Professional Documents
Culture Documents
Cliente:
Atencin:
Fecha:
Lnea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
Relleno y posterior esmerilado de pits en zonas indicadas, considerar un rea de 1"x1" por pit, mayor a 1500 pits
Reparacin del cordn de soldadura de las planchas del techo
TECHO FLOTANTE
Instalacin de pasa pontn y sistema antirotacional del techo
Limpieza del techo flotante
Apertura de ventana en el techo
Retiro de planchas antiguas del techo
Instalacin de planchas nuevas del techo
Instalacin de refuerzos para cambio de planchas de techo
Reemplazo de ngulos de soporte de drenajes de emergencia
Reemplazo de mallas de A. Inox. superior e inferior de drenajes de emergencia
Reemplazar empaquetaduras drenajes de emergencia
Limpieza interior de pontones para efectos de evaluacin
Reemplazar plancha de confinamiento de espuma
Limpieza mecnica de pits en zonas indicadas, considerar un rea de 1"x1" por pit, menor igual a 1500 pits
Limpieza mecnica de pits en zonas indicadas, considerar un rea de 1"x1" por pit, mayor a 1500 pits
Relleno y posterior esmerilado de pits en zonas indicadas, considerar un rea de 1"x1" por pit, menor igual a 1500 pits
Relleno y posterior esmerilado de pits en zonas indicadas, considerar un rea de 1"x1" por pit, mayor a 1500 pits
Reparacin del cordn de soldadura de las planchas del techo
Mantenimiento del sistema Antirotacional del techo flotante
Retiro de sello de techo flotante
Mantenimiento de elementos del sello del techo flotante
Reubicacin de soportes y guas de sello de techo flotante
Prueba neumtica de Pontones
Instalacin de componentes de sellos de techos flotantes
Suministro de zapata (en acero galvanizado) para reemplazo
Retiro del Sistema de Drenaje del Techo Flotante
Mantenimiento del Sistema de drenaje del Techo Flotante
Instalacin del Sistema de Drenaje del Techo Flotante
Reemplazo de Sumidero de Techo Flotante
Mantenimiento y reparacin de respiraderos automticos del Techo Flotante
Mantenimiento de lneas a tierra del techo, sello y escalera basculante
ESCALERAS, BARANDAS Y PASARELAS
Retiro de Escalera Tipo Caracol de Tanques (Escalera Rusa)
Retiro de Base de Concreto de Escalera Tipo Caracol (Escalera Rusa)
Retiro de peldaos (de plancha estriada) de la escalera helicoidal y/o pasarelas
Prefabricado, presentacin e instalacin de escalera helicoidal segn estndar Repsol
Retiro de Plataforma Antigua (corte en el sitio)
Retiro integral de barandas y plataformas de techo
Suministro e instalacin de peldaos (tipo rejilla antideslizante)
Instalacin de peldaos (tipo rejilla
antideslizante)
Instalacin de parrilla antideslizante para plataforma de techo, descansos de escalera y/o pasarelas
Instalacin de estructura soporte de plataformas de techo, descansos de escaleras o pasarelas
Reemplazo de rodapi de pasarelas, barandas y descansos
Reemplazo de pasamanos de baranda en pasarelas, plataformas o escaleras helicoidales
Reemplazo de soporte intermedio (horizontal) de barandas
Reemplazo de soportes tipo bastn, de peldaos de escaleras helicoidales
Reemplazo de soportes verticales de barandas
Prefabricado, presentacin e Instalacin de barandas de plataformas de techo o perimetrales del mismo, descansos de escaleras helicoidales o pasarelas.
Reemplazo parcial de barandas de plataformas de techo o perimetrales del mismo, descansos de escaleras helicoidales o pasarelas.
Retiro y reinstalacin de la escalera Basculante de un Tanque de Techo Flotante (Incluir Plano Tpico de Escalera)
Reemplazo de eje pivote inferior y/o superior de escalera basculante
Reemplazo de malla del carril de la Escalera Basculante
Traslado, izaje y presentacin de tuberas acero al carbono Sch80 para los tamaos: 14" - 16"
Rolado de planchas, ngulos y vigas de acero al carbono de 1/8" hasta 1"
Administracin de materiales
OBRAS CIVILES
Reparacin de superficie interna de cemento de buzn
Reemplazo de buzones de concreto
Reemplazo de tubera de concreto de 100mm dimetro
Reemplazo de tubera de concreto de 150mm dimetro
Reemplazo de tubera de concreto de 200mm dimetro
Reemplazo de tubera de concreto de 250mm dimetro
Reemplazo de tubera de concreto de 300mm dimetro
Reemplazo de tubera de concreto de 350mm dimetro
Reemplazo de tubera de concreto de 400mm dimetro
APOYOS A INSPECCION
Prueba de Kerosene en tanques de hasta 15m inclusive
Prueba de Kerosene en tanques desde 15m hasta 30m inclusive
Prueba de Kerosene en tanques de mas de 30m
OTROS
Servicio de gestin de contrato
Lavado de arena para Sand Oil
Secado de arena para Sand Oil
Instalacin de sello asfaltico
Instalacin de sello secundario de techo flotante
Prueba de compactacin de afirmado
Aplicacin de compuesto polimricos
Reparacin de geomembrana y/o geotextil
Cambio parcial de plancha de cilindro
Instalacin de sobre planchas en el cilindro
Instalacin de pivot master
Prueba neumtica de refuerzos de boquillas
Alquiler de grupo electrgeno
Cambio parcial o total de pernera de sabana flotante.
