7096 Federal Register / Vol. 70, No.

27 / Thursday, February 10, 2005 / Notices

document is added to a subscribed DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY


docket(s). For assistance with any FERC
Online service, please e-mail Federal Energy Regulatory Federal Energy Regulatory
FERCOnlineSupport@ferc.gov, or call Commission Commission
(866) 208–3676 (toll free). For TTY, call [Docket No. ER01–1807–016, et al.]
(202) 502–8659. Notice of New Docket Query Service in
eLibrary Carolina Power & Light Company, et
Comment Date: February 23, 2005.
February 3, 2005. al.; Electric Rate and Corporate Filings
Magalie R. Salas,
Secretary. Take notice that, effective January 24, February 3, 2005.
[FR Doc. E5–543 Filed 2–9–05; 8:45 am] 2005, the Commission added a New The following filings have been made
Docket Query service to its eLibrary with the Commission. The filings are
BILLING CODE 6717–01–P
system. This service is accessible from listed in ascending order within each
the Search New Docket Numbers (New docket classification.
DEPARTMENT OF ENERGY Dockets) link on the eLibrary home 1. Carolina Power & Light Company,
page. Florida Power Corporation
Federal Energy Regulatory ‘‘New Dockets’’ enables any interested [Docket Nos. ER01–1807–016 and ER01–
Commission person to determine the new docket or 2020–013]
subdocket number for a new filing as Take notice that on January 31, 2005,
[Docket No. EL05–56–000] soon as the docket or subdocket number Carolina Power & Light Company d/b/a
is assigned. After a docket number is Progress Energy Carolinas, Inc. (CP&L)
Connecticut Department of Public assigned to the new filing, Commission submitted a refund report pursuant to
Utility Control Complainant, v. ISO New staff get the filing ready for eLibrary and the Commission’s order issued May 21,
England and New England Power Pool issue a notice of filing. 2003 in Docket Nos. ER01–1807–005, et
Respondent; Notice of Amended al., 103 FERC ¶ 61,209 (2003).
‘‘New Dockets’’ works only for
Complaint and Extension of Time CP&L states that copies of the filing
dockets or subdockets assigned on or
February 4, 2005. after January 24, 2005. The query were served on the North Carolina
defaults to the current date, but users Utilities Commission and the South
On January 14, 2005, Connecticut Carolina Public Service Commission.
Department of Public Utility Control may enter any date range beginning on
or after January 24, 2005, provided the Comment Date: 5 p.m. eastern time on
(CT DPUC), submitted a petition to the February 22, 2005.
Commission for an order directing the range does not exceed 10 calendar days.
New England Power Pool (NEPOOL) The query returns a list of dockets and 2. Allegheny Energy Supply Lincoln
subdockets assigned up to the time of Generating Facility, LLC
and ISO New England (ISO–NE) to
amend the currently effective NEPOOL the query for the specified date or date [Docket No. ER01–2066–004]
Open Access transmission Tariff range.
Take notice that on January 31, 2004
(OATT) and the superseding OATT of For each new docket/subdocket in the Lincoln Generating Facility, LLC
the Regional Transmission Organization query results, the list displays the (Lincoln) formerly, Allegheny Energy
for New England (RTO–NE), approved docket or subdocket creation date, the Supply Lincoln Generating Facility,
by the Commission in ISO New filed date, the docket description, and LLC, filed with the Commission a notice
England, Inc.,106 FERC ¶ 61,280 (2004). the applicant(s). If the associated of change in status in connection with
The Commission issued a Notice of document is in eLibrary at the time of the transfer of the membership interests
Complaint on January 18, 2005, and the query, there is a link to the Docket that were held by Allegheny Energy
established February 7, 2005, as the date or subdocket report. Supply Company, LLC in Lincoln,
for comments and answers to the The results page also provides a link which owns and operates an
complaint. On February 2, 2005, approximately 672-megawatt generating
to the Commission’s eSubscription
CTDPUC filed an amendment to its facility located in Manhattan, Illinois, to
service so that users can subscribe to a
original complaint. the Grant Peaking Power Holdings, LLC
docket of interest and receive e-mail
and Colbath Peaking Power, LLC.
