Professional Documents
Culture Documents
Mobile:
Tel:
Address:
Email:
+971555106695
+97126222129
UAEAbuDhabi
R.azzam@hotmail.com
Objective
ToobtainaseniorpositioninaninternationalorganizationwhereIcanutilizemyexperience
inprojectmanagementnetworksaswellastoachievepersonalandorganizationalgoals.
Education
MastersinWaterResourcesUnitedArabEmiratesUniversity(AlAin)
CivilandEnvironmentalEngineeringDepartmentExpectedJune2014
B.Sc.CivilEngineeringUnitedArabEmiratesUniversity(AlAin)
CivilandEnvironmentalEngineeringDepartmentAugust2006.
EnvironmentalImpactAssessmentPrinciples&Applications.
SpatialAnalysisUsingGIS
WaterQuality
FundamentalsofGIS
HydraulicsofClosedConduits
WaterResourcesManagement
WaterLegislation&Regulation
SpecialCourses
Trainings
2013
D.I.pipes,valves&fittingsManufacturingprocesses&standardsPAMAcademy
2011
YoungTalentProgramforManagementDevelopmentTEBODINAcademy
2008
IntroductiontoInfoWorksCSWallingfordSoftware
2007
IntroductiontoArcGISI&IIGulfComputers
2007
TechnicalReportWritingSOSServicesBureau
2006
BasicHealthandSafetyTrainingTVMiddleEast
ProfessionalExperience
2011Present
TEBODINMiddleEastAbuDhabi
InfrastructureDepartment
ProjectManagerWaterProjects
ProjectmanagementofEngineeringProjects
Successfullymanagetodeliverprojectswithintimeand budget,handleClientsneeds
and ensure executing project as per the scope. Coordinate with client different
departments (Projects, Assets, O&M etc) to finalize project related issues as per
standardprocedures.Attendprofessionalmeetingswithclientandthirdparties.Make
decisions and solve problems. Supervise, delegate and oversee the work of technical
staffandengineers.MonitorthefinancialstatusoftheprojectthroughFinancialProject
Page1of4
Report(FPR)andmonthlyfinancialstatements.Monitorprojectprogress.Issueinvoices
to clients against performed services. Provide project forecasts, cost and invoices
accruals.Raiseclaims,DCNsandVariationOrders.
Theaboveactivitieswerecarriedforthefollowingprojects:
1.
HydraulicmodelingandwaterqualityanalysisforADISC(Client:Fibrex)
2.
DesignReviewandConstructionOverviewContractNo.D6625(Client:ADDC)
AlRahaBeachDevelopment
[ALDAR]
AlRahaGardensDevelopments
[ALDAR]
AlWataniDevelopmentProject
[Sorouh]
GolfGardenPhase2Development [Sorouh]
LuluatAlRahaDevelopment
2006Present
TEBODINMiddleEastAbuDhabi
InfrastructureDepartment
[ICT]
SeniorDisciplineEngineerWaterandWastewaterProjects
DesignofWaterDistributionNetworks
Including site survey, data collection, water pipeline/network layout design, route
approval, obtain authorities NOC and approvals including UPC, DoT, ADMTPD etc.
ensure compliance with authorities standards and procedures, design calculations,
preparation of preliminary and detailed design reports, setting project execution plan
and construction schedule, carryout quantity takeoff, cost estimation, detailed BOQ,
preparationoftenderdocumentsandperformtechnicalevaluationreviews.
Theaboveactivitieswerecarriedforthefollowingprojects:
ConsultancyServicesforReplacement&UpgradingofPressureRingMainsInAbu
DhabiIsland(Phase1)(ADDC)
ConsultancyServicesforReplacement&UpgradingofPressureRingMainsInAbu
DhabiIsland(Phase3)(ADDC)
ConsultancyServicesforConstructionofNewBulkConnectiontoNahilFarm.(AADC)
DesignofSecondaryInfrastructureforKP8,KP4andKP5inKPIZ(KhalifaPortand
IndustrialZone)(ADPC)
ReplacementofExistingDN800/DN600WaterPipelinefromIP35toIP17along
NajdaStreet.(ADDC)
ImprovementofWaterDistributionNetworksinMussafahandUmmAlNarAreas.
(ADDC)
DevelopmentofWaterDistributionNetworksSectorsW33&W39.(ADDC)
ReplacementofExistingDN800/DN600WaterPipelinefromIP35toIP17along
NajdaStreet.(ADDC)
HydraulicModelingandDesignofWaterDistributionNetworks
Perform water demand calculation, pipe sizing, hydraulic modeling, data integration,
demand allocation, hydraulic analysis, fire fighting simulation and detailed design of
water transmission and distribution systems, providing engineering recommendations
onnetworkdesignimprovement,carryouthydraulicmodelandwaterqualityanalysis.
