CR NUMBER CORE PROCESS NUMBER & TITLE

CP 200 - GENERAL SAFE WORK


PRACTICES

SUBCATEGORY NUMBER & TITLE

Subcategory 10 - Exits

QUESTION
NUMBER

ASSESSMENT QUESTION

Are there at least two means of egress remote


from each other in hazardous areas or where
employees may be endangered by the blocking of
any single means of egress due to fire or smoke?

PRIORITY
LEVEL

Critical

ANSWER

NO

COMMENTS

RECOMMENDATIONS

PROJECT SPECIFIC CORRECTIVE ACTION

The assessment team observed two locations were


there was only one means of exit, the BEO warehouse
and the Simeco contractor offices on the second floor.
An alternative means of escape should be provided in
In the warehouse there is a room way back in the store
both cases, in the Simeco case the products from the
that is surrounded by combustible materials mainly
Install additional stairs on the second level for secondary means of
upper level storage container should be moved to a
escape. Relocate chemical storage area at BEO
cardboard boxes, in the Simeco area there were offices
proper chemical store, along with the flammable product
constructed of wood built between containers on the
cabinets, to an area separated from any permanent or
upper level, at the exit end staircade there was a
temporary buildings.
container full of flammable products, also stored at the
bottom of the exit stairs were several flammable
product cabinets.

RESPONSIBLE PERSON(S)

LOCATION

Salvador Figerueroa, Alex Kimm, &


Roberto Laursen

Simeco Seavan at the


Concentrator & at BEO Puma
Marca

PHOTOGRAPH OF FINDNG

PHOTOGRAPH OF CORRECTION OR ATTACHED EVIDENCE

STATUS
(Open/Closed)

DATE

12/21/2014

COMMENTS

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

CP 201 - HOUSEKEEPING
REQUIREMENTS

Subcategory 3 - Access and Egress Routes

Are all emergency exits and access passageways,


fire doors, break-glass alarm points, fire fighting
equipment, first aid stations, and other emergency
stations kept clean and unobstructed?

Critical

NO

The assessment observed at least four areas where


fire extinguishers were blocked. Also a fire
extinguisher was observed padlocked into its bracket
on a pickup truck.

The project need to make more regular inspections of


fire fighting equipment and make sure that is does not
Check all fire extinguishers on vehicles (Cidelsa) Check all fire
become blocked by the construction operations and that extinguishers in general areas.
they are not padlocked in place.

NO

Proper storage of cylinders must be addressed. The


project must determine when "staging" of cylinders
Cylinders are being stored in several locations within becomes "storage" since different requirements apply.
work areas. Many such locations offer no protection to Cylinders that have been "staged" in areas and remain Remove all unused cylinders back to general stroage locations and
the cylinders. Most are stored in very close proximity untouched for more than 24 hours are no longer staged, evaluate and identify new storage location that are easily accessible.
to other work processes.
they are stored. The many of locations where this is
occurring increases the fire load of the work area and,
therefore, also increases the risk.

Percy Cardoza & Miguel Valdivia/ES&H

Recovery Pools
(Cidelsa)/Observed in all
Areas/Multiple Observations

12/15/2014

CLOSED

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 4 - Compressed Gas Cylinders

12

Are welding gases stored in isolated areas and


segregated by type of gas?

Critical

Area Managers

1/8/2015

Observed in all Areas

CLOSED

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 4 - Compressed Gas Cylinders

16

Are all compressed gas cylinders secured in place


(around the body of the cylinder, midway between
top and bottom, never around the cylinder neck)
during use and storage?

Critical

NO

Cylinders were observed on site and in the XP camp


secured by a chain around the neck of the bottle.

Compressed gas cylinders must never be secured


around the neck of the bottle, they should only be
Properly secure cylinders w/o the chain around the neck of the
secured around the body and with a substantial chain or cylinders.
wire rope.

Armando Garza & Luis Palomino/ Area


Managers

12/22/2014

XP Comedor/ Check all areas

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 5 - Hot Work

13

Do all employees use the proper personal


protective equipment and clothing when
performing or assisting in cutting and welding
operations?

Critical

NO

In several areas, employees working together at same


location were performing welding and grinding. Only
the welder was properly protected from UV hazards
associated with welding.

Individuals working or standing in close proximity of


welding tasks are exposed to the hazards presented by
the tasks. These individuals should use appropriate PPE
to protect them from UV radiation as appropriate.

The assessment team observed five instances were


workers were exposed to a fall hazard but they had
not used their secondary fall protection equipment.

The observations made by the assessment team were


addressed at the time, however as these were life critical
violations the project need to review each incident and
apply the appropriate consequences. Personnel should Conduct specific tool box meeting on correct fall protection utilization.
Salvador Figueria, Jeff Beiber, Jorge
"Hands On" Demonstration.
Lozano, Henrique Cabo, Raul Sequieros
employ 100% fall protection when exposed to a fall
hazard. The project should review the need and
importance for supervisors to plan suitable fall
prevention.

Provide proper PPE for workers working in close proximity or provide


more welding blinds around the welding operations.

Xavier Brito & WilliamTorrico

12/22/2014

Pipeline

CLOSED

CP 212 - FALL PROTECTION

Subcategory 1 - General Requirements

Do personnel traveling or working in elevated


areas more than six feet (1.83 m.) above ground
level or adjacent surface where a fall exposure
exists make use of secondary fall protection?

Critical

NO

Concentrator (240 Tunnel,


Seimens Representative,
Transfer Toxer 2 (BEO/Ameco)

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

CP 212 - FALL PROTECTION

Subcategory 1 - General Requirements

Do personnel secure their safety lanyard to a


structure, lifeline, or approved fall arresting device
capable of supporting 5000 pounds (2268 kg.)?

Critical

NO

A number of observations made by the assessment


team such as the rope life line used by the lining
contractor in the recovery pool was tied with a knot to
the anchor point, the life lines on many of the truck
beds have a considerable sag, the life line on the roof
of the new guard hut did not meet requirements
despite three attempts to get construction to fix the
situation prior to it being used. The assessment team
eventually observed the line in use and had to stop
the work, also the life lines used in the tailings
thickeners for pouring concrete was significantly
sagging (the line had not been used but was ready for
use, it did get addressed prior to use).

Field supervision must ensure that work at height is


properly evaluated and planed and that any engineered Remove all rope not rated fro fall protection and replace with
solution planned is installed by a competent person and approved fall protection systems (retractable, prefabricated rope
that the solution is capable of supporting a load of 5000 lifeline system).
pounds per person.

Percy Cardoza & Miguel Valdivia

12/15/2014

Recovery Pools (Cidelsa)

CLOSED

CP 212 - FALL PROTECTION

Subcategory 1 - General Requirements

13

Do vertical impaling objects such as rebar have


the ends capped with an article such as a block of
2 X 4 inch (5 X 10 cm) wood, rebar cap, or other
item which adequately covers the impaling end of
the object?

Critical

NO

A number of situations were observed where rebar


caps had not been installed or were missing.

Field supervision must be vigilant of their work areas and


Have discipline superintendents and supervisors conduct an
ensure that all impalement hazards are properly
assessment all areas to assure rebar caps are in place.
protected with a rebar cap, or other approved means.

Area Managers

1/8/2015

Observed in all Areas

CLOSED

CP 212 - FALL PROTECTION

Subcategory 2 - Fall Protection Systems

To achieve 100% fall prevention, are either


primary or secondary fall protection systems, or
both, being used?

Critical

NO

During the assessment on five occasions workers were More effort is required from supervision in evaluating
observed working at height with no fall protection in
and planning works at height to ensure 100% fall
place.
prevention.

Conduct specific tool box meeting on correct fall protection


utilization."Hands On" Demonstration.

Area Managers

Observed in all Areas/Multiple


Observations

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

10

CP 212 - FALL PROTECTION

Subcategory 2 - Fall Protection Systems

17

Does the lanyard and anchorage point limit the


maximum fall potential to six (6) feet (1.83
meters)?

Critical

NO

An observation was made at the MCC camp guard


house were workers were on the roof attached to a
lifeline via a lanyard, if the worker had fallen they
would have hit the floor before the lanyard could
arrest the fall, this would be caused by the length of
the lanyard and the considerable slack in the life line.

Supervision must ensure that proper fall protection


systems are used, and that equipment and / or anchor
points are selected to provide adequate protection. A
Tool Box talk is suggested to remind workers of the
consequences of improper equipment and / or anchor
point selection.

Train competent personnel for horizontal and vertical lifeline


installation and inspection. We will need enough personnel trained to Luis Calle, Luis Carvajal, Manny Mermolejo
cover the entire project.

Entire Project

CLOSED

11

CP 212 - FALL PROTECTION

Subcategory 2A - Fall Protection


Requirements (continued)

27

When used for vertical banked excavations, are


soft barricades placed more than 6 feet (1.83
meters) from the edge)?

Critical

NO

A number of soft barricades were observed to be


closer that the required 6 feet (1,83 metres) from the
edge of the excavation.

More effort is required from field supervision in ensuring


that soft barricades are not placed closer than the
Conduct a specific assessment to check all temporary barricade are
1.83 meters away from the edge. If needed for more than 24 hours
required 6 feet (1.83 metres) from the edge of the
install hard barricades at a minimum .60 cm away from the edge.
excavation, if the barricade needs to be closer then it
shall be a hard barricade.

Area Managers

Observed in all Areas/Multiple


Observations

1/5/2015

CLOSED

12

CP 214 - BARRICADES AND SIGNS Subcategory 1 - General Guidelines

Are imminent danger areas barricaded using


appropriate red and black barrier tape?

Critical

YES

The project are using a red rope for some imminent


danger barricades, the rope is hard to see and is
usually just wrapped around the outriggers of cranes.
As stated.
The assessment team recommends that the use of the
red rope be discontinued and the red tape used widely
in most areas be adopted as the project standard.

Red Chain will be purchased to replace the red rope for hire visibility.

ES&H

Fro all cranes.