The Commission is hereby extending notification when documents are added Comment Date: 5 p.m. eastern time on
the time to file answers to the to eLibrary. February 22, 2005.
complaint, as amended on February 2, Questions about the ‘‘New Dockets’’
2005. Accordingly, responses to 3. Midwest Independent Transmission
service may be directed to Brooks Carter
CTCPUC’s complaint, as amended, are System Operator, Inc.
at 202–502–8145 or
to be filed on or before February 22, brooks.carter@ferc.gov. If you need [Docket Nos. ER03–86–008, ER03–83–007]
2005. assistance or to report problems using Take notice that on January 28, 2004,
‘‘New Dockets,’’ e-mail the Midwest Independent Transmission
Magalie R. Salas,
FERCOnlineSupport@ferc.gov or call 1– System Operator, Inc. (Midwest ISO),
Secretary. submitted proposed revisions to the
866–208–3676 (toll free), or 202–502–
[FR Doc. E5–567 Filed 2–9–05; 8:45 am] Midwest ISO open access transmission
6652 (local).
BILLING CODE 6717–01–P tariff, regarding the removal of all
Magalie R. Salas, TRANSLink references from the OATT
Secretary. in compliance with the Commission’s
[FR Doc. E5–544 Filed 2–9–05; 8:45 am] order issued December 29, 2004 in
BILLING CODE 6717–01–P Docket No. ER03–83–004, et al., 109
FERC ¶ 61,374. Midwest ISO requests an
effective date of October 30, 2004.

VerDate jul<14>2003 16:20 Feb 09, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
Federal Register / Vol. 70, No. 27 / Thursday, February 10, 2005 / Notices 7097

The Midwest ISO states that it has 6. PJM Interconnection, L.L.C. regard to the compliance directives in
electronically served a copy of this Operating Companies, et al. Docket No. ER05–155–000.
filing, with attachments, upon all [Docket Nos. ER04–776–002 and ER04–776–
The ISO states that this filing has been
Midwest ISO members, member 004] served upon all parties on the official
representatives of Transmission Owners Take notice that on January 18, 2005, service list for the captioned docket. In
and Non-Transmission Owners, the as amended on January 21, 2005, the addition, the ISO states it has posted
Midwest ISO Advisory Committee Pennsylvania Public Utility Commission this filing on the ISO Home Page.
participants, as well as all states (PaPUC) filed a State Certification Comment Date: 5 p.m. eastern time on
commissions within the region. In setting out certain representations and February 22, 2005.
addition, Midwest ISO states that the warranties with respect to the treatment 10. Allegheny Power
filing has been electronically posted on of confidential information disclosed by
[Docket No. ER05–512–000]
the Midwest ISO’s Web site at http:// PJM Interconnection, L.L.C. and/or PJM
www.midwestiso.org. under the heading Market Monitor pursuant to section Take notice that on January 31, 2005
‘‘Filings to FERC’’ for other interested 18.17.4 of the Amended and Restated Monongahela Power Company, The
Operating Agreement of PJM Potomac Edison Company, and West
parties in this matter. The Midwest ISO
Interconnection, L.L.C. Penn Power Company, all doing
indicates that it will provide hard
Comment Date: 5 p.m. eastern time on business as Allegheny Power, filed eight
copies to any interested parties upon
February 11, 2005. (8) First Revised Interconnection and
request. Operating Agreements entered into with
Comment Date: 5 p.m. eastern time on 7. California Independent System Allegheny Power’s affiliate, Allegheny
February 18, 2005. Operator Corporation Energy Supply Company, LLC (AE
[Docket No. ER05–149–002] Supply). Allegheny Power states that
4. Allegheny Power System Operating
Take notice that on January 31, 2005, the purpose of the revisions is to add a
Companies: Monongahela Power monthly charge to compensate
Company; Potomac Edison Company; the California Independent System
Operator Corporation (ISO) submitted a Allegheny Power for AE Supply’s use of
and West Penn Power Company, All d/ Allegheny Power’s distribution system
b/a Allegheny Power; PHI Operating filing in compliance with the
Companies: Potomac Electric Power Commission’s December 30, 2004 Order to deliver the output of the generating
in Docket Nos. ER05–149–000 through facilities to the Allegheny Power
Company, Delmarva; Power & Light
ER05–155–000, 109 FERC ¶ 61,391, with transmission system. Allegheny Power
Company, and Atlantic City Electric requests an effective date of April 1,
regard to the compliance directives in
Company; Baltimore Gas and Electric Docket No. ER05–149–000. 2005.
