You are on page 1of 33

Meeting of the LDRRF Technical Committee

Venue: DMIC Conference Room, CDMP Office


Date: 28th November, 2013

Comprehensive Disaster Management Programme, Phase II


Ministry of Disaster Management & Relief
C D M P - I I
Ministry of Disaster Management & Relief

District: Coxs Bazar


Upazila: Moheshkhali
Union: Shaplaur
Major Hazards
River bank erosion
Flood
Cyclone
Tidal surge
Salinity
Source : FTRA Report

Existing Resources
Cyclone Shelter
Embankment
Road connection
Ponds for sweet water
Source : FTRA Report

Intervention proposed by UDMC


Re-construction of Embankment from Loilachhara Sluice Gate to Mukber Hoingachhara
Maitenance of Daneshpur Cyclone Shelter
Source : FTRA Report

C D M P - I I
Ministry of Disaster Management & Relief

District: Coxs Bazar, Upazila: Moheshkhali, Union: Shaplaur


Scheme detail
CBZ 0113005: Re-construction of Embankment from
Loilachhara Sluice Gate to Mukber Hoingachhara

Budget (BDT)

Benf.

7,445,918

3,000

573,017

3,500

CBZ 0113006: Maitenance of Daneshpur Cyclone Shelter

Design Depth
(m)

Impact
CBZ 0113005:
Protected fertile land from saline water intrusion
Reinforced opportunities of fish culture, salt
culture
Served as shelter for people and livestock during
flood
CBZ 0113006:
Served as safe shelter for people during flood and
Cyclone
C D M P - I I
Ministry of Disaster Management & Relief

KHL0913009

Length (m) X
Width (m)

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

Major Hazards
Flood, River Erosion, Drought,
Tornado, Noreaster, Cold Spell and
Soil Sedimentation on agricultural
Land
Source : FTRA Report

Intervention proposed by UDMC


Construction of Earthen Killa
Ground raising
Installation of Tube-well and Sanitary
Latrine

Source : FTRA Report

C D M P - I I
Ministry of Disaster Management & Relief

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa
Scheme detail
KRG1013004: Construction of Earthen Killa of Char Bazra
Dakkinpara Reg. Primary School field at Char Bazra.
KRG1013005: Construction of earthen Killa at Onontopur
Char Dargar Kuthi Eidgah field
KRG1013008: Construction of Earthen Killa at Char Gander
Alga.
KRG1013009: Construction of Earthen Killa at Mekurar Alga
KRG1013010: Construction of Earthen Killa at Dai Khawa
register primary school field.
KRG1113011: Ground raising cluster village at Salmara Gucha
Gram for 44 household including 44 sanitary latrines and 5
shallow tube well.
KRG1113012: Cluster ground rising, sanitary latrine and
shallow tube well for 25 house hold at Namapara (bridgepar).
KRG1113013: Construction of Earthen Killa at Dharka Baparir
Char.

C D M P - I I
Ministry of Disaster Management & Relief

Budget (BDT)

Benf.

225,620

1,200

574,099

3,000

1,224,732

1200

1,202,127

1800

1,063,545

1200

1,877,200

264

1,687,348

150

2,121,523

1,900

Design Depth (m)

Length (m) X
Width (m)

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa
Impact of proposed
schemes
Livestock saved from
flood
People are saved during
flood
In normal time used for
community programs
hygienic sanitation and
safe drinking water for
ultra-poor families
Vulnerable people are
more resilient to disaster
especially flood.

C D M P - I I
Ministry of Disaster Management & Relief

KRG 1013012: Earth raising

KRG1013013: Killa

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

KRG 1013004: Killa

KRG1013010: Killa

KRG1013011: Cluster village ground raising

C D M P - I I
Ministry of Disaster Management & Relief

District: Pirojpur Upazila: Nesarabad and Mothbaria


Union: Sudoykathi Mirukhali, Danisafa, Halta Gulshakhali, Boro Masua, Mothbaria
Sadar, Betmore Rajapara
Major Hazards
Cyclone and tidal surge, seasonal
high tide, raising river basin due to
silt and soil sedimentation, river
bank erosion, water logging,
Draught, salinity
Source : FTRA Report

Intervention proposed by UDMC


Construction of Earthen Killa
Installation of Solar System and provide
Hand Mike
Re-excavation of Pond

