Professional Documents
Culture Documents
NO
VOLUME
PSER:SCT:SRG-M1518:14
II SCOPE, TECHNICAL SPECIFICATION
JOB
TECHNICAL SPECIFICATIONS
FOR
DM PLANT
CONTENTS
VOLUME-IIB & III
VOLUME-IIB
SECTION
DESCRIPTION
SECTION A
SCOPE OF ENQUIRY
PAGE
NO.
1-3
SECTION B
PROJECT INFORMATION
4-8
SECTION C
SECTION C1
10-23
24-27
28-61
62-63
64-78
79-81
82-96
97-99
100-102
103-105
106
107-110
SECTION D
118
SECTION D1
119
120-138
139-148
SECTION C2
SECTION C3
SECTION D2
SECTION D3
VOLUME-III
SCHEDULE OF CLARIFICATIONS
SCHEDULE OF DEVIATIONS
SCHEDULE OF GUARANTEED CHEMICAL CONSUMPTION ANNEXURE I
SCHEDULE OF DECLARATION
SUGGESTIVE PRICE SCHEDULE
111-116
117
149-166
167-180
181-187
188-190
191
192-196
197-204
205-210
211-216
217-228
229-234
235-246
247-421
423
424
425
426
427-428
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: A
REV
V NO: 00
S
SECTION
NA
SCO
OPE OF ENQUIRY
E
Y
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: A
REV
V NO: 00
1.0
SCOPE OF INQUIR
RY/ INTENT OF
O SPECIFIC
CATION
1.1
The spe
ecification iss intended to
t cover de
esign, engineering, man
nufacture, faabrication, assembly,
inspectio
on and testiing at vendo
or's & sub-vvendors worrks, painting
g, mandatoryy spares, errection &
commisssioning spare
es, forwardin
ng, proper pa
acking, shipm
ment and delivery at sitee, unloading, handling
& transp
portation at site
s , Erectio
on & Commisssioning, tria
al run, preparation & subbmission of As
Built
drawingss, Performance and gua
arantee test ing at site and
a
handing over of DM
M PLANT as
s per the
details in different sections
s
/ vo
olumes of th
his specificattion for 2X66
60 MW Suraatgarh Supe
er Critical
age-V Unit 7 & 8 at Suratgarh, Rajas than
TPS, Sta
1.2
1.3
1.4
The exte
ent of supplyy under the contract
c
inclu
udes all items shown in the drawingss, notwithstan
nding the
fact thatt such items may have been
b
omitted from the sp
pecification or schedules.. Similarly, th
he extent
of supplyy also includ
des all items mentioned in
n the specification and /o
or scheduless, notwithstan
nding the
fact thatt such items may have be
een omitted iin the drawin
ng.
1.5
The gen
neral terms and
a conditions, instruction
ns to tendere
er and other attachment rreferred to elsewhere
are mad
de part of the
t
tender specification.
s
. The equip
pment materials and woorks covered
d by this
specifica
ation are sub
bject to compliance to alll attachments referred to
o in the speccification. Th
he bidder
shall be responsible for and gove
erned by all rrequirements
s stipulated herein.
h
1.6
1.7
Deviatio
ons along witth cost of withdrawal (po
ositive or neg
gative), if any, should bee very clearly
y brought
out clausse by clause
e in the enclo
osed schedu le; otherwise
e, it will be prresumed thaat the vendor's offer is
strictly in
n line with NIT
N specificattion and therre is no deviiation. Cost of
o withdrawaal to be prov
vided in a
sealed e
envelope.
1.8
1.9
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: A
REV
V NO: 00
as succcessful bidde
er/vendor and Customerr/Purchaser/E
Employer will mean BH EL and/or Customer
C
(RRVUN
NL: Rajastha
an Rajya Vid
dyut Utpada
an Nigam Lttd., Jaipur) including theeir consultan
nt (TATA
Consultiing Engineerrs Limited, Be
engaluru) ass interpreted by BHEL in the
t relevant context.
0
1.10
The equ
uipment cove
ered under this specifica
ation shall no
ot be dispatc
ched unless the same ha
ave been
finally inspected, acccepted and dispatch
d
relea
ase issued by
b BHEL/Cus
stomer.
