Federal Register / Vol. 70, No.

187 / Wednesday, September 28, 2005 / Notices 56679

Docket Numbers: ER05–1483–000. Filed Date: 09/16/2005. The filings in the above proceedings
Applicants: Smarr EMC. Accession Number: 20050919–0117. are accessible in the Commission’s
Description: Smarr EMC advises that Comment Date: 5 p.m. eastern time on eLibrary system by clicking on the
due to amendments to section 201(f) of Friday, October 07, 2005. appropriate link in the above list. They
the Federal Power Act, it is no longer a Docket Numbers: ER05–665–003. are also available for review in the
public utility. Applicants: Barrick Goldstrike Mines Commission’s Public Reference Room in
Filed Date: 09/15/2005. Inc. Washington, DC. There is an
Accession Number: 20050916–0181. Description: Barrick Goldstrike Mines eSubscription link on the Web site that
Comment Date: 5 p.m. eastern time on Inc submits Substitute Original Sheet enables subscribers to receive e-mail
Thursday, October 06, 2005. No. 4 to FERC Electric Tariff, Original notification when a document is added
Docket Numbers: ER05–1484–000. Volume No. 1 in compliance with to a subscribed docket(s). For assistance
Applicants: Xcel Energy Services, Inc. FERC’s 8/16/05 Order. with any FERC Online service, please e-
Description: Xcel Energy Services Inc Filed Date: 09/15/2005. mail FERCOnlineSupport@ferc.gov. or
submits the Connection Agreements for Accession Number: 20050916–0176. call (866) 208–3676 (toll free). For TTY,
Great River Energy’s Eagle Creek, Comment Date: 5 p.m. eastern time on call (202) 502–8659.
Rockville, Oakwood, Westwood # 2 and Thursday, October 06, 2005. Magalie R. Salas,
Northstar Ethanol Substations between Docket Numbers: ER05–939–002.
Northern States Power Company’s and Secretary.
Applicants: Vesta Trading LP. [FR Doc. E5–5254 Filed 9–27–05; 8:45 am]
Great River Energy. Description: Vesta Trading LP submits
Filed Date: 09/15/2005. Substitute Original Sheet No. 4 to FERC
BILLING CODE 6717–01–P
Accession Number: 20050916–0182. Electric Tariff, Original Volume No. 1 in
Comment Date: 5 p.m. eastern time on compliance with FERC’s 8/18/05 Order.
Thursday, October 06, 2005. DEPARTMENT OF ENERGY
Filed Date: 09/13/2005.
Docket Numbers: ER05–1485–000. Accession Number: 20050919–0059. Federal Energy Regulatory
Applicants: Alcoa Power Generating Comment Date: 5 p.m. eastern time on Commission
Inc—Yadkin Division. Tuesday, October 04, 2005.
Description: Alcoa Power Generating Any person desiring to intervene or to [Docket No. CP05–405–000]
Inc submits revisions to its Open Access protest in any of the above proceedings
Transmission Tariff—Yadkin Division must file in accordance with Rules 211 Natural Gas Pipeline Company of
which owns and operates transmission and 214 of the Commission’s Rules of America; Notice of Intent To Prepare
facilities in the Southeastern Electric Practice and Procedure (18 CFR 385.211 an Environmental Assessment for the
Reliability Council. and 385.214) on or before 5 p.m. eastern Proposed North Lansing NSS Project
Filed Date: 09/16/2005. time on the specified comment date. It and Request for Comments on
Accession Number: 20050919–0099. is not necessary to separately intervene Environmental Issues
Comment Date: 5 p.m. eastern time on again in a subdocket related to a September 16, 2005.