Company; Jersey Central Power & Light The ISO states that this filing has been Comment Date: 5 p.m. eastern time on
Company; Metropolitan Edison served on all parties on the official February 22, 2005.
Company; PECO Energy Company; service list for the captioned docket. In 11. PJM Interconnection, L.L.C.
Pennsylvania Electric Company; PPL addition, the ISO states it has posted
Electric Utilities Corporation; Public this filing on the ISO Home Page. [Docket No. ER05–513–000]
Service Electric and Gas Company; Comment Date: 5 p.m. eastern time on Take notice that on January 31, 2005,
Rockland Electric Company; UGI February 22, 2005. the PJM Transmission Owners, acting
Utilities, Inc. through the PJM and West Transmission
8. California Independent System
Owners Agreement Administrative
[Docket No. ER04–156–006] Operator Corporation
Committees, submitted revisions to
Take notice that on January 31, 2005, [Docket No. ER05–151–002] Schedule 12 of the PJM Interconnection,
Allegheny Power System Operating Take notice that on January 31, 2005, L.L.C. (PJM) Open Access Transmission
Companies, et al. (PJM Settling the California Independent System Tariff, to establish the procedures by
Transmission Owners) submitted a Operator Corporation (ISO submitted a which the PJM Transmission Owners
filing on intra-PJM rate design pursuant filing in compliance with the may, if they so choose, recover the costs
to the settlement agreement filed on Commission’s December 30, 2004 Order incurred in constructing new
May 26, 2004 in Docket No. ER04–156– in Docket Nos. ER05–149–000 through transmission facilities and to harmonize
000, et al. ER05–155–000, 109 FERC ¶ 61,391, with the rate treatment of new and existing
regard to the compliance directives in facilities. The PJM Transmission
Comment Date: 5 p.m. eastern time on Docket No. ER05–151–000. Owners state that this filing is being
February 22, 2005. The ISO states that this filing has been made to satisfy the obligation regarding
5. Diverse Power Incorporated served on all parties on the official the harmonization of rate treatment for
service list and posted on the ISO Home new and existing facilities undertaken
[Docket No. ER04–444–002] Page. by certain PJM Transmission Owners in
Take notice that on January 31, 2005, Comment Date: 5 p.m. eastern time on the settlement agreement in Docket Nos.
Diverse Power Incorporated, an Electric February 22, 2005. ER04–156–000, et al. (Settlement
Membership Corporation (Diverse Agreement) approved by the
9. California Independent System
Power) submitted for filing with the Commission on August 9, 2004,
Operator Corporation
Commission its triennial updated Allegheny Power System Operating Cos.,
[Docket No. ER05–155–002] et al., 108 FERC ¶ 61,167 (2004). The
market analysis in accordance with
Take notice that on January 31, 2005, PJM Transmission Owners state that the
Appendix A of the Commission’s letter
the California Independent System tariff sheets have an effective date of
order issued January 30, 2002 in Docket Operator Corporation (ISO) submitted a June 1, 2005, in accordance with the
No. ER02–476–000. filing in compliance with the Settlement Agreement.
