Professional Documents
Culture Documents
Outside Plant
Method of Procedure
Mop Number: M-FTE-00014
Page 1 of 32
Approval
NAME
POSITION
SIGNATURE
DATE
Issue History
ISSUE NO.
ISSUE DATE
AUTHOR
HISTORY
Draft Issue 01
Issue 02
Issue 03
Issue 03
February 2010
6 April 2010
7 April 2010
8 April 2010
Ian Roberts
Ian Roberts
Ian Roberts
Ian Roberts
First Issue
Final amendments as per STC Network Design
Insert CO floor layout Approvals
Final Issue to Network Design
Glossary of Terms
CCJ
CO
Central Office
FAT
FDF
FDT
FTTH
ISP
Inside Plant
MOP
Method of Procedure
NE
Network Engineer
ODB
ODF
ONT
OSB
OSP
OTB
PON
Page 2 of 32
Contents
Approval.2
Issue History ..................................................................................................................... 2
Glossary of Terms ............................................................................................................. 2
Contents ...3
1.
Introduction ....................................................................................................... 4
2.
Background ....................................................................................................... 4
3.
4.
4.1
5.
5.1
5.2
6.
6.1
7.
7.1
7.2
7.3
7.4
7.5
7.6
8.
8.1
Huttain 111-00-000 Cable Chamber Joint (CCJ) and Internal Fibre Route ...... 18
Schematic Layout of ODF to CCJ. ................................................................... 18
9.
10.
11.
11.1
11.2
11.3
11.4
11.5
11.6
288 & 48 Feeder Cable Bill of Materials direct to FDTs 120-123 & 145-148 .... 25
288 & 48 Feeder Cable Schedule direct to FDTs 106/107/108/116 ................. 26
288 & 48 Feeder Cable Bill of Materials direct to FDTs 106/107/108/116 ........ 29
12.
12.1
Appendix..32
Page 3 of 32
1.
Introduction
This document defines the Method of Procedure for the installation of the Outside Plant Primary
Fibre from Central Office to the Fibre Distribution Terminal and will cover:
2.
Background
The purpose of the Trial Project is to provide a turnkey solution for FTTH provision.
This will encompass:
The ISP / OSP solution is designed to provide a network to accommodate current service demands
and facilitate FTTH service evolution with minimal infrastructure changes. The goal is to provide duct
capacity for twenty years of growth and fibre capacity for five years.
The network is based on a Passive Optical Network utilising optical splitters at the FDF and FDT. In
addition optical splitters can be utilised at the customer premise for large count multiple dwellings.
High count single mode optical feeder cables from ODF provides fibre capacity to individual FDTs.
Spur joints located at specific positions allow fibre breakout and individual 48 fibre cables are
distributed to each FDT
From FDT 6 x 14/10mm blown fibre tubes are installed to feed up to three FATs, within these a 48
fibre micro cable is blown.
The connection between FAT to customer premise is provided by 2 x 14/10mm blown fibre tubes
within these are specific fibre bundles, which are terminated within OSB/OTB/ODB.
The optical physical path from Terminal Box located on customer premise boundary wall to
customer ONT position is out of scope within this project and will be surveyed and installed by STC.
Page 4 of 32
3.
Page 5 of 32
4.
FDT122
LATITUDE
463630.47E
FDT145
FDT106
FDT121
FDT120
FDT123
FDT148
FDT147
Huttain CO
FDT033
FDT116
FDT106
FDT107
FDT108
Page 6 of 32
4.1
FDT Allocation
The 13 FDT areas are allocated as follows:-
Page 7 of 32
HAY
Al Malqa
Al Malqa
Al Malqa
Al Malqa
Al Malqa
Hittin
Hittin
Hittin
Hittin
Al Malqa
Al Malqa
Al Malqa
Al Malqa
Page 8 of 32
5.
Individual Primary Fibre Cables have been allocated to serve the three specific areas as designated
by STC and have been sized accordingly to the requirements of FDT and its potential FTTH service
and future demands.