Friday, October 07, 2005. compliance filing if you have previously The staff of the Federal Energy
Docket Numbers: ER05–1486–000. intervened in the same docket. Protests Regulatory Commission (FERC or
Applicants: Graham County Electric will be considered by the Commission Commission) will prepare an
Cooperative, Inc. in determining the appropriate action to environmental assessment (EA) that will
Description: Graham County Electric be taken, but will not serve to make discuss the environmental impacts of
Cooperative, Inc advises that due to protestants parties to the proceeding. the North Lansing NSS Project involving
amendments to section 201(f) of the Anyone filing a motion to intervene or construction and operation of facilities
Federal Power Act, it is no longer a protest must serve a copy of that by Natural Gas Pipeline Company of
public utility. document on the Applicant. In reference America (Natural) in Harrison County,
Filed Date: 09/15/2005. to filings initiating a new proceeding, Texas.1 The proposed facilities include
Accession Number: 20050919–0119. interventions or protests submitted on new storage wells, field pipelines and
Comment Date: 5 p.m. eastern time on or before the comment deadline need appurtenances, storage well
Thursday, October 06, 2005. not be served on persons other than the recompletions, a new 30-inch-diameter
Docket Numbers: ER05–1487–000. Applicant. loop pipeline, 13,000 horsepower (hp)
Applicants: Fall River Rural Electric The Commission encourages of compression and related facilities.
Cooperative, Inc. electronic submission of protests and This EA will be used by the
Description: Fall River Rural Electric interventions in lieu of paper, using the Commission in its decision-making
Cooperative, Inc. advises that due to FERC Online links at http:// process to determine whether the
amendments to section 201(f) of the www.ferc.gov. To facilitate electronic project is in the public convenience and
Federal Power Act, it is no longer a service, persons with Internet access necessity.
public utility. who will eFile a document and/or be If you are a landowner receiving this
Filed Date: 09/16/2005. listed as a contact for an intervenor notice, you may be contacted by a
Accession Number: 20050919–0118. must create and validate an pipeline company representative about
Comment Date: 5 p.m. eastern time on eRegistration account using the the acquisition of an easement to
Friday, October 07, 2005. eRegistration link. Select the eFiling construct, operate, and maintain the
Docket Numbers: ER05–1488–000. link to log on and submit the proposed facilities. The pipeline
Applicants: Pacific Gas & Electric intervention or protests. company would seek to negotiate a
Company. Persons unable to file electronically mutually acceptable agreement.
Description: Pacific Gas & Electric Co should submit an original and 14 copies However, if the project is approved by
submits an executed Letter of of the intervention or protest to the
Agreement with the California Federal Energy Regulatory Commission, 1 Natural’s application was filed with the
Department of Water Resources-State 888 First St., NE., Washington, DC Commission under section 7 of the Natural Gas Act
Water Project. 20426. and Part 157 of the Commission’s regulations.