Comment Date: 5 p.m. eastern time on Commission’s December 30, 2004 Order The PJM Transmission Owners state
February 22, 2005. in Docket Nos. ER05–149–000 through that copies of the filing were served
ER05–155–000, 109 FERC ¶ 61,391, with upon all PJM Members, the regulatory

VerDate jul<14>2003 16:20 Feb 09, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
7098 Federal Register / Vol. 70, No. 27 / Thursday, February 10, 2005 / Notices

commissions in the PJM Region and Facilities Agreements, submitted (Service Agreement) between SPP and
parties listed on the official service list pursuant to the Procedures for Tex-La Electric Cooperative of Texas,
in Docket Nos. ER04–156, et al. Implementation of section 3.3 of the Inc. (Tex-La), as well as an unexecuted
Comment Date: 5 p.m. eastern time on 1987 Agreement between PG&E and the Network Operating Agreement (NOA)
February 22, 2005. City and County of San Francisco (City) between SPP, Tex-La and American
(Procedures) that were approved by this Electric Power Company (AEP). SPP
12. Avista Corporation
Commission in Docket No. ER99–2532– seeks an effective date of January 1,
[Docket No. ER05–514–000] 000 and recently updated in a 2005 for both the Service Agreement
Take notice that on January 31, 2005, negotiated clarifying supplement filed and the NOA.
Avista Corporation (Avista Corp) filed a in the parties’ settlement in Docket No. SPP states that both Tex-La and AEP
Non-conforming Long-Term Firm Point- ER04–215–000. PG&E states that this is were served with a copy of this filing.
to-Point Service Agreement between PG&E’s eighth quarterly filing submitted Comment Date: 5 p.m. eastern time on
Avista Corp and the Spokane Tribe of pursuant to section 4 of the Procedures. February 22, 2005.
Indians under Avista Corp’s FERC PG&E states that copies of this filing
18. Southwest Power Pool, Inc.
Electric Tariff Volume No. 8. Avista have been served upon City, the
Corp requests an effective date of April California Independent System Operator [Docket No. ER05–520–000]
1, 2005. Corporation, and the California Public Take notice that on January 31, 2005,
Avista Corp states that copies of the Utilities Commission. Southwest Power Pool, Inc. (SPP)
filing were served on the Spokane Tribe Comment Date: 5 p.m. eastern time on submitted for filing an unexecuted
of Indians. February 22, 2005. service agreement for Network
Comment Date: 5 p.m. eastern time on 15. PJM Interconnection, L.L.C. Integration Transmission Service
February 22, 2005. (Service Agreement) between SPP and
[Docket No. ER05–517–000] East Texas Electric Cooperative (ETEC),
13. Baltimore Gas and Electric
Take notice that on January 31, 2005, as well as an unexecuted Network
Company and Pepco Holdings, Inc.
PJM Interconnection, L.L.C. (PJM), Operating Agreement (NOA) between
Operating Affiliates: Potomac Electric
submitted for filing an executed SPP, ETEC and American Electric Power
Power Company, Delmarva Power &
interconnection service agreement Company. SPP seeks an effective date of
Light Company, and Atlantic City
among PJM, FirstEnergy Nuclear January 1, 2004 for both the Service
Electric Company
Operating Company, Duquesne Light Agreement and the NOA.
[Docket No. ER05–515–000] Company, and American Transmission SPP states that ETEC and American
Take notice that on January 31, 2005, Systems, Inc. PJM requests an effective Electric Power Company were served
Baltimore Gas and Electric Company date of January 1, 2005. with a copy of this filing.
(BGE) and the public utility operating PJM states that copies of this filing Comment Date: 5 p.m. eastern time on
affiliates of Pepco Holdings, Inc.: were served on the parties to the February 22, 2005.