Cable
#
Cable
Size
FDT #
FDT #
FDT #
FDT #
FDT #
FDT #
FDT #
FDT
#
1
2
3
288
144
288
120
33
106
121
122
123
145
146
147
148
107
108
116
Splitter
FDT Indoor
2
0
2
2
2
0
2
1
1
0
1
0
1
0
1
0
2
15
3
0
2
0
3
1
1
0
23
19
Fiber Requirement
Designed Additional Total
2
22
24
4
32
36
2
34
36
3
21
24
1
23
24
1
23
24
1
23
24
1
23
24
17
67
84
3
45
48
2
22
24
4
44
48
1
23
24
42
402
444
Page 9 of 32
Cable
Size
48
48
48
48
48
48
48
48
144
48
48
48
48
720
ODF
Fibre
1-24
25-60
61-96
97-120
121-144
145-168
169-192
193-216
1-84
1-48
49-72
73-120
121-144
n/a
GPON
Allocation
4
6
4
5
3
3
3
3
19
5
4
6
3
68
# of
FDT
Splitter
8
16
16
8
8
8
8
8
8
16
8
16
8
136
5.1
The primary fibre route will be surveyed with the intention of utilising available duct and sub duct
wherever possible.
In the event that new primary duct is required. STC will be consulted and advise on duct capacity
requirements.
All primary fibre will be installed within 25mm sub duct.
In most cases Primary Duct Installation will be covered under the OSP Civils MOP pertaining to
each FDT Area. This is due to trench sharing of the Primary Duct with the Blown Fibre Tubing within
the FDT area.
5.2
Survey Information
STC Network Engineer (NE) will provide all the basic information prior to commencement of the
external primary survey and will comprise of the following information.
Satellite imagery.
Land base.
Duct Plan. Showing Section and all underground structures
Duct Space Records
Exchange floor plans
Page 10 of 32
6.
Optical Budget
The sum of all the components must not exceed the systems planned capabilities; the following
standard component loss values are to be used to create an optical network. For Fujitsus GPON
Equipment the Optical budget of 29.0dB downstream and 29.5dB upstream provides the operating
optical threshold to be achieved.
Component
Exchange
Fibre cable
Splice
Termination
1x32 splitter
Connector
Internal loss at
central office
6.1
Loss
5dB
.4dB
/Km
.1dB
.1dB
16.7dB
0.2dB
5 dB
Outside plant
budget
23dB
Total optical
budget not to
exceed
28dB
Quantity
Central Office
Transition Splice
Primary Cable (Km)
FDT (In & Out Term)
FDT Connectors
FDT Splitter Term
FDT 32 Way Splitter
FAT Spine BF Cable
(Km)
FAT Splice
Final Drop BF Cable
(Km)
FTB / ODB Termination
FTB / ODB Connectors
TOTAL Distance
1
3
2
2
2
1
0.1
0.4
0.1
0.4
0.1
16.7
TOTAL
5
0.1
1.2
0.2
0.8
0.2
16.7
1
2
0.4
0.1
0.4
0.2
dB
dB
0.2
1
2
0.4
0.1
0.4
0.08
0.1
0.8
25.78
dB
dB
dB
dB
Page 11 of 32
dB
dB
dB
dB
dB
dB
dB
dB
7.
7.1
NO T ES
1. ALL DIMENSIONS ARE IN MILLIMETERS
UNLESS OTHERWISE NOTED.
4010
130
1500
6000
7200
1200
960
300
L EG END
200
300
300
300
300
10
08
07
06
05
04
03
02
01
12
11
10
09
08
07
06
05
04
03
02
01
800
EXISTING EQUIPMENT
10
09
08
07
06
05
04
03
02
12
01
11
10
09
08
07
06
05
04
03
02
01
FUTURE EQUIPMENT
600
FUJITSU OLT
ADM
GPON FDF
ADD/DROP MULTIPLEXER
08
13
600
09
07
06
05
04
SCRY
19
HUAWEI
ODF
202.06
202.07
202.08
03
02
01
10
05
04
03
07
06
02
01
102B.07
102B.06
102B.04
102B.03
102B.02
102B.01
SLM
102A.08
102A.07
102A.06
102A.04
102A.03
102A.02
102A.01
DCDP
ISM
ODF
800
10
09
08
07
05
06
04
03
02
01
201.08
201.09
201.10
201.11
10
08
102B.08
09
HUAWEI
ODF
202.11
ODF
12
DDF
10
6017
Odf
800
14
OLS
09
08
07
06
05
04
03
02
LGX
BTS
DSX
01
600
SMC
401B.02
201.06
201.07
101.04
10
401B.01
WINAX
CABINET
101.01
1317
09
DDF
DDF
06
07
05
DDF
DDF
SDH
09
10
08
11
DDF
12
SIEMENS-J2K
13
ALCATEL
401
14
150
HEIGHT FROM
FLOOR 4'-5"
5x600=3000
1740
600
06
000
340
082
001
SMC
LTP
SMC
002
000
001
000
LTP
SMC
001
000
RBS
DSX
2202
001
01
610
390
600
205
LTP
SWC
LTP
SMC
GPDF
STM-1
STM-1
STM-1
001
000
001
000
002
087
085
083
800
TIE CABLE
STM-1
112
DDF
DDF
FOR WLL
111
DDF
DDF
STM-1
081
05
COMM.