VerDate Aug<31>2005 17:26 Sep 27, 2005 Jkt 205001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
56680 Federal Register / Vol. 70, No. 187 / Wednesday, September 28, 2005 / Notices

the Commission, that approval conveys Land Requirements for Construction proposed project under these general
with it the right of eminent domain. Construction of all project facilities, headings:
Therefore, if easement negotiations fail including pipelines, well pads, access • Geology and soils
to produce an agreement, the pipeline roads, a pipe storage yard and extra • Water resources and wetlands
company could initiate condemnation workspaces would impact • Fisheries, vegetation, and wildlife
proceedings in accordance with state approximately 209 acres. Construction • Endangered and threatened species
law. • Land use, recreation, and visual
disturbance includes a 100-foot-wide
A fact sheet prepared by the FERC resources
construction right-of-way for the new
entitled ‘‘An Interstate Natural Gas • Socioeconomics
30-inch-diameter pipeline, an 80-foot-
Facility On My Land? What Do I Need • Cultural resources
wide construction right-of-way for the • Air quality and noise
To Know?’’ was attached to the project new field pipelines, one new well pad
notice Natural provided to landowners. • Reliability and safety
and the expansion of six existing well We will also evaluate possible
This fact sheet addresses a number of pads. The alignment of all new
typically asked questions, including the alternatives to the proposed project or
pipelines would be adjacent to existing portions of the project, and make
use of eminent domain and how to maintained pipeline right-of-way.
participate in the Commission’s recommendations on how to lessen or
Modifications to the compressor station avoid impacts on the various resource
proceedings. It is available for viewing would be performed completely within
on the FERC Internet Web site (http:// areas.
Natural’s property at the station site, Our independent analysis of the
www.ferc.gov). with the exception of a 4-inch-diameter issues will be in the EA. Depending on
Summary of the Proposed Project water line that would run outside of the the comments received during the
station fencing. The sixteen well scoping process, the EA may be
Natural is proposing to provide recompletions and meter upgrades
additional cycled working gas capacity published and mailed to federal, state,
would be performed on existing well
at its North Lansing Storage Field in and local agencies, public interest
pads and would result in no new
Harrison County, Texas by increasing groups, interested individuals, affected
disturbance areas.
the withdrawal rate during late season landowners, newspapers, libraries, and
Following construction, about 88
conditions. Natural’s proposed the Commission’s official service list for
acres would be maintained as new
construction would allow 10 billion this proceeding. A comment period will
aboveground facility sites, access roads,
cubic feet (Bcf) of cushion gas to be be allotted for review if the EA is
or 50-foot-wide permanent pipeline
converted into cycled working gas, for a published. We will consider all
right-of-way. The remaining 121 acres of
total working gas capacity of 95.2 Bcf in comments on the EA before we make
land would be restored and allowed to
the North Lansing Storage Field. In our recommendations to the
revert to its former use.
addition, Natural seeks authority to Commission.
increase the field’s certificated peak day The EA Process To ensure your comments are
withdrawal level from 1100 million The National Environmental Policy considered, please carefully follow the
cubic feet (MMcf) to 1240 MMcf. There Act (NEPA) requires the Commission to instructions in the public participation
would be no change in the maximum take into account the environmental section beginning on page 5.
inventory level of the field. Natural impacts that could result from an action Currently Identified Environmental
seeks authority to: whenever it considers the issuance of a Issues
• Drill twelve new injection/ Certificate of Public Convenience and
Necessity. NEPA also requires us to We have already identified several
withdrawal storage wells from seven
discover and address concerns the issues that we think deserve attention
well pads;
based on a preliminary review of the
• Recomplete sixteen existing public may have about proposals. This
process is referred to as ‘‘scoping’’. The proposed facilities and the
injection/withdrawal storage wells (non
main goal of the scoping process is to environmental information provided by
jurisdictional);
Natural. This preliminary list of issues
• Install new pigging facilities and focus the analysis in the EA on the
important environmental issues. By this may be changed based on your
modify existing pipeline and
Notice of Intent, the Commission staff comments and our analysis.
compressor station appurtenances (non
• There are thirteen existing and
jurisdictional); requests public comments on the scope
planned residences and out buildings
• Install about 1.8 miles of 12-inch- of the issues to address in the EA. All
within 50 feet of the construction work
diameter field pipelines and comments received are considered
areas.
appurtenances; during the preparation of the EA. State
• The project would permanently
• Upgrade existing field pipelines, and local government representatives
impact approximately 12 acres of soils
meters, and appurtenances; are encouraged to notify their
that are potentially prime farmland
• Construct 8.7 miles of 30-inch- constituents of this proposed action and
soils.
diameter loop pipeline; encourage them to comment on their
• There are three private wells
• Add a 30-inch-diameter tap to the areas of concern.
located within 150 feet of the project
Gulf Coast #3 mainline; and In the EA we 3 will discuss impacts
construction boundary.
• Add 13,000 hp of compression, gas that could occur as a result of the
• Five perennial streams, fourteen
cooling, separation, metering, a construction and operation of the
intermittent streams, and ten wetlands
transformer, and related equipment at would be crossed by the proposed
the existing Compressor Station 388. ‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington, project.
The general location of the project DC 20426, or call (202) 502–8371. For instructions • Clearing of 83 acres of upland forest
facilities is shown in Appendix 1.2 on connecting to eLibrary refer to the last page of would be necessary for well pad and
this notice. Copies of the appendices were sent to pipeline construction.
2 The appendices referenced in this notice are not all those receiving this notice in the mail.
being printed in the Federal Register. Copies of all 3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the • Suitable habitat is present for the
appendices, other than Appendix 1 (maps), are environmental staff of the Office of Energy Projects federally listed threatened Louisiana
available on the Commission’s Web site at the (OEP). black bear, and Texas State listed

VerDate Aug<31>2005 16:02 Sep 27, 2005 Jkt 205001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
Federal Register / Vol. 70, No. 187 / Wednesday, September 28, 2005 / Notices 56681

