You are on page 1of 40

Welcome

Wednesday| March 12, 2014

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Meeting of the LDRRF Approval Committee

Urban Projects

Sandwip Municipality under Chittagong


District
Major Hazard:

Existing
Resources :

Tidal Flood
Cyclone Prone
Salinity intrusion

Very fertile land


Fish processing
industry.

Vulnerability
Tidal flood causing
water logging in the
urban community

Source : FTRA Report

Source : FTRA Report

Interventions
Recommended By
Municipality:
1.
2.

RCC drain
Re-excavation of road
cum embankment

Sandwip Municipality under Chittagong


District

Scheme Details
District

Municipality

Chittagong Sandip

Scheme
Code
CTG08130
02(a)

CTG08130
02(b)

Budget
Beneficiaries
Design Details (m)
(BDT)
(Total)
Reconstruction of RCC U21,990,735 3500
Length: 1300 m
Drain from Anam nahar to
Width: 1.50m
Saner hat on main road of
Height: 1.50m
Sandwip Pourashava

Project Title/Details

Construction of RCC UDrain Saner hat to Taltoli


on main road of Sandwip
Pourashava

18,463,581

3500

Length: 1700m
Width: 0.60m
Height: 0.80m

Sandwip Municipality under Chittagong District

Expected
Results

Water congestion will


be reduced during
monsoon or tidal flood

Impact

Widening of the
drainage will allow
proper flow of
water

Improved road
communication

Alamdanga Municipality under Chuadanga


District
Major Hazard:

Monsoon Flood.

Arsenic problems in few areas.

Water logging.

Existing
Resources :

Few Cottage
industries.

Vulnerability

People gets stranded in houses and


students face difficulties due to
innudated roads during monsoon
flood

Source : FTRA Report

Pucca/Semi
pucca roads.
Source : FTRA Report

Interventions Recommended By
Municipality:
1.
Non Structural
Garbage van for disposal
of waste
2.
Infrastructure
Drain Construction
Road reconstruction
Canal Re-excavation

Alamdanga Municipality under Chuadanga


District

Scheme Details
District

Chuadanga

Municipality

Alamdanga

Scheme Code

CHU0314002

Proposed canal

Project
Title/Details

Canal
Re-excavation

Budget
(BDT)

4,061,565

Beneficiaries(T
Design Details (m)
otal)

4800

L: 2893m
Top Width: 7.9m
Bot Width: 1.52m
H: 2.53m

Proposed canal

Alamdanga Municipality under Chuadanga


District

Expected
Results

Canan rexcavation will


allow monsoon flood to
flow and reduce drainage
congestion

Impact

Good source of
water for irrigation
in the peri urban
areas

Proper disposal of
waste reducing
environmental polluttion

Rural Projects

Decreer Char Union of Faridpur Sadar Upazila


under Faridpur District
Major Hazard
Interventions proposed
by DMCs/Community
Flood & Sedimentation
people
River Bank Erosion
Vulnerabilities
Killa/School Ground
Crop loss in case of flash
raising
flood
Plinth Raising
Heavy soil erosion of the
Construction of Flood
village / settlements.
resilient house
Lack of permanent
Embankment cum road
protection against flood .

Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

Target Hazard
Flood
Existing Resources
*Raised Ground
*Embankments cum road
Proposed DRR
Interventions
Construction of 80 Flood
Resilient Houses with solar
panel & Improved Woven

Impacts & Expected Results


80 ultra poor and vulnerable
families will have safe flood
resilient shelter on raised land
with solar panel and Improved
Woven.

Construction of 80 Flood Resilient house with Solar Panel and Improved


Woven at Kazam Matabarar Dangi & Baparir Cluster Village

Improved Woven

Decreer Char Union of Faridpur Sadar Upazila under Faridpur District


Scheme

Name of the Scheme

Estimated
Budget-BDT
(without 3%)

Construction of 80 Flood 9,385,120


Resilient house with Solar
Panel and Improved
Woven at Kazam
Matabarar Dangi &
Baparir Cluster Village

Beneficiaries

Design Data

435

Room size 15x 10


Verandah 15x4-7

Gaukandia Union of Durgapur Upazila under Netrokona District


Major Hazard
Flash Flood
River Bank Erosion
Flood

Vulnerabilities
Sudden heavy rainfall in the

upstream inundate the vast


area Gaukandia union
through river Someshwari.
Existing infrastructures wash
away/breached due to heavy
current.
Damage of crops and silted
cultivable lands.