COMMUNICATION CABINET
AHU
BASE
CAB.
DDF
DDF
DDF
STM
DDF
DDF
ODF
WLL
01
CATU'S
080
JUNCTION
1000
SLR16
FOR
SM014
100
650
150
THERMOSTAT
05
900
SM015
RECTIFIER
RDB
SYNC
MDF
3X600=1800
100
SM016
SM013
LDB
RECT
04
660
SM017
RBS
2206
2202
LTP
DUCT
SM012
MPC
RBS
LTP
270
300
HUAWEI
DDF
INTERIM LDN
MCC
BSB
920
DDF
04
LTP
150
400
ISM
03
SMC
STM-1
206
525
610
ISM
02
NEW
3G ADM
ABB
113
LUCENT
CM2
150
600
TOLCU
HT:1240
NEW
3G ADM
480
ISM
01
75
810
790
04
MISCELLANEOUS CABINET
AM
165
08
260
100
ISM
580
9x600= 5400
900
ADD/DROP MULTIPLEXER
MI0
GPDF
AT&T SDH
DCDP
07
1420
ADM
DACS
HEIGHT FROM
FLOOR 3'-1"
CISCO
DCDP
580
580
LTP
HEIGHT FROM
FLOOR 3'-4"
HEIGHT FROM
FLOOR 3'-3"
250
JUNCTION
7650
10x762+108=7728
Odf
SMC
002
000
LTP
LTP
LTP
SMC
LTP
SMC
SMC
001
LTP
001
001
000
001
000
LTP
SMC
LTP
LTP
SMC
GPDF
LTP
SMC
LTP
SMC
001
000
002
001
000
001
001
000
000
001
000
SDH
SDH
SDH
ISM
ISM
9202
001
ISM
600
TMR
109
ISM
ISM
01
800
ALARM PANEL
300x130
HT=1400
SM008
108
EMPTY
CATU
CATU
CATU
CATU
107
ADM16/IC
CATU
CATU
CATU
CATU
AHU
BASE
600
SM009
SM010
LTP
SMC
000
001
000
ADM-16
HUAWEI
DSLM
HEIGHT FROM
FLOOR 3'-4"
DDN
302
HUAWEI
DDF
120
600
02E
01E
ADM
16/1
200.01E
303
600
01
02
4X762+108=3156
BSTDX
9000
200.02
STINGER
200.03
199.01
199.02
199.03
600
200B
SMC
LTP
18G
000
001
SMC
LTP
000
102
001
02
600
520
45
01
PORT
304
CAB
BSB
02
305
BSB
01
LDB 1
LDB 2
HUAWEI
200A.09
150
642
642
610
610
1000
800
OLS
OLS
400G
400G
306
03
Ri125-1
HUAWEI
HUAWEI
2500
DDF
04
03
ADM.
ADM.
16/1
16/1
2006
BRAS
DSL
200A
101
DDN
A111
BASIC
NODE
660
660
660
660
660
660
660
660
RECT.1
RECT.2
RECT.3
RECT.4
RECT.5
RECT.6
RECT.7
RECT.8
400A
400A
400A
400A
400A
400A
400A
400A
660
580
MSC WORKSTATION
1800
600
640
HT:950
250 230
650
HEIGHT FROM
FLOOR 1'-11"
BATB
500x155
HT:1400
100
PH-III
11970
01
600
260
100
750
RDB#2
HUAWEI
OPTIX
HEIGHT FROM
FLOOR 3'-1"
HEIGHT FROM
FLOOR 1'-11"
HEIGHT FROM
FLOOR 3'-1"
EML/FUSE BOX
(125x150x HT:1400)
320
DCDP
FOR INTERNET
FUT
HT=1400
680
ERICSON
Odf
01
HEIGHT FROM
FLOOR 3'-4"
118
307
600
360
AT & T
R.D.B.
