You are on page 1of 2

46502 Federal Register / Vol. 70, No.

153 / Wednesday, August 10, 2005 / Notices

DEPARTMENT OF ENERGY Description: Ontelaunee Power Filed Date: 07/29/2005.


Operating Company, LLC submits a Accession Number: 20050803–0075.
Federal Energy Regulatory Notice of Succession to notify the Comment Date: 5 p.m. eastern time on
Commission Commission that, as a result of a name Friday, August 19, 2005.
change, it adopts the CES Marketing VI, Docket Numbers: ER05–1279–000.
Combined Notice of Filings #1 LLC FERC Rate Schedule 1 as its own; Applicants: PJM Interconnection,
August 04, 2005. and an amendment to the Rate Schedule L.L.C.; Progress Energy Carolinas, Inc.
Take notice that the Commission to include changes to reflect the name Description: PJM Interconnection
received the following electric rate change and corrections in the reporting L.L.C. and Carolina Power & Light
filings requirement for changes in status and in Company d/b/a Progress Energy
Docket Numbers: ER01–2214–005. Market Behavior Rule 2(b). Carolinas, Inc. submit their Joint
Applicants: Entergy Services, Inc. Filed Date: 07/29/2005. Operating Agreement executed on
Description: Entergy Services, Inc. Accession Number: 20050803–0064. 7/27/05.
(Entergy) submits its response to the Comment Date: 5 p.m. eastern time on Filed Date: 07/29/2005.
Commission’s 7/19/05 letter requesting Friday, August 19, 2005. Accession Number: 20050803–0063.
additional information regarding Docket Numbers: ER05–1270–000. Comment Date: 5 p.m. eastern time on
Entergy’s January 24, 2005 filing of a Applicants: Allegheny Energy Supply Friday, August 19, 2005.
refund report, in particular information Company, LLC; Monongahela Power Docket Numbers: ER05–534–002;
relating to the calculation of refunds Company. ER05–365–004; ER03–296–004; ER01–
Entergy’s Schedule (Energy Imbalances Description: Allegheny Energy Supply 3121–003; ER02–418–002; ER03–416–
Service). Company, LLC and Monongahela Power 005; ER05–332–002; ER03–951–004;
Filed Date: 07/29/2005. Company submit rate schedules which ER04–94–002; ER02–417–002; ER05–
Accession Number: 20050802–0001. specify their revenue requirement for 481–002.
Comment Date: 5 p.m. eastern time on providing cost-based Reactive Support Applicants: Eastern Desert Power
Friday, August 19, 2005. and Voltage Control from Generation LLC; Elk River Windfarm, LLC; Flying
Docket Numbers: ER05–1262–000. Sources Service from Bath County Cloud Power Partners, LLC; Klamath
Applicants: Flat Rock Windpower Generating plant located in the Energy LLC; Klamath Generation LLC;
LLC. Dominion Virginia Power Zone within Klondike Wind Power LLC; Klondike
Description: Application of Flat Rock the PJM control area administered by Wind Power II LLC; Moraine Wind LLC;
Windpower, LLC requesting blanket the PJM Interconnection, L.L.C. Mountain View Power Partners III, LLC;
approval of market-based rates for the Filed Date: 07/29/2005. Phoenix Wind Power LLC; Trimont
wholesale sale of electric energy, Accession Number: 20050803–0057. Wind I LLC.
capacity and ancillary services from its Comment Date: 5 p.m. eastern time on Description: The above-listed