Potomac Electric Power Company, agreement and the state regulatory
19. ISO New England Inc.
Delmarva Power and Light Company, commissions within the PJM region.
and Atlantic City Electric Company Comment Date: 5 p.m. eastern time on [Docket No. ER05–521–000]
(collectively, the Transmission Owners) February 22, 2005. Take notice that on January 31, 2005,
tendered for filing revised sheets to the 16. Southern Company Services, Inc. ISO New England Inc. (the ISO)
PJM Interconnection, L.L.C. Open submitted an unexecuted market
Access Transmission Tariff to [Docket No. ER05–518–000] participant service agreement (MPSA)
implement a transmission cost of Take notice that, on January 31, 2005, on behalf of certain entities, identified
service formula rate for the Southern Company Services, Inc. acting in the filing, that are currently New
Transmission Owners. A June 1, 2005 as agent for Alabama Power Company, England Power Pool Participants. The
effective date is requested. Georgia Power Company, Gulf Power ISO proposes to include the MPSA
BGE and the Transmission Owners Company, Mississippi Power Company, within Attachment E of the ISO’s
state that a copy of the filing is being and Savannah Electric and Power Transmission, Markets and Service
served on representatives of PJM, the Company (collectively, Southern Tariff, FERC Electric Tariff No. 3, as
public utility commissions of each state Companies), filed a transmission service Service Agreement No. 1. The ISO states
in which the Transmission Owners agreement designated as Third Revised that MPSA sets the basic terms and
operate, and the PJM members (which Service Agreement No. 472 under the conditions under which the ISO will
includes all affected transmission Open Access Transmission Tariff of provide services and a Market
customers), and is also available for Southern Companies, FERC Electric Participant may participate in the
inspection at the Transmission Owners’ Tariff, Fourth Revised Volume No. 5. markets and programs administered by
offices. BGE and the Transmission Southern Companies state that a copy the ISO as a regional transmission
Owners further state that the filing is of the filing was forwarded to Morgan organization.
being posted on the ListServ compiled Stanley Capital Group, the counterparty The ISO also submitted an
in Docket No. ER04–156, and on the to the agreement. unexecuted Transmission Service
PJM Web site, http://www.PJM.com. Comment Date: 5 p.m. eastern time on Agreement for Regional Network
Comment Date: 5 p.m. eastern time on February 22, 2005. Service (TSA–RNS) on behalf of the
February 22, 2005. following entities: MassDevelopment;
17. Southwest Power Pool, Inc.
14. Pacific Gas and Electric Company Miller Hydro Group; Princeton
[Docket No. ER05–519–000] Municipal Light Department; and Town
[Docket No. ER05–516–000] Take notice that on January 31, 2005, of Wolfeboro Municipal Electric
Take notice that on January 28, 2005, Southwest Power Pool, Inc. (SPP) Department. The ISO states that it
Pacific Gas and Electric Company submitted for filing an unexecuted proposes to include the TSA–RNS
(PG&E) tendered for filing two Large service agreement for Network within Attachment E of the ISO’s
Facilities Agreements and nine Small Integration Transmission Service Transmission, Markets and Service

VerDate jul<14>2003 16:20 Feb 09, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
Federal Register / Vol. 70, No. 27 / Thursday, February 10, 2005 / Notices 7099

Tariff, FERC Electric Tariff No. 3, as SPP states that both NTEC and AEP Electric Company and Cambridge
Service Agreement No. 3. The ISO states were served with a copy of this filing. Electric Light Company; The United
that the ISA–RNS sets the basic terms Comment Date: 5 p.m. eastern time on Illuminating Company; Unitil Energy
and conditions under which the ISO February 22, 2005. Systems, Inc.; and Vermont Electric
will provide and a Transmission Power Company), submitted large
22. Lincoln Generating Facility, LLC
Customer will receive Regional Network generator interconnection procedures
Service. [Docket No. ER05–524–000] and a large generator interconnection
The ISO also submitted a Service Take notice that on January 31, 2005, agreement and related changes to the
Agreement No. 3 within Attachment E Lincoln Generating Facility, LLC ISO–New England Transmission,
of the ISO’s Transmission, Markets and (Lincoln) filed (1) a notice of succession markets and services tariff in
Service Tariff, FERC Electric Tariff No. to notify the Commission that, as a compliance with the orders issued by
3, for future use in the event that result of a name change, Lincoln has the Commission on March 24, 2004, 106
unexecuted service agreements need to succeeded to the FERC Rate Schedule FERC ¶ 61,280 (2004) and November 8,
be filed for the provision of Through or (rate schedule) of Allegheny Energy 2004, 109 FERC ¶ 61,155 (2004).
