Federal Register / Vol. 70, No.

77 / Friday, April 22, 2005 / Notices 20901

Policy Act, as amended. Requests for Summary: EPA has no objections to Summary: The final EIS addressed
copies of EPA comments can be directed the proposed project. EPA’s request for additional sediment
to the Office of Federal Activities at modeling and additional measures to
Rating LO
202–564–7167. mitigate sediment delivery to streams.
An explanation of the ratings assigned EIS No. 20050080, ERP No. D–FRC– EPA reiterates the need to monitor
to draft environmental impact G03025–TX, Ingleside Energy Center actual water quality effects from the
statements (EISs) was published in the Liquefied Natural Gas (LNG) Import salvage harvests, and if necessary,
Federal Register dated April 1, 2005 (70 Terminal and San Patricio Pipeline develop additional mitigation measures
FR 16815). Natural Gas Pipeline, Authorization to to promote consistency with TMDL
Draft EISs Construct, Install and Operate, San development and to further improve
Patricio and Nueces Counties, TX. Trail Creek.
EIS No. 20050011, ERP No. D–FAA– EIS No. 20050112, ERP No. F–AFS–
D40328–VA, Washington Dulles Summary: EPA had no objections to
the selection of the proposed J65397–WY, Woodrock Project,
International Airport Project, Proposal for Timber Sale, Travel
Acquisition of Land, Construction and alternative.
Management and Watershed
Operation, IAD 2004 Airport Layout Rating LO Restoration, Implementation, Bighorn
Plan (ALP), Dulles, VA National Forest, Tongue Ranger
Final EISs
Summary: EPA expressed concern District, Sheridan County, WY.
due to wetland and stream impacts EIS No. 20040581, ERP No. F–DOE–
Summary: EPA does not expect
associated with the proposed action, K08029–00, Imperial-Mexicali 230-kV
substantial impacts form the proposed
and requested that wetland impacts Transmission Lines, Construct a
action. However, EPA recommends
associated with the clear zones be Double-Circuit 230-kV Transmission
focusing harvest activities on Forest-
included in the mitigation plan. EPA Line, Presidential Permit and Right-
private lands interface areas both to
also requested that the wetland of-Way Grants, Imperial Valley
protect property and to minimize
avoidance alternative (Alternative 5) Substation to Calexico at the U.S.-
impacts in important wildlife habitat
should be carried forward for detail Mexico Border, Imperial County, CA
areas.
study to more closely track the and US.-Mexico Border.
alternatives analysis requirements under EIS No. 20050129, ERP No. F–AFS–
Summary: EPA has no objection to the J65431–UT, Duck Creek Fuels
Section 404 of the Clean Water Act. proposed action, but recommends that Treatment Analysis, To Reduce Fuels,
Rating EC2 DOE continue working with all Enhance Fire-Tolerant Vegetation and
stakeholders to support and encourage Provide Fuel Breaks, Dixie National
EIS No. 20050033, ERP No. D–IBR–
use of off-site mitigation measures as a Forest, Cedard City Ranger District,
K60035–NV, Humboldt Project
valuable means to address the Kane County, UT.
Conveyance, Transferring 83, 530
Acres from Federal Ownership to the limitations in modeling ozone impacts, Summary: EPA continues to express
Pershing County Water Conservation and to ensure that there would be no net concerns about impacts to water quality,
District (PCWCD), Pershing and increase of air pollution in the Imperial fish and wildlife habitats, soils and old
Lander Counties, NV. County region. growth forest resources.
Summary: EPA expressed EIS No. 20050079, ERP No. F–AFS–
Dated: April 19, 2005.
environmental concerns about potential K65273–CA, Cottonwood Fire
Robert W. Hargrove,
impacts to water quality, and requested Vegetation Management Project,
Control Vegetation that is Competing Director, NEPA Compliance Division, Office
that the Final EIS provide additional of Federal Activities.
information to support the cumulative with Conifer Seedlings, Sierraville
Ranger District, Tahoe National [FR Doc. 05–8115 Filed 4–21–05; 8:45 am]
impacts analysis, and further discussion BILLING CODE 6560–50–P
of tribal consultation efforts and impacts Forest, Sierra County, CA.
to Indian sacred sites. Summary: The final EIS addressed
EPA’s comments providing additional ENVIRONMENTAL PROTECTION
Rating EC2
information on the final decisions; no AGENCY
EIS No. 20050036, ERP No. D–AFS– formal comment letter was sent to the
K65278–CA, Burlington Ridge Trails preparing agency. [FRL–7902–6]
Project, To Eliminate, Reconstruct/or EIS No. 20050097, ERP No. F–FRC–
Reroute Unsound Trail Sections, Opportunity for Organizations That
G03023–TX, Cheniere Corpus Christi Have Expertise in Sustainable
Tahoe National Forest, Yuba River Liquefied Natural Gas (LNG) Project,
Ranger District, Camptonville, Nevada Development and Sustainable
To Provide Facilities for the Facilities To Cooperate With a New
County, NV. Importation, Storage and Vaporization Initiative in EPA’s Office of Site
Summary: EPA has no objections to of Liquefied Natural Gas, Nueces and Remediation Enforcement
the proposed action, but requested San Patricio Counties, TX.
additional monitoring after the project is AGENCY: Environmental Protection
Summary: EPA expressed concerns
implemented to confirm wildlife is not Agency (EPA).
about the potential introduction of
being impacted. ACTION: Notice; announcement of
invasive species from increased foreign
Rating LO vessel traffic. initiative and request for statements of
interest.
EIS No. 20050056, ERP No. D–FHW– EIS No. 20050106, ERP No. F–AFS–
G40184–TX, Trinity Parkway Project, J65018–MT, Sheep Creek Salvage SUMMARY: The Environmental Protection
Construction of Limited Access Toll Project, Moving Current Resource Agency, Office of Site Remediation
Facility from IH–35 E/TX–183 to US– Conditions and Trends Toward Enforcement (OSRE) within the Office
175/TX–310, U.S. Army COE Section Desired Future Conditions, of Enforcement and Compliance
10 and 404 Permits, Dallas County, Beaverhead-Deerlodge National Assurance (OECA) is interested in
TX. Forest, Beaverhead County, MT. cooperating with organizations with