Cantidad
20
Unid
Gl
P/Unit
P/Parciales
3,900.00
78,000.00
20
Gl
350.00
7,000.00
10
Ud
1,700.00
17,000.00
610
21.00
12,810.00
20
Gl
2,400.00
48,000.00
Gl
400.00
2,400.00
50
Ud
180.00
9,000.00
30
Gl
350.00
10,500.00
20
Gl
310.00
6,200.00
20
Gl
360.00
7,200.00
10
Ud
1,200.00
12,000.00
30
DE
350.00
10,500.00
150
80.00
12,000.00
20
Gl
600.00
12,000.00
50
DE
430.00
21,500.00
500
m3
155.00
77,500.00
250
m3
325.00
81,250.00
10,000
m2
5.00
50,000.00
30
m3
900.00
27,000.00
2,000
ML
7.00
14,000.00
1,000
m2
14.00
14,000.00
1,000
ML
7.10
7,100.00
20
Gl
350.00
7,000.00
15
m2
200.00
3,000.00
300
Kg
3.25
975.00
3,000
Kg
7.80
23,400.00
1,500
Ud
2.40
3,600.00
3,000
Ud
2.20
6,600.00
1,500
Ud
3.40
5,100.00
2,500
Ud
3.20
8,000.00
500
ML
48.00
24,000.00
500
Ud
14.00
7,000.00
25
ML
73.00
1,825.00
6,225
Kg
2.90
18,052.50
3,600.00
Gl
1,200.00
100
m2
55.00
5,500.00
500
m2
51.00
25,500.00
1,500
m2
40.00
60,000.00
400
m2
75.00
30,000.00
10
m3
128.00
1,280.00
25
m3
122.00
3,050.00
110
m3
112.00
12,320.00
540
m3
104.00
56,160.00
540
m3
106.00
57,240.00
10
m3
820.00
8,200.00
25
m3
820.00
20,500.00
110
m3
800.00
88,000.00
100
m2
138.00
13,800.00
500
m2
117.00
58,500.00
1,500
m2
94.00
141,000.00
400
m2
350.00
140,000.00
1,500
Kg
10.80
16,200.00
25
Ud
132.00
3,300.00
200
m2
37.50
7,500.00
200
ML
11.00
2,200.00
1,500
Ud
2.50
3,750.00
3,000
Ud
2.30
6,900.00
1,500
Ud
3.50
5,250.00
3,000
Ud
3.30
9,900.00
100
ML
52.00
5,200.00
35
m2
220.00
7,700.00
100
ML
102.00
10,200.00
1,000
Kg
9.00
9,000.00
10
Gl
140.00
1,400.00
500
ML
6.40
3,200.00
15
m3
900.00
13,500.00
500
ML
108.00
54,000.00
500
Kg
3.70
1,850.00
Ud
170.00
340.00
Ud
175.00
350.00
Ud
120.00
240.00
Ud
280.00
280.00
Ud
290.00
290.00
Ud
150.00
150.00
Ud
400.00
400.00
Ud
400.00
400.00
Ud
180.00
180.00
20
ML
57.00
1,140.00
120
Kg
9.20
1,104.00
50
m2
225.00
11,250.00
250
m2
33.00
8,250.00
500
Kg
3.80
1,900.00
500
Kg
4.00
2,000.00
500
Kg
6.50
3,250.00
500
Kg
6.30
3,150.00
1,000
Kg
3.60
3,600.00
200
m2
90.00
18,000.00
1,000
Ud
2.40
2,400.00
3,000
Ud
2.20
6,600.00
1,000
Ud
3.40
3,400.00
3,000
Ud
3.20
9,600.00
100
ML
46.00
4,600.00
12
Gl
5,500.00
66,000.00
10,000
m2
4.50
45,000.00
m2
115.00
575.00
5,000
Kg
1.30
6,500.00
5,000
Kg
5.20
26,000.00
3,000
Kg
3.50
10,500.00
ML
32.00
160.00
m2
340.00
1,020.00
Ud
54.00
216.00
300
m2
6.00
1,800.00
40
m2
202.00
8,080.00
1,500
Ud
2.50
3,750.00
3,000
Ud
2.20
6,600.00
1,500
Ud
3.50
5,250.00
3,000
Ud
3.20
