Example 1:
Material XXXX has Z2 availability check, procured externally, and has
planned delivery time of 10 days and GR processing time of 1 day.
Case -1: SO received today 03/21 with requested delivery date of 03/25
and quantity 10 EA
Calculation:ATP checks stock type C and B as
Today date
03/21
+
Planned delivery time
10 days (calendar days)
+
GR processing time
ATP checks stock position till 04/01 and confirms the order.
Let us assume the following is the stock position
Stock type C
5 EA
Stock type B
20 EA(Delivery date on PO
04/01)
ATP stock will show stock
25 EA
Quantity
03/25
Quantity
-
25 EA
25 EA
Confirmation date
Confirmation date
04/01
Example 2:
Material XXXX has Z2 availability check, manufactured in house, and has
total replenishment lead time of 10 days.
Case -1: SO received today 03/21 with requested delivery date of 03/25
and quantity 10 EA
Calculation:ATP checks stock type C and F as
Today date
03/21
Tot. RLT
10 days (work days)
ATP checks stock position till 04/04 and confirms the order.
Let us assume the following is the stock position
Stock type C
5 EA
Stock type F
20 EA(Delivery date on Prod.
Ord. 04/01)
ATP stock will show stock
25 EA
Example 3:
Material YYYY has Z3 availability check, manufactured in house, and has
total replenishment lead time of 10 days.
Case -1: SO received today 03/21 with requested delivery date of 03/25
and quantity 10 EA
Calculation:ATP checks stock type C and F as
Today date
03/21
Tot. RLT
10 days (work days)
+
+
ATP checks stock position till 04/04 and confirms the order.
Let us assume the following is the stock position
Stock type C
5 EA
Stock type F
20 EA(Delivery date on Prod Ord
04/01)
ATP stock will show stock
25 EA