You are on page 1of 2

37816 Federal Register / Vol. 70, No.

125 / Thursday, June 30, 2005 / Notices

stopgate positioned in the east bank of with the Commission and is available Commission strongly encourages
the dam; (3) a 10.62-acre impoundment; for public inspection. electronic filings. See 18 CFR
(4) an existing 20-foot-wide by 30-foot- a. Type of Application: Subsequent 385.2001(a)(1)(iii) and the instructions
long powerhouse; (5) an existing License. on the Commission’s Web site (http://
generator with installed capacity of 150 b. Project No.: 9184–013. www.ferc.gov) under the ‘‘eFiling’’ link.
kilowatts (kW); (6) an existing 150 kW c. Date Filed: June 10, 2005. m. This application is not ready for
turbine; and (7) an existing trashrack of d. Applicant: Flambeau Hydro, LLC. environmental analysis at this time.
unknown dimensions. e. Name of Project: Danbury n. The existing Clam River Project
The proposed project consists of an Hydroelectric Project. consists of: (1) A 30-foot-high dam with
existing dam, generating equipment, f. Location: On the Yellow River in a 48-foot-long, three-bay concrete
and powerhouse which ceased Burnett County, near Danbury, spillway section equipped with six steel
hydropower generation in early 1990. Wisconsin. The project does not occupy slide gates; (2) a 300-foot-long earthen
Hydraco proposes to restore these federal lands. dike that connects to the north side of
facilities. g. Filed Pursuant to: Federal Power the spillway; (3) a 255-acre reservoir
o. A copy of the application is on file Act 16 U.S.C. 791 (a)–825(r). with a normal water surface elevation of
with the Commission and is available h. Applicant Contact: Scott Klabunde, 929.0 feet msl; (4) a forebay structure
for public inspection. This filing is North American Hydro, Inc., PO Box with two steel slide gates leading to; (5)
available for review at the Commission 167, Neshkoro, WI 54960; 920–293– two 26-foot-long, 5.75-foot-diameter
in the Public Reference Room or may be 4628 ext. 14. penstocks to convey flow to; (6)
viewed on the Commission’s Web site at i. FERC Contact: Timothy Konnert, powerhouse 1 integral with the dam
http://www.ferc.gov using the (202) 502–6359 or containing two generating units with a
‘‘eLibrary’’ link. Enter the docket timothy.konnert@ferc.gov. combined capacity of 476 kW; (7) a
j. Cooperating agencies: We are asking power canal headworks structure with
number excluding the last three digits in
Federal, state, local, and tribal agencies stoplogs; (8) a 53-foot-wide, 2,500-foot-
the docket number field to access the
with jurisdiction and/or special long power canal; (9) a 95-foot-long,
document. For assistance, contact FERC
expertise with respect to environmental 1.67-foot-diameter penstock to convey
online support at
issues to cooperate with us in the flow from the power canal to; (10)
ferconlinesupport@ferc.gov or toll-free
preparation of the environmental powerhouse 2 containing a generating
at 1–866–208–3676, or for Text
document. Agencies who would like to unit with a capacity of 600 kW; and (11)
Telephone (TTY) call (202) 502–8659. A
request cooperating status should follow appurtenant facilities. The applicant
copy is also available for inspection and
the instructions for filing comments estimates that the average annual
reproduction at the address in item h
described in item l below. generation would be 3,844 megawatt
above.
k. Pursuant to § 4.32(b)(7) of 18 CFR hours using the three generating units