1.11
BHELs//Customers representativ
ve shall be g
given full acc
cess to the shop
s
in whichh the equipm
ments are
being manufactured or tested an
nd all test reccords shall be
e made availlable to him.
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: B
REV
V NO: 00
S
SECTION
NB
PROJE
ECT INFO
ORMATIO
ON
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION B
SHEET 1 OF 3
1.0
Owner
2.0
Consulting Engineer
3.0
4.0
5.0
186 m (approximate)
6.0
Climatic conditions
Temperatures : Monthly basis
6.1
32.3 deg.C
19.6 deg.C
50 deg.C
6.3
Relative humidity
6.4
312 mm
6.5
7.0
4 km / hr.
ISSUE
R1
FORM NO. 329 R5
5
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION B
SHEET 2 OF 3
8.0
a) Zone
Zone II
33 Deg C
c)
f)
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION B
SHEET 3 OF 3
DC supply
j) For instrument and control system
of steam generator and steam
turbine generator.
10.0
11.0 LOCATION :
The proposed power project shall be located in the state of Rajasthan, in Shriganganagar
Distt. The proposed power project is located within 393 km from Jaipur 169 km from
Bikaner and 367 Km from Delhi.
Major road distances of the project site are as follows:
Between
Distance in KMs.
Project - Suratgarh Junction
31 km (Nearest Railhead)
Project - Jaipur (State Capital)
393 km
Project - Delhi
367 km
Project Jaipur
393 km (Nearest Airport in Rajasthan)
Amritsar
378 km (Nearest Airport)
Project Bikaner
169 km
ISSUE
R1
FORM NO. 329 R5
7
Constituent
Unit
Value
1.
pH
8.5
2.
3.
mg/l
ND
4.
BOD
5.
COD
20
6.
Suspended solids
mg/l
<15
7.
Turbidity
NTU
<15
8.
mg/l
74
9.
mg/l
52
10.
Sodium as Na
mg/l
61
11.
Potassium
mg/l
12.
Chloride as cl
mg/l
39
13.
Sulphate as So4
mg/l
48
14.
Sulphide
mg/l
15.
M- Alkalinity as CaCO3
mg/l
140
16.
P-Alkalinity as CaCO3
mg/l
Nil
17.
Nitrates as No3
mg/l
17
18.
Nitrite
mg/l
Nil
19.
mg/l
15
20.
mg/l
0.6
21.
Iron as Fe-dissolved
mg/l
0.5
22.
Iron as Fe-suspended
mg/l
0.1
23.
mg/l
393
24.
Conductivity at 25 degree C
-mho/cm
500
25.
Dissolved Oxygen as O2
mg/l
5.0
26.
mg/l
*Clarified Water Analysis should take care of the following dosing in Pre-Treatment Plant:
a) Alum Dosing 20ppm
b) Lime Dosing 30ppm
c) PE Dosing 1ppm
Above water analysis modified by the above chemical dosage rate + 10% margin, shall be considered
as basis for the design of DM Plant.
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C
REV
V NO: 00
S
SECTION
NC
SPEC
CIFIC TE
ECHNICA
AL REQUIREMEN
NT
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
SECT
TION C1
C
SPECIFIC TECHN
NICAL R
REQUIRE
EMENT- MECHAN
M
NICAL
10
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
1.0
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
GENERA
RAL
M PLANT with
h regeneratio
on system a nd associate
ed accessories shall connform to the technical
The DM
ation for 2X
X660 MW Su
uratgarh Su
uper Critica
al TPS, Stag
ge-V Unit 7 & 8 at Su
uratgarh,
specifica
Rajasth
han.
2.0
Y (MECHAN
NICAL)
SCOPE OF SUPPLY
ng are in bidd
ders scope of
o supply:
Followin
ork of this package inclu
udes all equ
uipment and
d accessoriees. Please also
a
refer
Broad sscope of wo
Mechanical data sh
heet, P&ID and
a
the resspective section of Civil,Electrical aand C&I sec
ctions for
respectivve scopes.
