35238 Federal Register / Vol. 70, No.

116 / Friday, June 17, 2005 / Notices

The combined (direct plus indirect) impact on the Beaumont-Port Arthur DEPARTMENT OF ENERGY
emissions of NOX would exceed 50 tpy SIP cannot be quantified or credited for
during the construction and operational purposes of the general conformity Federal Energy Regulatory
phases of the project. Therefore, a determination. Commission
General Conformity Determination is
required for NOX emissions. Similarly, Golden Pass has committed to [Docket No. RP05–368–000]
the combined emissions of VOCs exceed purchasing and retiring 48 tons of NOX
50 tpy during the operational phases of emission reduction credits prior to Gulfstream Natural Gas System, L.L.C.;
the project, and a General Conformity commencement of operations. The 48 Notice of Filing
Determination is also required for VOC tons of NOX credits offset the maximum
emissions. projected long-term emissions of NOX June 10, 2005.
from terminal operations (47.7 tpy). Take notice that on June 6, 2005,
Preliminary General Conformity
This commitment by Golden Pass is Gulfstream Natural Gas System, L.L.C.
Determination
documented in the September 24, 2004 (Gulfstream) tendered for filing a service
A General Conformity Determination letter from TXCEQ. agreement with Tampa Electric
must be completed for projects requiring Company (TECO).
Federal authorization that are Other Impact Mitigation Practices
undertaken in areas designated as Gulfstream states that it is requesting
‘‘nonattainment’’ or ‘‘maintenance’’ for TXCEQ’s conditional conformity approval of the service agreement with
certain criteria air pollutants and for certification put forth additional TECO as part of the Bayside Lateral
which the combined direct and indirect conditions as requirements for a project, in which TECO will construct a
emissions of those air pollutants will determination of acceptability of the pipeline from its Bayside, Florida
equal or exceed certain thresholds. The project relative to the Beaumont-Port generation facility to Gulfstream’s
EPA has designated the Beaumont-Port Arthur SIP. These additional conditions, mainline in Manatee County, Florida.
Arthur area as a serious nonattainment which are also stated in the September Any person desiring to intervene or to
area for the 1-hour ozone standard. 24, 2004 letter from TCEQ (see protest this filing must file in
Consequently, a General Conformity Attachment 1), are as follows: accordance with Rules 211 and 214 of
Determination is required for certain • Golden Pass will encourage the Commission’s Rules of Practice and
projects undertaken in the Beaumont- construction contractors to participate Procedure (18 CFR 385.211 and
Port Arthur area for which the in the Texas Emission Reduction Plan 385.214). Protests will be considered by
combined direct and indirect emissions (TERP) grant program and to apply for the Commission in determining the
of either NOX or VOCs, as ozone TERP grant funds; appropriate action to be taken, but will
precursors, will equal or exceed 50 tpy. not serve to make protestants parties to
See 40 CFR 93.153(b) and 30 TAC • Golden Pass will establish bidding the proceeding. Any person wishing to
§ 101.30. The Project requires a General conditions to give preference to ‘‘Clean become a party must file a notice of
Conformity Determination for NOX Contractors’’; intervention or motion to intervene, as
because the combined direct and • Golden Pass will direct, through appropriate. Such notices, motions, or
indirect emissions of NOX would equal provisions included in its construction protests must be filed on or before the
or exceed 50 tpy. In addition, the Project contracts, construction contractors to date as indicated below. Anyone filing
requires a General Conformity exercise Best Management Practices an intervention or protest must serve a
Determination for VOC because the relating to air quality; and copy of that document on the Applicant.
combined direct and indirect emissions Anyone filing an intervention or protest
of VOC would equal or exceed 50 tpy. • Golden Pass will encourage
on or before the intervention or protest
On September 24, 2004, the TXCEQ construction contractors to use
date need not serve motions to intervene
issued a conditional general conformity appropriate low emission fuels. or protests on persons other than the
certification for the Project based on a Conditions for Granting a Final Applicant.
review of project emissions estimates, Conformity Determination The Commission encourages
modeling of the emissions from the
electronic submission of protests and
Project, and a number of commitments The commitments by Golden Pass as interventions in lieu of paper using the
proposed by Golden Pass (see described in sections 5.1 and 5.2 above ‘‘eFiling’’ link at http://www.ferc.gov.