5350
600
04
Ri125-1
05
CMX11
CMXCS
SIEMENS
SDH
LDN
DCDP3
7650
LDN ROOM
HUAWEI
9500
FLOOR CUT-OUT
01
SDH
HUAWEI
OSN
08
710
5x600 = 3000
DDF
HUAWEI
BTS
DSLAM
05
01
CDMA
600
& SYNC
DACS
PORT
260
&CTRL
DACS
380
DACS
MATRIX
600
600
OSN
3500
DACS
EQPT.
520x500
40
COMM.
MATRIX
ERICSON
Odf
CYLINK
DDN
DDF
02
05
CR22
06
130
SIEMENS
DDF
Odf
103
TDM
Ri*51-1
07
01
240
360
660
1800
600
INTERNET-2B
SIEMENS FBDC
TEP7 (300x 130)
740
05
ADM/1
ETHERNET
& PE
199
SM018
SM019
05
CBX
500
200.01
AIRCONDITIONING ROOM
BAB
TBD
06
600
600
600
BUS BAR
HT:3110
DACS4/ 4 /1
ISM
620
CATU
DIGITEST
EDGE
DDF
150000
800
05
600
CATU
DDF
2600
120
600
TNT
EXP.
580
DDF
ACC
150
9202
PH-III
500
SMC
001
DDF
LTP
000
280
GPDF
002
300
LTP
000
600
SMC
001
180
LTP
000
580
M10
400
AM
000
600
201
WLL
DCDP
ADM-16
ADM-16
5x600= 3000
SYSTEM
01
600
120
01
SYSTEM
560
SM003
TMR
600
SLR16
600
ADM-16
SYNC
VHF/UHF
BACK
CAMODS
205
03
DCDP
ADM-16
HEIGHT FROM
FLOOR 3'-1"
TBD
106
SIEMENS
DDF
AT&T
ALARM PANEL
610x100
RCR#5
HUAWEI
OSN
001
ODF
SM002
300
RCR#2
SIEMENS
HIT
7500
LAMBDA
UNIT
860
FAN TRANSFER
SWITCH(160x140)
HT=1400
RCR#4
CABLE
RCR#1
05
LAMBDA
UNIT
SM001
DCDP
DDF
600
CISCO
202.004
810
810
FOR TIE
150
NER#1
CISCO
202.003
610
4x600=2400
301
410
LGX
600
DDF
840
300
15300
150
800
DDF
DDF
MISC. EQPT.
TALK
CISCO
202.002
202
400
150
800
600
DSL&MISC
HEIGHT FROM
FLOOR 3'-4"
Odf
DDF
5x600=3000
GSM-NERA DMW
(120x260)
600
240
WALL CUT-OUT
450X350
HT:2990
900
01
SM007
800
900
SM006
5ESS-SERVICE NODE
810
900
FIBER OPTIC
v
1200
1120
1400
150
CABLE ACCESS
900
05
SM005
SM004
270
01
600
620
05
SM011
203
9150
LTP
TELLABS
270
600
204
HT:3210
VACANT
500X200
03
02
WALL CUT-OUT
900
900
M D F ROOM
110
600
1850
LTII
800
01
850
450
85
480
425
3000
HT:1400
AXE RACK LIGHTING SW.
LDN
DCDP2
02
18-03-2006
01
26Nov2005
AS-BUILT
REV
27-08-2001
AS-BUILT
100
350
300
OLS
CONFIDENTIALITY:
100
OLS
GENERATOR ROOM
DOWN
04
LGX
TOILET
ALARMS PANEL
260
308
309
LGX
CABLE LADDER
HT:1000
HEIGHT FROM
FLOOR 4'-5"
DACS
PORTS
HEIGHT FROM
FLOOR 4'-5"
1200
580
16/1
LDN
DCDP1
ADM
16/1
810
160X160
RCR#9
ADM
04
810
580
600
ADM
16/1
01
680
W=240
E/L LIGHT SW
CR#6/
CR#11
16/1
750
600
VERTICALDUCT
RICR#14
ADM
POWER
1330
LIGHT SW.
