Professional Documents
Culture Documents
PV-Plant Solution
References
2014/12
www.huawei.com
Europe
800MW
7.8MW
Location
Germany Reden
Solar
Inverter
SUN2000-20KTL
Time
2014 May
Customer
Value
48kg/uniteasy-install
5.3MW
Location
Germany Arneburg
Solar
inverter
SUN2000-20KTL
Time
2014 April
Customer
value
48kg/uniteasy-install
500kW
Location
Germany Simmersdorf
Solar
Inverter
SUN2000-20KTL
Time
2014 January
Customer
Value
48kg/uniteasy-install
250 kWp
Location
Toulouse ,FRANCH
Solar
Inverter
Huawei SUN2000-20KTL
Time
2014 August
Net volatge
400 V
Customer
Value
8.2MW
Location
FRANCH
Time
2014 November
Net voltage
20kV
Customer
value
IP65, free-maintenance
Japan
200MW
Page 8
Capacity
Location
Solar
Inverter
Net voltage
98kW2*49kW)
GumJapan
SUN2000-24.5KTL 4 units
210V
Customer
Value
IP65free-maintenance
Page 9
Capacity
Location
Solar
Inverter
Net voltage
220kW
HiroshimaJapan
SUN2000-28KTL 8 units
6.6kV
Customer
Value
No DC converge box
Easy-maintenance
Page 10
500kW
Location
HiroshimaJapan
Solar
Inverter
SUN8000-500KTL 1 unit
Net
voltage
6.6kV
Customer
Value
High efficiency
No air-condition
Remote monitor
Remote operation
Page 11
Capacity
Location
Solar Inverter
Net voltage
0.98MW
NagasakiJapan
SUN2000-24.5KTL 40 units
210V
Customer
Value
High efficiency
IP65
Page 12
China
4,500MW
8.93MW
Location
Zhejiang Jiaxing
Solar
Inverter
SUN2000-20KTL
Time
2014 April
Customer
Value
48kg/uniteasy-install in roof
Page 14
7.8MW
Location
Guangdong Shunde
Solar
Inverter
SUN2000-28KTL
Time
2014 April
Customer
Value
48kg/uniteasy-install in roof
IP65free-maintenance
Page 15
Requirement
Huawei solution
Raise electricity generation in 5~8%
Smart string testing achieve elaborate manage,
reduce 80% of fault time;
No DC converge box, avoid DC transfer and
electric arc.
Requirement
Huawei Solution
Compared with centre inverter solution, electricity
generation is raised>10%;
No need to build inverter house, reduce building
time;
Free-maintenance, save OPEX.
Requirement
Huawei Solution
Raise electricity generation in 20%-30%
Raise electricity generation in 3% compared
with other company
Easy-install;
6 path smart string testing, reduce 80% fault time
of location.
Requirement
Huawei solution
Electricity generation is raised>5%(compared
with other company);
6 path smart string testing, reduce 80% fault time
of location.
Reduce maintenance cost, raise electricity
generation, reduce feedback time of investment.
Easy
Maintenance
Continuous
Service