Attachment A). These commitments constitute conditions for granting a final Persons unable to file electronically
include: (1) NOX emission offsetting of conformity determination. should submit an original and 14 copies
terminal emissions, and (2) other impact Documentation of fulfillment of each of the protest or intervention to the
mitigation practices. Each is described condition is required prior to issuance Federal Energy Regulatory Commission,
in the sections to follow. of the final conformity determination 888 First Street, NE., Washington, DC
NOX Emission Offsetting and authorization of project 20426.
construction. Golden Pass may not
The Project may potentially result in This filing is accessible on-line at
NOX emission reductions that are far begin construction of the LNG terminal http://www.ferc.gov, using the
greater then the NOX emissions until the Commission has issued its ‘‘eLibrary’’ link and is available for
generated by the LNG terminal and final General Conformity Determination review in the Commission’s Public
associated sources (LNG trucks and and Golden Pass has received written Reference Room in Washington, DC.
ships). This emission reduction would approval by the Director of Office of There is an ‘‘eSubscription’’ link on the
occur when power plants and Energy Projects of its filing stating that Web site that enables subscribers to
residential customers convert boilers it would comply with all requirements receive email notification when a
and furnaces to higher-efficiency natural of the General Conformity document is added to a subscribed
gas fired units. However, these NOX Determination. docket(s). For assistance with any FERC
emission reductions would not be [FR Doc. E5–3124 Filed 6–16–05; 8:45 am] Online service, please email
enforceable reductions; therefore their BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov, or call

VerDate jul<14>2003 17:59 Jun 16, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\17JNN1.SGM 17JNN1
Federal Register / Vol. 70, No. 116 / Friday, June 17, 2005 / Notices 35239

(866) 208–3676 (toll free). For TTY, call the Commission’s Rules of Practice and Northern further states that copies of
(202) 502–8659. Procedure (18 CFR 385.211 and the filing have been mailed to each of
385.214). Protests will be considered by its customers and interested state
Magalie R. Salas,
the Commission in determining the commissions.
Secretary. Any person desiring to protest this
appropriate action to be taken, but will
[FR Doc. E5–3113 Filed 6–16–05; 8:45 am] not serve to make protestants parties to filing must file in accordance with Rule
BILLING CODE 6717–01–P the proceeding. Any person wishing to 211 of the Commission’s Rules of
become a party must file a notice of Practice and Procedure (18 CFR
intervention or motion to intervene, as 385.211). Protests to this filing will be
DEPARTMENT OF ENERGY appropriate. Such notices, motions, or considered by the Commission in
Federal Energy Regulatory protests must be filed in accordance determining the appropriate action to be
Commission with the provisions of Section 154.210 taken, but will not serve to make
of the Commission’s regulations (18 CFR protestants parties to the proceeding.
[Docket No. RP05–371–000] 154.210). Anyone filing an intervention Such protests must be filed on or before
or protest must serve a copy of that the date as indicated below. Anyone
Nautilus Pipeline Company; Notice of document on the Applicant. Anyone filing a protest must serve a copy of that
Proposed Changes in FERC Gas Tariff filing an intervention or protest on or document on all the parties to the
June 10, 2005. before the intervention or protest date proceeding.
Take notice that on June 7, 2005, need not serve motions to intervene or The Commission encourages
Nautilus Pipeline Company (Nautilus) protests on persons other than the electronic submission of protests in lieu
tendered for filing as part of its FERC Applicant. of paper using the ‘‘eFiling’’ link at
Gas Tariff, Original Volume No. 1, the The Commission encourages http://www.ferc.gov. Persons unable to
following tariff sheets, to become electronic submission of protests and file electronically should submit an
effective June 8, 2005: interventions in lieu of paper using the original and 14 copies of the protest to
‘‘eFiling’’ link at http://www.ferc.gov. the Federal Energy Regulatory
Second Revised Sheet No. 23 Commission, 888 First Street, NE.,
Third Revised Sheet No. 204 Persons unable to file electronically
First Revised Sheet No. 204A should submit an original and 14 copies Washington, DC 20426.