9,600.00
400
ML
45.00
18,000.00
Gl
1,700.00
6,800.00
480
ML
33.50
16,080.00
480
ML
52.00
24,960.00
Gl
1,750.00
7,000.00
100
Ud
700.00
70,000.00
480
ML
66.00
31,680.00
25
m2
205.00
5,125.00
Ud
405.00
1,620.00
Gl
555.00
2,220.00
Ud
865.00
3,460.00
Ud
2,350.00
9,400.00
Ud
165.00
1,320.00
Gl
475.00
1,900.00
Ud
4,060.00
8,120.00
10
m3
415.00
4,150.00
300
Ud
23.00
6,900.00
3,000
Kg
7.50
22,500.00
4,000
Kg
2.40
9,600.00
6,000
Kg
2.20
13,200.00
150
Ud
260.00
39,000.00
300
Ud
104.00
31,200.00
100
m2
500.00
50,000.00
4,000
Kg
7.00
28,000.00
800
ML
21.00
16,800.00
600
ML
25.00
15,000.00
500
ML
16.00
8,000.00
300
ML
21.00
6,300.00
100
ML
26.00
2,600.00
4,500
Kg
7.00
31,500.00
1,000
Kg
7.00
7,000.00
Gl
2,500.00
10,000.00
Gl
1,300.00
2,600.00
20
m2
170.00
3,400.00
Ud
550.00
3,300.00
m3
1,380.00
6,900.00
Ud
220.00
1,980.00
Ud
380.00
3,420.00
100
ML
38.00
3,800.00
15
Ud
136.00
2,040.00
Gl
100.00
800.00
Ud
1,150.00
5,750.00
50
ML
135.00
6,750.00
100
ML
160.00
16,000.00
100
ML
70.00
7,000.00
75
ML
58.00
4,350.00
10
Ud
500.00
5,000.00
80
Ud
145.00
11,600.00
40
Ud
150.00
6,000.00
3,600
m2
8.20
29,520.00
Gl
2,280.00
4,560.00
2,000
Kg
6.80
13,600.00
100
Ud
38.00
3,800.00
Gl
1,200.00
2,400.00
Gl
685.00
2,740.00
Gl
900.00
1,800.00
50
Kg
80.00
4,000.00
3,600
m2
43.00
154,800.00
24
Ud
306.00
7,344.00
2,000
Kg
3.50
7,000.00
Gl
540.00
540.00
2,000
Kg
6.30
12,600.00
100
Kg
6.30
630.00
Ud
450.00
450.00
Gl
320.00
1,280.00
24
Ud
720.00
17,280.00
Gl
900.00
900.00
Gl
450.00
450.00
Gl
610.00
610.00
250
Ud
18.00
4,500.00
Ud
500.00
1,000.00
10
ML
130.00
1,300.00
Gl
280.00
560.00
25
m3
1,239.00
30,975.00
20
m3
1,280.00
25,600.00
15
Ud
105.00
1,575.00
30
m2
86.00
2,580.00
20
DE
400.00
8,000.00
10
DE
410.00
4,100.00
DE
420.00
2,100.00
Ud
65.00
455.00
Ud
600.00
3,000.00
Ud
50.00
100.00
Ud
70.00
630.00
14
Ud
125.00
1,750.00
Ud
150.00
450.00
Ud
210.00
1,050.00
Ud
300.00
900.00
Ud
124.00
248.00
Ud
172.00
1,548.00
14
Ud
286.00
4,004.00
Ud
434.00
1,302.00
Ud
685.00
3,425.00
Ud
750.00
2,250.00
Ud
45.00
90.00
Ud
50.00
450.00
14
Ud
62.00
868.00
Ud
170.00
510.00
Ud
172.00
860.00
Ud
205.00
615.00
Ud
52.00
104.00
Ud
85.00
765.00
14
Ud
110.00
1,540.00
Ud
144.00
432.00
Ud
205.00
1,025.00
Ud
275.00
825.00
14
Ud
86.00
1,204.00
10
Ud
131.00
1,310.00
Ud
170.00
1,020.00
Ud
195.00
585.00
Ud
270.00
810.00
Ud
430.00
860.00
Ud
150.00
750.00
Ud
120.00
600.00
20
Ud
135.00
2,700.00
10
Ud
175.00
1,750.00
Ud
300.00
