2. References :
The Offer is based on the following references :
• The meeting attended in the costumer office on date of March 14 2010, was present in
the meeting :
3.1. Introduction :
The technical offer includes three sections Licensing assistance, Soil
tests compain, Construction Supervision.
The delay for the finalisation of the preceedings tasks will be three(3) to four(4) mounths.
This stamp will engage the penal and civil responsability of the signing
engineer or architect for a period of 11 years.
CIAC will endosse this responsability on behalf of the costumer and will
assume all futur legal conflicts intrduced by possible bad design and missings.
• Construction permit
• ETC.
For the obtention of the construction permit the engineering documentation must be
submited to the local authority (APC Sidi Abdallah) the APC will spread directly or by
the assistance of the project owner or representatif to all concerned directions
(Sonelgaz, Protection civil, direction des forets, direction de l'environement ...ETC).
The annoted documentation will be returned back to the APC that will transmit to the
project representatif for revision. The cycle will be repeated until satisfaction of all
requirments.
The CTC (technical center of construction) have to validate the structural design in
conformity to algerian standards and regulations. The process of validation will require
technical negtiations and tradoffs between the CTC and the project reprentatif.
• CIAC will proceed on behalf of the costumer to all the administratif and technical
procedures leading to the obtention of the required authorisations and permits.
• CIAC will provide all the necessary human ressources and logistics for the good
accomplishement of these tasks.
• 11 X 12 boring samplings
• 8X 12 Pressiometric tests
• 3 Seismic profiles
• Mechanical Tests
The Laboratory test will be done AT the National Laboratory of housing and
construction LNHC.
All The engineering recommendations and solutions will be provided in the final
report.
3.4. Construction Supervision :
CIAC will engage a technical team for the supervision of the
construction works of the project.
• One Architect.
The responsability of the team will be guaranty compliance of the works with the
engineering documentation and local standards, assist the building company to solve
all rising problems, to control quality and quantities of works accomplished by the
building company, to report to DAD group.
The prices are in ALGERIAN DINARS DZD including all tax and fees.
Two hundred forty tousands Algerian Dinars Excluding tax 220,000.00 DZD HT
Three hundred sixty tousands Algerian Dinars Excluding tax 360,000.00 DZD
HT
4.1.3 Administratif and technical procedures :
The offer proposed for the Administratif and technical procedures as described
on topic 3.2.3 will be of :
Total Amount excluding tax two millions three hundred ninty six thousand
Algerian Dinars 2,396,000.00 DZD
5.1. Annex A:
5.2. Annex B:
5.3. Annex C:
5.4. Annex D:
5.5. Annex E :
Document Prepared By :
Nassim Benhammadi
Ghazouane Chikhou
on March,17 2010.