First Revised Sheet No. 248 of the protest or intervention to the This filing is accessible on-line at
Original Sheet No. 255A Federal Energy Regulatory Commission, http://www.ferc.gov, using the
Original Sheet No. 255B 888 First Street, NE., Washington, DC ‘‘eLibrary’’ link and is available for
First Revised Sheet No. 259 20426. review in the Commission’s Public
Original Sheet No. 266A This filing is accessible on-line at Reference Room in Washington, DC.
Original Sheet No. 266B There is an ‘‘eSubscription’’ link on the
http://www.ferc.gov, using the
First Revised Sheet No. 270 Web site that enables subscribers to
Original Sheet No. 278A ‘‘eLibrary’’ link and is available for
review in the Commission’s Public receive email notification when a
Original Sheet No. 278B
First Revised Sheet No. 282 Reference Room in Washington, DC. document is added to a subscribed
Original Sheet No. 289A There is an ‘‘eSubscription’’ link on the docket(s). For assistance with any FERC
Original Sheet No. 289B Web site that enables subscribers to Online service, please email
First Revised Sheet No. 292 receive email notification when a FERCOnlineSupport@ferc.gov, or call
Original Sheet No. 299 document is added to a subscribed (866) 208–3676 (toll free). For TTY, call
Original Sheet No. 300 (202) 502–8659.
docket(s). For assistance with any FERC
Sheet Nos. 301–319 Protest Date: 5 p.m. Eastern Time on
First Revised Sheet No. 340 Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call June 17, 2005.
First Revised Sheet No. 345
Original Sheet No. 345A (866) 208–3676 (toll free). For TTY, call Magalie R. Salas,
Original Sheet No. 345B (202) 502–8659. Secretary.
Nautilus states that it is filing these Magalie R. Salas, [FR Doc. E5–3111 Filed 6–16–05; 8:45 am]
tariff sheets to amend its general terms Secretary. BILLING CODE 6717–01–P
and donditions to provide for specific [FR Doc. E5–3122 Filed 6–16–05; 8:45 am]
types of discounts in its tariff, consistent
BILLING CODE 6717–01–P
with Commission’s policy. Nautilus DEPARTMENT OF ENERGY
states that this will give it the flexibility
it needs to respond to the marketplace Federal Energy Regulatory
DEPARTMENT OF ENERGY Commission
and the needs of its shippers. Nautilus
also submits revised tariff sheets to Federal Energy Regulatory [Docket No. RP05–370–000]
reflect the commission’s order in Commission
Williston Basin Interstate Pipeline Co., Northern Natural Gas Company; Notice
110 FERC ¶ 61,210 (2005), which allows [Docket No. RP01–382–015]
of Proposed Changes in FERC Gas
pipelines to delete current tariff Tariff
provisions that permits shippers to Northern Natural Gas Company; Notice June 10, 2005.
retain selective discounts at secondary of Filing of Reimbursement Report Take notice that on June 3, 2005,
points.
Nautilus states that copies of its filing June 10, 2005. Northern Natural Gas Company
have been mailed to all affected Take notice that on June 7, 2005, (Northern) tendered for filing as part of
customers of Nautilus and interested Northern Natural Gas Company its FERC Gas Tariff, Fifth Revised
State Commissions. (Northern) tendered for filing various Volume No. 1, the following tariff
Any person desiring to intervene or to schedules detailing the Carlton buyout sheets, with an effective date of July 5,
protest this filing must file in and surcharge dollars reimbursed to the 2005:
accordance with Rules 211 and 214 of appropriate parties. Second Revised Sheet No. 212