600
2x600=1200
150
280
414
HEIGHT FROM
FLOOR 4'-5"
HEIGHT FROM
FLOOR 5'-4"
HT:1350
150
FBDC
S IE ME NS
950
SIEMENS
200
SAUDI T ELECOM
SITE: HUTTAYN - 111
GROUND FLOOR
EQUIPMENT FLOOR PLAN
DRAWN: ZEESHAN
HUTTEIN 111-00
DESIGNED: NP-STC
Page 12 of 32
SCALE: 1 :1
UPDATED BY DETASAD
DATED: 14-07-2008
DRAWING NO.
111-06AB
7.2
FDF expansion.
Page 13 of 32
7.3
Equipment Model/Services
Site Number
Rack Position
FDF
111-00-000
00.104.02
Location Code
00.103A.02/P ODF01 (1-72)
Cable #
#1
#1
#1
#1
#2
#2
#3
#3
#3
#3
Page 14 of 32
7.4
Page 15 of 32
7.5
Page 16 of 32
7.6
Page 17 of 32
8.
8.1
9.
Page 18 of 32
10.
Drawing # 0003/A/FUJITSU/111-00-000. Issue F covers the Primary Fibre Installation and Fibre
Allocation. Refer to Appendix 3 for A1 copy.
Page 19 of 32
11.
11.1
S r.
F rom
To
C able
C -C
T oleranc e
No.
HH No.
HH No.
No.
L eng th
L eng th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ODF
ODF
C V-111
MH-000
MH-001
MH-031
MH-032
MH-033
MH-029
MH-030
MH-055
MH-056
MH-057
MH-058
C V-111
C V-111
C V-111
MH-000
MH-001
MH-031
MH-032
MH-033
MH-029
MH-030
MH-055
MH-056
MH-057
MH-058
MH-059
MH-000
1
1
1
1
1
1
2
2
2
2
2
2
2
2
75
75
101
180
285
243
240
216
293
306
286
290
280
287
3007
25
25
25
5
5
5
5
5
5
5
30
5
5
25
125
16
17
18
19
MH-059
HH2-002
HH2-001
MH-059
HH2-002
HH2-001
F D T 33
F DT 33
2
2
2
180
130
3
313
3395
T otal
S ub/
100
100
0
101
F AT
0
126
185
290
248
245
221
298
311
316
295
285
312
3132
25
2
15
42
205
132
18
355
310
192
3487
100
1198
Page 20 of 32
R emarks
J oint S plic es
1
1
1
144
144
76
J O INT 1
285
216
286
30M L O O P MH-056
76
C AB L E E ND F O R J O INT 7
J O INT 7
76
C AB L E E ND F O R J O INT 7
76
F DT 33
296
to date
T otal
1198
n/a
3487
n/a
4685
0%
n/a
0%
n/a
0%
0
n/a
0
n/a
0
888
180
130
Ins talled
S ub duc t
P rimary 288
P rimary 144
P rimary 48
T otal
11.2
S TC
C UL
O S P 2229d
O S P 2231d
O S P 4292d
O S P 4293d
OS P
OS P
OS P
OS P
OS P
O S P 5517a
joint
O S P 939d O S P
Unit
QT Y
m
m
each
each
3
3,587
1
1
each
296
1,198
Materials
S /No.
S TC
C UL
Page 21 of 32
Unit
m
QT Y
3,587
11.3
288 & 48 Feeder Cable Schedule direct to FDTs 120-123 & 145-148
ODF
C V -111
75
25
ODF
C V -111
75
25
100
C V -111
MH-000
101
50
151
MH-000
MH-001
180
185
MH-001
MH-031
285
30
315
MH-031
MH-032
243
248
MH-032
MH-033
240
245
MH-033
MH-029
216
221
MH-029
MH-030
293
298
10
MH-030
MH-055
306
311
11
MH-055
MH-056
286
291
12
MH-056
MH-406
249
30
279
13
MH-406
MH-407
291
296
14
MH-407
MH-408
313
318
15
MH-408
MH-409
239
244
16
MH-409
MH-410
282
15
297
17
C V-111
MH-410
3524
175
3699
18
MH-410
MH-411
271
15
286
19
MH-411
MH-412
290
295
297
50
347
858
70
928
20
MH-412
MH-413
21
MH-410
MH-413
22
MH-413
MH-414