p. With this notice, we are initiating
of the Commission’s regulations, if any with a combined capacity of 1,076 kW.
consultation with the Texas State
resource agency, Indian Tribe, or person o. A copy of the application is
Historic Preservation Officer (SHPO), as
believes that an additional scientific available for review at the Commission
required by section 106, National
study should be conducted in order to in the Public Reference Room or may be
Historic Preservation Act, and the
form an adequate factual basis for a viewed on the Commission’s Web site at
regulations of the Advisory Council on
complete analysis of the application on http://www.ferc.gov using the
Historic Preservation, 36 CFR 800.4.
its merit, the resource agency, Indian ‘‘eLibrary’’ link. Enter the docket
q. Procedural schedule and final
Tribe, or person must file a request for number excluding the last three digits in
amendments: A separate notice will be
a study with the Commission not later the docket number field to access the
posted with the Commission’s proposed
than 60 days from the date of filing of document. For assistance, contact FERC
Hydro Licensing Schedule and a
the application, and serve a copy of the Online Support at
schedule for filing final amendments to
request on the applicant. FERCOnlineSupport@ferc.gov or toll-
the application.
l. Deadline for filing additional study free at 1–866–208–3676, or for TTY,
Magalie R. Salas, requests and requests for cooperating (202) 502–8659. A copy is also available
Secretary. agency status: August 8, 2005. for inspection and reproduction at the
[FR Doc. E5–3402 Filed 6–29–05; 8:45 am] All documents (original and eight address in item h above.
BILLING CODE 6717–01–P
copies) should be filed with: Magalie R. You may also register online at
Salas, Secretary, Federal Energy http://www.ferc.gov/docs-filing/
Regulatory Commission, 888 First esubscription.asp to be notified via
DEPARTMENT OF ENERGY Street, NE., Washington, DC 20426. email of new filings and issuances
The Commission’s Rules of Practice related to this or other pending projects.
Federal Energy Regulatory require all intervenors filing documents For assistance, contact FERC Online
Commission with the Commission to serve a copy of Support.
that document on each person on the p. With this notice, we are initiating
[Project No. 9184–013]
official service list for the project. consultation with the Wisconsin State
Flambeau Hydro, LLC; Notice of Further, if an intervenor files comments Historic Preservation Officer (SHPO), as
Application Tendered for Filing with or documents with the Commission required by section 106, National
the Commission, Soliciting Additional relating to the merits of an issue that Historic Preservation Act, and the
Study Requests, and Establishing may affect the responsibilities of a regulations of the Advisory Council on
Procedural Schedule for Relicensing particular resource agency, they must Historic Preservation, 36 CFR 800.4.
and a Deadline for Submission of Final also serve a copy of the document on q. Procedural schedule and final
Amendments that resource agency. amendments: The application will be
Additional study requests and processed according to the following
June 21, 2005. requests for cooperating agency status Hydro Licensing Schedule. Revisions to
Take notice that the following may be filed electronically via the the schedule will be made as
hydroelectric application has been filed Internet in lieu of paper. The appropriate. The Commission staff