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

13

CP 214 - BARRICADES AND SIGNS Subcategory 1 - General Guidelines

12

Has the swing radius of equipment been


barricaded as an IMMINENT DANGER AREA when
the super-structure is capable of rotating and
creating pinch points?

Critical

NO

A number of the cranes observed only had the body


and outriggers of the crane barricaded, this was in
most of the cases when the red rope was used, it did
not encompass the full swing radius of the crane
including the counterweight.

The full swing radius of cranes including the


counterweight must be properly barricaded with
imminent danger barricading.

Conduct specific tool box meeting on correct utilization of red


barricade around cranes and counterwieight areas. "Hands On"
Demonstration.

Alex Kimm & Roberto Laursen/Area


Managers

Observed in all Areas/Multiple


Observations

CLOSED

14

CP 217 - CONFINED SPACE ENTRY Subcategory 5 - Testing and Monitoring

Does the ESH Representative or designee perform


periodic or continuous air monitoring to ensure
that acceptable conditions exist at all times during
the entry operation?

Critical

NO

Confined spaces are only being monitored just prior to Confined spaces should not only be monitored before
entry, there is no continuous monitoring taking place. entry but at regular intervals during the entry.

Conduct specific tool box meeting with affected work groups about
atmospheric monitoring requirements for permitted confined spaces.
"Hands On" Demonstration

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

CLOSED

15

CP 217 - CONFINED SPACE ENTRY Subcategory 6 - Special Precautions

When work in a confined space is to be performed


by subcontractor or other non-Bechtel personnel,
does project procedure ensure that personnel
follow confined space entry procedure
requirements?

Critical

NO

The project procedure only address the works


conducted by BGyM, it does not address other
contractors working on the project.

Revise the procedure so that it address all contractors


working for Bechtel on the project including
subcontractors.

Conduct a gap analysis between BGyM sie Specific procedure and


Haug's procedrue to assure that Haug either meets or exceeds BGyM
site specific expectations.

Percy Cardoza & Miguel Valdivia/ES&H

12/15/2014

Molly (Haug)

CLOSED

16

CP 218 - EXCAVATION AND


TRENCHING (SWPP 4MP-T8103202)

Subcategory 1 - Earthwork Operations

Are soft barricades kept at least 6 feet (1.8


meters) from open edges of trenches and
excavations?

Critical

NO

Soft barricades are being used at the edges of


excavations closer than the required 6 feet (1.8
metres).

It is vital that supervision are properly managing the


placement of barricades, soft barricades must be placed Conduct a specific assessment to check all temporary barricade are
1.83 meters away from the edge. If needed for more than 24 hours
at least 6 feet (1.8 metres) from the edge of the
install hard barricades at a minimum .60 cm away from the edge.
excavation, if this can not be achieved then a hard
barricade must be used.

Area Managers

Observed in all Areas/Multiple


Observations

1/5/2015

CLOSED

17

18

19

CP 221 - LOCKOUT/TAGOUT
PROCEDURE (SWPP 4MP-T8101307)

CP 223 - CRANES AND LIFTING


OPERATIONS

CP 225 - COMPRESSED GAS


CYLINDERS

Subcategory 2 - Safety Tagging Permit


Requirements

Subcategory 3 - Appointed Persons


(Competent Person)

Subcategory 1 - Handling/Use and Storage

Are the specific protective measures (safety tags


and locks), as per the applicable/approved
System/Component Safety Tagging Permit, being
properly implemented?

Does a Competent Person ensure that the


equipment selected has been adequately
inspected and maintained?

Does the project ensure that all gas cylinders are


protected against shock and/or exposure to high
temperature extremes?

Critical

Critical

Critical

NO

Two maintenance workers were observed conducting


maintenance on a large generator, one was inside the
Maintenance team must properly lockout equipment
engine bay the other was at the electrical panel,
before starting work on the equipment.
neither had used their locks to lock out the generator
before starting work on it.

NO

SWPP 4MP-T81-01904, Crane Use and Operation,


requires daily, monthly and annual inspections to be
performed; however, there was evidence that periodic
inspections (i.e. monthly inspections) but they are on
an hours basis (250 hours) and are not occurring as
required by the SWPP on a monthly basis. Daily and
annual inspections are being conducted and select
evidence of 250 hourly boom inspections and winch
rope inspections have occurred; however, the 250
hourly boom and winch rope inspections do not satisfy
the monthly inspection requirement found within
SWPP 1904.

NO

Review site specific procedure and training program for BEO mobile
equipment lockout/Tagout program

Alex Kimm & Roberto Laursen

MC Camp/Aggeko Generator
Platform 7 (BEO)

12/30/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/14/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED
The project should ensure personnel responsible for
crane inspections also conduct and document the
required periodic (i.e. monthly) inspections. The
appropriate person to conduct the periodic crane
inspection should be the crane operator and the
Change inpsection process to a monthly basis per the SWPP
standards.
appropriate form necessary to document compliance
with the monthly inspection requirement is found in
SWPP 1904 appendix D, E, and F for crawler crane, RT
and pedestal crane, and truck crane periodic inspection,
respectively.

Gas cylinders were observed placed in close proximity


Cylinders should be placed in locations were they are not
to a road where they were at risk of being struck by a
at risk of being struck by a vehicle or heavy equipment.
vehicle or heavy equipment.

"

Alex Kimm & Roberto Laursen

BEO Puma Marco

CLOSED

Percy Cardoza & Miguel Valdivia

12/15/2014

Stock Pile Area (Haug)

CLOSED

20

CP 226 - ELECTRICAL EQUIPMENT Subcategory 1 - 120V/240V Single Phase


AND ASSURED GROUNDING
Equipment

Do employees visually inspect receptacles,


extension cords, and equipment connected by
cord and plug before each day's use (to determine
whether there are external defects)?

Critical

NO

If employees are inspecting cords they are less than


effective, several damaged cords attached to electric
tools were observed during the assessment, in one
case, a portable saw, an attempt to conceal the
damage was made by covering it with electricians
tape.

All quarterly inspection must be conducted by competent electrical

Supervision must make sure that employees are properly personnal on a quarterly and formally documented. Personnel using
inspecting electrical cords before putting their tools into electrical power tools on a daily basis must conduct a visual and
physical inspection prior to use. All damaged or inoperable tools
use.

John Hansen & Mark Weathers/Area


Managers

Observed in all Areas/Multiple


Observations

12/12/2014

must be properly tagged out.

CLOSED

21

CP 226 - ELECTRICAL EQUIPMENT Subcategory 1 - 120V/240V Single Phase


AND ASSURED GROUNDING
Equipment

Where there is evidence of damage, are the


damaged items taken out of service and tagged
with a defective tool tag?

Critical

NO

Damaged cords were not taken out of service as


required.

NO

Whilst the project have made great progress in this


area and have gone to a lot of trouble to properly
segregate pedestrians from traffic/equipment, there
are still a few areas that need attention such as the
parking area across the road from the project
warehouse, the copper thickeners, Boca Toma area,
the pipe line between the the camp and the
concentrator. It is also recommended that the project
review the road adjacent to the concentrator dinning
hall due the the large numbers of workers using the
road at peak time such as lunch times.

Damaged cords/tools must be properly tagged out and


returned to the tool room, when defects are found.

All quarterly inspection must be conducted by competent electrical


personnal on a quarterly and formally documented. Personnel using
electrical power tools on a daily basis must conduct a visual and
physical inspection prior to use. All damaged or inoperable tools
must be properly tagged out.

Area Managers

Observed in all Areas/Multiple


Observations

12/13/2014

CLOSED

22

CP 229 - VEHICLE SAFETY


MANAGEMENT

Subcategory 2 - Pedestrian Routes

Are pedestrian routes established on the site to


provide safe access to and from the parking, lay
down, and work areas for employees?

Critical

Review the locations listed above but not exclusively, in


regards to the road adjacent to the concentrator dinning
hall consider closing the road the road at peak times
such as lunch time.

All designated walkways along road way along roads must have hard
barricades to separate personnel from vehicle and equipment traffic.
All designated pedestrian cross walks must be marked to alert
vehicles/equipment about the cross walk and notify pedestrians the
designated location to cross the road. This requires 2 yellow & black
sign with the pedestrian symbol facing the direction of traffic on both
sides of the road way within 3 meters of the cross walk. Also 2
additional blue & white signs with the pedestrain symbol facing the
direction of the cross walk way on both sides of the road within 1
meter.

Salvador Figueria/Area Managers

Between Pebbles and


Concentrator Comedor. Check
all areas.

1/8/2015

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

23

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 4 - Hand, Air, and Electrical Tools

20

Are electric bench grinders equipped with an antirestart feature to prevent restart after an electrical
power outage?

Elevated

NO

The assessment team observed a bench grinder in use All bench grinders must be fitted with a anti-restart
that did not have an anti-restart device fitted.
device such as a foot pedal.

NO

The assessment team recommends that the project


implement an entry control system such as a badge
The project has a number of tunnels that do not
board that workers can place their badges on when
currently have entry control, some of the tunnels have entering and remove the badges on exit, this should be
oxygen depleting gas cylinders stored in them such as monitored and controlled by an entry watch person.
Argon, as well as welding operations taking place.
Also compressed gas cylinders should only be brought in
when needed and immediately removed when no longer
needed.

NO

Contractors are getting very good at the practice of


either removing the nails or backing them out so that
others will not be injured. However, they must ensure
that this practice occurs in every case and they must
never re-use wood pieces that still have nails protruding
from them. Nails must be removed from wood and
timbers immediately after separation to ensure that no
person who handles the materials afterwards is exposed
to a puncture hazard.

Remove all bench grinder from service and replace with bench
grinders with the anti-restart feature.

12/12/2014

John Hansen & Mark Weathers/ BEO Tools Electrical Work Shop/240 Area

CLOSED

24

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 12 - Underground Construction

Does the project/facility control access to all


openings to prevent unauthorized entry
underground?

Elevated

Carlos Fortio & Mauricio Fonseca

Primary Crusher, 240 Tunnels,


Thickener Tunnels

CLOSED

25

26

CP 201 - HOUSEKEEPING
REQUIREMENTS

CP 202 - HAZARD
COMMUNICATION PROGRAM

Subcategory 4 - Materials, Tools, and


Equipment Management

Subcategory 5 - Storage of Hazardous


Materials

Are all nails removed from timber and wood prior


to storing and stacking the materials?