1)
2)
3)
Tw
wo nos (2X10
00%) Air Blow
wers for Dua
al Media Filters along with suction fillter, silencerr, motors,
pip
ping, valves, fittings,
f
instru
umentation a
and accessories associatted with the ssame.
4)
ated Carbon Filters along with media, integral ppipe works, internals,
i
Thrree nos (3X70%) Activa
valvves, fittings, instrumentation and acccessories ass
sociated with
h the same.
5)
One no Filtered
d Water Tan
nk along with
h piping, valv
ves, fittings, instrumentaation and acc
cessories
h the same.
asssociated with
6)
Tw
wo nos (2X10
00%) DMF & ACF Backkwash Pump
ps along with
h motors, pi ping, valves
s, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
7)
8)
9)
S
Tan
nk along with
h piping, valv
ves, fittings, instrumenta
ation and
One no Degasssed Water Storage
h the same.
acccessories asssociated with
11
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
pip
pe works, inte
ernals, valves
s, fittings, insstrumentation accessorie
es associatedd with the sa
ame.
wo nos (2X10
00%) Air Blow
wers for Mixxed Bed Exch
hangers (2 numbers)
n
aloong with sucttion filter,
15) Tw
sile
encer, motorrs, piping, va
alves, fitting s, instrumen
ntation and accessories associated with the
sam
me.
16) Tw
wo nos (2X
X100%) Acid
d Unloading
g Pump alo
ong with motors,
m
pipi ng, valves, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
17) Tw
wo nos (2X100%) Alka
ali Unloadin g Pump along with motors,
m
pipiing, valves, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
18) Tw
wo nos of hosse stations for
f unloading
g of acid. Th
he hose station shall havve two nos of
o 80 NB
heliflex hoses.
wo nos of hosse stations fo
or unloading of caustic. The
T hose sta
ation shall haave two nos of 50 NB
19) Tw
heliflex hoses.
wo nos Bulk Acid Stora
age Tanks a
along with piping, valve
es, fittings, instrumenta
ation and
20) Tw
acccessories asssociated with
h the same.
21) Tw
wo nos Bulk Alkali Stora
age Tanks along with piping, valves, fittings, instrumenta
ation and
acccessories asssociated with
h the same.
22) Tw
wo nos (2X10
00%) Alkali Transfer
T
cum
m Recirculation Pumps along
a
with m
motors, piping
g, valves,
fittings, instrumentation and
d accessoriess associated with the sam
me.
nos Acid Mea
asuring Tank
ks along with
h piping, valv
ves, fittings, instrumentaation and acc
cessories
23) 5 n
asssociated with
h the same.
24) 5 n
nos Alkali Measuring
M
Tanks along with agitato
ors, agitator motors, pipping, valves, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
25) One no Alkali Preparation Tanks alon
ng with agita
ator, agitatorr motors, pipping, valves, fittings,
n and access
sories associ ated with the
e same.
insttrumentation
26) Sixx nos. (6 numbers)
n
Acid
A
Dosing Pumps allong with motors,
m
pipiing, valves, fittings,
insttrumentation
n etc.
27) Sixx nos. (6 numbers)
n
Alkali
A
Dosing
g Pumps along
a
with motors,
m
pipiing, valves, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
28) Acttivated Carb
bon Filter for Alkali (1 n
number) along with filter media, pipping, valves, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
29) Hott Water Tan
nk (1 numbe
er) along wiith heaters, piping, valv
ves, fittings, instrumenta
ation and
acccessories asssociated with
h the same.
30) Neutralization Pit (RCC- By BHEL). However in
nstrumentation, piping, valves, fittings and
h the same sshall be in bid
dders scope
e.
acccessories asssociated with
31) Tw
wo nos (2X10
00%) Air Blo
owers for Ne
eutralization Pit along witth suction fillter, silencer, motors,
pip
ping, valves, fittings,
f
instru
umentation a
and accessories associatted with the ssame.
ur nos Efflue
ent Disposall Pumps alo
otors, piping, valves, fittiings, instrum
mentation
32) Fou
ong with mo
and
d accessorie
es associated
d with the sam
me.
33) Tw
wo nos (2X1
100%) DM Regeneratio
on Pumps along
a
with motors, pipping, valves,, fittings,
insttrumentation
n and access
sories associ ated with the
e same.