Out Service to entities not required to Supply Lincoln Generating Facility,
execute the Market Participant Service LLC, and (2) amendments to the rate ISO–NE states that copies of said
Agreement. schedule to reflect the fact that Lincoln filing have been served upon all parties
The ISO states that copies of the filing is no longer affiliated with Allegheny to this proceeding, upon all NEPOOL
were sent to the New England state Energy, Inc. or any of its affiliates, or Participants (electronically), non-
governors and regulatory agencies and any other electric utility with a Participant Transmission Customers,
the Participants in NEPOOL. franchised service territory. Lincoln and the governors and regulatory
Comment Date: 5 p.m. eastern time on requests an effective date of December agencies of the six New England states.
February 22, 2005. 31, 2004. Comment Date: 5 p.m. eastern time on
20. Bluegrass Generation Company, Comment Date: 5 p.m. eastern time on February 18, 2005.
L.L.C. February 22, 2005.
Standard Paragraph
[Docket No. ER05–522–000] 23. Sun River Electric Cooperative, Inc.
Any person desiring to intervene or to
Take notice that on January 31, 2005, [Docket Nos. ES05–16–000, ES05–16–001]
protest this filing must file in
Bluegrass Generation Company, L.L.C. Take notice that on January 11, 2005, accordance with Rules 211 and 214 of
(Bluegrass) submitted for filing a rate and as amended on January 28, 2005, the Commission’s Rules of Practice and
schedule under which it specifies its Sun River Electric Cooperative, Inc.
revenue requirement for providing cost- Procedure (18 CFR 385.211 and
(Sun River) submitted an application
based Reactive Support and Voltage 385.214). Protests will be considered by
pursuant to section 204 of the Federal
Control from a natural gas-fired peaking the Commission in determining the
Power Act seeking authorization to
generating facility located in Oldham, appropriate action to be taken, but will
borrow money pursuant to a loan
Kentucky, which is interconnected with agreement with the National Rural not serve to make protestants parties to
the transmission system of Louisville Utilities Cooperative Finance the proceeding. Any person wishing to
Gas and Electric Company (LG&E), Corporation (CFC) in an amount not to become a party must file a notice of
currently a participant in the Midwest exceed $14,799,188. Sun River requests intervention or motion to intervene, as
Independent Transmission System a waiver from the Commission’s appropriate. Such notices, motions, or
Operator, Inc. (Midwest ISO). Bluegrass competitive bidding and negotiated protests must be filed on or before the
requests an effective date of March 1, placement requirements at 18 CFR 34.2. comment date. Anyone filing a motion
2005. Comment Date: 5 p.m. eastern time on to intervene or protest must serve a copy
Bluegrass states that it has provided February 14, 2005. of that document on the Applicant and
copies of the filing to the designated all parties to this proceeding.
corporate officials and or 24. ISO New England Inc. et al., Bangor
Hydro-Electric Company, et al. The Commission encourages
representatives of LG&E, the Midwest electronic submission of protests and
ISO, and the Kentucky Public Service [Docket Nos. RT04–2–011, ER04–116–011, interventions in lieu of paper using the
Commission. and ER04–432–004]
‘‘eFiling’’ link at http://www.ferc.gov.