The above activities are carried out using InfoWater and EPANET hydraulic modeling
softwareforthefollowingprojects:
Page2of4
HydraulicmodelingandwaterqualityanalysisforAbuDhabiInternationalShooting
Clubdevelopment.(Fibrex/PPM)
DesignofsecondarywaternetworksinKPIZKP4,5&8(ADPC)
MasterPlanningandDevelopmentofMainInfrastructureforPoliceTrainingVillage
inAlHafar.(AbuDhabiPolice)
DevelopmentandrelocationofwaterdistributionnetworkinMohammedBinZayed
CityCommercialTowersDevelopmentSectorsME8,ME9,Z6/01,Z9ANDZ29.
[ADMContractNo.664].(ADDC)
DevelopmentandrelocationofwaterdistributionnetworkinMohamedBinZayed
CityInternalRoadsandServicesinVariousSectorsPhaseIISectorsZ17/01,Z31,
Z36&Z36/01.(ADDC)
ImprovementandExtensionoftheWaterDistributionNetworkatShahama,
Shawamekh,AlSadrandNewBahya(459Plots).(ADDC)
WaterConnectionsatZebaraIsland.(ADDC)
DesignReviewofWaterDistributionNetworks
Conductingdesignreviewofhydraulicmodels,designcalculations,engineeringreports
(concept, preliminary and detailed), Tender Documents, detailed design drawings,
accordingtoclientrequirements,engineeringstandardsandspecifications.
TheaboveactivitieswerecarriedoutundertheConsultancyServicesforDesignReview
andConstructionOverviewforNewDevelopmentofthefollowingprojects:
AlRahaBeachDevelopmentEasternPrecinctsWaterNetwork
AlWataniDevelopment(Phase1and2)
LuLuatAlRahaDevelopment
GolfGardenPhase2
AlRahaGardens2Phase4.
WaterNetworkforZayedSportsCityDevelopment
BaniyasSportsClubDevelopment
Consultancyservicesforpotablewatersystems
Perform preparation of project methodology, setup of study procedures, data
collection, identification of survey inquiries as per project need, site selection, site
survey, data analysis, coordination with stakeholders, preparation of technical study
reportsandprojectpresentationforthefollowingproject:
WaterqualityinspectionsprojectRSBProject617
HydraulicModelingandDesignofSewerageNetworks
Carryoutwastewaterflowcalculation,pipesizing,hydraulicmodeling,dataintegration,
loadallocation,runninghydraulicmodelscenarios,realtimemodelsimulation,results
analysis and design assessment using InfoWorks modeling analysis software for the
followingprojects:
AGDII,EPCProjectConstructionofCampandTemporaryFacilitiesatASAB.
STPandRelatedCollectionandIrrigationSystemsatJumeirahGolfEstates.
Page3of4
WorkingwithGISDatabase
Including,PresentationofData,ProducingMaps,DatabaseEditing(creating,modifying
and deleting features) and Verifying Data Based on Actual Inspection. The above
activitieswerecarriedoutusingGISsoftware(ArcMapandArcCatalog)forthefollowing
projects:
Consultancyservicesforthestudyoftherehabilitation/replacementofthewater
distributionnetworkinAbuDhabiIsland.
InternalRoadsfor(647)HousesinShawamekhArea
SkillsandQualities
ComputerSkills
ModelingSoftware:
InfoWater
InfoWORKS
EPANET
SWWM
GISSoftware:
ArcCatalog
ProjectPlanningSoftware:
OtherSoftware:
ArcMAP
Primavera
AutoCAD
MicrosoftOffice(Word,Excel,PowerPoint)
Visio
Outlook
Photoshop
Prezi(PresentationSoftware)
CommunicationSkills
Strongpresentationskills
ExcellentuseofthecomputerandtheInternet.
Languages:ArabicandEnglish(writing,speakingandunderstanding)
StrongPersonality
Reliable,Responsible,efficient,selfmotivated,analytical.
Goalorientedprofessionalpossessingstrongworkethics.
Canworkindependentlyandingroups.
InterpersonalSkills
MicrosoftProject(XP)
MembershipandActivities
TebodinOfficeCommittee20122013
TebodinQualitySystemTeam20112013
TebodinYoungTalents2011
UAEUHonorsClub.(President20052006)
UAEUStudentsEnvironmentalAssociation(VicePresident20052006)
HonorsandAwards
TebodinChessChampionship20112012
UAEUConcreteCubeCompetition2003secondplaceinmixdesign.
UAEUHonorStudentProgram20002006
UAEUCivilandEnvironmentalEngineeringDepartmentDistinguishedstudentslist.
Page4of4