new wind farm located in Lewis Friday, August 19, 2005. subsidiaries of PPM Energy, Inc. submit
County, New York. Docket Numbers: ER05–1271–000. a joint triennial market power update in
Filed Date: 07/29/2005. Applicants: Lake Benton Power compliance with the Commission’s
Accession Number: 20050803–0070. Partners II, LLC. Order issued 5/31/05, 111 FERC ¶
Comment Date: 5 p.m. eastern time on Description: Lake Benton Power 61,295 (2005).
Friday, August 19, 2005. Partners II, LLC submits revised Code of Filed Date: 07/29/2005.
Docket Numbers: ER05–1263–000. Conduct tariff sheets. Accession Number: 20050803–0051.
Applicants: PJM Interconnection Filed Date: 07/29/2005. Comment Date: 5 p.m. eastern time on
L.L.C. Accession Number: 20050803–0056. Friday, August 19, 2005.
Description: PJM Interconnection, Comment Date: 5 p.m. eastern time on Docket Numbers: ER05–718–003.
L.L.C. submits amended network Friday, August 19, 2005. Applicants: California Independent
integration transmission service Docket Numbers: ER05–1272–000. System Operator Corporation.
agreements with Southeastern Power Applicants: Duke Power, a division of Description: California Independent
Administration & Virginia Electric & Duke Energy Corporation. System Operator Corporation, in
Power Company d/b/a Dominion Description: Duke Power, a Division compliance with the Commission’s 4/7/
Virginia Power to become effective July of Duke Energy Corporation, submits 05 order (111 FERC ¶ 61,008 (2005)),
1, 2005. First Revised Sheet 2 and 3 to Duke submits its proposal to maintain the ‘‘as-
Filed Date: 07/29/2005. Power’s Wholesale Cost-Based Rate bid’’ settlement rules for setting intertie
Accession Number: 20050803–0071. Tariff providing for the sales of capacity transactions (import/export bids) as the
Comment Date: 5 p.m. eastern time on and energy within the Duke Power longer-term solution to remain in effect
Friday, August 19, 2005. control area, to become effective beyond the 9/30/05 sunset date
Docket Numbers: ER05–1265–000. 7/30/05. specified in the 4/7/05 order.
Applicants: Mid American Energy Filed Date: 07/29/2005. Filed Date: 07/26/2005.
Company. Accession Number: 20050803–0055. Accession Number: 20050728–0050.
Description: MidAmerican Energy Comment Date: 5 p.m. eastern time on Comment Date: 5 p.m. eastern time on
Company submits a revised Friday, August 19, 2005. Tuesday, August 16, 2005.
Interconnection Agreement with Central Docket Numbers: ER05–1273–000. Docket Numbers: ER96–795–012.
Iowa Power Cooperative. Applicants: Mid-Continent Area Applicants: Gateway Energy
Filed Date: 07/29/2005. Power Pool. Marketing.
Accession Number: 20050803–0074. Description: Mid-Continent Area Description: Gateway Energy
Comment Date: 5 p.m. eastern time on Power Pool on behalf of its public utility Marketing submits its Triennial
Friday, August 19, 2005. members submits revisions to a Updated Market Power Analysis in
Docket Numbers: ER05–1266–000. component of charges for scheduling compliance with the Commission’s
Applicants: Ontelaunee Power and tariff administration service under order issued 5/31/05, 111 FERC ¶
Operating, Company, LLC. MAPP Schedule F. 61,295.

