You are on page 1of 1

Federal Register / Vol. 70, No.

50 / Wednesday, March 16, 2005 / Notices 12905

previous investigation of this case. The Signed in Washington, DC this 28th day of Signed in Washington, DC this 17th day of
subject worker group can be certified as February, 2005. February, 2005.
eligible to apply for TAA as adversely Elliott S. Kushner, Elliott S. Kushner,
affected secondary workers only if Certifying Officer, Division of Trade Certifying Officer, Division of Trade
Murray Engineering either: (1) Supplied Adjustment Assistance. Adjustment Assistance.
components or unfinished or semi- [FR Doc. E5–1134 Filed 3–15–05; 8:45 am] [FR Doc. E5–1142 Filed 3–15–05; 8:45 am]
finished goods to a firm employing BILLING CODE 4510–30–P
BILLING CODE 4510–30–P
workers who are covered by a
certification of eligibility for adjustment
assistance; or (2) assembled or finished DEPARTMENT OF LABOR DEPARTMENT OF LABOR
products made by such a firm. In the
case at hand, neither criterion is met Employment and Training
Employment and Training
because Murray Engineering did no Administration
Administration
assembly or finishing work, nor did any [TA–W–56,606]
of Murray Engineering’s customers’ [TA–W–56,456]
workers receive a certification of Solo Cup Company, Springfield, MO;
eligibility to apply for TAA during the Parker Cone Company, Maiden, NC; Notice of Termination of Investigation
relevant time period. Notice of Termination of Investigation Pursuant to section 221 of the Trade
In order to be eligible as suppliers of Act of 1974, an investigation was
components or unfinished or semi- Pursuant to section 221 of the Trade initiated on February 18, 2005, in
finished goods, as petitioner claims the Act of 1974, as amended, an response to a petition filed by the
subject worker group to be, the subject investigation was initiated on February International Brotherhood of Electrical
worker group must have produced a 1, 2005, in response to a petition filed Workers Union, Local 1553 on behalf of
component part of the product that is by a company official on behalf of workers at Solo Cup Company,
the basis of the TAA certification. workers of Parker Cone Company, Springfield, Missouri.
Because Murray Engineering did not Maiden, North Carolina. The petitioner has requested that the
produce a component part of a final The petition regarding the petition be withdrawn. Consequently,
product, they were not secondary investigation has been deemed invalid. the investigation has been terminated.
suppliers of a TAA-certified facility, as In order to establish a valid worker Signed in Washington, DC, this 1st day of
required by section 222(b) of the Trade group, there must be at least three full- March, 2005.
Act. Even if the design specifications time workers employed at some point Elliott S. Kushner,
were sometimes mounted or affixed to during the period under investigation. Certifying Officer, Division of Trade
their customers’ manufacturing Workers of the group subject to this Adjustment Assistance.
equipment, the display of the design investigation did not meet this [FR Doc. E5–1158 Filed 3–15–05; 8:45 am]
specifications on the equipment is not threshold level of employment. BILLING CODE 4510–30–P
necessary for the equipment to function Consequently, the investigation has
properly and does not enhance the been terminated.
equipment’s performance; thus, the DEPARTMENT OF LABOR
designs are not component parts. Signed in Washington, DC, this 1st day of
March 2005. Mine Safety and Health Administration
Further, Murray Engineering did no
Richard Church,
business with a TAA-certified company
during the relevant time period. The Certifying Officer, Division of Trade Petitions for Modification
petitioning worker specifically claims Adjustment Assistance.
The following parties have filed
that Murray Engineering provided [FR Doc. E5–1138 Filed 3–15–05; 8:45 am]
petitions to modify the application of
designs to Lamb Technicon, a TAA- BILLING CODE 4510–30–P existing safety standards under section
certified company (TA–W–40,267 & 101(c) of the Federal Mine Safety and
TA–W–40,267A). However, Murray Health Act of 1977.
Engineering did business with Lamb DEPARTMENT OF LABOR
Technicon most recently in 1999, which 1. Snyder Coal Company
is before the relevant time period for the Employment and Training [Docket No. M–2005–007–C]
Murray Engineering petition at issue in Administration
Snyder Coal Company, 66 Snyder
this case. Therefore, Lamb Technicon’s Lane, Hegins, Pennsylvania 17938 has
certification (TA–W–40,267 & TA–W– [TA–W–56,517] filed a petition to modify the
40,267A) is not a valid basis for application of 30 CFR 77.403(a) (Mobile
certifying Murray Engineering workers Shirley’s Sewvac, Hermiston, OR; equipment; rollover protective
as adversely affected secondary workers Notice of Termination of Investigation structures (ROPS) to its N & L Slope
eligible to apply for TAA. Mine (MSHA I.D. No. 36–02203) located
Pursuant to section 221 of the Trade
Conclusion in Northumberland County,
Act of 1974, as amended, an Pennsylvania. The petitioner requests a
As the result of the findings of the investigation was initiated on October modification of the existing standard to
investigation on remand, I affirm the 12, 2004, in response to a worker permit the Case Front End Loader,
original notice of negative petition filed by a company official on Model W26B, S/N No. 9107513 to be
determination of eligibility to apply for behalf of workers at Shirley’s SewVac, used at the N & L Slope Mine without
adjustment assistance for workers and Hermiston, Oregon. being equipped with rollover protection
former workers of Murray Engineering, The petitioner has requested that the structures (ROPS). The petitioner asserts
Inc., Complete Design Service, Flint, petition be withdrawn. Consequently, that the proposed alternative method
Michigan. the investigation has been terminated. would provide at least the same

VerDate jul<14>2003 16:45 Mar 15, 2005 Jkt 205001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1

You might also like