VerDate jul<14>2003 15:27 Apr 21, 2005 Jkt 205001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1
20902 Federal Register / Vol. 70, No. 77 / Friday, April 22, 2005 / Notices

expertise in sustainable development particular project for compensation if organization’s role in the projects; (2)
and sustainable facilities (e.g., non- the redeveloper and ER3 network applicable brochures or similar
profit organizations, universities, trade partner enter into a separate working information for the organization; and (3)
associations, organizations that practice agreement. EPA will not be a party to contact information. OSRE will make its
sustainable development, etc.) in these agreements. selections based upon the extent to
connection with its Environmentally Through this initiative, OSRE hopes which an organization can effectively
Responsible Redevelopment and Reuse to identify organizations with expertise cooperate with OSRE and private
(ER3) initiative. Please note that EPA consistent with the sustainable entities in many areas of sustainable
will not compensate cooperating development concepts noted above, and development and sustainable facilities,
organizations for their efforts in collaborate with the selected geographic location, and experience
connection with this initiative. organizations to establish one part of the with respect to contaminated properties
DATES: Statements of interest are due by ER3 network. Once OSRE has identified and brownfield sites.
5 p.m. e.s.t. on June 21, 2005. a variety of organizations, it will enter
Dated: April 18, 2005.
ADDRESSES: Please mail applications to into a non-financial cooperation
agreement with each organization that Susan E. Bromm,
Phil Page, Environmental Protection Director, Office of Site Remediation
Agency, Office of Site Remediation acknowledges both the organization’s
expertise in sustainability concepts and Enforcement.
Enforcement, Ariel Rios Building, 1200 [FR Doc. 05–8126 Filed 4–21–05; 8:45 am]
Pennsylvania Ave. NW., M/C 2273A, the working relationship between the
Washington, DC 20460. In the organization and OSRE. The agreements BILLING CODE 6560–50–P

