65894 Federal Register / Vol. 70, No.

210 / Tuesday, November 1, 2005 / Notices

industries, were proposed on April 23, collecting, validating, and verifying 3501 et seq.), this document announces
1986, and promulgated on September information, processing and that an Information Collection Request
28, 1992. These standards apply to new, maintaining information, and disclosing (ICR) has been forwarded to the Office
modified and reconstructed calciners and providing information; adjust the of Management and Budget (OMB) for
and dryers at mineral processing plants existing ways to comply with any review and approval. This is a request
that process or produce any of the previously applicable instructions and to renew an existing approved
following minerals and their requirements; train personnel to be able collection. This ICR is scheduled to
concentrates or any mixture of which to respond to a collection of expire on October 31, 2005. Under OMB
the majority is any of the following information; search data sources; regulations, the Agency may continue to
minerals or a combination of these complete and review the collection of conduct or sponsor the collection of
minerals: alumina, ball clay, bentonite, information; and transmit or otherwise information while this submission is
diatomite, feldspar, fire clay, fuller’s disclose the information. pending at OMB. This ICR describes the
earth, gypsum, industrial sand, kaolin, Respondents/Affected Entities: Owner nature of the information collection and
lightweight aggregate, magnesium or operator of each calciner and dryer at its estimated burden and cost.
compounds, perlite, roofing granules, a mineral processing plant. DATES: Additional comments may be
talc, titanium dioxide, and vermiculite. Estimated Number of Respondents: submitted on or before December 1,
Owners or operators of the affected 167. 2005.
facilities must make one-time-only Frequency of Response: Semiannual,
reports including notification of startup, initially and on occasion. ADDRESSES: Submit your comments,
initial performance test, notification of Estimated Total Annual Hour Burden: referencing docket ID number OAR–
any physical or operational change to an 6,955 hours. 2003–0052, to (1) EPA online using
existing facility, and notification of the Estimated Total Annual Costs: EDOCKET (our preferred method), by e-
demonstration of the continuous $674,035, which includes $108,550 mail to a-and-r-Docket@epa.gov, or by
monitoring system (CMS). Owners or annualized capital/startup costs, $4,000 mail to: EPA Docket Center,
operators are also required to maintain annual O&M costs, and $561,485 annual Environmental Protection Agency, Mail
records of the occurrence and duration labor costs. Code 6102T, Air Docket, 1200
of any startup, shut down, or Changes in the Estimates: The Pennsylvania Ave., NW., Washington,
malfunction, or any period during increase in the burden from the most DC 20460, and (2) OMB at: Office of
which the monitoring system is recently approved ICR is due to the fact Information and Regulatory Affairs,
inoperative. Performance tests are that there is an increase of one source Office of Management and Budget
needed as these are the Agency’s per year. In addition, we are presently (OMB), Attention: Desk Officer for EPA,
records of a source’s initial capability to accounting for management and clerical 725 17th Street, NW., Washington, DC
comply with emissions standards and person hours per year, which was not 20503.
note the operating conditions under shown in the previous ICR, and we have FOR FURTHER INFORMATION CONTACT: Sicy
which compliance was achieved. updated the salary table. Jacob, 5104A, Office of Solid Waste and
Semiannual reports of excess emissions There is however, a decline in the Emergency Response, Office of
are also required. annualized cost. The reason for the Emergency Management, Environmental
Any owner or operator subject to the decline is because there is only one new Protection Agency, 1200 Pennsylvania
provisions of this part must maintain a source in the renewal ICR instead of two Ave., NW., Washington, DC 20460;
file of these measurements, and retain
as in the previous ICR. telephone number: (202) 564–8019; fax
the file for at least two years following
Dated: October 24, 2005. number: (202) 564–2625; e-mail address:
the collection of such measurements,
maintenance reports, and records. All Oscar Morales, jacob.sicy@epa.gov.
reports are sent to the delegated state or Director, Collection Strategies Division. SUPPLEMENTARY INFORMATION: EPA has
local authority. In the event that there [FR Doc. 05–21760 Filed 10–31–05; 8:45 am] submitted the following ICR to OMB for
is no such delegated authority, the BILLING CODE 6560–50–P
review and approval according to the
reports are sent directly to the EPA procedures prescribed in 5 CFR 1320.12.
regional office. On June 2, 2005 (70 FR 32325), EPA
An agency may not conduct or ENVIRONMENTAL PROTECTION sought comments on this ICR pursuant
sponsor, and a person is not required to AGENCY to 5 CFR 1320.8(d). EPA received only
respond to, a collection of information one comment. The Agency’s response is
unless it displays a currently valid OMB [OAR–2003–0052; FRL–7991–6] included in the supporting statement.
Control Number. The OMB Control EPA has established a public docket
Agency Information Collection
Numbers for EPA’s regulations are listed for this ICR under Docket ID No. OAR–
Activities; Submission to OMB for
in 40 CFR Part 9 and 48 CFR Chapter 2003–0052, which is available for public
Review and Approval; Comment
15, and are identified on the form and/ viewing at the Air and Radiation Docket
Request; Risk Management Program
or instrument, if applicable. and Information Center in the EPA
Requirements and Petitions To Modify
Burden Statement: The annual public Docket Center (EPA/DC), EPA West,
the List of Regulated Substances
reporting and recordkeeping burden for Room B102, 1301 Constitution Ave.,
under Section 112(r) of the Clean Air
this collection of information is NW., Washington, DC. The EPA Docket
Act (Renewal), EPA ICR Number
estimated to average 20 hours per Center Public Reading Room is open
1656.12, OMB Control Number 2050–
response. Burden means the total time, from 8:30 a.m. to 4:30 p.m., Monday
0144
effort, or financial resources expended through Friday, excluding legal
by persons to generate, maintain, retain, AGENCY: Environmental Protection holidays. The telephone number for the
disclose or provide information to or for Agency. Reading Room is (202) 566–1744, and
a Federal agency. This includes the time ACTION: Notice. the telephone number for the Air and
needed to review instructions; develop, Radiation Docket and Information
acquire, install, and utilize technology SUMMARY: In compliance with the Center is (202) 566–1742. An electronic
and systems for the purposes of Paperwork Reduction Act (44 U.S.C. version of the public docket is available