VerDate jul<14>2003 15:02 Aug 09, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1
Federal Register / Vol. 70, No. 153 / Wednesday, August 10, 2005 / Notices 46503

Filed Date: 07/29/2005. The Commission encourages h. Licensee Contact: James A. Besha,
Accession Number: 20050729–5051. electronic submission of protests and P.E., Albany Engineering Corporation,
Comment Date: 5 p.m. eastern time on interventions in lieu of paper, using the 447 New Karner Road, Albany, NY
Friday, August 19, 2005. FERC Online links at http:// 12205, (518) 456–7712.
Docket Numbers: ER97–3428–008. www.ferc.gov. To facilitate electronic i. FERC Contact: Stefanie Harris,
Applicants: Tri-Valley Corporation. service, persons with Internet access stefanie.harris@ferc.gov, (202) 502–
Description: Tri-Valley Corporation who will eFile a document and/or be 6653.
submits its Triennial Updated Market listed as a contact for an intervenor j. Effective date of current license:
Power Analysis in compliance with the must create and validate an May 1, 1965.
Commission’s order issued 5/13/05, 111 eRegistration account using the k. Expiration date of current license:
FERC ¶ 61,295. eRegistration link. Select the eFiling July 31, 2005.
link to log on and submit the l. Description of the Project: The
Filed Date: 07/29/2005.
intervention or protests. project consists of the following existing
Accession Number: 20050729–5052.
Persons unable to file electronically facilities: (1) A 13-foot-high, 240-foot-
Comment Date: 5 p.m. eastern time on
should submit an original and 14 copies long masonry gravity dam with a
Friday, August 19, 2005.
of the intervention or protest to the Taintor gate and trash sluice near the
Docket Numbers: ER99–1773–005; south abutment; (2) a 46-acre reservoir
ER99–2284–005. Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC with a normal pool elevation of 174.3
Applicants: AES Eastern Energy, L.P.; feet USGS; (3) two 7.5-foot-diameter,
AES Creative Resources, L.P., AEE 2, 20426.
The filings in the above proceedings 2,860-foot-long, riveted-steel pipelines;
L.L.C. (4) a 25-foot-diameter surge tank; (5) two
Description: AES Eastern Energy LP are accessible in the Commission’s
eLibrary system by clicking on the 200-foot-long steel penstocks; (6) a
and AES Creative Resources, L.P. and powerhouse containing a single 2.8-
AEE 2, L.L.C. submit proposed revisions appropriate link in the above list. They
megawatt generating unit; and (7) other
to their market-based rate tariffs to are also available for review in the
appurtenances.
incorporate the new change in status Commission’s Public Reference Room in m. Pursuant to 18 CFR 16.8, 16.9, and
reporting requirements and conform to Washington, DC. There is an 16.10 each application for a new license
language ordered by the Commission for eSubscription link on the Web site that and any competing license applications
other affiliates of the AES Parties. enables subscribers to receive e-mail must be filed with the Commission at
Filed Date: 07/29/2005. notification when a document is added least 24 months prior to the expiration
Accession Number: 20050803–0061. to a subscribed dockets(s). For of the existing license. However, as a
Comment Date: 5 p.m. eastern time on assistance with any FERC Online result of Public Law No. 108–137,
Friday, August 19, 2005. service, please e-mail which was signed by President Bush on
Docket Numbers: ER99–1773–006; FERCOnlineSupport@ferc.gov. or call December 1, 2003, the Commission
ER99–2284–006. (866) 208–3676 (toll free). For TTY, call issued an order on December 30, 2003
Applicants: AES Eastern Energy, L.P.; (202) 502–8659. (105 FERC ¶ 62,231) that reinstated the
AES Creative Resources, L.P.; AEE2, Linda Mitry, previously-surrendered project license,
L.L.C. Deputy Secretary. with its original expiration date of July
Description: AES Eastern Energy LP; [FR Doc. E5–4315 Filed 8–9–05; 8:45 am] 31, 2005, and transferred the license to
AES Creative Resources, L.P.; and AEE2, the current co-licensees, Town of
BILLING CODE 6717–01–P
L.L.C. submits their joint triennial Stuyvesant and Stuyvesant Falls Hydro
market power update. Corporation.
Filed Date: 07/29/2005. DEPARTMENT OF ENERGY Under normal circumstances, the
Accession Number: 20050803–0062. relicensing process would have
Comment Date: 5 p.m. eastern time on Federal Energy Regulatory commenced with the licensee filing, by
Friday, August 19, 2005. Commission at least five years prior to the end of the
Any person desiring to intervene or to license term (July 2000), a notice of
protest in any of the above proceedings [Project No. 2696–000]
intent to seek or not to seek a new
must file in accordance with Rules 211 Town of Stuyvesant and Stuyvesant license. However, the surrender of the
and 214 of the Commission’s Rules of Falls Hydro Corporation; Notice of original license for the project became
Practice and Procedure (18 CFR 385.211 Intent To File an Application for a New effective on February 17, 1999, prior to
and 385.214) on or before 5 p.m. eastern License the notice of intent deadline. The co-
time on the specified comment date. It licensees filed the notice of intent on
is not necessary to separately intervene August 2, 2005. July 22, 2005, stating their intent to seek
again in a subdocket related to a a. Type of Filing: Notice of intent to relicensing of the project and their
compliance filing if you have previously file an application for a new license. intent to use the Traditional Licensing
intervened in the same docket. Protests b. Project No.: P–2696–000. Process in preparing their relicense
will be considered by the Commission c. Date Filed: July 22, 2005. application. The December 30, 2003
in determining the appropriate action to d. Submitted by: Town of Stuyvesant Commission Order stated that the
be taken, but will not serve to make and Stuyvesant Falls Hydro Commission would issue a notice
protestants parties to the proceeding. Corporation—current licensees. establishing a relicensing schedule for
Anyone filing a motion to intervene or e. Name of Project: Stuyvesant Falls the project, and given these unusual
protest must serve a copy of that Hydroelectric Project. circumstances, the Commission will
document on the Applicant. In reference f. Location: On Kinderhook Creek, proceed in accordance with the
to filings initiating a new proceeding, partly within the Town of Stuyvesant, following schedule.
interventions or protests submitted on in Columbia County, New York. The n. The relicensing process will
or before the comment deadline need project does not utilize Federal lands. proceed according to the following
not be served on persons other and the g. Filed Pursuant to: Section 15 of the schedule. Revisions to the schedule will
Applicant. Federal Power Act be made as appropriate.

VerDate jul<14>2003 15:02 Aug 09, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1