12
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
13
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
PIPING
All the p
piping as liste
ed below sha
all be in bidd
ders scope. The below in
ndicated pipees shall be designed,
d
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
14
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
supplied
d, erected, llaid and tes
sted by the bidder. Elb
bows, tees, flanges Hanngers and supports,
s
embedm
ment plates with
w lugs etc
c required fo
or the below
w given pipin
ng shall alsoo be provide
ed by the
bidder.
1)
d outlet pipe
es for each vessel, pum
mps, other eq
quipments, etc.
e with pipee connection
ns to the
Inlet and
respectivve vessels/e
equipments.
2)
Minimum
m 150 NB of 300 meter piping from
m N.Pit to Blo
ow down Ta
ank confirminng to HDPE IS 4984
PN10 sh
hall be in bidders scope.
3)
All piping
g within the DM
D Plant shall be in bidd
ders scope.
4)
5)
All SS P
Pipes shall be
e of minimum
m Schedule 1
10S.
6)
3.0
Y (ELECTRICAL)
SCOPE OF SUPPLY
ecification a nd details indicated in Section C22 (Specific Technical
T
Complette electrical as per spe
Requirement Electriccal) and D2 (General
(
Tecchnical Requ
uirement Elec
ctrical).
4.0
Y (C&I)
SCOPE OF SUPPLY
dicated in Section
S
C3 (Specific Technical
T
Complette C&I as per specification and details ind
Requirement C&I) an
nd D3 (Gene
eral Technica
al Requireme
ent C&I).
5.0
SCOPE OF SUPPLY
Y (CIVIL)
Total Ciivil is in BHELs Scope of work, ho
owever comp
plete grouting for equipm
ment, fixing and any
concreting inside the
e vessels and
d lining shall be in bidderrs scope.
Also dettailed Civil Input
I
drawin
ng shall be p
provided by bidder. Suc
ccessful biddder shall furnish civil
assignm
ment drawing
gs. The corresponding C
CIVIL drawin
ng prepared by BHEL / C
CIVIL agenc
cy, based
on civil a
assignment drawing
d
of biidder will be furnished to the success
sful bidder forr concurrenc
ce
CPU reg
generation syystem and DM
D Plant sha ll be kept under a commo
on shed.
6.0
CES
SCOPE OF SERVIC
ders scope also
a
includes
s following se
ervices for sc
cope under this specificaation:
The bidd
(i)
n and Commiissioning, un
nloading, storrage and han
ndling at site.
Erection
(ii))
(iii)
(iv
v)
Complette grouting fo
or equipment, fixing and any concreting inside the
e vessels andd lining.
15
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
(v))
All perso
onnel require
ed during ma
aintenance, C
Commissioning and PG test.
(vi)
Trial run
n for requisite
e period.
(vii)
Performance guaran
ntee testing.
(viii)
x)
(ix
Final tou
uch up paint at site.
7.0
TS
TERMIINAL POINT
(i)
(ii)
2 (g) - At 5 meter
m
distanc
ce from DM Plant area. However
25 NB Service air supply at 5 to 7 kg/cm2
ution and pip
ping inside DM Plant area
a shall be in bidders sco
ope. If servicee air required
d is more
distribu
than p
provided by BHEL,
B
bidde
er to provide necessary compressors
c
s/blowers annd associated
d valves,
piping,, fittings, flanges, instrum
ments etc. to m
meet the sys
stem requirem
ment.
(iii)
e water con
nnection (50 NB connecctions) at 5 meter distan
nce from DM
M Plant area
a. Piping
Service
inside DM Plant are
ea for mentio
oned service
es will be in bidders
b
scop
pe.
(iv)
(v)
DM Wa
ater upto DM
M Water stora
age tank.
8.0
SIONS
EXCLUS
8.1
8.2
Instrume
ent air & servvice air up to
o terminal poiints.
8.3
All chem
micals.
8.4
Air cond
ditioning, ven
ntilation & fire
e fighting faciilities.
8.5
8.6
Drinking
g water (or po
otable water)), service wa
ater up to term
minal points.