VerDate Aug<31>2005 15:39 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\01NON1.SGM 01NON1
Federal Register / Vol. 70, No. 210 / Tuesday, November 1, 2005 / Notices 65895

through EPA Dockets (EDOCKET) at Burden to sources that are currently estimated for 15 states that may be
http://www.epa.gov/edocket. Use covered by part 68, for initial rule implementing a Part 68 program is 6,157
EDOCKET to submit or view public compliance, including rule hours (18,471 hours for three years).
comments, access the index listing of familiarization and program Therefore, the total annual burden for
the contents of the public docket, and to implementation were accounted for in all sources and states is estimated to be
access those documents in the public ICR 1656.03. Sources submitted their 98,599 hours (295,797 hours for three
docket that are available electronically. first RMPs on June 21, 1999. The next years).
Once in the system, select ‘‘search,’’ compliance deadline was June 21, 2004, Burden means the total time, effort, or
then key in the docket ID number five years after the first submission. financial resources expended by persons
identified above. Some of the sources revised and to generate, maintain, retain, or disclose
Any comments related to this ICR submitted their RMPs between the or provide information to or for a
should be submitted to EPA and OMB mandatory deadlines. These sources Federal agency. This includes the time
within 30 days of this notice. EPA’s were then assigned a five-year needed to review instructions; develop,
policy is that public comments, whether compliance deadline based on the date acquire, install, and utilize technology
submitted electronically or in paper, of their revised plan submission. The and systems for the purposes of
will be made available for public next submission of RMPs for all sources collecting, validating, and verifying
viewing in EDOCKET as EPA receives is by June 21, 2009. The period covered information, processing and
them and without change, unless the by this ICR is between the two maintaining information, and disclosing
comment contains copyrighted material, mandatory deadlines (2004 and 2009). and providing information; adjust the
CBI, or other information whose public Therefore, in this ICR, EPA has existing ways to comply with any
disclosure is restricted by statute. When accounted for only on-going program previously applicable instructions and
EPA identifies a comment containing implementation costs for all sources that requirements; train personnel to be able
copyrighted material, EPA will provide are currently covered by part 68 to respond to a collection of
a reference to that material in the requirements, compliance costs for new information; search data sources;
version of the comment that is placed in sources that may become subject to the complete and review the collection of
EDOCKET. The entire printed comment, regulations, and burden for sources that information; and transmit or otherwise
including the copyrighted material, will re-submit RMPs before the next disclose the information.
be available in the public docket. compliance deadline. Respondents/Affected Entities:
Although identified as an item in the An agency may not conduct or
Chemical manufacturers, petroleum
official docket, information claimed as sponsor, and a person is not required to
refineries, water treatment systems, non-
CBI, or whose disclosure is otherwise respond to, a collection of information
chemical manufacturers, etc.
restricted by statute, is not included in unless it displays a currently valid OMB
the official public docket, and will not control number. The OMB control Estimated Number of Respondents:
be available for public viewing in numbers for EPA’s regulations in 40 1,397, including state implementing
