You are on page 1of 3

23860 Federal Register / Vol. 70, No.

86 / Thursday, May 5, 2005 / Notices

Generation, Inc., Conectiv Bethlehem, automatic generation control (866) 208–3676 (toll free). For TTY, call
LLC, Fauquier Landfill Gas, LLC, and equipment. Whiting requests an (202) 502–8659.
Rolling Hills Landfill Gas, LLC, (jointly, effective date of April 25, 2005.
Linda Mitry,
the PHI Entities) submitted for filing Comment Date: 5 p.m. eastern time on
proposed revisions to their respective Deputy Secretary.
May 5, 2005. [FR Doc. E5–2193 Filed 5–4–05; 8:45 am]
market-based rate tariffs to incorporate
the reporting requirements of the 6. EnergyUSA–TPC Corp. Northern BILLING CODE 6717–01–P
Commission’s order, Reporting Indiana Public Service Company
Requirement for Changes in Status for [Docket No. ER05–865–000]
Public Utilities with Market-Based Rate DEPARTMENT OF ENERGY
Authority, Final Rule, 110 FERC Take notice that on April 26, 2005,
Federal Energy Regulatory
¶ 61,097 (2005) (Order No. 652). The EnergyUSA–TPC Corp. (TPC) and
Commission
PHI Entities state that copies of the Northern Indiana Public Service
filing were served on parties on the Company (NIPSCO) tendered for filing a
official service lists in the above- purchased power agreement pursuant to [Docket No. EC04–90–000, et al.]
captioned proceedings. which TPC will provide automatic
Oregon Electric Utility Company, et al.;
Comment Date: 5 p.m. eastern time on generation control regulation capacity
Electric Rate and Corporate Filings
May 5, 2005. and energy to NIPSCO. TPC and
NIPSCO state that they are corporate April 27, 2005.
3. Midwest Independent Transmission affiliates and have complied with all
System Operator, Inc. The following filings have been made
Commission requirements regarding with the Commission. The filings are
[Docket Nos. ER03–580–005 and EL03–119– purchased power agreements between listed in ascending order within each
005] affiliates. docket classification.
Take notice that on June 25, 2004, Comment Date: 5 p.m. eastern time on
Midwest Independent Transmission 1. Oregon Electric Utility Company
May 6, 2005.
System Operator, Inc. (Midwest ISO) Portland General Electric Company
submitted a refund report in compliance Standard Paragraph [Docket No. EC04–90–000]
with Commission’s letter order issued
Any person desiring to intervene or to Take notice that on April 8, 2005,
March 3, 2004 in Docket Nos. ER03–
protest this filing must file in Oregon Electric Utility Company and
580–000, 001, 002, 003, 004 and EL03–
accordance with Rules 211 and 214 of Portland General Electric Company filed
119–000.
the Commission’s Rules of Practice and a withdrawal of their application for
Comment Date: 5 p.m. eastern time on
Procedure (18 CFR 385.211 and Approval of a Transfer of Control over
May 11, 2005.
385.214). Protests will be considered by Jurisdictional Facilities and Request for
4. Pacific Gas and Electric Company the Commission in determining the Waiver of Regulations in Docket No.
[Docket No. ER05–858–000] appropriate action to be taken, but will EC04–90–000 filed on April 6, 2004, as
not serve to make protestants parties to amended on July 22, 2004, and
Take notice that on April 25, 2005, December 7, 2004.
the proceeding. Any person wishing to
Pacific Gas and Electric Company
become a party must file a notice of Comment Date: 5 p.m. eastern time on
(PG&E) tendered for filing temporary
intervention or motion to intervene, as May 9, 2005.
modifications to Service Agreement No.
appropriate. Such notices, motions, or
42 for network integration transmission 2. Florida Power & Light Company
protests must be filed on or before the
service (NITS) between PG&E and the
comment date. Anyone filing a motion [Docket Nos. ER93–465–034, ER96–417–003,
San Francisco Bay Area Rapid Transit ER96–1375–004, OA96–39–011, OA97–245–
to intervene or protest must serve a copy
District (BART). 004]
of that document on the Applicant and
PG&E states that copies of this filing
all parties to this proceeding. Take notice that on April 25, 2005,
have been served upon BART, the
California Public Utilities Commission The Commission encourages Florida Power & Light Company (FPL)
and the California Independent System electronic submission of protests and submitted a compliance filing pursuant
Operator Corporation. interventions in lieu of paper using the to the Commission’s order issued
Comment Date: 5 p.m. eastern time on ‘‘eFiling’’ link at http://www.ferc.gov. January 25, 2005, in Florida Power &
May 16, 2005. Persons unable to file electronically Light Co., 110 FERC ¶ 61,058 (2005).
should submit an original and 14 copies FPL states that copies of the filing
5. Whiting Clean Energy, Inc. of the protest or intervention to the were served on parties on the official
[Docket No. ER05–860–000] Federal Energy Regulatory Commission, service lists in the above-captioned
Take notice that on April 25, 2005, 888 First Street, NE., Washington, DC proceedings.
Whiting Clean Energy, Inc. (Whiting) 20426. Comment Date: 5 p.m. eastern time on
tendered for filing a Power Sales Tariff. This filing is accessible on-line at May 16, 2005.
Whiting owns and operates a 525 MW http://www.ferc.gov, using the 3. Dow Pipeline Company
generation facility located in Whiting, ‘‘eLibrary’’ link and is available for
[Docket No. ER00–2529–003]
Indiana. Whiting states that, pursuant to review in the Commission’s Public
the Power Sales Tariff, it will offer for Reference Room in Washington, DC. Take notice that on April 25, 2005,
sale energy and capacity at cost-based There is an ‘‘eSubscription’’ link on the Dow Pipeline Company submitted a
rates. In addition, Whiting states that if Web site that enables subscribers to compliance filing pursuant to the
desired by a buyer under the Power receive e-mail notification when a Commission’s March 25, 2005, order in
Sales Tariff, Whiting will provide the document is added to a subscribed Dow Pipeline Company, 110 FERC
buyer with the ability to increase or docket(s). For assistance with any FERC ¶ 61,354 (2005).
decrease the output of Whiting’s Online service, please e-mail Comment Date: 5 p.m. eastern time on
generation facility through the use of FERCOnlineSupport@ferc.gov, or call May 16, 2005.