Source : FTRA Report

C D M P - I I
Ministry of Disaster Management & Relief

District: Pirojpur Upazila: Nesarabad and Mothbaria


Union: Sudoykathi Mirukhali, Danisafa, Halta Gulshakhali, Boro Masua, Mothbaria
Sadar, Betmore Rajapara
Scheme detail
PRJ 1013017: Construction of earthen Killa near Laxmankathi
Cyclone shelter at Village Laxmankathi in Wd # 1.
PRJ 1013018: Installation of Solar System and provide Hand
Mike for 7 Cyclone Shelters cum Primary schools in Wd # 1, 2,
4, 5, 6, 7 & 8
PRJ0613017: Re-Excavation of govt Pond near Near house of
Nanna member
PRJ0613018: Re-Excavation of govt Pond near Near house of
Chan Gazi
PRJ0613019: Re-Excavation of Pond near DSH Dakhil
Madrasha
PRJ0613020: Re-Excavation of Pond near Boro Showla
Adarsha High School
PRJ0613021: Re-Excavation of Pond near house of Boro
Showla sudonna mistri bari (Jakir Sikdar)
PRJ0613022: Re-Excavation of govt. Pond near house of
Choto showla Ali Mollick
PRJ0613023: Re-Excavation of govt Pond near Near house of
Faruk Mia
PRJ0613024: Re-Excavation of govt Pond near Near house of
Nafaz Mukter
C D M P - I I
Ministry of Disaster Management & Relief

Budget (BDT)
50,546

Benf.
500

654,500

5,000

343,672

446

538,429

500

276,279

700

337,638

840

352,456

600

325,755

640

598,476

700

444,009

500

Design Depth (m)

Length (m) X
Width (m)

District: Pirojpur Upazila: Nesarabad and Mothbaria


Union:

Sudoykathi Mirukhali , Danisafa, Halta Gulshakhali , Boro Masua, Mothbaria Sadar, Betmore Rajapara
Scheme detail

Budget (BDT)

Benf.

PRJ0613025: Re-Excavation of govt Pond near Near house of Asmot Ali

431,713

640

PRJ0613026: Re-Excavation of govt. Pond at danisafa Bazar

571,551

1,500

PRJ0613027: Re-Excavation of govt. Pond near Danisafa Salahia Fazil Madrasha

351,617

1,000

PRJ0613028: Re-Excavation of govt. Pond near house of Nur Mohammad Talukder

434,428

500

PRJ0613029: Re-Excavation of Pond near near Uttar Kobotorkhali Primary School

403,663

500

PRJ0613030: Re-Excavation of govt. Pond at Boro masua Bazar

794,958

1,500

PRJ0613031: Re-Excavation of Pond adjacent to Majid Contractor Jamey Mosque

368,554

900

PRJ0613032: Re-Excavation of Pond near house of Suja hawlader

811,289

2,000

PRJ0613033: Re-Excavation of govt. Pond near house of Rajbihari Kritonia

306,418

2,100

PRJ0613034: Re-Excavation of Pond adjacent to Jankhali high school

133,135

2,100

PRJ0613035: Re-Excavation of Upazila Dormitory Pond

440,250

2,000

C D M P - I I
Ministry of Disaster Management & Relief

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

Impact of proposed schemes


Ensured early warning and awareness on disaster before and during disaster through Miking
Ensured light at the Cyclone shelter during disaster
Reduced insecurity and awkwardness by avoiding darkness specially at night
Ensured round the year solar energy for the respective schools
People will be more resilient to disaster especially Cyclone
Ensured shelter for about 400 livestock during Cyclone
Used in social programs
People will be more resilient to disaster especially Cyclone
People and animal could access arsenic and saline free water
Saved from health hazards and will prevent water scarcity during dry season

C D M P - I I
Ministry of Disaster Management & Relief

District: Rangpur Upazila: Gangachara and Piragacha


Union: Nohali, Kolkonda, Laxmitari and Sawla
Major Hazards
Flood, River Erosion, Drought,
Tornado, Noreaster, Cold Spell and
Soil Sedimentation on agricultural
Land
Source : FTRA Report

Intervention proposed by UDMC


Construction of Earthen Killa
Cluster village ground raising
Re-construction of road cum
embankment
Re-excavation of canal

Source : FTRA Report

C D M P - I I
Ministry of Disaster Management & Relief

District: Rangpur Upazila: Gangachara and Piragacha


Union: Nohali, Kolkonda, Laxmitari and Sawla
Scheme detail
RAN1013021: Construction of Earthen Killa at Char Bugduhohora (Purbapara).

RAN1013022: Construction of Earthen Killa at Char Bugduhohora Chwkidar para.


