You are on page 1of 2

35240 Federal Register / Vol. 70, No.

116 / Friday, June 17, 2005 / Notices

Third Revised Sheet No. 309 DEPARTMENT OF ENERGY eRegistration account using the
eRegistration link. Select the eFiling
Northern states that the purpose of the Federal Energy Regulatory link to log on and submit the
filing is to add a provision to the general Commission intervention or protests.
terms and conditions of its tariff stating Persons unable to file electronically
that, upon request, Northern will [Docket No. ER05–1061–000]
should submit an original and 14 copies
negotiate with a delivery point operator PJM Interconnection, L.L.C.; Notice of of the intervention or protest to the
regarding how Northern will manage the Filing Federal Energy Regulatory Commission,
quality of gas delivered to the delivery 888 First Street, NE., Washington, DC
point operator. June 10, 2005. 20426.
Northern states that the copies of the Take notice that on June 1, 2005, PJM The filing in the above proceeding is
filing have been mailed to each of its Interconnection, L.L.C. (PJM) submitted accessible in the Commission’s eLibrary
customers and interested state revisions to the PJM amended and system. It is also available for review in
commissions. restated operating agreement (operating the Commission’s Public Reference
agreement) concerning the Room in Washington, DC. There is an
Any person desiring to intervene or to confidentiality and scheduling and eSubscription link on the Web site that
protest this filing must file in dispatch provisions of the Operating enables subscribers to receive e-mail
accordance with Rules 211 and 214 of Agreement. PJM states that the proposed notification when a document is added
the Commission’s Rules of Practice and revisions expand the scope of sections to a subscribed docket(s). For assistance
Procedure (18 CFR 385.211 and 18.17.1(b) and 1.76(a) of the PJM OA, with any FERC Online service, please
385.214). Protests will be considered by respectively, to enable the office of the e-mail FERCOnlineSupport@ferc.gov or
the Commission in determining the interconnection to provide member call (866) 208–3676 (toll free). For TTY,
appropriate action to be taken, but will confidential documents, data or other call (202) 502–8659.
not serve to make protestants parties to information to reliability coordinators Comment Date: 5 p.m. on June 22,
the proceeding. Any person wishing to that are responsible for overseeing 2005.
become a party must file a notice of electric system reliability operations of
Magalie R. Salas,
intervention or motion to intervene, as regions outside of the PJM service
appropriate. Such notices, motions, or territory, and enable the office of the Secretary.
protests must be filed in accordance interconnection to recognize [FR Doc. E5–3108 Filed 6–16–05; 8:45 am]
with the provisions of Section 154.210 transmission constraints on all BILLING CODE 6717–01–P