1,500.00
Ud
500.00
1,500.00
Ud
950.00
2,850.00
Ud
275.00
1,375.00
Ud
450.00
2,250.00
Ud
500.00
2,500.00
Gl
1,810.00
1,810.00
Gl
2,100.00
2,100.00
Gl
2,120.00
2,120.00
5,000
Kg
9.40
47,000.00
5,000
Kg
8.60
43,000.00
1,180
Kg
8.50
10,030.00
2,000
Kg
8.00
16,000.00
1,000
Kg
6.30
6,300.00
1,000
Kg
6.25
6,250.00
10,000
Kg
7.30
73,000.00
150
150
Ud
9.50
1,425.00
Ud
26.00
3,900.00
50
Ud
48.00
2,400.00
25
Ud
78.00
1,950.00
150
Ud
9.50
1,425.00
150
Ud
15.00
2,250.00
75
Ud
36.50
2,737.50
75
Ud
50.00
3,750.00
150
Ud
8.50
1,275.00
150
Ud
22.00
3,300.00
50
Ud
43.00
2,150.00
25
Ud
66.00
1,650.00
150
Ud
7.20
1,080.00
150
Ud
13.00
1,950.00
75
Ud
27.50
2,062.50
37.5
Ud
43.00
1,612.50
150
Ud
8.00
1,200.00
150
Ud
14.00
2,100.00
75
Ud
29.00
2,175.00
37.5
Ud
44.00
1,650.00
150
Ud
9.00
1,350.00
150
Ud
13.10
1,965.00
75
Ud
28.60
2,145.00
37.5
Ud
43.20
1,620.00
150
Ud
6.50
975.00
150
Ud
13.50
2,025.00
75
Ud
28.00
2,100.00
37.5
Ud
42.00
1,575.00
150
Ud
6.50
975.00
150
Ud
14.00
2,100.00
75
Ud
28.50
2,137.50
37.5
Ud
42.50
1,593.75
150
Ud
44.00
6,600.00
150
Ud
76.00
11,400.00
75
Ud
134.00
10,050.00
37.5
Ud
218.00
8,175.00
22.5
Ud
342.00
7,695.00
150
Ud
47.00
7,050.00
150
Ud
82.00
12,300.00
75
Ud
135.00
10,125.00
37.5
Ud
230.00
8,625.00
22.5
Ud
360.00
8,100.00
300
ML
9.00
2,700.00
750
ML
13.20
9,900.00
300
ML
20.00
6,000.00
150
ML
26.00
3,900.00
75
ML
29.50
2,212.50
300
ML
9.20
2,760.00
750
ML
13.20
9,900.00
300
ML
21.00
6,300.00
150
ML
27.00
4,050.00
75
ML
29.00
2,175.00
3,500
Kg
3.10
10,850.00
60,000
Ud
1.00
60,000.00
20
m2
85.00
1,700.00
10
m3
1,450.00
14,500.00
10
ML
95.00
950.00
10
ML
110.00
1,100.00
10
ML
123.00
1,230.00
10
ML
138.00
1,380.00
10
ML
178.00
1,780.00
10
ML
225.00
2,250.00
10
ML
270.00
2,700.00
18
Gl
300.00
5,400.00
18
Gl
490.00
8,820.00
18
Gl
670.00
12,060.00
24
MS
49,900.00
1,197,600.00
70
m3
250.00
17,500.00
70
m3
120.00
8,400.00
1,000
ML
26.50
26,500.00
3,000
ML
57.00
171,000.00
20
Ud
330.00
6,600.00
100
m2
430.00
43,000.00
500
m2
75.00
37,500.00
2,000
Kg
8.50
17,000.00
1,000
Kg
7.00
7,000.00
2,000
Kg
3.60
7,200.00
30
Ud
250.00
7,500.00
90
DE
430.00
38,700.00
1,500
Ud
15.00
22,500.00
CALCULO PRODUCC
Operarios 1
Tapia
Moran
Operarios 2
Oliva
Recurso
Operario 1
Operario 2
Operario 3
Oficial
Ayudante
Costo/da
S/.
100.00
S/.
80.00
S/.
60.00
S/.
40.00
S/.
30.00
Soldador
S/.
110.00
Operarios 3
Paz
Oficiales
Cordova C.
Linea
P/U
Topalaya
Socola
S/. 21.00
Tapia P.
