oeste, uniendo los sectores San Rafael, Luz de Amricahasta el sector la Unin (Lmite con la Parroquia 11 de Noviembre). El
segundo Tramo, sealado como tramo 2, inicia en el centro del sector
Luz de Amrica y contina en sentido Norte-Sur hasta unir con el
camino asfaltado, lmite con la parroquia 11 de Noviembre. El tramo 3
parte desde San Rafael, avanza de Sur a Norte en su parte inicial y de
Oriente a Occidente en la parte final hasta llegar al sector llamado
Marquez de Maenza. El tramo identificado con el nmero 4 en este
proyecto, inicia en el sitio Llamaan y finaliza en el sector de
Ugshaloma, est implantado en sentido Nor-Occidental. El tramo 5,
parte desde la Curva de Maca de la va Latacunga-Pujil-La Mana,
avanza en sentido Nor-Occidental y Occidente-Oriente hasta llegar al
sector denominado Chuquiraloma. El tramo nmero 6, con su punto de
inicio en el Barrio Mariscal sucre, se prolonga en sentido OrienteOccidente en su primera parte y luego avanza en orientacin Sur-Norte
en varios tramos, Nor-Occidente y Oriente-Occidente hasta llegar al
lmite con Santa Rosa.
Debido a su relieve Topogrfico, el drenaje natural que afecta a
la vas
obstruidas
MAIL: c_villacs1961@hotmail.com
208
Para el
vas
fundamentalmente
los
dos
de condiciones
que
no
son
posibles
de
medir
escurrimiento,
por
lo
que
no
MAIL: c_villacs1961@hotmail.com
209
es
posible
optar
por
mtodos
indirectos
utilizando
modelos
que
emplean
el
factor
pluviomtrico.
Para estimar los caudales mximos probables en los sitios de
implantacin de las obras de drenaje se aplica el Mtodo Racional
que
toma
en
consideracin
las
caractersticas
de
la cuenca de
- cobertura
as
como
El
Este mtodo se
las
de
los
pluviogrficas
Tlf: 0998118389
datos
de
las
registrados
cantidades
MAIL: c_villacs1961@hotmail.com
en
de
las
diversas
lluvia
estaciones
medidas
210
en
los
Instituto
Geogrfico
naturales
correspondientes. Las
se
de
detalle,
delimitan
cartas
donde
las
se
reas
topogrficas
en
aprecian los
de
aportacin
escala 1:50.000,
de
mismas.
drenaje
precisin
de
varias
el punto
de control
para
las
se
puede
por
un
indicar
sistema
MAIL: c_villacs1961@hotmail.com
que
de
el
de
este
rea
en
depositacin
211
estudio;
estudio
de
sin
est
productos
volcnicos
tipo
aportantes
de
sedimentacin que
sedimentos
debido
se constituyen
a
la
erosin
en
grandes
hdrica
de
la
Para el
en metros.
El tiempo de concentracin mnimo utilizado es de 5 min, conforme se
indica en el mtodo del INAMHI.
5.10. Coeficiente de Escorrenta
Este coeficiente establece la relacin que existe entre la cantidad
total de lluvia que se precipita y la que escurre superficialmente; su
valor depende de varios factores como: la permeabilidad
morfologa
de
la
cuenca,
pendientes
longitudinales
vegetal.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
212
del
y
suelo,
cobertura
de
la
hidrulica,
en
sus
El
estudio
hidrulico
de
la
vas comprende la
regulada
por
la
geometra
de
la
diseo
hidrulico
de
las
alcantarillas
permite
establecer
las
MAIL: c_villacs1961@hotmail.com
213
larga,
La alineacin es viajada
que
se
justifica
por
el
encauzamientos
la
saltos
entrada.
la
Para
salida,
evitar
la
MAIL: c_villacs1961@hotmail.com
214
captacin
para
Las
permisible
Para los
enrocado.
Estos
detalles
se
muestran
en
los
planos
correspondientes.
5.17 Carga Admisible a la Entrada
Para evitar que el agua sobrepase la corona de la carretera, la altura
permisible del remanso en la entrada de la alcantarilla debe limitarse a
0.80 metros debajo del nivel de la rasante, se consideran alcantarillas
con control de entrada.
5.17.1 Seleccin del Tipo de alcantarillas
En
la
seleccin
del
tipo
de
alcantarilla
se
ha
observado
la
MAIL: c_villacs1961@hotmail.com
215
Con estos
atoradas,
completamente
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
216
de
hormign
simple
con
pendientes
son
longitudinales
Las
pendientes de las cunetas de pie de talud sern similares a las del perfil
longitudinal de la va pero no menor a 0,5%, con un valor mximo
que est limitado por la velocidad del agua.
La velocidad mxima
MAIL: c_villacs1961@hotmail.com
217
al
estudio
realizado
por
el
MTOP
respecto
al
MAIL: c_villacs1961@hotmail.com
218
1.00 m. x 0,40 m.
Revestimiento de hormign (I > 4%)
MAIL: c_villacs1961@hotmail.com
219
SEALIZACIN VIAL
5.21.1 ANTECEDENTES.
Como complemento a los estudios de las vas, que viene realizando el
GAD. Parroquial Poal, se realizaron
que
de las
vas en mencin, lo que nos permitir contar con una carretera que
cumpla con las normas y polticas viales.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
220
las
seales
deben
permanecer
en
posicin
correcta,
deben satisfacer
mnimos.
Desempear una funcin necesaria
La razn de existencia de un dispositivo de regulacin es la funcin
que realiza, si esta es innecesaria, el dispositivo ser no solamente
intil, sino tambin perjudicial.
Llamar atencin
Es muy importante que los usuarios
presencia
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
221
claros
seales de reglamentacin,
al
identifique la va y poblaciones.
MAIL: c_villacs1961@hotmail.com
222
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
223
MAIL: c_villacs1961@hotmail.com
224
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
225
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
226
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
227
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
228
(guardavas),
que
permitan
minimizar
los
peligros
de
accidentes.
Estas defensas sern metlicas y se sujetarn a postes del mismo
material, debern tener una buena visibilidad y la relacin exacta de
resistencia y flexibilidad, adems de ser de fcil instalacin y
reparacin. Debern poseer tachas retro reflectivas para una mayor
visibilidad al conductor y por ende tendremos una va ms segura.
rtulos
al
igual
que
la
sealizacin
cumplirn
las
normas
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
229
abastecimientos,
sitios
de
inters
turstico,
guas
las
verticales
llevan
casi
siempre
un
carcter
de
permanente.
5.22. PLANOS
En los planos constan adems del eje del polgono, los bordes del
camino existente, todo lo relacionado a construcciones como casas,
postes de luz, curvas de nivel cada metro, las referencias con sus
acotaciones incluidos BMs.
El reajuste del proyecto vertical fue realizado en base a las rasantes
actuales, tratando en lo posible de cortar optando ms bien por rellenar,
con el objeto de no quitar capa resistente.
En el perfil longitudinal estn dibujadas las cotas del terreno (en ste
caso corresponden la mayor parte a la rasante existente), las cotas del
proyecto con los respectivos cortes y rellenos. Tambin estn sealadas
las curvas verticales y gradientes longitudinales.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
230
1:1000
1:100
Otros
1: 50
el
cronograma
de
actividades,
en
el
siguiente
Presupuesto de construccin.
Tlf: 0998118389
MAIL: c_villacs1961@hotmail.com
231
cuadro.