Svenska Kraftnt

The EIA planning and experiences from differens projects


Ulrika Sigerud, Svenska Kraftnt, Sweden

Offices

Sollefte,
Control Centre

Sundsvall,
Maintenance

sbro,
Storage

Halmstad
Maintenance,
Preparedness

Sundbyberg
Head Office
National Control Centre

The National Grid

>

Transmission lines
>

Total length

15 000 km

400 kV

10 600 km

220 kV

4 400 km

poles: 52 000
Number of p

>

Switching stations
>

Total in the National Grid

168

>

Owned by Svenska Kraftnt

41

Our mission is to
>

Provide transmission of power on the national grid well in


compliance with security, efficiency and environmental
requirements

> To perform the system operator function for electricity and

natural gas cost-efficiently


> To promote an open Swedish, Nordic and European

market for electricity and natural gas


> To
T ensure a robust
b t nationwide
ti
id supply
l off electricity
l t i it

Drivers for investments

>

Reinvestments

>

Political considerations for integration and renewable


energy

>

New production Wind- and Nuclear power

>

Joint
J
i t investments
i
t
t for
f network
t
k and
d interconnections
i t
ti
within
ithi
the Nordic and other neighboring countries

>

Network infrastructure of major


j cities Stockholm,,
Uppsala

Drivers for investments cont


cont.

>

Increased capacity

>

Increased reliability and personal safety

1. Mrttjrnberget

100 MW. Connects to Brcke, new 220 kV station to KL1

2. Blaiken

270 MW. Connects in stages to Juktan. New 400 kV station

3. Norrhlsinge

160 MW. Start 2011. 11 km 220 kV line. New station to RL8

4. Bohusln - Dalsland

Several projects. New station to CL35

5. Sdra Storfjllet

SvK has approved that 120 MW connects to AL7 in existing station

6. Middagsfjllet

165 400 MW. Probably new station to Nea-Jrpstrmmen

7. Stekenjokk

150 250 MW. Connection to AL2 in Stalon

8. Skarasltten

Several projects, connection to regional network. No studies done

9. Uppvidinge

Several projects. Maybe new 400 kV station to FL1 S4-5

10. Gvleborg + Storgrundet

Several projects. New 220 kV station to KL2

11. Hrjedalen

Several projects. New station to CL26 or CL1

12. Skellefte area

Several projects, maybe new station to UL4

13. Fbodliden/Hgaliden

May result in new 400 kV station to UL17

14. Markbyggden stage 1-3

Two new stations to UL4 and UL6

15. sele, rnskldsvik

Several projects, maybe new stations to UL6 and UL7

16. Markbyggden stage 4-6

New 400 kV line between UL4 and UL6

17. Dalarna

Around 1000 MW. Connection to new station to CL1

18. Klocktrnan

660 MW. Connection to Svartbyn

19. Finngrunden

1500 MW, connects to ngsberg

20. Stora Middelgrund

Unclear when. 800 MW, connects to Breared

21. Blekinge Offshore

Unclear when. 2500 MW, several connections

22. Kriegers Flak

Unclear when. SvK has withdrawn from the project


Short term 2010 - 2012

Wind power plans

longer term 2013 - 2015

Long term 2016 -

Renewal of lines and


new lines (400 kV)
>

New (30)

>

> 3000 km

Also
> Renew shield wires (25 proj) 2010-2014
> Replace poles (10 proj) 2010-2015
> New lines when establish new wind power

AC
DC

Permit and licences (selected) for net


work operations
>

Concession under the Electricity Act

>

Consultation and Environmental Impact Act under the


Environmental Act

>

Water permission

>

Permit for Natura 2000 (a special EIA)

>

International agreements (Esbokonventionen)

>

Right/permit for land access under the Management Act

The Electricity Act

>

Grid operation requires permissions (for exampel


concession)

>

The Energy Market Inspectorate assesses the


applications for new power links, and in some cases the
Swedish
S
ed s Go
Government
e
e t makes
a es the
t e legal
ega dec
decision
so o
on tthe
e
application

>

40 years validity for line concession (SvKs national grid)