VerDate jul<14>2003 13:10 May 04, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1
Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices 23861

4. Southern California Edison Company 7. Deephaven RV Sub Fund Ltd. Carolina and North Carolina state public
[Docket No. ER04–435–012] [Docket No. ER05–725–001]
service commissions.
Comment Date: 5 p.m. eastern time on
Take notice that on April 22, 2005, Take notice that on April 22, 2005, May 13, 2005.
Southern California Edison Company Deephaven RV Sub Fund Ltd.
(SCE) tendered for filing revisions to its (Deephaven) tendered for filing a 11. Virginia Electric and Power
Wholesale Distribution Access Tariff supplement to its March 24, 2005, Company
(WDAT), FERC Electric Tariff, First application in Docket No. ER05–725– [Docket No. ER05–856–000]
Revised Volume No. 5, in compliance 000 for market-based rate authority. Take notice that on April 22, 2005,
with the Commission’s Order issued Deephaven states that the supplement Virginia Electric and Power Company
February 18, 2005, in Docket Nos. adds a new rate sheet to Deephaven’s (VEPCO) tendered for filing Supplement
ER04–435–006, 110 FERC ¶ 61,176. SCE proposed rate schedule setting forth the No. 2 to the Agreement for the Purchase
states that the present filing is also change in status reporting requirements of Electricity for Resale from Virginia
tendered pursuant to section 205 of the adopted by the Commission in Order Electric and Power Company between
Federal Power Act, 16 U.S.C. 824d No. 652. Deephaven requests an VEPCO and the Town of Windsor, North
(2004) and section 35.13 of the effective date of April 25, 2005. Carolina. VEPCO requests an effective
Comission’s Rules of Practice and Comment Date: 5 p.m. eastern time on date of June 21, 2005.
Procedure, 18 CFR 35.13 (2004). May 2, 2005. VEPCO states that copies of the filing
SCE states that copies of this filing were served upon the Town of Windsor,
8. Victoria International Ltd.
were served on parties on the official the Virginia State Corporation
service list in the above-captioned [Docket No. ER05–757–002] Commission and the North Carolina
proceeding. Take notice that on April 25, 2005, Utilities Commission.
Victoria International Ltd. (Victoria) Comment Date: 5 p.m. eastern time on
Comment Date: 5 p.m. eastern time on
submitted an amendment to its March May 13, 2005.
May 13, 2005.
31, 2005, and April 12, 2005, filings 12. Tampa Electric Company
5. Milford Power Company, LLC submitting a petition for authority to
sell power at market-based rates, [Docket No. ER05–859–000]
[Docket No. ER05–163–003]
acceptance of proposed rate schedule, Take notice that on April 22, 2005,
Take notice that, on April 21, 2005, Tampa Electric Company (Tampa
and granting of certain waivers. Victoria
Milford Power Company, LLC (Milford) Electric) filed a notice pursuant to the
requests an effective date 60 days from
submitted a compliance filing pursuant order issued March 30, 2005, in North
the date of filing of the petition or the
to the Commission’s order issued March American Electric Reliability Council,
date of the order accepting Victoria’s
22, 2005, in Docket No.ER05–163–000, 110 FERC ¶ 61,388, stating that: (1) It
rate schedule for filing, whichever is
Milford Power Company, LLC, 110 FERC uses the North American Electric
earlier.
