Rev 3
SAIC NUMBER
SAIC K-4001
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
HVAC
CONTRACTOR / SUBCONTRACTOR
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ACCEPTANCE CRITERIA
REFERENCE
Receiving
A1
SAES-K-001
Para 4.8.9.1
A2
SAES-K-001
Para 4.8.9.1
A3
SAES-K-001
Para 4.8.9.1
A4
SAES-K-001
Para 4.8.9.1
A5
SAES-K-100
Section 1
A6
SAES-K-100
Section 1
A7
SAES-K-100
Section 1
A8
SAES-K-001
Para 4.8.1.2.1
A9
SAES-K-001
Para 4.8.1.2.2
B1
PASS
Schedule Q
Section 5, Att. IV
* Verification is required by checking the equipment submittal if verification is not possible by visual inspection
Page 1 of 2
QR NUMBER
15-Dec-09
EQPT CODE
ITEM
No.
30-Jun-08
DATE APPROVED
FAIL
N/A
RE-INSP DATE
Rev 3
SAIC NUMBER
SAIC K-4001
PROJECT TITLE
30-Jun-08
DATE APPROVED
WBS / BI / JO NUMBER
QR NUMBER
15-Dec-09
HVAC
CONTRACTOR / SUBCONTRACTOR
REMARKS:
REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 25 November, 2006
2-SAES-K-100 -- Saudi Aramco Mechanical (HVAC) Code, 31 May, 2004
3-Schedule "Q" -- Saudi Aramco Quality Requirements
4-Uniform Mechanical Code (UMC), 1997
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 2
N = NO F = FAILED