VerDate jul<14>2003 16:26 Jun 29, 2005 Jkt 205001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\30JNN1.SGM 30JNN1
Federal Register / Vol. 70, No. 125 / Thursday, June 30, 2005 / Notices 37817

proposes to issue one environmental 2. Given the general level of DEPARTMENT OF ENERGY
assessment rather than issue a draft and understanding among participants
final EA. Comments, terms and regarding the proposed Reliability Federal Energy Regulatory
conditions, recommendations, Pricing Model (RPM) and proposed Commission
prescriptions, and reply comments, if alternatives, commenters are requested [Docket No. ER05–1065–000]
any, will be addressed in an EA. Staff to refrain from discussing the proposals
intents to give at least 30 days for generally, but rather to respond to the Entergy Services, Inc.; Supplemental
entities to comment on the EA, and will following: Notice of Technical Conference
take into consideration all comments
received on the EA before final action is • Conditions under which a June 22, 2005.
taken on the license application. consensus could be reached on issues as As announced in the Notice of
Issue Acceptance or Deficiency Letter: to which the commenter does not Technical Conference issued on June 17,
July 2005. currently support the resolution within 2005, a technical conference will be
Issue Scoping Document: August the current RPM and alternative held on June 30 and July 1, 2005, in
2005. proposals, and as to which the New Orleans, Louisiana, to discuss
Notice of application is ready for commenter would be able to Entergy Services, Inc.’s (Entergy)
environmental analysis: October 2005. compromise; and if so, what would be proposal to establish an Independent
Notice of the availability of the EA: required for that compromise; Coordinator of Transmission (ICT). The
April 2006. • Position on issues raised at the conference will be held from 9 a.m. to
4:30 p.m. (c.s.t.) on June 30, and 9 a.m.
Ready for Commission’s decision on technical conference;
to 12 p.m. on July 1. The conference
the application: June 2006. • Elements of the RPM and will be held in the Egyptian Ballroom of
Final amendments to the application alternative proposals that the the Hotel Monaco, 333 St. Charles
must be filed with the Commission no commenter supports; Avenue, New Orleans, Louisiana,
later than 30 days from the issuance 70130. Conference Attendees should
date of the notice of ready for • Elements of- or changes to the
current market proposals that could be call 1–866–561–0010 for room
environmental analysis. reservations. A negotiated rate is
phased in while further development
Magalie R. Salas, and consensus are explored on available by mentioning ICT Technical
Secretary. remaining issues; and Conference.
[FR Doc. E5–3419 Filed 6–29–05; 8:45 am] Entergy has also made a Dial-In
• Identification of specific Facility available for those who cannot
BILLING CODE 6717–01–P
impediments to the completion of attend in person. The Dial-In number is
identified and proposed transmission 1–888–685–8359 and the Participant
DEPARTMENT OF ENERGY projects; as well as, proposed fixes to Code is 706244.
the transmission planning process that To ensure adequate space both at the
Federal Energy Regulatory will eliminate these impediments and hotel and for the Dial-In Facility, please
Commission facilitate the completion of identified contact Geri Jackson at
projects. gjackso@entergy.com to confirm your
Notice on Post-Technical Conference in-person or call-in attendance.
The Commission encourages
Procedures A Draft Agenda prepared by Entergy
electronic submission of comments in
lieu of paper using the ‘‘eFiling’’ link at is attached.
June 23, 2005.
For more information about the
http://www.ferc.gov. Persons unable to
Capacity Markets in the PJM Region conference, please contact Sanjeev
(Docket No. PL05–7–000); PJM file electronically should submit an Jagtiani at (202) 502–8886;
Interconnection, LLC (Docket No. EL03– original and 14 copies of the comment sanjeev.jagtiani@ferc.gov or Christy
236–000); PJM Interconnection, LLC to the Federal Energy Regulatory Walsh at (202) 502–6523;
(Docket No. ER04–539–000); Promoting Commission, 888 First Street, NE., christy.walsh@ferc.gov.
Regional Transmission Planning and Washington, DC 20426.
Magalie R. Salas,
Expansion to Facilitate Fuel Diversity All filings in this docket are
Including Expanded Uses of Coal-Fired Secretary.
accessible online at http://www.ferc.gov,
Resources (Docket No. AD05–3–000); using the ‘‘eLibrary’’ link and will be Attachment
PSEG Energy Resources and Trade, LLC available for review in the Agenda for Technical Conference
(Docket No. ER05–644–000); PJM Commission’s Public Reference Room in
Interconnection, LLC (Docket No. Washington, DC. There is an June 30
RT01–2–000); New York Independent ‘‘eSubscription’’ link on the Web site Docket No. ER04–699–000, et al.
System Operator, Inc. (Docket No. that enables subscribers to receive e-
ER04–1144–000) 9–9:15 Introduction
mail notification when a document is 9:15–10 ICT Agreement and Attachment
On June 16, 2006, the Commission added to a subscribed docket(s). For S
convened a technical conference in assistance with any FERC Online 10–10:45 Planning Protocol
these proceedings to discuss the service, please e-mail 10:45–11 Break
capacity markets in the PJM FERCOnlineSupport@ferc.gov, or call 11–12 Transmission Service Protocol
Interconnection, LLC region. The (866) 208–3676 (toll free). For TTY, call 12–12:45 Lunch (on your own)
following procedures regarding the (202) 502–8659. 12:45–1:45 Attachment V
filing of comments were announced at 1:45–2:45 Attachment T
Magalie R. Salas,
the conclusion of the conference. 2:45–3 Break
1. Comments are due on or before July Secretary. 3–3:45 Attachment T, cont.
7, 2005, and reply comments are due on [FR Doc. E5–3412 Filed 6–29–05; 8:45 am] 3:45–4:30 Attachment T—Analysis of
or before July 14, 2005. BILLING CODE 6717–01–P previously incurred costs

VerDate jul<14>2003 16:26 Jun 29, 2005 Jkt 205001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\30JNN1.SGM 30JNN1

You might also like