RAN1013023: Ground rising of Cluster village for 50 poor HH including 50 sanitary latrines and 5 Shallow tube well.
RAN1013024: Re-construction of Embankment cum road from house of Chotour mur at Binbiner Char to H/O Atiar at
Sankardha The scheme ended with WDB embankment.
RAN1013025: Re-construction of embankment cum road from house of Hafizul at Mutukpur to H/O Rafiqul at Chila khal
RAN1013026: Re-construction of embankment cum road from house of Hafizul at Mutukpur to H/O Rafiqul at Chila khal
RNG 0613001: Road cum Embankment re-construction from the west side of Mohipur new bridge to the H/o Mokbul of
Char Sankardah village via H/o Ekramul (2120m)
RAN1113027: Construction of Earthen Killa at Zowan mouza.

RAN1113028: Re-excavation of canal starts from near H/o Siraj at Ramsingh and ended at brench of Tista river near house
of Earshad at Zowan moza

C D M P - I I
Ministry of Disaster Management & Relief

Budget
(BDT)
457,200
1,072,027
2,879,456
3,713,157

2,045,695
1,719,598
2,985,818
726,777
5,216,472

Benf.
1,200

1,600
300
3,000
2,500
3,200

2,750
2300
3500

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

Impact of proposed schemes


Ensured shelter for people and
livestock during flood
Used in social programs
People will be more resilient to
disaster especially Cyclone

Ensured hygienic sanitation and


safe drinking water for people
Reduced health hazards
Ensured easy access and
communication from and to
vulnerable areas

C D M P - I I
Ministry of Disaster Management & Relief

RNG 1013021: Killa


RNG 1013022: Killa

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

RNG 1013026: Embankment

RNG 1013024: Embankment

C D M P - I I
Ministry of Disaster Management & Relief

RNG 1013025: Embankment

District: Kurigram, Upazila: Ulipur & Nageswari


Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

RNG 1013027: Killa

RNG 1013028: Canal

C D M P - I I
Ministry of Disaster Management & Relief

RNG 1013025: Embankment

District: Lalmonirhat, Upazila: Patgram, Union: Dahagram

Major Hazards
Flood, River Erosion, Drought,
Tornado, Noreaster, Cold Spell and
Soil Sedimentation on agricultural
Land
Source : FTRA Report

Intervention proposed by UDMC


Construction of cluster village by
constricting 60 flood resilient house with
CI sheet on top, 60 sanitary latrine, 6
shallow tube well with cattle as
livelihood support.

Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Lalmonirhat, Upazila: Patgram, Union: Dahagram


Scheme detail
LMH1113025: Construction of cluster village by constricting 60 flood resilient house with CI sheet on top, 60 sanitary
latrine, 6 shallow tube well with cattle as livelihood support.

Budget
(BDT)

Benf.

10,863,951

836

Impact of proposed schemes


60 homeless ultra-poor
families will have safe shelter
on raised khas land

60 homeless ultra-poor
families will have access to
hygienic sanitation and safe
drinking water
Women will have income
generation support with
cattle
Vulnerable people of flood
affected Chhit Mohal will be
more resilient to disaster
especially flood.
C D M P - I I
Ministry of Disaster Management & Relief

LMH 1113025: Cluster village for 60 HHs

District: Lalmonirhat, Upazila: Patgram, Union: Dahagram


Scheme detail

Budget
(BDT)

Benf.

BHL 0913019: Construction of Earthen Killa near Hanif Dalal Bazar (size: 120 m X 200 m)

8,756,661

1,710

BHL 0913020: Construction of Earthen Killa near Muktijoddha Bazar (size: 120 m X 200 m)

8,756,661

1,710

Impact of proposed
schemes
* Livestock and people will
get shelter during flood
* People will be resilient to
disaster espacially Cyclone
and tidal surge
* Could be used for social
gathering

BHL 0913019: Killa


C D M P - I I
Ministry of Disaster Management & Relief

BHL 0913020: Killa

District: Bhola, Upazila: Tozummudin, Union: Chandpur

Major Hazards
Cyclone, Tidal surges, Monsoon
flood, siltation and soil
sedimentation at river basin, River
bank erosion, Water logging,
Salinity.

Intervention proposed by UDMC


Construction of killa

Source : FTRA Report

Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Bhola, Upazila: Tzumuddin, Union: Chandpur


Scheme detail

Budget
(BDT)

Benf.