of the Commission’s regulations (18 CFR coordinated flowgates external to the


154.210). Anyone filing an intervention PJM region. PJM requests an effective
or protest must serve a copy of that date of August 1, 2005. DEPARTMENT OF ENERGY
document on the Applicant. Anyone PJM states that copies of this filing
Federal Energy Regulatory
filing an intervention or protest on or have been served on all PJM members
Commission
before the intervention or protest date and the utility regulatory commissions
need not serve motions to intervene or in the PJM region. [Docket No. RP05–348–001]
protests on persons other than the Any person desiring to intervene or to
Applicant. protest in any of the above proceedings Sea Robin Pipeline Company, LLC;
must file in accordance with Rules 211 Notice of Compliance Filing
The Commission encourages and 214 of the Commission’s Rules of
electronic submission of protests and June 10, 2005.
Practice and Procedure (18 CFR 385.211 Take notice that on June 3, 2005, Sea
interventions in lieu of paper using the and 385.214) on or before 5 p.m. Eastern
‘‘eFiling’’ link at http://www.ferc.gov. Robin Pipeline Company, LLC (Sea
time on the specified comment date. It Robin) tendered for filing as part of its
Persons unable to file electronically is not necessary to separately intervene
should submit an original and 14 copies FERC Gas Tariff, Original Volume No. 2,
again in a subdocket related to a the following revised tariff sheet to
of the protest or intervention to the compliance filing if you have previously
Federal Energy Regulatory Commission, become effective February 6, 1991:
intervened in the same docket. Protests
888 First Street, NE., Washington, DC will be considered by the Commission Sub First Revised Sheet No. 661.
20426. in determining the appropriate action to Sea Robin states that the purpose of
This filing is accessible on-line at be taken, but will not serve to make this filing is to reflect the correct
http://www.ferc.gov, using the protestants parties to the proceeding. abandonment date for Rate Schedule X–
‘‘eLibrary’’ link and is available for Anyone filing a motion to intervene or 33 on Sub First Revised Sheet No. 661.
review in the Commission’s Public protest must serve a copy of that Any person desiring to protest this
Reference Room in Washington, DC. document on the Applicant. In reference filing must file in accordance with Rule
There is an ‘‘eSubscription’’ link on the to filings initiating a new proceeding, 211 of the Commission’s Rules of
Web site that enables subscribers to interventions or protests submitted on Practice and Procedure (18 CFR
receive e-mail notification when a or before the comment deadline need 385.211). Protests to this filing will be
document is added to a subscribed not be served on persons other than the considered by the Commission in
docket(s). For assistance with any FERC applicant. determining the appropriate action to be
Online service, please email The Commission encourages taken, but will not serve to make
FERCOnlineSupport@ferc.gov, or call electronic submission of protests and protestants parties to the proceeding.
(866) 208–3676 (toll free). For TTY, call interventions in lieu of paper, using the Such protests must be filed in
(202) 502–8659. FERC Online links at http:// accordance with the provisions of
www.ferc.gov. To facilitate electronic Section 154.210 of the Commission’s
Magalie R. Salas,
service, persons with Internet access regulations (18 CFR 154.210). Anyone
Secretary. who will eFile a document and/or be filing a protest must serve a copy of that
[FR Doc. E5–3115 Filed 6–16–05; 8:45 am] listed as a contact for an intervenor document on all the parties to the
BILLING CODE 6717–01–P must create and validate an proceeding.

VerDate jul<14>2003 17:59 Jun 16, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\17JNN1.SGM 17JNN1
Federal Register / Vol. 70, No. 116 / Friday, June 17, 2005 / Notices 35241

