You are on page 1of 2

29298 Federal Register / Vol. 70, No.

97 / Friday, May 20, 2005 / Notices

TransColorado states that it filed the DEPARTMENT OF ENERGY Web site that enables subscribers to
above-referenced request to petition the receive e-mail notification when a
Commission to allow TransColorado to Federal Energy Regulatory document is added to a subscribed
waive certain force majeure provisions Commission docket(s). For assistance with any FERC
of section 14 of the general terms and [Docket No. RP05–337–000]
Online service, please e-mail
conditions of its FERC Gas Tariff. FERCOnlineSupport@ferc.gov, or call
Transcontinental Gas Pipe Line (866) 208–3676 (toll free). For TTY, call
TransColorado states that copies of its (202) 502–8659.
filing have been served upon all of its Corporation; Notice of Proposed
customers and effected state Changes in FERC Gas Tariff Magalie R. Salas,
commissions. May 13, 2005. Secretary.
Any person desiring to intervene or to Take notice that on May 10, 2005, [FR Doc. E5–2550 Filed 5–19–05; 8:45 am]
protest this filing must file in Transcontinental Gas Pipe Line BILLING CODE 6717–01–P

accordance with Rules 211 and 214 of Corporation (Transco) tendered for
the Commission’s Rules of Practice and filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, the DEPARTMENT OF ENERGY
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by following tariff sheets to become Federal Energy Regulatory
the Commission in determining the effective June 9, 2005: Commission
appropriate action to be taken, but will Third Revised Sheet No. 120
[Docket No. RP05–338–000]
not serve to make protestants parties to Fourth Revised Sheet No.122
the proceeding. Any person wishing to Second Revised Sheet No. 122D
Second Revised Sheet No. 122E
Transcontinental Gas Pipe Line
become a party must file a notice of Third Revised Sheet No. 122F Corporation; Notice of Proposed
intervention or motion to intervene, as Changes in FERC Gas Tariff
appropriate. Such notices, motions, or Transco states that the purpose of the
instant filing is to update and clarify May 13, 2005.
protests must be filed in accordance
certain provisions included in Rate Take notice that on May 10, 2005,
with the provisions of Section 154.210
Schedule LG–A and Rate Schedule LNG Transcontinental Gas Pipe Line
of the Commission’s regulations (18 CFR
of Transco’s Tariff. Corporation (Transco) tendered for
154.210). Anyone filing an intervention filing as part of its FERC Gas Tariff,
or protest must serve a copy of that Any person desiring to intervene or to
protest this filing must file in Third Revised Volume No. 1, the
document on the Applicant. Anyone following tariff sheet, to become
accordance with Rules 211 and 214 of
filing an intervention or protest on or effective June 9, 2005:
the Commission’s Rules of Practice and
before the intervention or protest date Procedure (18 CFR 385.211 and Third Revised Sheet No. 3740.01
need not serve motions to intervene or 385.214). Protests will be considered by
protests on persons other than the Transco states that the purpose of the
the Commission in determining the instant filing is to revise certain
Applicant. appropriate action to be taken, but will provisions included in section 48 of the
The Commission encourages not serve to make protestants parties to General Terms and Conditions of
electronic submission of protests and the proceeding. Any person wishing to Transco’s Tariff, Right of First Refusal
interventions in lieu of paper using the become a party must file a notice of Procedures to clarify the procedures to
‘‘eFiling’’ link at http://www.ferc.gov. intervention or motion to intervene, as be followed in the event no bids are
Persons unable to file electronically appropriate. Such notices, motions, or received (or accepted by Transco) in
should submit an original and 14 copies protests must be filed in accordance response to a posting under section 48.
of the protest or intervention to the with the provisions of Section 154.210 Any person desiring to intervene or to
Federal Energy Regulatory Commission, of the Commission’s regulations (18 CFR protest this filing must file in
888 First Street, NE., Washington, DC 154.210). Anyone filing an intervention accordance with Rules 211 and 214 of
20426. or protest must serve a copy of that the Commission’s Rules of Practice and
document on the Applicant. Anyone Procedure (18 CFR 385.211 and
This filing is accessible on-line at filing an intervention or protest on or 385.214). Protests will be considered by
http://www.ferc.gov, using the before the intervention or protest date the Commission in determining the
‘‘eLibrary’’ link and is available for need not serve motions to intervene or appropriate action to be taken, but will
review in the Commission’s Public protests on persons other than the not serve to make protestants parties to
Reference Room in Washington, DC. Applicant. the proceeding. Any person wishing to
There is an ‘‘eSubscription’’ link on the The Commission encourages become a party must file a notice of
web site that enables subscribers to electronic submission of protests and intervention or motion to intervene, as
receive e-mail notification when a interventions in lieu of paper using the appropriate. Such notices, motions, or
document is added to a subscribed ‘‘eFiling’’ link at http://www.ferc.gov. protests must be filed in accordance
docket(s). For assistance with any FERC Persons unable to file electronically with the provisions of Section 154.210
Online service, please e-mail should submit an original and 14 copies of the Commission’s regulations (18 CFR
FERCOnlineSupport@ferc.gov, or call of the protest or intervention to the 154.210). Anyone filing an intervention
(866) 208–3676 (toll free). For TTY, call Federal Energy Regulatory Commission, or protest must serve a copy of that
(202) 502–8659. 888 First Street, NE., Washington, DC document on the Applicant. Anyone
20426. filing an intervention or protest on or
Magalie R. Salas, This filing is accessible on-line at before the intervention or protest date
Secretary. http://www.ferc.gov, using the need not serve motions to intervene or
[FR Doc. E5–2553 Filed 5–19–05; 8:45 am] ‘‘eLibrary’’ link and is available for protests on persons other than the
BILLING CODE 6717–01–P review in the Commission’s Public Applicant.
Reference Room in Washington, DC. The Commission encourages
There is an ‘‘eSubscription’’ link on the electronic submission of protests and