195
200
23
MH-414
MH-415
164
169
24
MH-415
MH-416
230
235
25
MH-416
MH-417
271
276
Page 22 of 32
100
288
288
R emarks
J O INT 1
C AB L E E ND F O R C V J O INT
288
C AB L E E ND F O R J O INT 2
288
J O INT 2
C AB L E E ND F O R J O INT 2
72
L O O P F O R J O INT 3
72
J O INT 3
L O O P AD J AC E NT F D T 123
MH-417
MH-418
287
292
27
MH-418
MH-419
292
50
342
28
MH-413
MH-419
1439
75
1514
29
MH-419
MH-423
234
239
239
30
MH-423
MH-424
182
187
182
200
15
215
616
25
641
31`
MH-424
MH-425
32
MH-419
MH-425
33
MH-413
MH-NE W
205
15
205
34
MH-NE W HH2-NE W
288
30
288
35
HH2-NE W HH2-001
288
288
15
F DT 147
621
84
L O O P F O R J O INT 4
84
J OINT 4
L O O P F O R J O INT 4
200
0
R emarks
60
C AB L E E ND F O R J O INT 5
60
J OINT 5
C AB L E E ND F O R J O INT 3
30M MAINT E NANC E L O O P IN MH-NE W
36
HH2-001
37
MH-413
F DT 147
784
62
38
MH-413
MH-NE W
205
25
39
MH-NE W HH2-NE W
288
30
40
HH2-NE W HH2-001
288
F DT 147
846
781
41
HH2-001
HH2-001
342
42
HH2-001
F DT 148
15
43
MH-413
F DT 148
1126
74
44
MH-413
MH-414
195
25
45
MH-414
MH-415
164
46
MH-415
MH-416
230
47
MH-416
HH2-002
12
30
12
48
HH2-002
HH2-001
39
39
49
HH2-001
F DT 123
15
50
MH-413
F DT 123
643
82
Page 23 of 32
C AB L E E ND F O R F DT 147
0
F DT 147
C AB L E E ND F O R J O INT 3
342
C AB L E E ND F O R F DT 148
0
1200
342
F DT 148
C AB L E E ND F O R J O INT 3
C AB L E E ND F O R F DT 123
0
725
51
F DT 123
MH-419
HH2-001
161
25
52
HH2-001
F DT 146
15
53
MH-419
F DT 146
164
40
54
MH-419
MH-420
240
25
55
MH-420
MH-421
176
56
MH-421
HH2-010
150
30
150
57
HH2-010
HH2-009
55
55
58
HH2-009
HH2-008
14
14
59
HH2-008
HH2-001
55
55
60
HH2-001
F DT 145
15
61
MH-419
F DT 145
693
81
62
MH-419
MH-420
240
25
63
MH-420
MH-421
176
64
MH-421
MH-422
128
65
MH-422
HH2-001
49
30
66
HH2-001
F DT 122
15
C AB L E E ND F O R F DT 122
67
MH-419
F DT 122
596
80
68
MH-425
HH2-001
62
25
69
HH2-001
F DT 121
15
70
MH-425
F DT 121
65
40
71
MH-425
MH-426
289
25
289
72
MH-426
MH-427
217
217
73
MH-427
HH2-011
143
30
143
74
HH2-011
HH2-001
412
412
75
HH2-001
F DT 120
15
76
MH-425
F DT 120
1064
77
1141
1061
11647
906
6782
5671
100
3353
890
T otal
Page 24 of 32
161
24
R emarks
C AB L E E ND F O R J O INT 4
C AB L E E ND F O R F DT 146
204
161
24
F DT 146
C AB L E E ND F O R J O INT 4
C AB L E E ND F O R F DT 145
0
774
676
274
62
F DT 145
16
C AB L E E ND F O R J O INT 4
16
F DT 122
18
C AB L E E ND F O R J O INT 5
C AB L E E ND F O R F DT 121
105
62
18
F DT 121
C AB L E E ND F O R J O INT 5
C AB L E E ND F O R F DT 120
F DT 120
11.4
288 & 48 Feeder Cable Bill of Materials direct to FDTs 120-123 & 145-148
Page 25 of 32
11.5
S r.
F rom
To
C able
C -C
T oleranc e
No.
HH No.
HH No.
No.