Comment Date: 5 p.m. eastern time on Take notice that on January 28, 2005, Persons unable to file electronically
February 22, 2005. ISO New England Inc., (ISO–NE) and should submit an original and 14 copies
21. Southwest Power Pool, Inc. the New England transmission owners of the protest or intervention to the
(consisting of Bangor Hydro-Electric Federal Energy Regulatory Commission,
[Docket No. ER05–523–000] Company; Central Maine Power 888 First Street, NE., Washington, DC
Take notice that on January 31, 2005, Company; Fitchburg Gas and Electric 20426.
Southwest Power Pool, Inc. (SPP) Light Company; Maine Electric Power
submitted for filing an unexecuted Company; New England Power This filing is accessible on-line at
service agreement for Network Company; Northeast Utilities Service http://www.ferc.gov, using the
Integration Transmission Service Company on behalf of its operating ‘‘eLibrary’’ link and is available for
(Service Agreement) between SPP and companies, The Connecticut Light and review in the Commission’s Public
Northeast Texas Electric Cooperative Power Company, Western Reference Room in Washington, DC.
(NTEC), as well as an unexecuted Massachusetts Electric Company, Pubic There is an ‘‘eSubscription’’ link on the
Network Operating Agreement (NOA) Service Company of New Hampshire, Web site that enables subscribers to
between SPP, NTEC and American Holyoke Power and Electric Company receive email notification when a
Electric Power Company (AEP). SPP and Holyoke Water Power Company; document is added to a subscribed
seeks an effective date of January 1, NSTAR Electric and Gas Corporation on docket(s). For assistance with any FERC
2005 for both the Service Agreement behalf of its operating affiliates, Boston Online service, please email
and the NOA. Edison Company, Commonwealth FERCOnlineSupport@ferc.gov, or call

VerDate jul<14>2003 16:20 Feb 09, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
7100 Federal Register / Vol. 70, No. 27 / Thursday, February 10, 2005 / Notices

(866) 208–3676 (toll free). For TTY, call Salas, Secretary, Federal Energy in the Public Reference Room or may be
(202) 502–8659. Regulatory Commission, 888 First viewed on the Commission’s Web site at
Street, NE., Washington, DC 20426. http://www.ferc.gov using the
Linda Mitry,
Comments may be filed electronically ‘‘eLibrary’’ link. Enter the docket
Deputy Secretary. via the Internet in lieu of paper; see 18 number, excluding the last three digits
[FR Doc. E5–564 Filed 2–9–05; 8:45 am] CFR 385.2001(a)(1)(iii) and the in the docket number field (P–2100), to
BILLING CODE 6717–01–P instructions on the Commission’s Web access the document. For assistance,
site (http://www.ferc.gov) under the ‘‘e- contact FERC Online Support at
Filing’’ link. After logging into the e- FERCOnlineSupport@ferc.gov, or toll-
DEPARTMENT OF ENERGY Filing system, select ‘‘Comment on free at 1–866–208–3676, or for TTY,
Filing’’ from the Filing Type Selection
Federal Energy Regulatory (202) 502–8659. A copy is also available
screen and continue with the filing and
Commission process. The Commission strongly for inspection and reproduction at the
[Project No. 2100–052] encourages electronic filing. address in item h above.
l. Status: This application has not You may also register online at
California Department of Water been accepted for filing. We are not http://www.ferc.gov/esubscribenow.htm
Resources; Notice of Application and soliciting motions to intervene, protests, to be notified via e-mail of new filings
Applicant Prepared Environmental or final terms and conditions at this and issuances related to this or other
Assessment Tendered for Filing With time. pending projects. For assistance, contact
the Commission, and Establishing m. Description of Project: The FERC Online Support.