131
S/. 7.00
Kg
26.8
S/. 0.00
Robinet
Cardenas
31T4
Unidad
S/. 0.00
Sandoval
S/. 0.00
Mogollon
S/. 0.00
Lopez D.
S/N
S/. 505.00
NA
Lopez L.
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
5
14
32
S/. 2,400.00
S/. 600.00
S/. 14.00
Gl
Gl
Ud
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Alvarez
Ayudantes
Oritte
TAG
Soldadores
Inoan
31T332B
Zavalu
Chaparro
31T10B
Cantidad de Personal
Operario 1
2
Operario 2
Operario 3
1
2
Oficiales
10
Ayudantes
Soldadores
Cantidad
0.07
0.5
24
GANANCIA NETA
Hora Inicio
8:00
Hora Final
18:30
%MO
HH
NA
40%
20.0
62%
40%
49%
GANANCIA NETA
27.0
24.0
42.5
COSTO EN MO
NOTAS
Caseta y Almacn.
Se coloc 4 mts de ngulo de 2"x1/4" en zona retirada de la plataforma superior. Vase "Detalles"
Retiro de malla perimetral del lado norte del tanque (zona de patio de ventas). Vase "Detalles"
Se instal 1 PC de 3"x150 (los dems no se pudieron colocar debido a que contenan producto). Vase "Detalles"
Se desconect la bomba porttil.
Se prepararon y adaptaron las "efes" antiguas para ser empleadas en el tanque para el cambio de fondo. Vase "Detalles"
PRECIO MO
-S/. 558.09
10/27/2015
Monto Gastado
S/. 300.00
S/. 120.00
S/. 180.00
S/. 600.00
S/. 135.00
X1.5
S/. 165.00
S/. 1,200.00
Monto Ganado
S/. 13.65
S/. 48.78
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 328.25
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 67.70
S/. 78.00
S/. 105.53
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 641.91
x65%x%MO
ESFERA 31T4
REEMPLAZO DE SEGMENTOS DE E
Costo de la Linea 131
S/.
187.60
TANQUE 31T332B
DESMONTAJE DE
Detalle Clculo HH
PERSONAL
CANTIDAD
Operario
Oficial
Ayudante
TANQUE 31T10B
S/.
2,400.00
ETAPAS
Instalacin de Platos Ciegos
Retiro de Platos Ciegos
CANTIDAD DE PC
AVANCE
% TOTAL
14%
PREFABRICADO DE "EFES" (
Costo de la Linea 32
S/.
ETAPAS
Prefabricado de "efes"
Instalacin de "efes"
Retiro de "efes"
994.00
S/.
121.94
4 mts
4.7 Kg/m2
18.8 Kg
REFLEJADO EN COSTOS
8 Kg
S/. 121.94
26.8 Kg
DESMONTAJE DE MALLAS
Duracin de la tarea
COSTO/HH
5 horas
HH
COSTO
S/.
28.00
S/.
140.00
S/.
25.00
S/.
125.00
S/.
24.00
S/.
240.00
TOTAL
S/.
505.00
S/.
1,560.00
% ASIGNADO
% TOTAL DE LINEA 5
50%
7%
50%
REFLEJADO EN COSTOS
S/. 111.43
S/.
646.10
% TOTAL DE LINEA 32
33%
33%
33%
33%
71
100%
REFLEJADO EN COSTOS
S/. 215.37
PERSONAL
Cantidad
Costo/da
Costo Parcial/da
Costo
Operario
1 S/.
80.00 S/.
80.00
8.0 S/.
75.29
Oficial
1 S/.
40.00 S/.
40.00
8.0 S/.
37.65
Ayudante
1 S/.
30.00 S/.
30.00
8.0 S/.
28.24
7% Costo CIME
EQUIPOS/HERRAMIENTAS
10% de la MO
PERSONAL
Cantidad
Costo/da
Costo Parcial/da
HH
Costo
Operario
1 S/.
80.00 S/.
80.00
6.7 S/.
63.11
Oficial
1 S/.
40.00 S/.
40.00
6.7 S/.
31.56
Ayudante
1 S/.
30.00 S/.
30.00
6.7 S/.
23.67
Soldador
1 S/.
100.00 S/.
100.00
6.7 S/.
78.89
37%
EQUIPOS/HERRAMIENTAS
10%
90 "efes"/da
8.5 H
71 "efes"/da
6.7 H
Costo (x1.5)
S/.
112.94
S/.
56.47
S/.
42.35
S/.
109.20
S/.
21.18
S/.
342.14
62%
Costo (x1.5)
S/.
94.67
S/.
47.33
S/.
35.50
S/.
118.33
S/.
239.06
S/.
64.61
S/.
599.50