Are storage areas located away from high traffic


areas on site and reasonably protected from the
potential for vehicle/equipment damage by
guardrails, fences, or other structural controls?

Elevated

Elevated

NO

Numerous observations of nails being left in wood


creating a puncture hazard for anyone that must
handle or come into contact with the wood.

The assessment team observed some compressed gas


stored in close proximity to an area where vehicles
Hazardous chemicals and compressed gasses must not
were passing close by, thereby exposing the cylinders be stored in locations were they could be hit by passing
to a potential strike by the passing vehicles or
construction equipment or vehicles.
construction equipment.

"

Percy Cardoza & Miguel Valdivia/ Area


Managers

Recovery Pools
(Cidelsa)/Observed in all
Areas/Multiple Observations

12/15/2014

CLOSED

"

Percy Cardoza & Miguel Valdivia

12/15/2014

Stock Pile Area (Haug)

CLOSED

27

CP 205 - PERSONAL PROTECTIVE


Subcategory 3 - Eye and Face Protection
EQUIPMENT

Are suitable protective goggles, face shields, or


screens worn by personnel who may be exposed
to an eye or face hazard from either chemical,
mechanical, or biological work processes?

Elevated

NO

The assessment team observed several instances of


More effort is required from field supervision in enforcing Conduct specific tool box meeting with affected work groups about
face shield not being worn when required for instance
CP and SWPP requirements in order to prevent injuries. use face sheilds "Hands On" Demonstration.
during grinding and the placement of concrete.

Area Managers

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/22/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/22/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

1/7/2015

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

28

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 8 - Kitchens, Dining Hall, and


Feeding Facilities

17

Are dishwashing machines capable of operating at


the minimum temperatures to ensure proper
sterilization (Wash: 150F/65C; Rinse:
175F/80C)?

Elevated

NO

The gauge on the dish washing machine was showing


approximately 75f/23c this is well below the required The project needs to review the dish was machines to
levels of 150f/65c for washing and 175f/80c for the
ensure they are operating at the required temperatures.
rinse cycle.

"

Armando Garza & Luis Palomino

XP Comedor

CLOSED

29

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 8 - Kitchens, Dining Hall, and


Feeding Facilities

22

Are fish products and chicken products either


placed in a separate freezer or in a separate
compartment in a combined freezer?

Elevated

NO

Fish and Chicken products must be stored in separate


The kitchen is storing chicken products directly next to
freezers or in separate compartments in the same
fish products in the same freezer.
freezer.

"

Armando Garza & Luis Palomino

XP Comedor

CLOSED

30

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 8 - Kitchens, Dining Hall, and


Feeding Facilities

31

Are foods maintained and served at the correct


temperatures with regular temperature checks of
the food service line made and recorded during
mealtime hours?

Elevated

NO

Whilst the main kitchens are meeting requirements


the field meal serving halls are not taking and
recording the food temperatures at arrival and at
regular intervals during the serving session to ensure
temperatures are maintained at the correct levels to
keep the food wholesome and bacteria free.

Implement a temperature taking and recording process


for the field dining halls.

"

Armando Garza & Luis Palomino

Concentrator Comedor

CLOSED

31

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 3 - Flammable and Combustible


Liquids

Are flammable/combustible liquids handled and


used only in approved, properly labeled, safety
cans?

Elevated

NO

Instances of unlabelled, and unapproved plastic fuel


cans were noted in some of the flammable liquid
storage cages throughout the project area as well as
in tool cribs and on the backs of maintenance trucks.

Flammable liquids have traditionally been stored in metal containers,


however in recent years, plastic containers of a wide variety of shape,
size, type, and materials, have seen widespread adoption for the
storage and transport of liquids and other free flowing materials.
Unfortunately, most plastics are highly electrically insulating and tend
to become electrostatically charged and may result in either
electrostatic or spark discharges which are capable of igniting
explosive atmospheres. Potentially incendive electrostatic discharges
can occur from the surface of the plastic container, or from the
surface of the insulating liquid in the container. Spark type
Review all chemical staorage area and fuel distribution operations
discharges can occur from charged conducting objects (either solids
and remove aall plastic fuel containers.
or conducting liquids), that have become isolated (e.g. by the plastic)

BEO/Area Managers

Observed in all Areas/Multiple


Observations

1/5/2015

and are unable to dissipate their charge. There are two distinct
ignition hazards that must be considered with plastic containers internal ignitions of flammable contents and external ignitions of
flammable atmospheres surrounding the container. In the case of the
latter, the contents of the plastic container may not actually be
flammable. For these reasons, projects must use properly rated
metal safety cans. If plastic containers are used, then they must be
of a type approved by the local authority having jurisdiction for use
with flammable or combustible liquids.

CLOSED

32

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 3 - Flammable and Combustible


Liquids

Does the project ensure that flammable and


combustible liquids are not stored in areas used as
exits, stairways, or passageways, and do not
adversely affect a means of egress?

Elevated

NO

The assessment team observed a bank of flammable Remove the cabinets from the base of the stairs and
product cabinets containing flammable products at the place in a location away from the stairs and any
base of the exit stairs form Simeco offices.
temporary building.

NO

Whilst many of the electrical installations met


requirements the assessment team observed
numerous instances of poor electrical practice, for
example, cable routed through metal plate with no
More effort is needed, review all construction areas for
protection for the cable, areas with no GFCI protection, proper electrical practices and implement corrective
lights improperly suspended, lights with missing
actions when non-compliances are observed.
covers, blanking plates to switch boxes missing, poor
practice in regards to grounding rod insertion into the
ground (just pushed in a short distance by hand).

Conduct specific tool box meeting with eletrical work groups about
electrical maintenance and cable routing practices.

The assessment team recommends that the project


The life line erected at one of the thickener tanks for a
appoint a single point of contact for the management
concrete poor and the life line erected on the MCC
and control of life lines on the project, ideally a person
camp guard house would indicate that they had not
for field engineering who can review and approve all
been installed by a competent person.
installations.

Train competent personnel for horizontal and vertical lifeline


installation and inspection. We will need enough personnel trained to Luis Calle, Luis Carvajal, Manny Mermolejo
cover the entire project.

"

Salvador Figueroa

Simeco Seavan at the


Concentrator

12/21/2014

CLOSED

33

34

CP 211 - FIRE PREVENTION AND


PROTECTION

CP 212 - FALL PROTECTION

Subcategory 9 - Electrical Equipment

Subcategory 2 - Fall Protection Systems

22

Are all electrical installations performed by a


competent electrician in conformance with
applicable electrical codes?

Are lifelines installed and maintained by persons


competent in the rigging practices necessary to
ensure adequate lifeline systems?

Elevated

Elevated

NO

John Hansen & Mark Weathers/Area


Managers

Observed in all Areas/Multiple


Observations

12/12/2014

CLOSED

Entire Project

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

1/8/2015

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

1/8/2015

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

35

CP 214 - BARRICADES AND SIGNS Subcategory 4 - Erection of Barricades

Are barricades complete (i.e., the work area is


entirely isolated and identified)?

Elevated

NO

Supervision must make sure that their work area


A significant number of the work areas that were
barricades are complete and enclose the work areas on
barricaded were not completely enclosed on all sides.
all sides.

Conduct specific tool box meeting with all work groups about proper
installation and removeal of temporary barricades.

Area Managers

Entire Project

CLOSED

36

CP 217 - CONFINED SPACE ENTRY Subcategory 1 - General Requirements

Has the project properly evaluated the workplace


to determine which spaces (if any) are confined
spaces?

Elevated

NO

The project has evaluated the confined spaces on the Conduct a site wide evaluation of all confined spaces to
project to determine the controls and signage that
determine the controls and signage/protection that may
may be required.
be required.

"

Thomas Tansil/ES&H Leads

Observed in all Areas/Multiple


Observations

CLOSED

37

CP 217 - CONFINED SPACE ENTRY Subcategory 1 - General Requirements

Are confined space areas properly marked and


protected with warning signs and barriers?

Elevated

NO

Whilst some of the confined spaces are marked as


such the vast majority are not marked in any way or
protected from entry.

The project must make sure that suitable protection and


signage is applied to all confined spaces on the project.

"

Thomas Tansil/ES&H Leads

Observed in all Areas/Multiple


Observations

CLOSED

38

CP 218 - EXCAVATION AND


TRENCHING (SWPP 4MP-T8103202)

Subcategory 1 - Earthwork Operations

Are ladders or other means of egress provided in


each excavation?

Elevated

NO

A number of the excavations observed did not have


proper access provisions in place such as ladders or
ramps.

Field supervision must make sure that proper access is


provided to excavations.

Proper access and barricades must be installed prior to conductinng


any work activities.

Area Managers

Observed in all Areas/Multiple


Observations

1/5/2015

CLOSED

39

CP 222 - PORTABLE LADDERS INSPECTION AND CONTROL

Subcategory 2 - Ladder Specifications

Are straight ladders no longer than 20 feet (6


meters)?

Elevated

NO

The project have several straight ladders that are


much longer than 6 metres, most are attached to the
outside of scaffolds.

Straight ladders should not be longer than 6 metres, if


they are required to be longer than 6 metres, a break
Conduct an assessment of all scaffold hire than 6 meters.
with a platform should be used to break up the length of
the ladder.

George Jaimes

Entire Project

12/28/2014

NO PICTURE AVAILABLE

\\amers.ibechtel.com\mining\Santiago\Projects\Xstrata\XCO-25

CLOSED

40

CP 226 - ELECTRICAL EQUIPMENT


Subcategory 2 - GFCI/ELCB Requirements
AND ASSURED GROUNDING

Where applicable, are GFCIs/ELCBs provided for all


120V, single-phase, 15 and 20 Amp receptacle
outlets (or 240V, single-phase, 30 and 40 Amp, as
applicable) that are not part of the permanent
wiring of a building or structure?