Procedural Schedule for Relicensing Oroville Facilities are located on the
and Deadline for Submission of Final Feather River in the foothills of the o. With this notice, we are initiating
Amendments Sierra Nevada in Butte County, consultation with the California State
California. Oroville Dam is located 5 Historic Preservation Officer (SHPO), as
February 3, 2005. miles east of the City of Oroville and required by section 106, National
Take notice that the following about 130 miles northeast of San Historic Preservation Act, and the
hydroelectric application has been filed Francisco. The Oroville Facilities are regulations of the Advisory Council on
with the Commission and is available part of the State Water Project (SWP), a Historic Preservation, 36 CFR 800.4.
for public inspection. water storage and delivery system of
a. Type of Application: New—major p. Procedural Schedule and Final
reservoirs, aqueducts, power plants, and Amendments: The application will be
license. pumping plants. One of the two main
b. Project No.: 2100–52. processed according to the following
purposes of the SWP is to store and
c. Date Filed: January 26, 2005. Hydro Licensing Schedule. Revisions to
distribute water to supplement the
d. Applicant: California Department the schedule will be made if the
needs of urban and agricultural water
of Water Resources. users in Northern California, the San Commission determines it necessary to
e. Name of Project: Oroville Facilities. Francisco Bay Area, the San Joaquin do so:
f. Location: On the Feather River near Valley Central Coast, and Southern
Oroville, California. The project affects Tentative
California. The Oroville Facilities are Milestone date
Federal lands. also operated for flood management,
g. Filed Pursuant to: Federal Power power generation, water quality Issue Acceptance/Deficiency Apr. 2005.
Act, 16 U.S.C. 791(a)–825(r). improvement in the Sacramento-San Letter and request Additional
h. Applicant Contact: Henry M. Joaquin Delta (Delta), recreation, and Information, if needed.
‘‘Rick’’ Ramirez, Program Manager, fish and wildlife enhancement. Notice asking for final terms and Aug. 2005.
Oroville Facilities Relicensing Program, The existing facilities encompass conditions.
California Department of Water 41,100 acres and include Oroville Dam, Notice of the availability of the Apr. 2006.
Resources, 1416 9th Street, Sacramento, Lake Oroville, three power plants (Hyatt draft EIS.
California 95814. Phone: 916–657–4963. Pumping-Generating Plant, Thermalito Notice of the availability of the Oct. 2006.
E-mail: ramirez@water.ca.gov. Diversion Dam Powerplant, and final EIS.
i. FERC Contact: James Fargo at (202) Thermalito Pumping-Generating Plant), Ready for Commission’s deci- Jan. 2007.
502–6211, or james.fargo@ferc.gov. Thermalito Diversion Dam, the Feather sion on the application.
j. Cooperating Agencies: We are River Fish Hatchery and Fish Barrier
asking Federal, State, local, and tribal Dam, Thermalito Power Canal, the Final amendments to the application
agencies with jurisdiction and/or Oroville Wildlife Area, Thermalito must be filed with the Commission no
special expertise with respect to Forebay, Thermalito Forebay Dam, later than 30 days from the issuance
environmental issues to cooperate with Thermalito Afterbay, Thermalito date of the notice soliciting final terms
us in the preparation of the Afterbay Dam, and transmission lines, and conditions.
environmental document. Agencies who as well as a number of recreational
would like to request cooperating status facilities. Magalie R. Salas,
should follow the instructions for filing Oroville Dam, along with two small Secretary.
comments described in item k below. saddle dams, impounds Lake Oroville, a [FR Doc. E5–550 Filed 2–9–05; 8:45 am]
Agencies granted cooperating status will 3.5 million acre-foot capacity storage BILLING CODE 6717–01–P
be precluded from being an intervenor reservoir with a surface area of 15,810
in this proceeding consistent with the acres at its normal maximum operating
Commission’s regulations. level. The hydroelectric units at the
k. Deadline for Requests for Oroville Facilities have a combined
Cooperating Agency Status: 60 days licensed generating capacity of
from the date of this notice. approximately 762 MW.
All documents (original and eight n. A copy of the application is
copies) should be filed with: Magalie R. available for review at the Commission

VerDate jul<14>2003 16:20 Feb 09, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1