You are on page 1of 1

Federal Register / Vol. 70, No.

23 / Friday, February 4, 2005 / Notices 6005

2005 has been Extended to 03/01/ ERP No. D–NIH–G84000–TX Rating U.S. Army Corps of Engineers as the
2005. LO, Galveston National Laboratory for Aquatic Resources Mitigation Plan is
Dated: February 1, 2005. Biodefense and Emerging Infectious finalized and the Clean Water Act
Robert W. Hargrove,
Diseases Research Facility at the Section 404 permit application is
University of Texas Medical Branch, reviewed.
Director, NEPA Compliance Division, Office
of Federal Activities.
Construction, Partial Funding, Grant, ERP No. F–FTA–D54041–VA Dulles
Galveston, TX.
[FR Doc. 05–2177 Filed 2–3–05; 8:45 am] Corridor Rapid Transit Project, High-
Summary: EPA had no objection to
BILLING CODE 6560–50–P
the selection of the preferred alternative. Quality and High-Capacity Transit
However, EPA asked that the Final EIS Service in the Dulles Corridor, West
include a discussion of general air Falls Church Metrorail Station in
ENVIRONMENTAL PROTECTION Fairfax County to the Vicinity of Route
quality conformity.
AGENCY ERP No. D–STB–G53010–TX Rating 772 in Loudoun County, VA.
[ER–FRL–6660–3] EC2, Southwest Gulf Railroad Project, Summary: EPA’s comments have been
Construction and Operation Exemption, adequately addressed in the Final EIS
Environmental Impact Statements and To Transport Limestone from Vulcan and has no objections to the preferred
Regulations; Availability of EPA Construction Materials (VCM) Quarry to alternative.
Comments Del Rio Subdivision, Medina County,
ERP No. F–IBR–K39088–CA
Availability of EPA comments TX.
Summary: EPA expressed Sacramento River Settlement
prepared pursuant to the Environmental Contractors (SRSC), To Renew the
environmental concerns about the
Review Process (ERP), under Section Settlement Contractors Long-Term
proposed project regarding the Spill
309 of the Clean Air Act and Section Contract Renewal for 145 Contractors,
Prevention, Containment and
102(2)(c) of the National Environmental Central Valley Project (CVP),
Countermeasure Plan, aquatic steam
Policy Act, as amended. Requests for Sacramento River, Shasta, Tehama,
crossing mitigation measures, and air
copies of EPA comments can be directed Butte, Glenn, Colusa, Sutter, Yolo,
quality impacts.
to the Office of Federal Activities at Sacramento, Portion of Placer and
(202) 564–7167. Final EISs Solano Counties, CA.
An explanation of the ratings assigned ERP No. F–BIA–L02031–OR Wanapa
to draft environmental impact Summary: EPA expressed continuing
Energy Center, Construction and concerns regarding direct, indirect, and
statements (EISs) was published in the Operation a New 1,200 Megawatt (MW)
Federal Register dated April 2, 2004 (69 cumulative impacts to water quality
Natural Gas-Fired Electric Power associated with the contract renewals.
FR 17403). Generating Facility, Confederated Tribes EPA requested additional information
Draft EISs of the Umatilla Indian Reservation on water quality degradation in the area,
(CTUIR), in the City of Hermiston and water demand calculations, and
ERP No. D–FAA–E51051–FL Rating the Port of Umatilla, OR.
EC2, Panama City-Bay County methods of water conservation that will
Summary: No formal comment letter
International Airport (PFN), Proposed be implemented.
was sent.
Relocation to a New Site, NPDES Permit ERP No. F–FHW–D40093–PA City of ERP No. F–USA–J11020–UT
and U.S. Army COE Section 404 Permit, Lebanon Bridge Over Norfolk Southern Activities Associated with Future
Bay County, FL. Railroad Tracks Construction Project, Programs at U.S. Army Dugway Proving
Summary: EPA expressed concerns 12th Street to Lincoln Avenue, Funding, Ground, Implementation, Tooele and
due to wetland and secondary impacts, Lebanon County, PA. Jaub Counties, UT.
and requested additional information on Summary: EPA has no objections to Summary: No formal comment letter
secondary development and impacts the preferred alternative.
induced by the proposed airport was sent.
ERP No. F–FHW–F40408–00 Trunk
relocation, wetland mitigation, and the Highway 60 Reconstruction Project, ERP No. FB–FTA–L40205–00 South
sponsor’s site selection process. Improvements from 1.8 miles south of Corridor Project, I–205/Portland Mall
ERP No. D–FHW–H40183–00 Rating the Minnesota-Iowa Border (120th Light Rail (Phase I), Selected the Locally
LO, Council Bluffs Interstate System Street) to I–90 north of the City of Preferred Alternative (LPA), Clackamas
Improvements Project, Transportation Worthington, Funding, U.S. Army COE and Multnomah Counties, OR.
Improve from Missouri River on I–80 to Section 404 and NPDES Permits Summary: No formal comment letter
East of the I–480 Interchange, (Tier 1), Issuance, Nobles County, MN and was sent.
Pottawattamie County, IA and Douglas Osceola County, IA.
County, NB. ERP No. FS–GSA–G80000–TX Del Rio
Summary: EPA has no objections to
Summary: EPA has no objections to Port of Entry (POE), Increased Security
the preferred alternative.
the proposed project. ERP No. D–FRC– ERP No. F–FRC–G03022–LA Sabine Measures Associated with Phase II
G03023–TX Rating EC2, Cheniere Pass Liquefied Natural Gas (LNG) and Expansion, Supplement to the 1992 Del
Corpus Christi Liquefied Natural Gas Pipeline Project, Construction and Rio Border Patrol Station, Del Rio, Val
(LNG) Project, To Provide Facilities for Operation LNG Import Terminal and Verde County, TX.
the Importation, Storage and Natural Gas Pipeline Facilities, Several Summary: EPA has no objections to
Vaporization of Liquefied Natural Gas, Permits, Cameron Parish, LA. the proposed project.
Nueces and San Patricio Counties, TX. Summary: EPA expressed Dated: February 1, 2005.
Summary: EPA expressed environmental concerns and requested
environmental concerns and requested additional information regarding post- Robert W. Hargrove,
additional information regarding construction monitoring of wetland Director, NEPA Compliance Division, Office
wetlands mitigation measures, the mitigation and sediment toxicity testing of Federal Activities.
potential for invasive species of dredged material. EPA will also [FR Doc. 05–2178 Filed 2–3–05; 8:45 am]
introduction, and air quality impacts. continue coordination efforts with the BILLING CODE 6560–50–P

VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\04FEN1.SGM 04FEN1

You might also like