Federal Register / Vol. 70, No.

198 / Friday, October 14, 2005 / Notices 60129

DEPARTMENT OF TRANSPORTATION Dated: Issued in Washington, DC, on 2, DEIS analysis for more detailed study.
October 5, 2005. The Tier 2 work will involve further
Federal Aviation Administration Natalie Ogletree, refinement of the Preferred Alternative,
FAA General Engineer, RTCA Advisory including locating the Bypass within the
RTCA Special Committee 135; Committee. preferred corridor, evaluation of
Environmental Conditions and Test [FR Doc. 05–20632 Filed 10–13–05; 8:45 am] detailed engineering options, and
Procedures for Airborne Equipment BILLING CODE 4910–13–M additional environmental analysis.
Improvements to the corridor are
AGENCY: Federal Aviation
considered necessary to provide for the
Administration (FAA), DOT.
DEPARTMENT OF TRANSPORTATION existing and projected traffic demand
ACTION: Notice of RTCA Special and to reduce congestion. Traffic
Committee 135 meeting. Federal Highway Administration congestion and travel delays have
reached unacceptable levels for those
SUMMARY: The FAA is issuing this notice Environmental Impacts Statement: who live and work in or travel through
to advise the public of a meeting of Yamhill County, OR Newberg, Dundee and the surrounding
RTCA Special Committee 135: areas. By 2025, Newberg and Dundee
Environmental Conditions and Test AGENCY: Federal Highway
Administration (FHWA), DOT. are expected to have congestion in their
Procedures for Airborne Equipment. downtowns for over 14 hours a day. The
ACTION: Notice of intent.
DATES: The meeting will be held 2002 peak period travel time between
November 2–3, 2005 starting at 9 a.m. SUMMARY: The FHWA is issuing a notice East Newberg and Dayton is about 25
ADDRESSES: The meeting will be held at to advise the public that an minutes. Without the Bypass the travel
RTCA, 1828 L Street, NW., Suite 805, Environmental Impact Statement (EIS) time in 2025 will be 40 minutes on OR
Colson Board Room, Washington, DC. will be prepared for a proposed highway Highway 99W. If the Bypass were
project in Yamhill County, Oregon. constructed the travel time between East
FOR FURTHER INFORMATION CONTACT: (1)
FOR FURTHER INFORMATION CONTACT: Newberg and Dayton on OR Highway
RTCA Secretariat, 1828 L Street, NW.,
Elton Chang, PE, Environmental 99W would be 19 minutes and the travel
Suite 805, Washington, DC, 20036; time on the Bypass would be 12
telephone (202) 833–9339; fax (202) Coordinator, FHWA Oregon Division,
530 Center Street NE., Suite 100, Salem, minutes.
833–9434; Web site http://www.rtca.org. ODOT uses volume to capacity ratios
OR 97301, (503) 399–5749,
SUPPLEMENTARY INFORMATION: Pursuant to measure the levels of mobility on
elton.chang@fhwa.dot.gov.
to section 10(a)(2) of the Federal state highways. The ratios show the
Advisory Committee Act (Pub. L. 92– SUPPLEMENTARY INFORMATION: The volume of traffic over the capacity of the
463, 5 U.S.C., Appendix 2), notice is FHWA, in cooperation with the Oregon highway to handle traffic. When the
hereby given for a Special Committee Department of Transportation (ODOT), ratio approaches 1.0 the entire capacity
135 meeting. The agenda will include: will prepare a Design (Tier 2) of the highway is being used and the
• March 2–3: Environmental Impact Statement (EIS) highway is very congested. At this point
• Opening Plenary Session (Welcome on a proposal to construct the Newberg even minor disruptions in flow can
and Introductory Remarks). Dundee Bypass (Bypass), in Yamhill cause severe backups. The v/c ratios for
• Approval of Summary from the County, Oregon. The proposed Bypass most of the major intersections on OR
Forty-Fifth Meeting. project is a part of the Newberg Dundee Highway 99W in Newberg and Dundee
Transportation Improvement Project exceeded 1.0 in 2002 during peak travel
• RTCA Paper No. 099–05/SC135–
(NDTIP), which seeks to improve periods. ODOT’s policy and the goal set
650.
regional and local transportation along by the Newberg Dundee Transportation
• Review Results of EUROCAE ED–14
the Oregon Highway 99W corridor in Improvement Project Oversight Steering
Meeting.
the Newberg and Dundee area by Team for urban highways is a volume to
• Discuss Options and Directions of reducing traffic congestion. The
DO–160 User Guide. capacity ratio of 0.75.
proposed Bypass project area Newberg and Dundee want to make
• Review Status of Working Group encompasses a section of OR Highway their downtowns more pedestrian
16. 99W that extends northeast across friendly. Noise levels measured on the
• Review Status of Working Group Yamhill County from the OR Highway sidewalk in Newberg in 2002 were 72
21. 99W/OR Highway 18 intersection near decibels. This is loud enough to require
• Review Change Proposals for all Dayton to Rex Hill east of the City of that people need to raise their voices to
other Sections. Newberg. The eastern terminus is converse. The heavy truck traffic
• Review Schedule to Release DO– located at OR Highway 99W mile post through town is the source of most of
160F. 20.08. The western terminus is located the noise. Truck traffic also adds to the
• Closing Plenary Session (New/ where OR Highway 99W intersects with congestion in the towns. By 2025,
Unfinished Business, Date and Place of Oregon 18 at OR Highway 18 mile post Dundee is expected to have about 3,700
Next Meeting). 51.84. freight trips per day rumbling through
Attendance is open to the interested FHWA and ODOT are conducting the town and Newberg is expected to have
public but limited to space availability. environmental analysis of the Bypass in 4,400 freight trips per day.
With the approval of the chairmen, a two-tiered NEPA process. The Tier 1 Alternatives under consideration
members of the public may present oral work, which was the subject of a include alternatives within the
statements at the meeting. Persons Location Environmental Impact approved corridor and the No Build
wishing to present statements or obtain Statement LFEIS, identified feasible alternative for comparison purposes and
information should contact the person alternative corridors for the Bypass various design options.
listed in the FOR FURTHER INFORMATION project, and culminated in a Record of Letters describing the proposed action
CONTACT section. Members of the public Decision on the preferred corridor and soliciting comments related to this
may present a written statement to the alternative. This Preferred Alternative proposed action will be sent to Federal,
committee at any time. will be carried forward through the Tier State and local agencies, and to private

VerDate Aug<31>2005 13:54 Oct 13, 2005 Jkt 208001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\14OCN1.SGM 14OCN1