BHL 0913019: Construction of Earthen Killa near Hanif Dalal Bazar (size: 120 m X 200 m)

8,756,661

1,710

BHL 0913020: Construction of Earthen Killa near Muktijoddha Bazar (size: 120 m X 200 m)

8,756,661

1,710

Impact of proposed
schemes
* Livestock and people will
get shelter during flood
* People will be resilient to
disaster espacially Cyclone
and tidal surge
* Could be used for social
gathering

BHL 0913019: Killa


C D M P - I I
Ministry of Disaster Management & Relief

BHL 0913020: Killa

District: Barguna, Upazila: Amtoli, Union: Chawra

Major Hazards
Cyclone, tidal surges, salinity,
decrease land fartility,
deterioration of under ground
water level

Intervention proposed by UDMC


Construction of killa

Source : FTRA Report

Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Lalmonirhat, Upazila: Patgram, Union: Dahagram


Scheme detail
BAR 1113014: Re-excavation of Khash Pond near H/o Motiur Rahman at Gotkhali village with RCC Stair (size: 38 m X 36 m)
BAR 1113015: Re-excavation of Chawra Union Parishad Pond at Lodagram with RCC Stair (size: 61 m X 41 m)
BAR 1113016: Re-excavation of Pond near H/o Nasiruddin Hawlader at Chalitabunia with RCC Stair (size: 45 m X 36 m)
BAR 1113017: Re-excavation of Khash Pond near H/o Ruhul Amin at Patakata with RCC Stair (size: 55 m X 42 m)
BAR 1113018: Re-excavation of Khan Bari Jame Mosque Pond at Boithakata with RCC Stair (size: 44 m X 39 m)

Impact of proposed schemes


Enhanced source of surface water
* Ensured sweet water for drinking and domestic use round the year
* Reduced intensity of water borne diseases
* Increased agriculratural production
* Impact on favourable environment
C D M P - I I
Ministry of Disaster Management & Relief

Budget
(BDT)
535,002
1,317,037
710,769
1,016,989
299,007

Benf.
500
600
500
600
500

District: Satkhira, Upazila: Assasuni, Union: Munshiganj, Shyamnagar, Anulia

Major Hazards
Cyclone, Tidal surges, Monsoon
flood, siltation and soil
sedimentation at river basin, River
bank erosion, Water logging
Source : FTRA Report

Intervention proposed by UDMC


Construction of Embankment
Provide (Motka) Pitcher

Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Satkhira, Upazila: Assasuni, Union: Munshiganj, Shyamnagar, Anulia


Scheme detail
SAT..: Provide earthen Pitcher (Motka) for preserving rain water and Seed money to village women for IGA
SAT.: Re-construction of BWDB road cum embankment near the land of Kalam Sardar to H/o Abdul Hakim in Anulia
village

Impact of proposed schemes


Enhanced source of surface water
* Ensured sweet water for drinking and domestic use round the year
* Reduced intensity of water borne diseases
* Increased agriculratural production
* Impact on favourable environment

C D M P - I I
Ministry of Disaster Management & Relief

Budget
(BDT)
400,000
2,699,974

Benf.
285
14500

District: Faridpur, Upazila: Char Bhadrasahn, Union: Jhaukanda

Major Hazards
Cyclone, Tidal surges, Monsoon
flood, siltation and soil
sedimentation at river basin, River
bank erosion, Water logging

Intervention proposed by UDMC


Construction of killa

Source : FTRA Report

Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Faridpur, Upazila: Char Bhadrasahn, Union: Jhaukanda


Scheme detail
FRD.: Re-excavation of earthen Killa at Char Gopalpur Cluster Village

Impact of proposed schemes


* Ensured safe shelter for people and livestock during disaster
* Improved communication
* People will be more resilient to disaster especially Cyclone

C D M P - I I
Ministry of Disaster Management & Relief

Budget
(BDT)

Benf.

1,572,053

4000

District: Jhalokathi, Upazila: Nalchity, Union: Mollar hat, Kushangal

Major Hazards
Cyclone, Tidal surges, Monsoon
flood, Water logging, salinity,
Arsenic contamination
Source : FTRA Report

Intervention proposed by UDMC


Construction of killa
Re-excavation of Canal
Installation of Deep Tube-well
Source : FTRA Report & physical verification of scheme

C D M P - I I
Ministry of Disaster Management & Relief

District: Jhalokathi, Upazila: Nalchity, Union: Mollar hat, Kushangal


Budget
(BDT)

Benf.

JLK.: Installation of 30 nos. Hand Deep Tube-well at Ward # 1,2 3 & 9.

1,878,390

5500

JLK: Re-excavation of Canal from Gohail Bari Khal to H/o Rafiqul Islam (UP Member) via H/o Mr. Mukim (Ex MP) at
W # 4 (size: 2155 m).

1,197,209

Scheme detail

JLK: Re-construction of earthen Killa at Rajabaria (size: 38.11 m X 182.93 m).


