Professional Documents
Culture Documents
(Head of Project Operation – Project Management & Control, Procurement & Construction
Management for Oil and gas, Refinery & petrochemical & chemical and Industrial Plants)
________________________________________________________________________________________________
Ramdas Saharkar
(rgstskj@rediffmail.com)
In India
- TOYO ENGINEERING INDIA LIMITED, MUMBAI.
- ENGINEERS INDIA LIMITED, NEW DELHI
- COAL INDIA LIMITED CALCUTTA
International
- TOYO ENGINEERING CORPORATION JAPAN
From Nov 93 to Oct 94 Deputed to TOYO ENGINEERING CORPORATION
Japan for CAPC Project - Ethylene Plant in West Java Indonesia.
- SNAMPROGETTI SAUDI ARABIA LTD as Project site Control Coordinator for SAUDI ARAMCO PROJECT
at YANBU REFINERY in SAUDI ARABIA.
- SAMSUNG ENGINEERING CO. LTD SEOUL KOREA for ENGINEERING & INTERFACE COORDINATION
activities of Ethylene Plant for TASNEE Petrochemicals Saudi Arabia.
- PETROFAC INTERNATIONL LTD SHARJA (UAE) for Karachaganak 4th Stage Stabilization and sweet gas
processing Project at KAZAKSTAN for KPO (Karachaganak Petroleum Organization BV)
- JACOBS ENGINEERING INDIA PVT LTD, for project implementation of DHT, HGU, SRU & OSBL facilities
for HPCL at Mumbai refinery.
- SNC-LAVALIN Engineering India Ltd, Presently working as Head of Project Operation division &
responsible for Project Management & Controls, including other functions like Procurement &
Construction Management for medium & Large Size projects.
(RAMDAS SAHARKAR)
Page 1 of 6
CURRICULUM – VITAE (Personal data & Experience)
C Nationality: Indian
Experence profile:
Presently working with SNC-LAVALIN Engineering India Ltd as Head of Project Operation
division & responsible for Project Management & Control, including other functions like
Procurement & Construction Management for medium & Large Size projects
Page 2 of 6
1.2 JACOBS ENGINEERING INDIA PVT LTD (Mumbai, INDIA)
(From June 08 – Mar 09)
Worked as General Manager (Project Controls) for the project Control functions of medium
& Large Size projects for project implementation of DHT, HGU, SRU & OSBL facilities for HPCL
at Mumbai refinery.
Worked as Proposal Engineer for providing Project Control support to Proposal team for
SAS Full field development project for ADCO (Abu Dhabi Company for onshore Oil
Operations)
Worked as Project Control Engineer for Karachaganak 4th Stage Stabilization and sweet
gas processing Project at KAZAKSTAN, for KPO (Karachaganak Petroleum Organization BV)
Project comprises the installation of additional one train, upgradation of Utilites & Tie
in with Existing facilities in the Gas Processing Complex.
The function involves the Engineering Coordination with the different departments of
company & Interface Coordination work with other EPC Contractors involved in Engineering
& Construction of different Process plants & Utilities being under construction for the owner
investment programme inside the Petrochemical Complex.
Page 3 of 6
• To act as a focal point for the entire project related activities and reporting to
Project Manager.
• To maintain close co-ordination with Consultant & Client job officers
• Coordinating with other departments, contractors, vendors for establishing methods
for implementation of engineering packages, follow up contractor sourcing
material, approval of contractor documents etc
• To act as a focal point of contact for all interface issues within scope of Contact &
responsible for coordination & reaching detailed interface agreement with the
various other contractor working within the complex.
• To develop the procedure, how the interface with the other contractor can be
coordinated.
• To call for interface meetings as deemed necessary in addition to the
correspondences exchanged among the relevant parties for ensuring good
cooperation and proper implementation of interface programs by concerned
parties.
• To ensure that all detailed engineering required for interface points is completed
to the required detail to enable construction, pre-commissioning and
commissioning to be executed in an efficient manner within all parties involved in
realization of the project.
Worked as a Project Control Engineer, Nigeria LNG Project, for Construction Planning &
Progress Monitoring, using COPR & PROM Software developed by Snamprogetti spa Italy, for
ensuring the progress evaluation at any level of WBS of the project.
Responsibility includes.
Page 4 of 6
• Preparation of Monthly Progress Report for Construction & Compilation of Complete
Project Report for Engineering, Procurement & Construction.
Worked as Assistant Project Manager India for the followings Project Management functions
of the Project.
• Propose the formation of a Project Group during the initial project phase, issue of
the Project Procedure during this phase.
• Act as the single point of contact with the Client and to ensure that positive
relations are maintained with Client Representatives within the Contract obligations.
• Ensure that the performance of the work is in accordance with the Contract
specifications, within budget and maintaining Project schedules in accordance with
agreed milestones.
• Ensure the development and review of project planning and to monitor the progress
of allocated projects, maintaining agreed schedules and within quality / cost
estimates.
• Ensure proper allocation of resources for the successful completion of the project.
• Provide for the management of all Subcontracts during all phases to ensure correct
fulfilment of the requirements.
• Plans for pre-tender, pre-contract stages and post-contract award administration
including commercial commitment, ensuring the contracting strategies and the
ultimate contracts developed are consistent with our management’s approved
policy.
• Expediting engineering progress, obtaining vendor information for major
equipment’s and package items including floating enquiries, Bid Evaluation, vendor
drawing review and release of construction drawing for trouble free construction
• Co-ordination with sites for vendor support requirement. Commercial evaluation
and negotiation, as and when necessary.
• Carry out modifications in technical Scope of Work to clarify requirements and
obligations as per the agreed contracting strategy.
• Identifies wherever deficiencies in Scope of Work acceptance and specification.
Carries out duties related to contracts, such as preparation of variation orders,
claims, insurance co-ordination, co-ordination with finance with respect to
performance and bid bonds etc
Worked as a Senior Engineer for Construction Management & Planning of EPCM projects
And minor revamping and expansion projects for Oil & Natural Gas Commission (ONGC) at
URAN terminal Bombay offshore in Maharastra state India.
Page 5 of 6
• Multi-discipline project construction supervision activities like Civil Construction,
Structural Steel Fabrication & Erection, Piping Prefabrication & Erection and
Equipment Installation work
• Planning/Scheduling & Progress Measurement Certification
• Contract administration of subcontracts for all the disciplines like Civil & structural
work, Piping Prefabrication & Equipment erection, electrical & Instrumentation,
Painting & Insulation etc
• And other Construction management activities during the entire Construction phase
of project.
2.1 Notice period for Joining: one month from acceptance of offer.
Page 6 of 6