Elevated

NO

Many of the small distribution boxes did not have GFCI Review all of the small distribution boxes and ensure that
protection, when traced back to the main panel no
they have GFCI protection fitted, or install the required
GFCI was present.
GFCI protection at the main distribution panel.

"

John Hansen, Mark Weathers & Roman


Reyes/ Area Managers

Observed in all Areas/Multiple


Observations

12/9/2014

CLOSED

41

CP 227 - SAFETY WATCHES

Subcategory 5 - Traffic Watch

Does the supervisor ensure that Traffic Watches do


not leave the area for any reason unless the work
has been stopped and/or another Traffic Watch
replaces them?

Elevated

NO

The traffic watch personnel leave there posts at lunch


time, they are not relieved by a stand-in, in some
Traffic watch personnel should be replaced during breaks Assign traffic watch personnel during lunch time hours in needed
areas to control traffic.
locations the traffic watch is critical to maintain safe
such that the traffic watch can be maintained.
traffic operations.

Enrique Burmester/Area Managers

Observed in all Areas/Multiple


Observations

12/22/2014

NO PICTURE AVAILABLE

CLOSED

42

CP 101- ESH RESPONSIBILITIES

Subcategory 4 - Field Supervision (Foreman,


General Foreman, Superintendents, Field
Engineers)

Is Field Supervision thoroughly familiar with


Bechtel's ESH policies and procedures and with
their individual responsibilities regarding its
implementation and enforcement?

Normal

NO

Observations made during the assessment would


indicate that some Field Supervision are not fully
familiar with Bechtel's ES&H Policies and Procedures
and their individual responsibilities or they are
choosing not to engage. For example, improper
electrical installations, improper use of fall protection
equipment, and improper barricading.

The project should verify that Field Supervisors are


familiar with Bechtel ES&H requirements and provide
Field Supervisors with additional training as needed. The
project may consider providing field supervisors a
handbook or pocket card containing their responsibilities
and ES&H requirements, to be used as reference, so that
Field Supervision can become more proactive (rather
Conduct a meeting to review roles & responsibilities with
supervisors and foremen.
than reactive) in correcting unsafe behaviors and / or
unsafe conditions in the field. The project should also
consider using an engagement scorecard that
incorporates a number of measurement tools such as the
supervisor inspection tool from the building to zero
program, as well as incorporating other department
evaluations of construction field engagement.

Paul Anderson, Antonio Crovetto, &


Thomas Tansil

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/17/2015

Conducted Supervisor Safety Meeting & by Areas to review ES& Roles & Responsibilitis.

CLOSED

43

CP 101- ESH RESPONSIBILITIES

Subcategory 5 - Employees

44

CP 102 - ORIENTATION, TRAINING Subcategory 4 - Continuing New Employee


AND DEVELOPMENT
Orientation

Do project personnel know and abide by ESH


practices and procedures applicable to their work
tasks and reporting substandard practices,
conditions, or behaviors to their supervisor?

If the project utilizes the Continuing New


Employee Orientation Process, are all new
employees issued a temporary hard hat (or vest,
or badge, etc.), in a color different from the
permanent one after receiving the Basic New Hire
Orientation?

Normal

NO

There are indications that personnel may need


additional reminders and/or consequences regarding
unsafe behaviors and/or conditions, as there were
observations of not wearing PPE (face shields, correct
gloves for the task, and use of fall protection) where
required, and cell phone use.

YES

The assessment team recommends that the project


The project provide new hires with a sticker for their
consider the use of a coloured hard hat such as orange,
hard hat, these stickers are not very visible and come
as this is more visible and durable than a hard hat
of in the wet weather
sticker.

NO

Due to the findings observed during the assessment,


the assessment team considers that personnel are not
working in compliance with the controls established in
Supervision must enforce the controls laid out in the
the JHA's, for example not suing fall protection when
JHA's
required, not reporting damaged electrical cords, not
completely enclosing work areas with barricades, not
using face shields when required, etc.

NO

Additional attention is needed: Personnel were


observed working in unsafe manners. Examples
include not using face shields or proper hand PPE
when required, improper storage of chemicals and
several other findings as listed in this report. These
observations indicate that daily or ongoing
assessments are either not occurring or are less than
adequate.

A constant and consistent focus on ownership of the ESH


process must continue for all levels of the organization
Conduct a meeting to review roles & responsibilities with
supervisors and foremen.
and especially front-line supervision and their
employees.

Paul Anderson, Antonio Crovetto, &


Thomas Tansil

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/17/2015

Conducted Supervisor Safety Meeting & by Areas to review ES& Roles & Responsibilitis.

CLOSED

45

CP 105 - SAFETY TASK


Subcategory 2 - JHA (or Method Statement)
ANALYSIS/JOB HAZARD ANALYSIS
Requirements
PROCESS

10

Are personnel observed working in accordance


with the hazard control measures prescribed by
applicable JHAs?

Normal

No change to current process.

NO PICTURE AVAILABLE

CLOSED

Normal

Conduct a meeting to review working compliance and


execution with supervisors and foremen.

Area Managers

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/17/2015

Conducted Supervisor Safety Meeting & by Areas to review ES& Roles & Responsibilitis.

CLOSED

46

CP 111 - ESH ASSESSMENT


PROCESS

Subcategory 1 - Daily/Routine Assessments

Do supervisors who direct the work activities of


employees conduct daily/routine assessments of
work processes within their area for unsafe
conditions, practices, and at risk behavior?

Normal

Supervision must ensure that any unacceptable work


practices, conditions, and/or behaviors are recognized
and corrected immediately.

Conduct a meeting to review conducting daily work area assessments


with supervisors and foremen.

Area Managers

Observed in all Areas/Multiple


Observations

12/6/2014

NO PICTURE AVAILABLE

CLOSED

47

CP 111 - ESH ASSESSMENT


PROCESS

Subcategory 3 - CSM/FM Assessments

Do in-depth assessments involve employees,


supervisors, and others, as necessary, to further
define root causes?

Normal

NO

The assessment team recommends that the project


Due to the number of repeat findings, the assessment
management team review the findings of this
team feels that in-depth assessments are either not
assessment, establish the root causes and allocates
occurring or are less than adequate in identifying root
accountability for the closure the action items, in a
causes.
systematic way.

"

Paul Anderson & Antonio Crovetto

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

OPEN

48

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 3- Radios and Electronic


Equipment

Does the project prohibit the use of cell phones by


employees engaged in work tasks that may be
considered critical, hazardous, or where the use of
such devices could increase the potential for
mishap due to distractions caused by cell phone
use?

Normal

NO

A policy and/or tool box talk on this subject should be


issued and enforced. It is essential that employees
The project is not enforcing this requirement. Multiple
perform their assigned tasks effectively and safely,
observations were made of workers (and some
without distractions that could interfere (either partially
supervision) using cell phones in work areas as well as
or completely) with their ability to react to noises around
when crossing roadways etc.
them. Suggest the creation of cell phone safe use
stations where phones may be used.

"

Paul Anderson & Antonio Crovetto

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

OPEN

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

49

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 4 - Hand, Air, and Electrical Tools

12

Are temporary construction outlets used for 120 V


(or 240 V, as applicable) tools protected by ground
fault circuit interruption devices (or ELCB, as
applicable) or an assured grounding program?

Normal

NO

The project have a GFCI program in place, however


there were a number of areas that did not have the
GFCIs fitted as per the project program.

The assessment team recommends that the project


check all areas for GFCI use and make sure that all
temporary construction outlets are protected with a
GFCI, this includes all temporary tool rooms, offices and
storage containers etc.

"

John Hansen, Mark Weathers & Roman


Reyes/ Area Managers

Observed in all Areas/Multiple


Observations

12/4/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

50

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 4 - Hand, Air, and Electrical Tools

16

Do tool rests have a maximum clearance of 1/8inch (3 mm) between the wheel and grinding
stone?

Normal

NO

To prevent materials being processed from being caught


A tool rest on the grinder at the Electrical shop in the
in the open space between wheel and tool rest causing Conduct specific tool box meeting with all affected work groups about
proper use and adjustment of the tool rest on all bech grinders.
240 area were adjusted to a distance exceeding the 3
possible injury to the operator, ensure that tool rests are Signage shall also be placed in these areas as reference information.
millimeter maximum.
no more than 3 millimeters from the grinding wheel.

John Hansen & Mark Weathers

12/9/2014

Electrical Work Shop/240 Area

CLOSED

51

52

53

CP 200 - GENERAL SAFE WORK


PRACTICES

CP 200 - GENERAL SAFE WORK


PRACTICES

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 4 - Hand, Air, and Electrical Tools

Subcategory 6 - General Electrical


Requirements

Subcategory 6 - General Electrical


Requirements

21

Are shop machines (e.g., drill presses, fixed saws,


bench grinders, etc.) effectively fastened or
secured in place to prevent movement during
operation and use?

Are lamps for general illumination protected from


breakage, and metal shell sockets
grounded/earthed?

Are temporary lights properly suspended (i.e., not


suspended by their cords, unless they are so
designed)?

Normal

Normal

Normal

NO

NO

NO

The assessment team observed several shop


machines, a chop saw, and 2 drill presses that were
Review all shop machines to ensure that they have all
not fixed in place to prevent toppling of the equipment been fixed in place.
during use.

A number of storage containers/tool cribs and offices


had unprotected fluorescent light fixtures in use at
heights low enough to subject the bulbs to possible
breakage from contact.

"

Fluorescent bulbs have several hazards if broken.


Depending on the type, there may be a partial vacuum
or the lamp may be under pressure. Breaking the glass
can cause shrapnel injuries, along with the release of
mercury and other hazardous compounds. The
phosphor-coated glass can easily cut skin. If any
phosphor gets into a wound it can interfere with blood
clotting and healing. Infections are likely. Also, although
the amount of mercury in a typical bulb is relatively
Conduct an assessment of all office areas in the field and seavans to
small (5 mg), it is a toxic heavy metal that is in gaseous assure proper protection has been installed.
form when the bulb is hot and, therefore, can easily be
inhaled when released to the open air. Even in liquid
form (when bulbs are cool), mercury presents a severe
risk to health. Ensure that light fixtures that are installed
at a height low enough where bulb contact and breakage
is possible are properly protected with manufacturerprovided protective shields or covers or fabricated
covers.

