You are on page 1of 16

Dont Just BuildCreate

PRE ENGINEERED BUILDINGS

WHAT IS
PRE ENGINEERED
(PEB) BUILDING ?
Pre Engineered Building is a metal building designed and
fabricated in the factory premises; all components are
shipped to site and are assembled and erected at site with
nut-bolts/ anchor bolts.

o DESIGNING

o MANUFACTURING

o STACKING OF MATERIAL

PROCESS OF DEVELOPING PRE ENGINEERED BUILDING


o SHIPPING

o ERECTION

o BUILDING READY
TO HANDOVER

COMPONENTS OF PRE ENGINEERED


BUILDING
Pre Engineered Buildings are steel structures built over
a structural concept of:

PRIMARY MEMBERS
SECONDARY MEMBERS
ROOF SHEETING
WALL CLADDING
ACCESSORIES

PRIMARY FRAMING SYSTEM


Primary framing consists of all structural elements which
transfer load to the foundation and comprise

RIGID FRAMES;
ENDWALL FRAMES;
BRACING;
CRANE BEAM

RIGID FRAME

ENDWALL FRAME

PRIMARY FRAMING SYSTEM


BRACING

CRANE BEAM

SECONDARY FRAMING SYSTEM


Secondary framing consists of elements which support the
roof & wall sheeting and transfer load to the prImary
framing. These includes

ROOF PURLINS;
WALL GIRTS;
EAVE STRUTS;
SAG RODS

ROOF PURLINS

WALL GIRTS

SECONDARY FRAMING SYSTEM


EAVE STRUTS

SAG RODS

ROOF SHEETING

WALL CLADDING

2015-10-1

TURBO VENT

SKY LIGHT

RIDGE VENT

ACCESSORIES

LOUVERS

SCOPE OF PRE ENGINEERED BUILDING

Factories
Warehouse
Railway/Metro Stations
Stadium
Aircraft Hanger
Petrol Pumps
Showrooms
Workshops
Shelters

Sport Club
Office Building
School
Stadium
Supermarket
Community Centre
Houses
Multistorey Buildings

ADVANTAGES OF
PRE ENGINEERED BUILDING
Steel is recyclable and is considered as a green building material.
Quality control is much better as material is pre-fabricated.
Speed of construction could be much higher as offsite fabrication helps
increasing speed.
Steel with its high strength in tension and compression offers lot of choice to
architects. Lot of shapes which cannot be imagined in RCC can be imagined in
steel.
Dependency on labour is reduced as much less manpower is engaged at site.
Modifications in steel building are much easier than RCC building. 8.Keeping in
view lower dead loads of steel buildings loading capacity of a structure can be
much easily increased compared to an RCC building.
Advanced technologies are being deployed in manufacturing of these buildings.
The industry is using BIM (building information modelling) software like TEKLA.

PROJECTS OF RICHA
INDUSTRIES

2015-10-1

RICHA KASHIPUR PLANT

2015-10-1

CORPORATE CUM REGISTERED OFFICE :


Plot No 29, DLF Industrial Area, PH-II
Faridabad -121003, Haryana
Ph: +91-129-4009262
Fax: +91-129-4133969
Email : richa@richa.in

KASHIPUR MANUFACTURING PLANT :


8th Km Stone, Ram Nagar Road , Distt Udham
Singh Nagar, NH-121, Kashipur-244713,
Uttarakhand
Ph: +91-9547-223073
Email : kashipur@richa.in

For all the latest updates, follow us on


http://richaindustries.wordpress.com/
https://www.facebook.com/richaindustries

www.richa.in
2015-10-1

THANK YOU !

2015-10-1

You might also like