Interventions proposed by

DMCs/Community people
Killa/Ground raising
Construction or

extension of
embankment cum road
River bank protection
work

Gaukandia Union in Durgapur Upazila under Netrokona District


Target Hazards
Flood,River Erosion,Flash Flood
Existing Resources
*Two Embankments
*06 School used as temporary
shelter.
Proposed DRR Interventions
One Embankment cum road

Impacts & Expected Results


@ Protect sand deposition on
cultivable land
@ Protect people and homestead
from hilly flash flood
@ Shelter for livestock on the
embankment during disaster
@
Develop
communication
network.

Construction of Embankment cum Road from Gaukandia primary School to adjacent dead Khal near
H/O of Shorab at Biswanathapur Village

Gaukandia Union in Durgapur Upazila under Netrokona District


Scheme Name of the Scheme

Estimated
Budget-BDT
(without 3%)

Beneficiaries Design Data

3,767,278

4,500

Construction of
Embankment cum Road
from Gaukandia primary
School to adjacent Mora
Khal near H/O of Shorab
at Biswanathapur Village

Length: 1215 m
Top Width: 4.27 m
Bottom Width: 16.27m
Height: 3.0 m
HFL: 2.25 m from base
Soil Type : Sandy Clay
Side Slope: 1:1.5

Poksia Union of Borhanuddin Upazila under


Bhola District
Major Hazard
Interventions proposed by
DMCs/Community people
Cyclone
Tidal Surge
Flood
Cyclone Resilience Habitat
River Bank Erosion
Killa construction
Water logging
Raising of Graveyard for
Vulnerabilities
Burial
Lack of permanent structures
Plinth Raising of Houses
against cyclone
Embankment cum road
Crop loss in case of flood
Heavy soil erosion of the
village / settlements.
Un-availability of raised
ground during flood .

Poksia Union of Borhanuddin Upazila under Bhola District


Target Hazard
Flood
Existing Resources
*Embankments cum road
*Cyclone Shelters
* School & Madrasa fields
Proposed DRR
Interventions
Earth raising for Graveyard
near Keramotgonj Bazar

Impacts & Expected Results


People will have safe place for
burial of dead bodies all the
year round.

Poksia Union of Borhanuddin Upazila under Bhola District


Scheme Name of the Scheme

Estimated
Budget-BDT
(without 3%)

Beneficiaries Design Data

220,677

6060

Earth raising for


Graveyard near
Keramotgonj Bazar

Length: 71.0 m
Width: 14.0 m
Height: 2.3 m
HFL: 1.0 m from base

Laxmitari Union of Gangachara Upazila under Rangpur District

Laxmitari Union of Gangachara Upazila under Rangpur


District
Major Hazard
Flood
River Bank Erosion
Drought
Tornado
Water logging
Vulnerabilities
Crop loss in case of flash
flood and water logging.
Heavy soil erosion of the
village / settlements.
Lack of permanent
protection against flood.

Interventions proposed

by DMCs/Community
people
Killa/School Ground

raising
Plinth Raising
Embankment cum road

Laxmitari Union of Gangachara Upazila under Rangpur District


Target Hazard
Flood & River Bank Erosion
Existing Resources
*Raised Ground
*Embankments cum road
*River bank protection cum
road
*Groin
Proposed DRR Interventions
2 Embankment cum road
schemes

Impacts & Expected Results


140 ultra poor families and
vulnerable people of the flood
affected area covering 3500
Hector of land will be more
resilient to disaster especially
flood.

Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under Laxitary UP

Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxitary UP

Laxmitari Union of Gangachara Upazila under Rangpur District


Scheme Name of the Scheme

Estimated
Budget-BDT

Beneficiaries

Design Data

Embankment cum Road at 2,596,266


Esli Bridge to Sonkar-dah
Madrasa Mor under
Laxitary UP

700

Length: 2165 m
Top Width: 4.3 m
Bottom Width: 10.7m
Height: 1.6 m
HFL: .7 m from base
Soil Type : Sandy
Side Slope: 1:2

Embankment cum Road at 935,215


Esli Karar Bridge to
Bagarhat under Laxitary
UP

400

Length: 1220 m
Top Width: 4.3 m
Bottom Width: 10.3m
Height: 1.5 m
HFL: .6 m from base
Soil Type : Sandy
Side Slope: 1:2

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

General Description of the Unions


Villages are isolated and surrounded by

Haor; locally named as AATI. After flash


flood, the entire area gets inundated
when erosion of soil takes place due to
wave action causing damage of HH &
disrupts livelihood.
The only rice crop (Boro) is cultivated
and harvest is subject to sudden flash
flood and require high ground for
storage.
People use RCC roads for
communication which remains
submerged for more than 6 months.
90% of inhabitants use open toilets.
Within 4 to 5 km there is no markets or
even graveyard for burial.
No Electricity

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamgonj District


Major Hazard
Flash flood
Wave action
Inundation
Sanitation

Vulnerabilities

Crop loss in case of flash flood


Heavy soil erosion of the village /
settlements.
Lack of permanent/insufficient
protection against wave.
Un-hygienic toilet.
Un-availability of drinking water.
Village remains isolated from other
villages, union, upazila.