Many of the large lights in the crusher building as well


Buy or manufacture proper fit for purpose brackets that
as several other areas are suspended by tying wire or
will allow the lights to be fixed securely in place. Also
bent welding rods, rather than a proprietary fit for
remove the wood packers that have been used.
purpose bracket.

"

John Hansen & Mark Weathers/Carlos


Fortio & Mauricio Fonseca

Electrical Work Shop/240 Area


& Weling Fabribrication
Shop/Primary Crusher

12/9/2014

CLOSED

John Hansen & Mark Weathers/ Area


Managers

Observed in all Areas/Multiple


Observations

12/18/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

John Hansen & Mark Weathers/ Area


Managers

Observed in all Areas/Multiple


Observations

12/12/2014

CLOSED

54

CP 200 - GENERAL SAFE WORK


PRACTICES

Subcategory 11 - Liquefied Petroleum Gas

Does the project prohibit the storage of liquefied


petroleum gas within buildings?

Normal

NO

A LPG cylinder was found stored in a tool crib along


with several cans of fuel.

LPG cylinders must not be stored in un-vented


enclosures such as tool cribs, they should be stored
upright in well ventilated areas.

Conduct specific tool box meeting with all work groups about proper
storage of chemicals and flammable products. Signs shall be
installed on all seavans (without adquate ventilation) to prohibit the
storage of specific chemicals and flammable products.

Area Managers

Observed in all Areas/Multiple


Observations

12/27/2014

\\amers.ibechtel.com\mining\Santiago\Projects\Xstrata\XCO-25

CLOSED

55

CP 201 - HOUSEKEEPING
REQUIREMENTS

Subcategory 4 - Materials, Tools, and


Equipment Management

11

Are appropriate fire prevention arrangements (fire


extinguishers, sand and water buckets, shovel)
stored adjacent to waste containers holding
flammable or combustible materials?

Normal

NO

All of the waste areas where wood and other


Areas where combustible materials must have fire
combustible materials are stored did not have any fire fighting capability close by, such as shovels sand
fighting capability close by.
buckets and or fire extinguishers.

Install fire extinguisher in the general area where trash bins are
established in each area.

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11

C. Fortio/M. Fonseca Area 1 & 2 (Closed)

OPEN

56

CP 201 - HOUSEKEEPING
REQUIREMENTS

Subcategory 8 - Health and Hygiene

Are all containers emptied on a regular basis and


wastes disposed of appropriately?

Normal

NO

Many of the small barrel containers in all areas were


observed to be in an overflowing condition.

Review the waste management system for the project


Develop a trash removal schedule by area for designated trash
and if needed have the barrel waste containers emptied disposal/pick up areas.
more frequently to avoid an overflow condition.

Area Managers

Observed in all Areas/Multiple


Observations

12/26/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

1/8/2015

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/22/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

57

CP 201 - HOUSEKEEPING
REQUIREMENTS

Subcategory 9 - Environmental Considerations

Does the project conduct regular inspections of


waste storage areas and areas prone to overflow
conditions?

Normal

NO

If such inspections are taking place they are less than


effective. The assessment team observed many of
Review the inspection program and if required conduct
the barrel waste containers in an overflowing
more frequent inspections.
condition.

Conduct specific tool box meeting with all work groups about
conducting physical inspection daily per the AST/STARRT process

Area Managers

Observed in all Areas/Multiple


Observations

CLOSED

58

CP 202 - HAZARD
COMMUNICATION PROGRAM

Subcategory 1 - General Responsibilities

Do Supervisors ensure that all hazardous


chemicals are properly labeled, stored, and
disposed of in accordance with the MSDSs?

Normal

NO

Corrosives and flammables, were observed stored


together in close proximity to each other, at the
Simeco contractor offices and in the XP camp.

Chemical compatibility storage information should be


reviewed so that the appropriate distance can be
Remove incompatible chemiclas from storage area (Simeco).
established between incompatible chemicals in storage. Conduct specific tool box meeting with Simeco work group about
Suggest a Toolbox Talk to communicate this information proper storage of chemicals, flammable , and incompatible products.
to project personnel.

Salvador Figueroa/Environmental

Simeco Seavan at the


Concentrator

CLOSED

59

CP 205 - PERSONAL PROTECTIVE


Subcategory 2 - Wearing Apparel
EQUIPMENT

Are finger rings or necklaces prohibited when


there is a danger of catching them on moving
parts or contacting energized conductors?

Normal

YES

Whilst the project do have a prohibition in place it is


not being observed, the assessment team observed
More effort is required from supervision in enforcing
several cases of metal finger rings, bracelets, watches
project policies.
being worn bay worked engaged in welding
operations.

Prepare a site specific project bulletin to be reviewed with all


workers about prohibiting wearing certain types of jewelry
during work activities.

Paul Anderson, Antonio Crovetto, &


Thomas Tansil

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/19/2015

Conducted Safety Toolbox Meeting all workers about wearing jewelry and loose clothing.

CLOSED

60

CP 205 - PERSONAL PROTECTIVE


Subcategory 6 - Hearing Protection
EQUIPMENT

Are all areas where hearing protection is required


properly posted with warning signs in English and
the language of the host country (if applicable)?

Normal

NO

The project have several areas where hearing


protection is required, however these areas have not
been posted with the required signs.

Supervision must properly evaluate their work areas for


hazards such as loud noise, and post the required
mandatory signage where required.

Conduct specific tool box meeting with all work groups about
hearing protection and warning signs for areas that exceed
85dbl.. Signage shall also be placed in these areas at any
enty or ext points.

C. Fortio/M. Fonseca Area 1 & 2


R.
Sequueros/S. Figueroa Area 3 Jeff
Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11

12/28/2015

NO PICTURE AVAILABLE

CLOSED

61

CP 207 - POWERED INDUSTRIAL


TRUCKS

Subcategory 1 - Material Handling


Requirements

20

Are all industrial truck steering wheels free of


spinner knobs or other such devices?

Normal

NO

While there are some trucks that have had their


spinner knobs removed, others were seen in use with
spinner knobs on the steering wheels. With the
exception of stand up operated forklifts designed for
one hand operation and the accommodation of a
counterbalanced truck for a disabled person, there is
no reason for the use of a spinner knob on industrial
lift trucks. Controls for lift, tilt, side-shift, and
automatic fork positioning, etc., should not be
operated while the truck is in motion. Activities such
as eating, drinking, using a radio, using a cell phone,
etc. are prohibited while the truck is in motion. Both
operators' hands, excluding the above exceptions,
should be on the steering wheel while in motion.

If any fork truck has a mechanical steering linkage


connecting the steering wheels to the steering hand
wheel, then spinner knobs cannot be used on the
steering hand wheel. Even if the truck has power
steering with a booster cylinder or power assist hydraulic
cylinder, if there is a mechanical linkage from the
steering gear box to the steering spider on the steering
axle, and to the wheels, a spinner knob must not be
installed on the steering hand wheel because when the
steer wheels hit something on the ground, the shock is
transmitted through the mechanical linkage to the
steering hand wheel, causing the hand wheel to "whip"
or spin in an uncontrolled manner. The operator's hand,
wrist, or arm can be seriously injured by the spinner
knob. Also, due to the poor lateral stability of forklifts
especially when not carrying a load, spinner knobs have
been a cause factor in lateral overturn accidents
because they allow for much quicker and sharper turns.
In addition to the potential for road reactions to cause
hand injuries and the overturn hazard, there is also the
possibility for serious head or chest injuries in the event
of an accident and an impact to the spinner knob occurs.
For these reasons, spinner knobs for normal use are
generally not permitted.

"

Alex Kimm & Roberto Laursen

Primery Crusher &


Concentrator

1/15/2015

All spinner knobs have been removed from the forklifts.

CLOSED

62

CP 207 - POWERED INDUSTRIAL


TRUCKS

Subcategory 3 - Operation Requirements

Are trucks found to be in an unsafe condition


promptly removed from service, tagged-out, and
not used until necessary repairs are made?

Normal

NO

The assessment team held several discussions with


industrial truck operators, during one of these
discussions it was found that the truck had numerous
faults, these faults were marked on the daily check list
but the truck was still in service.

Field supervision must review daily inspection sheets


and make sure that field equipment is fit for service, as
well as encouraging their workers to report defects up
the management chain for corrective action.

"

Alex Kimm & Roberto Laursen

Primery Crusher

12/30/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/30/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

63

CP 207 - POWERED INDUSTRIAL


TRUCKS

Subcategory 4 - Maintenance Requirements

Does the appropriate supervisor take corrective


actions when defects are discovered during the
daily inspections or otherwise?

Normal

NO

More effort is required from supervision. An Industrial


Supervision should be reviewing daily inspection sheets
trucks was observed in service with noted defects on
to make sure defects are being reported and corrected.
the daily inspection sheet.

"

Alex Kimm & Roberto Laursen

Primery Crusher

CLOSED

64

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 2 - Accommodations

Does each room used for sleeping purposes


contain at least 50 square feet (4.6 square meters)
of floor space for each occupant?

Normal

YES

The rooms used for craft workers have four people


sharing, the size of the room (9.7m2) equals only
The project have a deviation approved by GBU ES&H
2.4m2 per person, exceeding the requirements of CPmanagement.
210 and SWPP No. 4MP-T81-03111 "Construction of
Camp Facilities" of 4.6m2 per person.

"

NO PICTURE AVAILABLE

CLOSED

65

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 2 - Accommodations

Are beds or similar facilities spaced no closer than


36 inches (0.9 meters) both laterally and end to
end, and elevated at least 12 inches (0.3 meters)
from the floor?

Normal

YES

The beds in the in the supervisor accommodations,


which house two persons per room, are spaced 0.61m
The project have a deviation in place approved by GBU
(24") apart, less than the required 0.91m (36") of
ES&H management.
clearance, per CP-210 and SWPP No. 4MP-T81-03111
"Construction of Camp Facilities."