>

The EA refers to the Environmental Code

Early statement

>

- Targeting decision

>

- Environmental Code

>

- Early information

>

- Feasibility study with alternative routes

>

- Public hearing arranged by Svenska Kraftnt

>

- Consultation with authorities

>

- Consultation report incl. refutation

Environmental Impact Assessment


(EIA) process
>

Environmental Code and Energy Act

>

Consultation with authorities, concerned individuals and


organizations

>

- Public hearing arranged by Svenska Kraftnt

>

- Consultation report

>

- The route is chosen by Svenska Kraftnt after EIAprocedure

>

- EIA appendix to application of licences

>

- Ev.
Ev requests of supplementary to the EIA

The Environmental Act - contents

>

Summary and purpose of the facility

>

Planning and permit procedure

>

Alternatives route, technological issues

>

Overall conditions

>

Technical performance

>

Electric and magnetic fields

>

Sound effects

>

Impacts on enviromental surroundings

The Swedish Permit Procedure


Grid planning
- Scenarios
- Nordels plan
- Domestic studies
- Proposal to grid
investments

Environmental Impact
Assessment (EIA) process

Early statement
-

Targeting decision
Environmental Code
Early information
Feasibility study with alternative
routes
- Public hearing arranged by
Svenska Kraftnt
- Consultation with
authorities
- Consultation report incl. refutation

Approval and permits


- Application of licences (network concession)
issued by the Energy Markets Inspectorate
g the EIA or the g
government administrated
including
by the Ministry of Enterprise, Energy and
Communications.
- Investment decision
- Network concession must be renewed after 40 years
- Other permits and dispensations issued by either
the Municipality (290),
the County Administrative Board (21 counties)
the Swedish Road Administration,
the Swedish Forest Agency
the Environmental Courts or
the Legal, Financial and Adm. Services Agency

- Environmental Code and Energy Act


- Consultation with authorities, concerned
individuals and organizations
- Public hearing arranged by Svenska
Kraftnt
- Consultation report
- The route is chosen by Svenska Kraftnt
after EIA-procedure
- EIA appendix to application of licences
- Requests of supplementary to the EIA

Land Access
- Temporary agreement
according pilot survey
- Private voluntary
agreement
- Compulsory utility
easement
by the Cadastral
authority
- Utility Easements Act
- No time limit

Construction
- Felling of trees
- Takes normally about
2 years (100 km 400
kV)

Time table permit procedure

Sweden

Early
statement

EIA

1 year

1-2
years

Approval and
permits
it

Land Constructio
Acces
n
s

1-2 years

2 years

(incl. Land Acess)

(100 km 400
kV)

Some inputs

>

A need for more sufficient legal frameworks

>

Realisation of projects will require a commitment from


national, regional and local authorities to accelerate
administrative procedures and authorisations.

>

Earlier contacts need to be taken between owners of new


power plant and network owners to facilitate the
permission procedures

>

A future balancing act between the need for expansion of


the electricity network and other infrastructure projects
and land owners right of property

Southwest Link 712 km

>

Green line:
>

AC technique

>

400kV AC

>

Hallsberg Nssj

>

Overhead line 177 km

Lila linje:
>

Likstrmsteknik VSC HVDC

>

Nssj Hrby

>

Nssj Norge

>

Markkabel och luftledning


535 km

East Svealand

>

Power increase Forsmark

>

Wind power

>

Reliability and increased


capacity
Ongoing studies Investments
will be done 2011 2020

Target
Network
400 kV

AC
DC

Stockholms Strm
National

Hamra

Grid 2020
400 kV overhead line
400 kV cable
Hagby

220 kV overhead line


220 kV cable

Danderyd
Beckomberga Jrva
Bredng

Liding
Vrtan
Skanstull
Nacka
Hgdalen

Kolbotten
Ekudden

Vrmd

Smland

>

Power increase Oskarshamn

>

HVDC Gotland

>

HVDC NordBalt

>

Wind power

>

Reliability, increased capacity

Ongoing studies
Investments will be done 2010 2020

Target
Network
400 kV

AC
DC

3:rd AC-line between Sweden and


Finland
>

Wind power

>

Increased capacity

Ongoing study
together with Fingrid
In operation ~2020

Conference Schedule