threatened species including the (Appendix 3). If you do not return the using the eLibrary link. Click on the
northern scarlet snake, timber/ Information Request, you will be taken eLibrary link, click on ‘‘General Search’’
canebrake rattlesnake, and Rafinesque’s off the mailing list. and enter the docket number excluding
big-eared bat. the last three digits in the Docket
Becoming an Intervenor
• Three noise sensitive areas (i.e. Number field. Be sure you have selected
residences) are located approximately In addition to involvement in the EA an appropriate date range. For
875 feet north, 1,210 feet northeast, and scoping process, you may want to assistance, please contact FERC Online
837 feet northwest from the compressor become an official party to the Support at FercOnlineSupport@ferc.gov
station. proceeding, or ‘‘intervenor’’. To become or toll free at 1–866–208–3676, or for
Also, we have made a preliminary an intervenor you must file a motion to TTY, contact (202) 502–8659. The
decision to not address the impacts of intervene according to Rule 214 of the eLibrary link also provides access to the
the nonjurisdictional facilities that do Commission’s Rules of Practice and texts of formal documents issued by the
not require clearing, grading or Procedure (18 CFR 385.214). Intervenors Commission, such as orders, notices,
excavation. We will briefly describe have the right to seek rehearing of the and rulemakings.
their location and status in the EA. Commission’s decision. Motions to In addition, the Commission now
Nonjurisdictional facilities that require Intervene should be electronically offers a free service called eSubscription
disturbance will be included in the submitted using the Commission’s which allows you to keep track of all
project analysis. eFiling system at http://www.ferc.gov. formal issuances and submittals in
Persons without Internet access should specific dockets. This can reduce the
Public Participation send an original and 14 copies of their amount of time you spend researching
You can make a difference by motion to the Secretary of the proceedings by automatically providing
providing us with your specific Commission at the address indicated you with notification of these filings,
comments or concerns about the project. previously. Persons filing Motions to document summaries and direct links to
By becoming a commentor, your Intervene on or before the comment the documents. Go to http://
concerns will be addressed in the EA deadline indicated above must send a www.ferc.gov/esubscribenow.htm.
and considered by the Commission. You copy of the motion to the Applicant. All Finally, public meetings or site visits
should focus on the potential filings, including late interventions, will be posted on the Commission’s
environmental effects of the proposal, submitted after the comment deadline calendar located at http://www.ferc.gov/
alternatives to the proposal (including must be served on the Applicant and all EventCalendar/EventsList.aspx along
alternative locations/routes), and other intervenors identified on the with other related information.
measures to avoid or lessen Commission’s service list for this Magalie R. Salas,
environmental impact. The more proceeding. Persons on the service list
Secretary.
specific your comments, the more useful with e-mail addresses may be served
[FR Doc. E5–5204 Filed 9–27–05; 8:45 am]
they will be. Please carefully follow electronically; others must be served a
BILLING CODE 6717–01–P
these instructions to ensure that your hard copy of the filing.
comments are received in time and Affected landowners and parties with
properly recorded: environmental concerns may be granted
DEPARTMENT OF ENERGY
• Send an original and two copies of intervenor status upon showing good
your letter to: Magalie R. Salas, cause by stating that they have a clear Federal Energy Regulatory
Secretary, Federal Energy Regulatory and direct interest in this proceeding Commission
Commission, 888 First St., NE., Room which would not be adequately
1A, Washington, DC 20426. represented by any other parties. You do [Docket No. CP05–396–000]
• Label one copy of the comments for not need intervenor status to have your
the attention of Gas Branch 3. Sabine Pass LNG, L.P.; Notice of Intent
environmental comments considered.
• Reference Docket No. CP05–405– To Prepare an Environmental
000. Environmental Mailing List Assessment for the Proposed Sabine
• Mail your comments so that they An effort is being made to send this Pass LNG Terminal Phase II Project
will be received in Washington, DC on notice to all individuals, organizations, and Request for Comments on
or before October 17, 2005. and government entities interested in Environmental Issues
Please note that we are continuing to and/or potentially affected by the September 14, 2005.
experience delays in mail deliveries proposed project. This includes all The staff of the Federal Energy
from the U.S. Postal Service. As a result, landowners who are potential right-of- Regulatory Commission (FERC or
we will include all comments that we way grantors, whose property may be Commission) will prepare an
receive within a reasonable time frame used temporarily for project purposes, environmental assessment (EA) that will
in our environmental analysis of this or who own homes within distances discuss the environmental impacts of
project. However, the Commission defined in the Commission’s regulations the Sabine Pass LNG Phase II Project
strongly encourages electronic filing of of certain aboveground facilities. By this involving construction and operation of
any comments or interventions or notice we are also asking governmental liquefied natural gas (LNG) import
protests to this proceeding. See 18 CFR agencies, especially those in Appendix terminal facilities by Sabine Pass LNG,
385.2001(a)(1)(iii) and the instructions 2, to express their interest in becoming L.P. (SPLNG) in Cameron Parish,
on the Commission’s Web site at cooperating agencies for the preparation Louisiana.1 These facilities would
http://www.ferc.gov under the ‘‘e- of the EA. consist of three additional LNG storage
Filing’’ link and the link to the User’s tanks and new and expanded LNG
Guide. Before you can file comments Additional Information
vaporization systems. This EA will be
you will need to create a free account Additional information about the
used by the Commission in its decision-
which can be created on-line. project is available from the
We may mail the EA for comment. If Commission’s Office of External Affairs, 1 SPLNG’s application was filed with the
you are interested in receiving it, please at 1–866–208–FERC or on the FERC Commission under section 3 of the Natural Gas Act
return the Information Request Internet Web site (http://www.ferc.gov) and Part 153 of the Commission(s regulations.

VerDate Aug<31>2005 16:02 Sep 27, 2005 Jkt 205001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1