¶ 61,299. Reliability Council’s (NERC’s) revised
Comment Date: 5 p.m. eastern time on
Milford states that copies of the filing May 13, 2005. transmission loading relief (TLR)
were served on parties on the official procedures; and (2) its open access
service list in the above-captioned 9. Virtual Energy, Inc. transmission tariff (OATT) shall be
proceeding. [Docket No. ER05–798–001] considered so modified. Tampa Electric
Comment Date: 5 p.m. eastern time on also tendered for filing First Revised
Take notice that on April 22, 2005,
May 12, 2005. Sheet No. 121, which updates the notice
Virtual Energy, Inc. (Virtual Energy)
concerning use of the NERC TLR
6. Transmission Owners of the Midwest filed an amended petition for
procedures in the OATT. Tampa
Independent Transmission System acceptance of Virtual Energy Rate
Electric requests an effective date of
Operator Inc. Schedule FERC No. 1; the granting of
April 1, 2005.
certain blanket approvals, including the Tampa Electric states that copies of
[Docket No. ER05–447–004]
authority to sell electricity at market- the filing have been served on all
Take notice that on April 22, 2005, based rates; and the waiver of certain persons on the service list in Docket No.
the Transmission Owners of the Commission regulations, originally filed ER05–580–000, all customers under
Midwest Independent Transmission with the Commission on April 8, 2005, Tampa Electric’s OATT, and the Florida
System Operator (Midwest ISO in Docket No. ER05–798–000. Public Service Commission.
Transmission Owners) submitted for Comment Date: 5 p.m. eastern time on Comment Date: 5 p.m. eastern time on
filing in compliance with the May 13, 2005. May 13, 2005.
Commission’s order issued March 24,
2005, in Docket No. ER05–447–000, et 10. Duke Energy Corporation 13. North West Rural Electric
al., an amendment to the proposed [Docket No. ER05–855–000] Cooperative
Schedule 23 to the Midwest Take notice that on April 22, 2005, [Docket No. ES05–29–000]
Independent Transmission System Duke Energy Corporation, on behalf of Take notice that on April 21, 2005,
Operator, Inc.’s Tariff. Duke Electric Transmission, North West Rural Electric Cooperative
The Midwest ISO Transmission (collectively, Duke) submitted a large (North West) submitted an application
Owners state that they are serving this generator interconnection agreement pursuant to section 204 of the Federal
filing on all Midwest ISO’s affected between Duke Electric Transmission Power Act seeking authorization to
customers as well as on all applicable and Power Ventures Group, LLC (PVG), make long-term borrowings in an
state commissions. In addition, the which is designated as Service amount not to exceed $13.5 million
Midwest ISO Transmission Owners Agreement No. 339 under Duke Electric under a line of credit with the National
state that the Midwest ISO will post a Transmission FERC Electric Tariff Third Rural Utilities Cooperative Finance
copy on its home page. Revised Volume No. 4. Corporation.
Comment Date: 5 p.m. eastern time on Duke states that copies of the filing North West also requests a waiver
May 13, 2005 were served upon PVG and the South from the Commission’s competitive

VerDate jul<14>2003 13:10 May 04, 2005 Jkt 205001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1
23862 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices

bidding and negotiated placement or Commission) has prepared a draft Moffat Counties) and 51.9 miles located
requirements at 18 CFR 34.2. environmental impact statement (EIS) in Wyoming (Sweetwater County);
Comment Date: 5 p.m. eastern time on on the interstate natural gas pipeline • Additional compression to be
May 18, 2005. transmission facilities proposed by installed at the existing CIG Greasewood
Wyoming Interstate Company, Ltd. Compressor Station in Colorado;
Standard Paragraph • Four meter stations at
(WIC) in Moffat and Rio Blanco
Any person desiring to intervene or to Counties, Colorado, and Sweetwater interconnections with other pipeline
protest this filing must file in County, Wyoming, in the above- systems (two associated with the CIG
accordance with Rules 211 and 214 of referenced docket. Greasewood Compressor Station, two at
the Commission’s Rules of Practice and The draft EIS was prepared to satisfy the CIG Wamsutter Compressor Station);
Procedure (18 CFR 385.211 and the requirements of the National • Three pigging facilities (one
385.214). Protests will be considered by Environmental Policy Act (NEPA). Its associated with each compressor station
the Commission in determining the purpose is to inform the Commission, and a new facility at milepost 54.0 near
appropriate action to be taken, but will the public, and other permitting County Road 4 in Moffat County,
not serve to make protestants parties to agencies about the potential adverse and Colorado);
the proceeding. Any person wishing to beneficial environmental impacts • Nine mainline valves (one valve at
become a party must file a notice of associated with the proposed Piceance each of the two existing compressor
intervention or motion to intervene, as Basin Expansion Project (Piceance stations and seven valves along the
appropriate. Such notices, motions, or Project) and its alternatives, and to pipeline ROW); and
protests must be filed on or before the recommend practical, reasonable, and • Other associated facilities, such as
comment date. Anyone filing a motion appropriate mitigation measures which access roads and communication
to intervene or protest must serve a copy would avoid or reduce any significant towers.
of that document on the Applicant and adverse impacts to the maximum extent The proposed project would be
all parties to this proceeding. practicable and, where feasible, to less capable of transporting up to 350,000
The Commission encourages than significant levels. The draft EIS dekatherms of natural gas per day (Dth/
electronic submission of protests and concludes that the proposed project, d) from the CIG Greasewood
interventions in lieu of paper using the with appropriate mitigating measures as Compressor Station to interconnections
‘‘eFiling’’ link at http://www.ferc.gov. recommended, would have limited at Wamsutter, Wyoming with the CIG
Persons unable to file electronically adverse environmental impact. and WIC interstate transmission
should submit an original and 14 copies The U.S. Department of Interior, pipeline systems that serve markets east
of the protest or intervention to the Bureau of Land Management (BLM) is and west of Wamsutter.
Federal Energy Regulatory Commission, participating as a cooperating agency in Comment Procedures and Public
888 First Street, NE., Washington, DC the preparation of the draft EIS because Meetings
20426. the project would cross Federal lands
This filing is accessible on-line at under BLM administration in Wyoming Any person wishing to comment on
http://www.ferc.gov, using the and Colorado. The draft EIS will be used the draft EIS may do so. To ensure
‘‘eLibrary’’ link and is available for by the BLM to consider the issuance of consideration of your comments on the
review in the Commission’s Public a right-of-way (ROW) grant for the proposal in the final EIS, it is important
Reference Room in Washington, DC. portion of the project on federal lands. that we receive your comments before
There is an ‘‘eSubscription’’ link on the While the conclusions and the date specified below. Please follow
Web site that enables subscribers to recommendations presented in the draft these instructions carefully to ensure
receive e-mail notification when a EIS were developed with input from the that your comments are received in time
document is added to a subscribed BLM as a cooperating agency, the BLM and are properly recorded:
docket(s). For assistance with any FERC will present its own conclusions and • Send an original and two copies of
Online service, please e-mail recommendations in its Record of your comments to: Magalie R. Salas,
FERCOnlineSupport@ferc.gov, or call Decision for the project. Secretary, Federal Energy Regulatory
(866) 208–3676 (toll free). For TTY, call Commission, 888 First Street, NE.,
Proposed Project Room 1A, Washington, DC 20426;
(202) 502–8659.
The Piceance Project involves the • Reference Docket No. CP05–54–
Linda Mitry, construction and operation of a new 000;
Deputy Secretary. interstate natural gas pipeline system • Label one copy of your comments
[FR Doc. E5–2194 Filed 5–4–05; 8:45 am] that would extend between the existing for the attention of Gas Branch 1, PJ11.1;
BILLING CODE 6717–01–P Colorado Interstate Gas Company (CIG) and
Greasewood Compressor Station in Rio • Mail your comments so that they
Blanco County, Colorado, and the will be received in Washington, D.C. on
DEPARTMENT OF ENERGY existing CIG Wamsutter Compressor or before June 20, 2005.
Station in Sweetwater County, The Commission strongly encourages
Federal Energy Regulatory Wyoming.1 electronic filing of any comments or
Commission The draft EIS assesses the potential interventions or protests to this
environmental effects of the proceeding. See 18 Code of Federal
[Docket No. CP05–54–000]
construction and operation of the Regulations (CFR) 385.2001(a)(1)(iii)
Wyoming Interstate Company, Ltd.; following facilities in Colorado and and the instructions on the
Notice of Availability of the Draft Wyoming: Commission’s Web site at http://
Environmental Impact Statement for • About 141.7 miles of 24-inch- www.ferc.gov under the ‘‘e-Filing’’ link
the Piceance Basin Expansion Project diameter new pipeline with 89.8 miles and the link to the User’s Guide. Prepare
located in Colorado (Rio Blanco and your submission in the same manner as
April 29, 2005. you would if filing on paper and save
The environmental staff of the Federal 1 Both WIC and CIG are affiliates owned by El it to a file on your hard drive. Before
Energy Regulatory Commission (FERC Paso Corporation. you can file comments, you will need to

VerDate jul<14>2003 13:10 May 04, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1