Interventions proposed by DMCs/Community

people
@Construction of Killa
@Protection wall
@Killa connecting road
@Community Toilet & Sanitary latrine
@Tube-well
@Grave yard raising
@Solar system
@Tree plantation

Bahara and Sullah Union of Shalla Upazila under Sunamgonj District


Target Hazard
Existing Resources
Flood Shelters
Submerged RCC roads constructed by
LGED
Embankment constructed by BWDB

Flood

Proposed DRR Interventions


Comprehensive scheme including
@3 Nos of Killa
@7 Village and Killa Protection Walls
@One Killa connecting road
@ 130 nos Sanitary latrine
@10 nos Deep Tube-wells
@Sultanpur,Bhatgaon,Kartikpur and
Shobji Mohal grave yard raising
@35 Solar system & Tree plantation
@ One Foot bridge connecting
village and High school

Impacts & Expected Results

Killa can be used as storage of crops


and shelter for Livestock in high
flood season, use as market place,
religious and social gathering round
the year.
Village
will be permanently
protected from flood/Haor wave
action.
Graveyard will facilitate funeral
during flood and in dry season as
well.
Improved WatSan .

Bahara Union of Shalla Upazila under Sunamgonj District


Scheme Name of the Scheme

Estimated
Budget-BDT

Beneficiaries

Comprehensive scheme at Meda.


880,4625
Interventions: i) Construction of Killa, ii)
Killa Protection wall, iii) Killa connecting
road, iv) Community Toilet, v) Tube-well

Comprehensive scheme at Shantipur.


Interventions: i)Village Protection wall,
ii) Sultanpur grave yard raising, iii)
Sanitary latrine, iv) Tube-well, v) Solar
system, vi) Tree plantation
Comprehensive scheme at Harinagar.
Interventions: i) Killa Protection wall,
ii) Construction of Killa, iii) Sanitary
latrine, iv) Tube-well

8,604,714

330

3,643,424

6000

Comprehensive scheme at Bhatgaon.


Interventions: i)Village Protection wall,
ii)Bhatgaon grave yard raising

4,383,660

1000

3,000

Design Data

As attached

Sullah Union of Shalla Upazila under Sunamganj District


Scheme Name of the Scheme

3
4
5

Comprehensive scheme at Bolorampur.


Interventions: i) Raise school field, ii) Foot bridge
connect to school and village, iii) Tree plantation,
iv) Solar panel
Comprehensive scheme at Kartikpur (Notunhati).
Interventions: i) Village protection wall, ii)
Kartikpur Graveyard raising, iii) Sanitary latrine, iv)
Tube-well
Comprehensive scheme at Rowa Notunhati
(Bagerhat). Interventions: i) Village protection
wall, ii) Sanitary latrine, iii) Tube-well
Comprehensive scheme at Graam Sullah.
Interventions: i) Construction of Killa, ii) Raam
shallah sbojimohol ghrave yard raising.
Construction of village protection at Kandigaon by
CC block.

Estimated
Budget-BDT

Beneficiaries

788,340

420

3,914,857

230

4,663,902

300

2,183,323

7000

2,157,269

1800

Design Data

As Attached

Detailed Drawing of Village protection wall at Kartikpur Notun Hati under Shalla
Union of Shalla Upazila, Sunamganj.

Earth side
300mm

250

Earth Filling

375

300mm
300mm

500

Filter materials (Brick Bats)

GL

625

300mm
300mm

750

300mm

875

300mm

1000

300mm
150mm CC
75mm BFS
150mm Sand Filling

375mm

1300 mm

Section of Brick Retaining Wall


Project type: Retaining Wall

Comprehensive Disaster Management Program (CDMP-II)

For more information contact:


Comprehensive Disaster Management Programme (CDMP II)
United Nations Development Programme (UNDP)
Department of Disaster Management Bhaban (6th Floor)
92-93 Mohakhali C/A, Dhaka-1212, Bangladesh, Tel: (+88 02) 989 0937, 882 1255
Comprehensive Disaster Management Programme (CDMP II)
Ministry of Disaster Management & Relief

Website: www.cdmp.org.bd

Photo: Otin Dewan/CDMP

Thank you

You might also like