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1
Federal Register / Vol. 70, No. 97 / Friday, May 20, 2005 / Notices 29299

interventions in lieu of paper using the (Bonneville), PacifiCorp, and Idaho Comment Date: 5 p.m. Eastern Time
‘‘eFiling’’ link at http://www.ferc.gov. Power Company, pursuant to Rule on May 26, 2005.
Persons unable to file electronically 207(a)(2) of the Commission’s Rules of
7. PPL University Park, LLC
should submit an original and 14 copies Practice and Procedures, 18 CFR
of the protest or intervention to the 385.207(a)(2), filed a petition for a [Docket No. ER02–1327–003]
Federal Energy Regulatory Commission, declaratory order on a conceptual Take notice that on May 9, 2005, PPL
888 First Street, NE., Washington, DC proposal in reference to certain issues of University Park, LLC (PPL University
20426. importance to the further development Park) submitted an updated market
This filing is accessible on-line at of Grid West. power analysis and updated tariff sheets
http://www.ferc.gov, using the Comment Date: 5 p.m. Eastern Time to incorporate the change in status
‘‘eLibrary’’ link and is available for on May 27, 2005. reporting requirement adopted by the
review in the Commission’s Public Commission in Order No. 652,
Reference Room in Washington, DC. 3. Coral Power, L.L.C.; Coral Energy
Management, LLC Reporting Requirement for Changes in
There is an ‘‘eSubscription’’ link on the Status for Public Utilities With Market-
Web site that enables subscribers to [Docket Nos. ER96–25–027, ER01–1363–005] Based Rate Authority, 70 FR 8253 (Feb.
receive e-mail notification when a Take notice that on May 4, 2005, 18, 2005), FERC Stats. & Regs.,
document is added to a subscribed Coral Power, L.L.C. (Coral Power) and Regulations Preambles ¶ 31,175 (2005).
docket(s). For assistance with any FERC Coral Energy Management, LLC (Coral PPL University Park states that copies
Online service, please e-mail EM) (together, Coral Entities) submitted of the filing were served on parties on
FERCOnlineSupport@ferc.gov, or call a notice of change in status describing the official service list in the above-
(866) 208–3676 (toll free). For TTY, call a change in the upstream ownership of captioned proceeding.
(202) 502–8659. the Coral Entities. In addition, Coral Comment Date: 5 p.m. Eastern Time
Magalie R. Salas, Power and Coral EM each submitted a on May 31, 2005.
revised market-based rate tariff sheet
Secretary. 8. Mirant Oregon, LLC
which incorporates the Commission’s
[FR Doc. E5–2551 Filed 5–19–05; 8:45 am] [Docket No. ER02–1331–007]
change in status reporting requirement
BILLING CODE 6717–01–P
set forth in Order No. 652. Coral Power Take notice that on May 5, 2005,
and Coral EM requests an effective date Mirant Oregon, LLC submitted a
of March 21, 2005. compliance filing pursuant to the
DEPARTMENT OF ENERGY
Coral Power and Coral EM state that Commission’s letter order issued April
Federal Energy Regulatory copies of the filing were served upon all 5, 2005 in Docket Nos. ER99–1435–007
Commission persons listed on the official service and ER02–1331–005.
lists compiled by the Secretary in the Comment Date: 5 p.m. Eastern Time