alternative, you may e-mail applications will recognize expertise that may be
to page.phil@epa.gov. valuable to reuse and redevelopment
efforts in connection with the ER3 EQUAL EMPLOYMENT OPPORTUNITY
FOR FURTHER INFORMATION CONTACT: Phil
initiative. The agreements will not COMMISSION
Page, (202) 564–4211, or Erin Smith,
provide an endorsement of any
(202) 564–2038, or go to http:// particular ER3 partner’s products and Sunshine Act Meeting
www.epa.gov/compliance/cleanup/ services, nor are they a vehicle for these
redevelop/er3. entities to receive compensation of any FEDERAL REGISTER CITATIONS OF PREVIOUS
SUPPLEMENTARY INFORMATION: ER3, a type from the Agency. However, nothing ANNOUNCEMENT: 70 FR 20217, April 18,
new initiative sponsored by OECA, has in this process prohibits selected EPA 2005 & 70 FR 19452, April 13, 2005.
several components, one of which is partners from entering into private PREVIOUSLY ANNOUNCED TIME AND DATE OF
developing working relationships with agreements for compensation with those MEETING: 9 a.m. (eastern time) Thursday,
one or more interested organizations entities engaged in the reuse or April 21, 2005.
that have expertise in sustainable redevelopment process. Further, EPA
development. CHANGE IN THE MEETING: The closed
may enter into separate financial session of the Meeting has been
The purpose of ER3 is to encourage transactions with cooperative partners
the reuse and redevelopment of cancelled.
to the extent consistent with applicable
contaminated and previously- FURTHER INFORMATION CONTACT: Stephen
procurement and financial assistance
contaminated property in an regulations and policies governing Llewellyn, Acting Executive Officer on
environmentally responsible manner, competition. OSRE may, with the (202) 663–4070.
incorporating concepts such as green permission of the selected Dated: April 20, 2005.
building design, construction and organizations, post links to the Stephen Llewellyn,
operation; ecological and greenspace organizations’ Web sites on EPA’s ER3 Acting Executive Officer.
enhancement; energy efficiency; the use Web page to provide additional [FR Doc. 05–8240 Filed 4–20–05; 2:48 pm]
of renewable energy sources; information and resources to entities BILLING CODE 6750–06–M
environmental management systems; that visit the ER3 site.
storm water and wastewater Organizations that wish to participate
management; pollution prevention; in this initiative must send a statement
waste minimization and recycling; and of interest to the address listed below. FEDERAL HOUSING FINANCE BOARD
healthy buildings. As part of the ER3 The statement of interest must include:
[No. 2005–N–01]
initiative, OSRE is willing to provide (1) A statement that identifies (a) the
incentives, where necessary, to entities areas of expertise of the organization Federal Home Loan Bank Members
that plan to redevelop contaminated or with respect to the concepts discussed Selected for Community Support
formerly-contaminated property (e.g., above (green building design, Review
communities, developers, or other construction and operation; ecological
organizations) to encourage these and greenspace enhancement; energy AGENCY: Federal Housing Finance
entities to incorporate sustainability efficiency; the use of renewable energy Board.
concepts into their projects. sources; environmental management ACTION: Notice.
To assist redevelopers with the systems; storm water and wastewater
logistics of integrating environmentally- management; pollution prevention; SUMMARY: The Federal Housing Finance
superior redevelopment and reuse waste minimization and recycling; and Board (Finance Board) is announcing
concepts into particular projects, OSRE healthy buildings); (b) the manner in the Federal Home Loan Bank (Bank)
is forming, in part through this notice, which the organization can assist members it has selected for the 2004–05
a network of governmental and non- entities with incorporating fifth quarter review cycle under the
governmental partners. The ER3 sustainability concepts into the Finance Board’s community support
network partners will serve as a source redevelopment and reuse of requirements regulation. This notice
of general information to redevelopers contaminated or formerly-contaminated also prescribes the deadline by which
(for example, through information on a property; and (c) examples of relevant Bank members selected for review must
Web site). Further, an ER3 network projects in which the organization has submit Community Support Statements
partner may provide services on a participated, along with the to the Finance Board.

VerDate jul<14>2003 15:27 Apr 21, 2005 Jkt 205001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1

You might also like