"

NO PICTURE AVAILABLE

CLOSED

66

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 2 - Accommodations

When double-deck bunks are used, are they


spaced not less than 48 inches (1.2 meters) both
laterally and end to end?

Normal

YES

The beds in the in the supervisor accommodations,


which house two persons per room, are spaced 0.61m
The project have a deviation in place approved by GBU
(24") apart, less than the required 0.91m (36") of
ES&H management, which includes bed spacing.
clearance, per CP-210 and SWPP No. 4MP-T81-03111
"Construction of Camp Facilities."

"

NO PICTURE AVAILABLE

CLOSED

67

CP 210 - TEMPORARY LABOR


CAMPS

Subcategory 2 - Accommodations

16

Are all exterior openings effectively screened with


16-mesh material (minimum)?

Normal

NO

The accommodation units being re-used from the


Antapaccay project do not have the required mesh
screens in place.

Install the required mesh screens per the requirements


of CP 210.

"

Armando Garza & Luis Palomino

MC Camp

12/5/2014

NO PICTURE AVAILABLE

CLOSED

68

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 1 - Fire Prevention General


Requirements

Does the project ensure that flammable and


combustible materials are not stacked or stored
against any temporary or permanent building,
structure, or storage facility?

Normal

NO

In the Simeco contractor area flammable products


were observed stored next to temporary stores and
office units, also at the BEO warehouse a chemical
storage unit containing flammable and combustible
products is placed directly against the warehouse
(igloo) building.

Relocate the flammable products to a safe location that


is not against any temporary building.

NO

Ventilation ports on flammable liquid lockers were


observed with bung seals missing in a number of
areas. Unless these ports are equipped with piped
ventilation to an outside location, the bung seals must
remain in place for the cabinet to perform as intended
by the manufacturer. Another cabinet in the project
warehouse had holes cut into the sides and a large
vent slot cut into the back.

Chemical storage cabinets, whether used for


flammables, corrosives, or pesticides/poisons, often
come with capped bung openings that allow ventilation.
While cabinet manufacturers may provide the bungs for
venting, ventilation for chemical storage cabinets is NOT
required or even recommended by any Federal
regulatory agency. Cabinet manufacturers include
venting bungs for users who are required to install
ventilation by state or local codes, or by individual
company or insurance carrier policies.

"

Alex Kimm & Roberto Laursen

BEO Puma Marca

1/15/2015

All chemicals removed form this area.

CLOSED

69

70

CP 211 - FIRE PREVENTION AND


PROTECTION

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 3 - Flammable and Combustible


Liquids

Subcategory 3 - Flammable and Combustible


Liquids

20

Are approved, properly labeled and grounded


storage cabinets supplied for the storage of
flammable liquids in quantities exceeding 15 U.S.
gallons (12.9 UK gallons)?

When welding and cutting in locations where


combustibles are exposed, are combustible
materials removed or protected with fire-resistant
blankets or equivalent, and is an adequate number
of approved fire extinguishers immediately
available?

Normal

Normal

NO

Evaluate all flammable storgae cabinets to check by location that


bung caps are in place if the cabintes are in an enclosed area.

Salvador Figueroa/Environmental/ES&H

Simeco Seavan at the


Concentrator

12/22/2014

CLOSED

Welding, grinding and cutting was seen to be taking


More effort is required, field supervision must ensure all
Conduct specific tool box meeting with affected personnel to comply
place with wood either used as a support for the work combustible materials are removed from any area where with the hot worl permit requirements prior to starting work.
or was laid in the area.
hot works are performed.

Area Managers

Observed in all Areas/Multiple


Observations

12/19/2014

NO PICTURE AVAILABLE

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

71

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 6 - Temporary Buildings

Have temporary buildings located outdoors that do


not contain or store flammable commodities been
properly separated from other structures that do
contain such commodities (minimum 10 feet/3
meters)?

Normal

NO

The assessment team observed several instances of


flammable chemicals being stored next to other
buildings.

72

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 7 - Inspection and Testing

Has the project developed and implemented


general and specific site inspection schedules?

Normal

NO

Discussions with the project ES&H team revealed that


Develop and implement the required general and
inspections are ad-hoc and not to any
specific inspection schedules.
formalized/agreed schedule.

Review storage locations and where they do not meet


requirements, move the chemicals to another area at
least 10 feet/3 metres from any other temporary
building.

"

Salvador Figueroa/Environmental

Simeco Seavan at the


Concentrator

"

Salvador Figueroa/Environmental

Simeco Seavan at the


Concentrator

Based the this assessment the flammable chemical are in a flammable staorage cabinet and
the tempory building is actually a seavan and is a durable metal structure.

NO PICTURE AVAILABLE

ClOSED

11/21/2014

1/15/2015

1/8/2015

WEEKLY PROGRAM INSPECTIONS BY RESCUE

CLOSED

73

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 7 - Inspection and Testing

Are general inspections conducted weekly


covering all construction areas, storage and lay
down areas, fabrication and painting areas?

Normal

NO

If such inspections are taking place observations made Review and revise the fire inspection process used on
Site specific cheklist will be developed for periodic (weekly)
by the assessment team indicate that they are less
the project to ensure that inspections are taking place at inspection of all work areas.
than effective.
the required frequency and that they are effective.

Salvador Figueroa/Environmental

Simeco Seavan at the


Concentrator

NO PICTURE AVAILABLE

1/8/2015

WEEKLY PROGRAM INSPECTIONS BY RESCUE

CLOSED

74

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 7 - Inspection and Testing

Are all inspections conducted to an agreed


standard and recorded using an Inspection
Checklist Record?

Normal

NO

Checklists are not used or recorded by the project.

Develop and implement the required inspections check


lists and maintain copies of the completed inspections
on file.

Site specific cheklist will be developed for periodic (weekly)


inspection of all work areas.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/8/2015

WEEKLY PROGRAM INSPECTIONS BY RESCUE

CLOSED

75

CP 211 - FIRE PREVENTION AND


PROTECTION

Subcategory 11 - Fire Protection Equipment

14

Are portable electric heaters equipped with a tip


alarm and an automatic shut-off that will turn the
heater off when tipped?

Normal

NO

The assessment team observed several portable


electric heaters in use on site that did not have the
required automatic cut-off device or tip alarm.

Review all locations for non-compliant heater and


remove from service or replace for the compliant type
with the tip alarm and automatic cut-off device.

Evaluate all all space heaters in the field and the offices to check the
automatic cut off device. Remove and replace all heaters without the
automatic cutt device.

Area Managers, BEO Tools & ES&H

Observed in all Areas/Multiple


Observations

C. Fortio/M. Fonseca Area 1 & 2 (Closed)

OPEN

76

CP 212 - FALL PROTECTION

Subcategory 1 - General Requirements

Do all supervisors and subcontractors evaluate all


overhead work for fall exposures and pre-plan and
install required fall protection systems prior to
assigning the work to employees?

Normal

NO

The assessment team observed several locations were More effort is needed from field supervision when it
Conduct specific tool box meeting with supervision on correct fall
fall protection requirements had not been properly
comes to the proper evaluation and planning of works at protection planning utilization. "Hands On" demonstration with form
and evaluation.
evaluated.
height.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

12/28/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

77

CP 212 - FALL PROTECTION

Subcategory 2 - Fall Protection Systems

Is the top rail of guard rail systems constructed of


2 X 4 in. (5 X 10 cm) lumber or equivalent material
approximately 42 inches (106.7 cm) above the
walking/working surface?

Normal

NO

In a number of areas the top rails of barricading are


only 36 inches (91.4 cm) above the walking/working
surface rather than the required 42 inches(106.7cm).

The project should perform a review of all barricades


All permanent handrials needs to reviewed and installed per site
constructed to bring the top rail to the required height of specific requirements
approximately 42 inches (106.7 cm).

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

12/28/2014

CLOSED

78

CP 212 - FALL PROTECTION

Subcategory 2 - Fall Protection Systems

Are floor opening covers marked "HOLE COVER DO NOT REMOVE?"

Normal

NO

Whilst some of the floor openings did have the


required signage a significant number did not.

Field supervision must apply more effort and make sure


hole covers are properly marked with the wording "HOLE
COVER - DO NOT REMOVE"

"

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

11/16/2014

CLOSED

79

CP 212 - FALL PROTECTION

Subcategory 2A - Fall Protection


Requirements (continued)

Is each retractable lifeline device equipped with a


rope tag line for extending the device to
elevations below the point of attachment?

Normal

NO

Whilst the majority of the retractable life lines were


equipped with a tag line, a large number were not.

Field supervision must make sure that retractable life


line are fitted with a tag line and not clipped to
scaffolding or as in the case of the flatbed trucks not
clipped up at top of the truck cab back board.

Install taglines on all retractable liflines that are fixed in one location
or on boom trucks.

C. Fortio/M. Fonseca Area 1 & 2


R.
Sequueros/S. Figueroa Area 3 Jeff
Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11

C. Fortio/M. Fonseca Area 1 & 2 (Closed)


15/01/2015

OPEN

80

CP 212 - FALL PROTECTION

Subcategory 2A - Fall Protection


Requirements (continued)

13

Are all access openings in platforms or catwalks


provided with closure devices such as ladder
gates?

Normal

NO

Whilst scaffolds do have ladder gates fitted the


assessment team observed at least 4 ladder gates
that were in the open position as the return closure
springs were not working.

Supervision must carefully inspect scaffold to ensure


they are complete and all components such as ladder
gates are fully functioning.

Physically inspect all gates prior to installation to assure it properly


close.

George Jaimes

Observed in all Areas/Multiple


Observations

12/22/2014

CLOSED

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

81

CP 214 - BARRICADES AND SIGNS Subcategory 2 - Wood Guardrails

Is the top rail made from a 2- by 4-inch (5 by 10


cm) board arranged such that the top of the 2- by
4-inch board (5 by 10 cm) is 42 inches (106.7 cm)
from the floor or platform level?

Normal

NO

In a number of areas the top rails of barricading are


only 36 inches (91.4 cm) above the walking/working
surface rather than the required 42 inches(106.7cm).