EDOCKET. For further information CFR are listed in 40 CFR part 9 and are agencies.
about the electronic docket, see EPA’s identified on the form and/or Frequency of Response: Every five
Federal Register notice describing the instrument, if applicable. years, unless the facilities need to
electronic docket at 67 FR 38102 (May Burden Statement: The public update their previous submission.
31, 2002), or go to www.epa.gov/ reporting burden will depend on the Estimated Total Annual Hour Burden:
edocket. regulatory program tier into which 98,599 hours.
Title: Risk Management Program sources are categorized. In this ICR, the Estimated Total Annual Cost:
Requirements and Petitions to Modify public reporting burden for rule $3,582,614, which includes $0
the List of Regulated Substances under familiarization for new sources is annualized capital, $6,910 O&M costs,
Section 112(r) of the Clean Air Act estimated to range from 20 to 40 hours and $3,575,704 Respondent Labor costs.
(Renewal). per source. The public reporting burden Changes in the Estimates: There is a
Abstract: The 1990 CAA Amendments to prepare and submit a RMP for new decrease of 32,204 hours in the total
added section 112(r) to provide for the sources is estimated to range from 10 to estimated burden currently identified in
prevention and mitigation of accidental 30 hours. The public reporting burden the OMB Inventory of Approved ICR
releases. Section 112(r) mandates that for new sources to develop prevention Burdens. This decrease is mainly due to
EPA promulgate a list of ‘‘regulated programs is estimated to range from 70 the RMP submission schedule. The last
substances,’’ with threshold quantities to 95 hours per source. The public submission of RMPs by all sources was
and establish procedures for the reporting burden for CBI claims is in June 2004. The next compliance
addition and deletion of substances estimated to be 9.5 hours per source. deadline is June 2009, which is after
from the list of ‘‘regulated substances.’’ Burden for RMP revisions is estimated this ICR period. This ICR only accounts
Processes at stationary sources that to range from 10 to 40 hours per source. for compliance burden for new sources
contain a threshold quantity of a The public record keeping burden to that may become subject to the
regulated substance are subject to maintain on-site documentation for regulations, any revised RMP that may
accidental release prevention currently covered sources is estimated be submitted by existing sources, and
regulations promulgated under CAA to range from 3 hours to 146 hours. The on-site documentation for existing
section 112(r)(7). These two rules are total annual public reporting burden for sources. The burden may increase in the
codified as 40 CFR part 68. Part 68 new sources to become familiar with the next ICR renewal since the next
requires that sources with more than a rule, develop and submit a RMP, deadline for all sources to submit RMPs
threshold quantity of a regulated develop prevention program, will fall within the next ICR period.
substance in a process develop and substantiate claims for confidential
implement a risk management program Dated: October 24, 2005.
business information, submit revised
and submit a risk management plan RMPs, and develop on-site Oscar Morales,
(RMP) to EPA. The compliance schedule documentation for existing sources is Director, Collection Strategies Division.
for the part 68 requirements was about 92,442 hours (277,326 hours over [FR Doc. 05–21761 Filed 10–31–05; 8:45 am]
established by rule on June 20, 1996. three years). The total annual burden BILLING CODE 6560–50–P

VerDate Aug<31>2005 15:39 Oct 31, 2005 Jkt 208001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\01NON1.SGM 01NON1