[Docket No. EC05–43–000, et al.] above-captioned dockets. on May 26, 2005.
Comment Date: 5 p.m. Eastern Time
Exelon Corporation, et al.; Electric on May 25, 2005. 9. Chehalis Power Generating Limited
Rate and Corporate Filings Partnership
4. Montana-Dakota Utilities Co.
May 13, 2005. [Docket No. ER03–717–002]
The following filings have been made [Docket No. ER98–4289–004] Take notice that on May 5, 2005,
with the Commission. The filings are Take notice that on May 9, 2005, Chehalis Power Generating Limited
listed in ascending order within each Montana-Dakota Utilities Co. (Montana- Partnership (Chehalis) filed a
docket classification. Dakota) submitted for filing an notification of change in status.
amendment to its updated market power Comment Date: 5 p.m. Eastern Time
1. Exelon Corporation, Public Service analysis filed on October 18, 2004 in on May 26, 2005.
Enterprise Group Incorporated Docket No. ER98–4289–003.
10. Pacific Gas and Electric Company
[Docket No. EC05–43–000] Comment Date: 5 p.m. Eastern Time
Take notice that on May 10, 2005, on May 31, 2005. [Docket No. ER04–242–002]
Exelon Corporation and its subsidiaries 5. Puget Sound Energy, Inc. Take notice that on May 5, 2005,
that are PUBLIC utilities subject to the Pacific Gas and Electric Company
Commission’s jurisdiction (collectively, [Docket No. ER99–845–009] submitted a compliance filing pursuant
Exelon) and Public Service Enterprise Take notice that on May 4, 2005, to the Commission’s order issued April
Group Incorporated and its subsidiaries Puget Sound Energy, Inc. (Puget) 27, 2005 in Docket No. ER04–115–002,
that are public utilities subject to the submitted a compliance filing pursuant et al., 111 FERC ¶ 61,125 (2005).
Commission’s jurisdiction (collectively, to the Commission’s order issued April Pacific Gas and Electric Company
PSEG) submitted an answer to various 13, 2005 in Docket No. ER99–845–003, states that copies of the filing were
motions to intervene, protests and et al., 111 FERC ¶ 61,020 (2005). served on parties on the official service
requests for hearing which provides Comment Date: 5 p.m. Eastern Time list in the above-captioned proceeding.
certain additions to their proposal filed on May 25, 2005. Comment Date: 5 p.m. Eastern Time
on February 4, 2005 as supplemented on on May 26, 2005.
6. Indigo Generation, LLC; Larkspur
February 9, 2005. Energy LLC; Wildflower Energy LP 11. California Independent System
Comment Date: 5 p.m. Eastern Time
[Docket No. ER01–1822–004]
Operator Corporation
on May 27, 2005.
Take notice that on May 5, 2005, [Docket No. ER05–224–002]
2. Bonneville Power Administration,
Indigo Generation LLC, Larkspur Energy Take notice that on May 9, 2005, the
PacifiCorp, Idaho Power Company
LLC and Wildflower Energy LP California Independent System Operator
[Docket No. EL05–106–000] submitted a compliance filing pursuant Corporation (ISO) submitted a
Take notice that on April 29, 2005, to the Commission’s order issued April compliance filing pursuant to the
Bonneville Power Administration 5, 2005 in Docket No. ER01–1822–003. Commission’s April 8, 2005 order in

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1

You might also like