JLK.: Installation of 11 nos. Hand Deep Tube-well at Ward # 9.

Impact of proposed schemes


Ensured safe water for drinking and other domestic uses

Reduced intensity of water borne diseases


Ensured quick disposal of lodged water from homesteads and agricultural land
Reduced intensity of water borne diseases
Ensured safe shelter for livestock as well as people during disaster
Used for community programs in normal time
C D M P - I I
Ministry of Disaster Management & Relief

202,476

688,743

1,900
660
1,650

District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara,


Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

Major Hazards
Cyclone, Tidal surges, Monsoon
flood, Water logging, salinity,
Arsenic contamination, Low
plinth of houses, insufficient
protection against wave, Arsenic
contamination, unhygienic
sanitation, poverty
Source : FTRA Report

C D M P - I I
Ministry of Disaster Management & Relief

Intervention proposed by UDMC


Ground raising
Re-construction of embankment
Installation of Sanitary latrine and Tubewell
Source : FTRA Report & physical verification of scheme

District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara,


Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul
Scheme detail
KRG 1113001: Earth raising at Shekerhati Grave Yard
KRG 1113002: Re-construction of sub-merged embankment from BWDB embankment near land of Ainuddin to Dongerpar
Khal connecting road
KRG 1113003: Re-construction of sub-merged early flood protection embankment from Dongerpar Khal near land of Musa
to land of Abdul Quddus at Sokunmari
KRG 1113004: Earth raising at Chhatirchar grave yard.
KRG 1113005: Installation of 55 nos. sanitary latrines and 10 nos. Tube-well
KRG 1113006: Construction of protection wall from Doulatpur Madrasha center wall to community clinic
KRG 1113007: Re-construction of sub-merged early flood protection embankment from Chhatirchar road DB point to
Garimatra land of Netai

KRG 1113008: Earth raising at Nayahati grave yard.


KRG 1113021: Installation of 04 nos. Deep Tube-well
KRG 1113022: Earth raising of cluster village at Nansree including 30 nos. sanitary latrine and 02 nos. Deep Tube-well

C D M P - I I
Ministry of Disaster Management & Relief

Budget
(BDT)
1,190,482
902,027
2,161,411

245,052
702,000
3,269,279
1,774,715
308,901
250,452
1,588,709

Benf.
6,000
10,000
10,000
3,500
2,000
900
15,000

10,000
4,000
400

District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara,


Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul
Scheme detail
KRG1113009: Construction of Dhopajhura Eidgah cum Killa including protection wall, tree plantation, sanitary latrine-2
nos. & TW-01 nos.

Budget
(BDT)

Benf.

1,876,362

2,000

405,293

4,000

1,092,743

7,000

KRG1113012: Re-excavation of Canel from Culvert near L/S Land of Aziz Mia to Dholeswari rive

743,374

5,500

KRG1113013: Earth raising at Baluchar grave yard

71,261

2,000

KRG1113014: Earth raising at Nurpur grave yard

459,112

8,000

KRG1113010: Re-construction of embankment at Mora ganger khal from the land of Abdur Rashid to Ratan Mia.
KRG1113011: Installation of Sanitary latrine -40 Nos. and TW-11 nos. at Bajuka & Baligaon village ward # 03 & 09 under
Abdullahpur Union

KRG1113015: Re-construction of sub-merged early flood protection road cum embankment from Badhaghat Tufa sluidge
1,364,561
gate to Joldubi Canel. Length 1950m
KRG 1113016: Re-construction of sub-merged early flood protection road cum embankment from Kuliarkandi land of Sohel
528,472
to Badhaghat Tufa sluidge gate. Length 750m
KRG 1113017: Re-construction of sub-merged early flood protection road cum embankment from Badshala land of Mehraj
3,138,092
mia to Bahadurpur embankment. Length 5250m
KRG 1113018: Re-construction of sub-merged early flood protection road cum embankment from Shekerhati to land of
2,109,162
Jamaluddin at village Badshala. Length 4100m

10,000
2,000
8,000
8,000

KRG 1113019: Earth filling at Bahadurpur grave yard.

681,762

6,000

KRG 1113020: Earth filling at Kastul grave yard.

428,593

4,000

C D M P - I I
Ministry of Disaster Management & Relief

District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara,


Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

KRG 1113001: Grave Yard

C D M P - I I
M i n i s t KRG
r y o 1113015:
f D i s a s t Road
e r M cum
a n a gembankment
ement & Relief

KRG 1113003: Sub-merged Embankment

KRG 1113014: Grave Yard

KRG 1113010: Road cum Embankment

KRG 1113016: Road cum embankment

You might also like