L eng th
L eng th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ODF
ODF
C V-111
MH-000
MH-001
MH-031
MH-032
MH-033
MH-034
MH-035
MH-036
MH-037
MH-038
MH-039
C V-111
C V-111
C V-111
MH-000
MH-001
MH-031
MH-032
MH-033
MH-034
MH-035
MH-036
MH-037
MH-038
MH-039
MH-070
MH-070
2
3
3
3
3
3
3
3
3
3
3
3
3
3
0
0
101
180
285
243
240
246
295
279
295
285
287
293
3029
0
0
50
5
5
5
5
5
30
5
5
5
5
25
150
Page 26 of 32
S ub/
0
0
J oint S plic es
1
1
288
288
R emarks
J O INT 8
C AB L E E ND F O R C V J O INT
C AB L E L O O P IN MH 035
1
1
244
244
C AB L E E ND F O R J O INT 9
J O INT 9
S r.
F rom
To
C able
C -C
T oleranc e
No.
HH No.
HH No.
No.
L eng th
L eng th
16
17
18
19
20
21
22
23
24
25
26
27
MH-070
MH-071
MH-072
MH-073
MH-074
MH-075
MH-076
MH-077
MH-078
MH-079
MH-080
MH-070
MH-071
MH-072
MH-073
MH-074
MH-075
MH-076
MH-077
MH-078
MH-079
MH-080
MH-081
MH-081
3
3
3
3
3
3
3
3
3
3
3
178
298
295
272
294
285
299
248
255
302
302
3028
25
5
5
5
5
30
5
5
5
5
25
120
28
29
30
MH-081
MH-428
MH-429
MH-428
MH-429
MH-430
3
3
3
150
265
265
25
5
30
175
270
295
31
MH-430
MH-431
220
25
245
32
MH-081
MH-431
900
85
33
34
35
36
MH-081
MH-082
MH-436
MH-437
MH-082
MH-436
MH-437
HH2-NE W
193
177
160
222
25
5
30
2
3
3
3
3
Page 27 of 32
S ub/
R emarks
J oint S plic es
C AB L E E ND F O R J O INT 9
C AB L E L O O P IN M/H 076
985
1
1
192
192
C AB L E E ND F O R J O INT 10
J O INT 10
C AB L E E ND F O R J O INT 10
C AB L E L O O P IN M/H 430
0
218
182
190
224
96
C AB L E E ND F O R J O INT 11
96
J O INT 11
C AB L E E ND F O R J O INT 10
C AB L E L O O P IN M/H 437
222
S r.
F rom
To
C able
C -C
T oleranc e
No.
HH No.
HH No.
No.
L eng th
L eng th
37
38
39
40
41
42
43
44
45
46
47
48
49
50
HH2-NE W
HH2-001
MH-081
MH-431
MH-432
MH-435
HH2-015
HH2-001
MH-431
MH-431
MH-432
MH-433
HH2-001
MH-431
HH2-001
F D T 108
F DT 108
MH-432
MH-435
HH2-015
HH2-001
F D T 107
F DT 107
MH-432
MH-433
HH2-001
F D T 107
F DT 106
3
3
221
34
1007
193
270
374
270
3
1110
193
150
222
19
584
2
15
79
25
30
2
2
15
74
25
5
5
15
50
51
52
53
54
55
MH-431
MH-NE W
MH-NE W
HH2-001
MH-431
MH-NE W
MH-NE W
HH2-001
F D T 116
F DT 116
3
3
3
3
270
240
304
3
817
25
5
5
15
50
10475
608
T otal
3
3
3
3
3
3
3
3
3
Page 28 of 32
S ub/
J oint S plic es
223
49
1086
218
300
376
272
18
1184
218
155
227
34
634
295
245
309
18
867
814
24
24
3771
2452
964
6327 985
R emarks
221
0
443
48
48
C AB L E E ND F O R F D T 108
F DT 108
C AB L E E ND F O R J O INT 11
C AB L E L O O P IN M/H 435
374
270
0
644
179
150
222
24
24
C AB L E E ND F O R F D T 107
F DT 107
C AB L E E ND F O R J O INT 11
551
48
48
C AB L E E ND F O R F D T 106
F DT 106
270
240
304
C AB L E E ND F O R J O INT 11
C AB L E E ND F O R F D T 116
F DT 116
11.6
S TC
C UL
Unit
QT Y
m
each
each
11,083
1
3
each
964
m
each
2,452
2.00
Materials
S /No.
S TC
C UL
Page 29 of 32
Unit
m
m
m
QT Y
3,771
985
6,327
12.
Additional Information
12.1
For the purpose of the Trial Project, materials utilised will not be subjected to the normal STC type
approval process.
Page 30 of 32
Page 31 of 32
APPENDIX
Page 32 of 32