The Commission encourages Second Revised Sheet No. 23J May 1, 2005 DEPARTMENT OF ENERGY
electronic submission of protests in lieu First Revised Sheet No. 23K March 1, 2005
of paper using the ‘‘eFiling’’ link at Second Revised Sheet No. 23K May 1, 2005 Federal Energy Regulatory
http://www.ferc.gov. Persons unable to First Revised Sheet No. 23L March 1, 2005 Commission
file electronically should submit an Second Revised Sheet No. 23L April 1, 2005
[Docket No. CP05–371–000]
original and 14 copies of the protest to First Revised Sheet No. 23M March 1, 2005
the Federal Energy Regulatory Southern Star Central Gas Pipeline,
Southern requests that the
Commission, 888 First Street, NE., Inc.; Notice of Application
Washington, DC 20426. Commission grant such approval of the
This filing is accessible on-line at tariff sheets effective March 1, 2005, June 10, 2005.
http://www.ferc.gov, using the April 1, 2005 or May 1, 2005, as set On June 9, 2005, Southern Star
‘‘eLibrary’’ link and is available for forth above. Central Gas Pipeline, Inc. (Southern
review in the Commission’s Public Any person desiring to intervene or to Star), pursuant to section 3 of the
Reference Room in Washington, DC. protest this filing must file in Natural Gas Act (NGA), and part 157 of
There is an ‘‘eSubscription’’ link on the accordance with Rules 211 and 214 of the regulations of the Federal Energy
Web site that enables subscribers to Regulatory Commission (Commission)
the Commission’s Rules of Practice and
receive e-mail notification when a filed an abbreviated application for
Procedure (18 CFR 385.211 and
document is added to a subscribed abandonment by sale to Keystone Gas
385.214). Protests will be considered by Corporation (Keystone) of Southern
docket(s). For assistance with any FERC the Commission in determining the
Online service, please email Star’s Mulhall-Drumright line consisting
appropriate action to be taken, but will of approximately 46.4 miles of 12 and
FERCOnlineSupport@ferc.gov, or call not serve to make protestants parties to
(866) 208–3676 (toll free). For TTY, call 16-inch diameter steel pipe and
the proceeding. Any person wishing to appurtenances located in Creek, Payne,
(202) 502–8659. become a party must file a notice of and Logan Counties of Oklahoma.
Magalie R. Salas, intervention or motion to intervene, as Southern Star also requested a
Secretary. appropriate. Such notices, motions, or jurisdictional determination exempting
[FR Doc. E5–3112 Filed 6–16–05; 8:45 am] protests must be filed in accordance the facilities operation from NGA
BILLING CODE 6717–01–P with the provisions of Section 154.210 jurisdiction following the sale.
of the Commission’s regulations (18 CFR Southern Star states that the facilities
154.210). Anyone filing an intervention were originally constructed in 1947 to
DEPARTMENT OF ENERGY or protest must serve a copy of that support Southern Star’s former
document on the Applicant. Anyone merchant function and provide
Federal Energy Regulatory filing an intervention or protest on or mainline transmission, but in more
Commission before the intervention or protest date recent years has only served to gather
gas from local producers and provide
[Docket No. RP01–205–008] need not serve motions to intervene or
limited gas service to various parties
protests on persons other than the
Southern Natural Gas Company; along the system, which will continue
Applicant. upon the transfer of facilities to
Notice of Negotiated Rate Tariff Filing
The Commission encourages Keystone, as more fully described in the
June 10, 2005. electronic submission of protests and application. This filing is available for
Take notice that on June 3, 2005, interventions in lieu of paper using the review at the Commission or may be
Southern Natural Gas Company ‘‘eFiling’’ link at http://www.ferc.gov. viewed on the Commission’s Web site at
(Southern) tendered for filing the tariff Persons unable to file electronically http://www.ferc.gov, by using the
sheets set forth below to reflect new should submit an original and 14 copies eLibrary (FERRIS) link. Enter the docket
negotiated rate arrangements resulting of the protest or intervention to the number excluding the last three digits in
from the addition of new consenting Federal Energy Regulatory Commission, the docket number filed to access the
parties to Southern’s settlement dated 888 First Street, NE., Washington, DC document. For assistance, please contact
April 29, 2005 in Docket No. RP04–523, 20426. FERC Online Support at FERC
new negotiated rate arrangements with OnlineSupport@ferc.gov or call toll-free
existing parties or new shippers on This filing is accessible on-line at at (866) 206–3676, or for TTY, contact
Southern’s system, corrections to http://www.ferc.gov, using the (202) 502–8659.
negotiated rate arrangements shown in ‘‘eLibrary’’ link and is available for Questions concerning the application
Southern’s previous filings and name review in the Commission’s Public may be directed to: David N. Roberts,
changes for existing negotiated rate Reference Room in Washington, DC. Manager, Regulatory Affairs, Southern
arrangements. There is an ‘‘eSubscription’’ link on the Star Central Gas Pipeline, Inc., 4700
Sixth Revised Sheet No. 23 April 1, 2005
Web site that enables subscribers to Highway 56, Owensboro, KY 42301 or
Seventh Revised Sheet No. 23 May 1, 2005 receive e-mail notification when a call (270) 852–4654; and, Beverly H.
First Revised Original Sheet No. 23A March document is added to a subscribed Griffith, Senior Vice President, General
1, 2005 docket(s). For assistance with any FERC Counsel and Corporate Secretary,
Substitute First Revised Sheet No. 23A April Online service, please e-mail Southern Star Central Gas Pipeline, Inc.,
1, 2005 FERCOnlineSupport@ferc.gov, or call 4700 Highway 56, Owensboro, KY
Second Revised Sheet No. 23A May 1, 2005 42301 or call 270 852–4940.
(866) 208–3676 (toll free). For TTY, call
First Revised Sheet No. 23B March 1, 2005 There are two ways to become
Second Revised Sheet No. 23B April 1, 2005 (202) 502–8659.
involved in the Commission’s review of
First Revised Sheet No. 23D April 1, 2005 Magalie R. Salas,
First Revised Sheet No. 23E April 1, 2005
this project. First, any person wishing to
First Revised Sheet No. 23F March 1, 2005 Secretary. obtain legal status by becoming a party
Second Revised Sheet No. 23G March 1, 2005 [FR Doc. E5–3110 Filed 6–16–05; 8:45 am] to the proceedings for this project
Second Revised Sheet No. 23H March 1, 2005 BILLING CODE 6717–01–P should, on or before the comment date,
First Revised Sheet No. 23J April 1, 2005 file with the Federal Energy Regulatory

VerDate jul<14>2003 17:59 Jun 16, 2005 Jkt 205001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\17JNN1.SGM 17JNN1

You might also like