The project should perform a review of all barricades


All permanent handrials needs to reviewed and installed per site
constructed to bring the top rail to the required height of specific requirements
approximately 42 inches (106.7 cm).

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

1/5/2015

CLOSED

82

CP 214 - BARRICADES AND SIGNS Subcategory 6 - Safety Warning Signs

Are warning signs erected and displayed for fire


hazards, electrical equipment, openings, overhead
work, noisy areas, utilities, overhead power lines,
and other hazards?

Normal

NO

Areas were there are high noise such as compaction


The assessment team observed several noisy areas
plate works, nut tourquing and noisy machinery areas
that did not have the required warning signs in place. must have the required mandatory hearing protection
signage posted.

"

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

12/28/2014

NO PICTURE AVAILABLE

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

83

CP 215 - FLOOR AND WALL


OPENINGS

Subcategory 2 - Floor or Wall Penetrations

Are all floor holes covered with -inch (1.9 cm)


exterior-grade plywood or the equivalent?

Normal

NO

The assessment team observed several holes that had Holes must be properly covered with 3/4 inch (1.9 cm)
not been protected with a hole cover or a barricade.
marine plywood or by a substantial barricade.

"

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11

"

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11
ES&H

"

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11
ES&H

C. Fortio/M. Fonseca Area 1 & 2 (Closed)


15/01/2015

OPEN

84

CP 215 - FLOOR AND WALL


OPENINGS

Subcategory 4 - Cover Removal, Alteration,


and Marking

Does the supervisor inspect the area where the


cover or covers are to be removed to determine
what precautions are warranted?

Normal

NO

In one of the tunnels at the stock pile had some floor


plates had been removed, the workers were pulling
equipment up through the large hole with no fall
protection in place, it would appear that the
supervisor for the area had not evaluated this work in
advance of assigning the crew to the work.

Supervision assigning work that requires the removal of


floor plates must properly evaluate the work area and
make sure that engineering controls are put in place to
protect those who have to work at the opening.

C. Fortio/M. Fonseca Area 1 & 2 (Closed)


15/01/2015

OPEN

85

CP 215 - FLOOR AND WALL


OPENINGS

Subcategory 4 - Cover Removal, Alteration,


and Marking

Are all covers marked FLOOR OPENING - DANGER,


DO NOT REMOVE?

Normal

NO

A number of the hole covers observed did not have


the required signage on them.

Hole covers must be properly marked with the wording


"HOLE COVER - DO NOT REMOVE"

C. Fortio/M. Fonseca Area 1 & 2 (Closed)


15/01/2015

OPEN

86

CP 217 - CONFINED SPACE ENTRY Subcategory 6 - Special Precautions

Does the project utilize a Pre-Entry Checklist that


provides the action sequence for pre-entry
activities and lists the employee responsible for
the action?

Normal

YES

The pre-entry checklist in use does not address all the


items required by the CP, it is recommended that the
As stated
project revise the pre-entry checklist to include all the
required items in the CP checklist.

A checklist will be modified and implemented as a part of the onfined


space site specific procedure.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

12/28/2014

NO PICTURE AVAILABLE

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

87

CP 217 - CONFINED SPACE ENTRY Subcategory 6 - Special Precautions

Does the project utilize a Post-Entry Checklist that


provides the action sequence for post-entry
activities and lists the employee responsible for
the action?

Normal

NO

The post-entry checklist is not being used by the


project.

Revise the project procedure to include the post-entry


checklist.

A checklist will be developed and implemented as a part of the


onfined space site specific procedure.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

1/11/2015

Formal Quarterly inspection are being conducted for January 2015

CLOSED

88

CP 222 - PORTABLE LADDERS INSPECTION AND CONTROL

Subcategory 3 - Ladder Inspection


Requirements

Are the results of the quarterly inspections noted


on an inspection log and filed with the
Environmental, Safety, and Health Department?

Normal

Implement the required inspection log system for the


inspection of ladders.

NO

Inspection logs are not kept.

NO

UV exposed fiberglass tends to weather and degrade


with chalking resin and fading color. Also, the reinforcing
fibers in fiberglass rails may become exposed, resulting
Ladders not in use were observed throughout the site
in a condition known as "fiber bloom" or fiberglass fuzz.
both indoors and outside. Rarely were ladders not
Exposure to strong sunlight, and/or extreme cold can
Build Ladder rack with covers in all work locations to protect ladders
being used stored on any kind of storage racks, and
accelerate the condition. Fiber bloom does not affect a from the elements and sun light.
many were seen laying flat on the concrete deck floors
ladder's strength but it will affect the appearance and
or on the ground.
may cause users mild discomfort if exposed fibers
penetrate their skin. Stored ladders should be protected
from the elements.

"

George Jaimes

Observed in all Areas/Multiple


Observations

1/14/2015

NO PICTURE AVAILABLE

CLOSED

89

90

CP 222 - PORTABLE LADDERS INSPECTION AND CONTROL

CP 223 - CRANES AND LIFTING


OPERATIONS

Subcategory 4 - Storing and Transporting


Ladders

Subcategory 9 - Safety Signs and Markings

When not in use, are ladders stored on racks in


locations protected from the elements, with good
ventilation, away from excessive heat?

Are all warning signs posted in English and the


language of the host project?

Normal

Normal

NO

Most of the signs are in English and not in the local


language of Spanish.

Translate and produce the signs in Spanish and place


them adjacent to the English.

"

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Observed in all Areas/Multiple
Gamero/ I Palacios/J. Atalaya Area 8
Observations
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11
ES&H

OPEN

Alex Kimm & Roberto Laursen

Observed in all Areas/Multiple


Observations

OPEN

91

CP 226 - ELECTRICAL EQUIPMENT Subcategory 1 - 120V/240V Single Phase


AND ASSURED GROUNDING
Equipment

Is all electrical equipment plugged into cords and


receptacles equipped with a grounding/earthing
line?

Normal

NO

A number of the grounding rods observed were not


Grounding rods must be properly inserted such that an
properly installed such that an adequate grounding is
effecting ground is achieved.
provided.

YES

The GFCI are visually inspected, however the


inspection record is not specific to each GFCI present
in the panel, it is a block inspection, also it is
recommended that an electronic trigger test is
performed to confirm the trigger speed is as per the
manufacturers specification and has not deteriorated
as a best practice.

Most grounding not secured were very short. Ground rods should be
a minimum of .60 cm.

Alex Kimm & Roberto Laursen/Area


Observed in all Areas/Multiple
Managers/ John Hansen & Mark Weathers
Observations

12/30/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

12/25/2014

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED

92

CP 226 - ELECTRICAL EQUIPMENT


Subcategory 2 - GFCI/ELCB Requirements
AND ASSURED GROUNDING

Are all GFCIs/ELCBs inspected and checked as per


the quarterly program?

Normal

As stated

"

John Hansen & Mark Weathers

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

CLOSED

93

CP 226 - ELECTRICAL EQUIPMENT


Subcategory 4 - Distribution
AND ASSURED GROUNDING

Is the method of cable routing in a manner that


does not damage or affect the integrity of the
cable?

Normal

NO

A number of instances were noted in which cables


channeled through metal light housings and in one
The project should verify that cables entering
case through a metal floor plate, are not protected by distribution boxes are protected by rubber grommets
rubber grommets and / or there were additional
and that unused holes are covered.
unused holes without covers.

"

John Hansen & Mark Weathers

Observed in all Areas/Multiple


Observations

12/9/2014

CLOSED

94

CP 226 - ELECTRICAL EQUIPMENT


Subcategory 4 - Distribution
AND ASSURED GROUNDING

10

Are blanks used to protect exposed conductor


points in distribution panels where breakers have
been removed?

Normal

NO

Multiple instances were noted in which breaker


boxes/panels had open spaces or missing blanks,
exposing the energized buss.

The project should verify that blanks are in place where


breakers are removed from panels and boxes. This item
should be a focus in daily inspections of work areas.

"

John Hansen & Mark Weathers

Observed in all Areas/Multiple


Observations

12/12/2014

CLOSED

95

CP 227 - SAFETY WATCHES

Subcategory 3 - Man Way (or Entry) Watches

Is the Man Way Watch able to obtain additional


assistance easily (e.g., radio, horn, alarm, etc.)?

Normal

NO

During the assessment a confined space entry


preparation was observed, in discussions with the
Entry watch personnel must be equipped such that they
All Confined Space Entry watches will be provided with a radio or air
entry watch it was unidentified that he did not have a can easily summon help and raise an alarm in the event horn to alert supervision in case of an emergency.
telephone, radio or air horn for raising the alarm and of an incident.
summoning help in the event of an incident.

Percy Cardoza & Miguel Valdivia/ES&H

12/15/2014

Molly (Haug)

CLOSED

96

CP 229 - VEHICLE SAFETY


MANAGEMENT

Subcategory 2 - Pedestrian Routes

Are pedestrian routes free from obstructions and


have safe and even footing?

Normal

NO

The project has provided pedestrian walkways to


separate vehicles and pedestrians traveling on the
jobsite. However, several instances of large rocks
were noted on the walk paths within designated
pedestrian walkways.

NO

Bieber/Henrique Cabo Area 4 J.


The project should review all areas where mini busses
ZeballosF/De La Cruz/C. Donayre Area 5,
The assessment team observed a number of pick-up and pick-up truck are parking that are not designated
Evaluate all designated parking locations to assure adequate parking
6&7
F.
trucks and mini busses parked in congested areas or parking areas as well as project parking rules.
Observed in all Areas/Multiple
is available by area. Add or modify parking location to maintain
Gamero/ I Palacios/J. Atalaya Area 8
Observations
in roadways, by doing so obstructing access, not only Supervision must also make sure that all access road are vehicle capacity.
M. Lopez/J.
for equipment but potentially for emergency vehicles. not obstructed so that emergency equipment can access
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
areas in the event of an emergency.

The project should continually maintain the walk paths


and remove any obstructions or tripping hazards.

We will have ZAT team evaluate all designated walk ways to remove
large roaks and add gravel rock for better walkway surfaces.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

1/8/2015

NO PICTURE AVAILABLE

Q:\XCO-25635-Site\ESH\ES&H Las Bambas\9. Implementacin

CLOSED
R. Sequueros/S. Figueroa Area 3 Jeff

97

CP 229 - VEHICLE SAFETY


MANAGEMENT

Subcategory 6 - Driving Rules

21

Do drivers avoid parking in heavily congested


areas or where heavy equipment is in operation?

Normal

C. Fortio/M. Fonseca Area 1 & 2 (Closed)


15/01/2015

NO PICTURE AVAILABLE

Area 11

OPEN

98

CP 230 - NIGHT WORK

Subcategory 2 - Requirements

Are all points of exit, pathways, and muster points


clearly illuminated and marked?

Normal

NO

Whilst the project work areas are well light, there are
several areas that need attention such as, the PEE
points which not illuminated at night, the bus loading
area at the concentrator is not illuminated and some
of the other pedestrian areas need improvement.

Review the areas listed above and provide additional


lighting where required, consider the use of the balloon
type mast lights for some areas as they give a more
even all-round distribution of light and reduce glare.

Order specific type solar lighting for PEE areas.

Area Managers/ES&H

Observed in all Areas/Multiple


Observations

1/5/2015

NO PICTURE AVAILABLE

CLOSED

99

CP 318 - DRUG AND ALCOHOL


ABUSE TESTING

Subcategory 3 - Requirements

As a minimum, does the Project/Facility Drug and


Alcohol Abuse Testing Program screen for the
abuse or misuse of the drugs listed in CP-318,
Exhibit C?

Normal

NO

The project are only using the minimum five panel


analysis for Bechtel employees, all other project
personnel are only subjected to a two panel test
(marihuana and Cocaine).

The project should test all project personnel using the


minimum five panel test as per the requirements of CP
318.

Lissette Urday/Thomas Tansil

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

OPEN

100

CP 318 - DRUG AND ALCOHOL


ABUSE TESTING

Subcategory 4 - Training Requirements

Does supervisor training include information on


the effects of drugs, alcohol, and associated
paraphernalia on human performance, the
indications and symptoms of impairment, the
project/facility Drug and Alcohol Abuse Testing
requirements, and intervention actions?

Normal

NO

The project is not providing the required training for


supervisor in recognition of the signs of substance
abuse as required by the CP.

Develop the required training package and deliver to all


Develop and implement training for Supervisors.
supervisors.

Lissette Urday, Thomas Tansil & Jaime


Gonzalez

Observed in all Areas/Multiple


Observations

NO PICTURE AVAILABLE

OPEN

Critical

22

Several

19

Normal

59

OPEN
CLOSED

13
87

STATUS OF CLOSING

87%

CR NUMERO

CORE PROCESS NUMBER & TITLE

55

CP 201 - REQUERIMIENTOS DE
ORDEN Y LIMPIEZA

83

CP 215 - VANOS DE SUELOS Y


MUROS

84

CP 215 - VANOS DE SUELOS Y


MUROS

89

CP 222 - ESCALERAS PORTTILES


- INSPECCIN Y CONTROL

97

CP 229 - GESTIN DE
SEGURIDAD VEHICULAR

SUBCATEGORY NUMBER & TITLE

Subcategory 4 - Gestin de Materiales,


herramientras y equipos

QUESTION
NUMBER

11

Subcategory 2 - Orificios en suelos y muros

Subcategory 4 - Retiro de cubierta, alteracin


y sealizacin

Subcategory 4 - Almacenamiento y transporte


de escaleras

Subcategory 6 - Reglas de manejo

Critical
Several
Normal

21

ASSESSMENT QUESTION

PRIORITY
LEVEL

ANSWER

Se cuenta con los equipos apropiados para


prevencin de incendios (exintores, area y cubetas
de agua y palas) almacenados cerca de los
contenedores de residuos o materiales inflamables
o conbustible?

Normal

NO

Todos los orificios en piso se encuentran cubiertos


con madera contraplacada de 3/4 pulgadas (1.9
cm) o un equivalente.

Normal

NO

La supervisin inspecciona el rea donde las


cubiertas van a ser removidas para determinar las
precausiones necesarias?

Normal

NO

Cuando no se utilizan, las escaleras son


almacenadas en bastidores en lugares protegidos
con buena ventilacin y lejos de calor excesivo.

Normal

NO

Los conductores evitan estacionarse en reas


congestionadas o donde hay operaciones de
equipo pesado?

Normal

NO

COMMENTS

Todas las reas de residuos donde se almacenan


madera y otros materiales combustibles no tena
ninguna capacidad de lucha contra incendio cerca.

El equipo auditor observ en varios orificios que no


estaban protegidos con una cubierta adecuada o una
barricada.

En uno de los tneles en el Stock pile se observa


algunas cubiertas que fueron removidas, los
trabajadores jalaban equipo a travez del gran agujeron
sin proteccin contra cada, aparentemente la
supervisin del area no haba evaluado este trabajo
asignado a la cuadrilla.

Las escaleras que no se utilizan se observaron al


interior y exterior. En muy pocos lugares se observ
escaleras que no estaban siendo utilizadas
almacenadas en un tipo de bastidores y muchas
gueron observadas en el piso o en plataformas de
concreto.

El equipo auditor observ un nmero de camionetas


Pick-ups y mini busses estacionados en reas
congestionadas, obstruyendo el acceso, no solo para
equipos sino tambien para vehculos de emergencia.

RECOMMENDATIONS

Las reas donde se encuentras materiales combustibles


deben tener cerca equipos contra incendios con la
capacidad suficiente, como contenedores de arena o
extintores.

Los vanos deben ser cubiertos adecuadamente con una


madera contraplacada de 3/4'' (1.9 cm) o con una
barricada dura.

La supervisin que asigna el trabajo, que necesita


remover una cubierta de vano, debe evaluar
apropiadamente el area de trabajo para asegurar que los
controles de ingeniera sean implementados para
proteger a lostrabajadores que se encuentren en o cerca
del vano.
La exposicin UV de la fibra de vidrio tiende a
degradarse con el tiempo.
Tambien, las fibras de refuerzo en los carriles de fibra de
vidrio podran resultar expuesto en una condicin de de
los carriles de el refuerzo de "fiber bloom" o pelusa de
fibra de vidrio. La exposicin a la luz solar y/o al frio
extremo puede acelerar la condicin. La pelusa de fibra
de vidrio no afecta a las escaleras, pero si puede afectar
la apariencia y puede causar molestias en los usuarios si
es que la fibra penetra su piel. El almacenamiento de
estas escaleras deberan estar protegidos de estos
elementos.

El proyecto debe revisar en todas las reas donde hay


minibuses y camionetas pick-up estacionadas en areas
que no estan designadas como estacionamiento. La
supervisin debe asegurar que todas las rutas de acceso
no se encuentren obstruidas de tal manera que los
equipos de emergencia tengan acceso a las areas en
caso de emergencia.

PROJECT SPECIFIC CORRECTIVE ACTION

Instalar extintor de incendios en el rea general donde los


contenedores de basura estn puestos en cada rea establecida.

RESPONSIBLE PERSON(S)

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F. Gamero/ I Palacios/J. Atalaya
Area 8
M. Lopez/J. Mozombite
Area 9
P. Cardova/M. Valdivia Area
10
X. Brito/W. Torrico Area 11

"

C. Fortio/M. Fonseca Area 1 & 2


R.
Sequueros/S. Figueroa Area 3 Jeff
Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F. Gamero/ I Palacios/J. Atalaya
Area 8
M. Lopez/J. Mozombite
Area 9
P. Cardova/M. Valdivia Area
10
X. Brito/W. Torrico Area 11

"

C. Fortio/M. Fonseca Area 1 & 2


R.
Sequueros/S. Figueroa Area 3 Jeff
Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F. Gamero/ I Palacios/J. Atalaya
Area 8
M. Lopez/J. Mozombite
Area 9
P. Cardova/M. Valdivia Area
10
X. Brito/W. Torrico Area 11

Construir un portaescaleras con cubiertas en todos los lugares de


trabajo para proteger las escaleras de los elementos y la luz del sol.

R. Sequueros/S. Figueroa Area 3 Jeff


Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F.
Gamero/ I Palacios/J. Atalaya Area 8
M. Lopez/J.
Mozombite Area 9
P. Cardova/M.
Valdivia Area 10
X. Brito/W. Torrico
Area 11
ES&H

Evaluar todos los lugares de estacionamiento para asegurar que


haya suficiente estacionamiento disponible por rea. Aadir o
modificar la ubicacin de estacionamiento para mantener la
capacidad de vehculos.

C. Fortio/M. Fonseca Area 1 & 2


R.
Sequueros/S. Figueroa Area 3 Jeff
Bieber/Henrique Cabo Area 4 J.
ZeballosF/De La Cruz/C. Donayre Area 5,
6&7
F. Gamero/ I Palacios/J. Atalaya
Area 8
M. Lopez/J. Mozombite
Area 9
P. Cardova/M. Valdivia Area
10
X. Brito/W. Torrico Area 11

LOCATION

Observado en todas las reas/Mltiples


Observaciones

Observado en todas las reas/Mltiples


Observaciones

Observado en todas las reas/Mltiples


Observaciones

Observado en todas las reas/Mltiples


Observaciones

PHOTOGRAPH OF FINDNG

Observado en todas las reas/Mltiples


Observaciones

NO PICTURE AVAILABLE

PHOTOGRAPH OF CORRECTION OR ATTACHED EVIDENCE

STATUS
(Open/Closed)

DATE

OBSERVACIONES

ABIERTO

C. Fortio/M. Fonseca Area 1 & 2 (Closed)

ABIERTO

3.Se reviso la altura de las barricadas rigidas con una


wincha para verificara que la altura cumple segun
requerimiento. C. Fortio/M. Fonseca Area 1 & 2
(Closed)

ABIERTO

C. Fortio/M. Fonseca Area 1 & 2 (Closed)

ABIERTO

ABIERTO

C. Fortio/M. Fonseca Area 1 & 2 (Closed)