9.0
QP AND
D SUB VEND
DOR APPRO
OVAL
9.1
16
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
BHEL/C
Customer. Bid
dder shall submit the qu
uality plans in BHEL forrmat during detailed eng
gineering
stage. B
Bidder to notte further tha
at during dettailed engine
eering all the
e QAPs/cheeck lists etc. shall be
submitte
ed to Custo
omer/BHEL for approva
al. All inspe
ection & tes
sting etc. sshall be carrried out
accordin
ngly.
9.2
10.0
The sub
b vendor list enclosed
e
AN
NNEXURE-II is indicative
e only and is subject to aapproval / acc
ceptance
by custo
omer (RRUV
VNL). Bidder to propose his sub vendor list with back up doccuments (ex
xperience
list, end user certificcate as appliicable) etc. T
The same sh
hall subject to
t BHEL andd Customer approval
neering stage
e without anyy technical, commercial
c
& delivery im
mplication to BHEL.
during detailed engin
UIDATED DAMAGES
D
(LD)
TECHNIICAL EVALUATION AND LIQU
CONSUMPTION 33%
3
HCl perr annum AN D 48% NaOH per annum
m)
CRIT
TERIA
(CH
HEMICAL
BIDDER T
TO CONSIDER
R 365 REGENE
ERATION PER
R ANNUM FOR
R SAC, WBA & SBA AND 997 REGENERA
ATION PER
ANNUM F
FOR MB.
17
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
EVALUA
ATION FACT
TOR
a
of 33
3% HCl Evalu
uation Factorr is Rs. 0.0544 Million.
For everry Tonne diffferential per annum
For everry Tonne diffferential per annum
a
of 48
8% NaOH Ev
valuation Fac
ctor is Rs. 0.55 Million.
ATED DAMA
AGES (LD) FACTOR
F
LIQUIDA
a
of 33
3% HCl LD Factor
F
is Rs 0.054
0
Million
For everry Tonne diffferential per annum
For everry Tonne diffferential per annum
a
of 48
8% NaOH LD
D Factor is Rs 0.5 Million
uaranteed chemical
c
con
nsumption (33% HCl pe
er annum an
nd 48% NaO
OH per
Bidder tto submit gu
annum)) in Annexurre I (as given
n in VOL. III ) in a sealed
d envelope.
11.0
0
DESIGN
N/ CONSTRU
UCTION
quirements of
o Section C & D the following shall also be com
mplied under scope of
In addition to the req
this speccification.
e
herrein in this se
ection for bid
dders complia
ance.
The P&I diagram is enclosed
nstruction sp
pecified in da
ata sheet-A are minimum requiremeents and ma
aterial of
The material of con
er componen
nts not speciified shall be
e similarly se
elected by thee bidder for intended
construcction for othe
duty wh
hich shall be
e subject to BHEL / Cu
ustomer app
proval during
g detail engiineering with
hout any
commerrcial & delivery implication
n to BHEL.
12.0
0
DRAWIN
NG/DOCUMENTS REQU
UIREMENT
After aw
ward of LOI, following
f
min
nimum drawiing/documen
nts shall be submitted
s
byy the bidder for
f BHEL
and Cusstomer appro
oval. Howeve
er any additio
onal drawing
g/document ifi found neceessary for co
ompletion
of the e
engineering, the same shall be su
ubmitted by bidder with
hout any co mmercial & delivery
implicatiion to BHEL.
Procedure, please
p
refer Annexure-IIII. The bidde
er has to
For the Drawings/Documents Submission P
d
ument along with the com
mpliance she
eet indicatingg enumerate
e reply to
submit tthe revised drawing/docu
all BHEL
L and custom
mer commen
nts or observvations. With
hout complia
ance sheet thhe submissio
on of the
drawingss/documentss will not be considered and the delay on this account
a
will bbe solely on bidders
side onlly. Bidder to
o comply witth the obserrvations of the
t
BHEL and CUSTOM
MER withoutt price &
delivery implication.
o note that the
t drawings
s to be subm
mitted by bidd
der in the ev
vent of awardd of contractt shall be
Bidder to
as per th
he below givven drawing/document lisst. Bidder to note that an
ny additional drawings/do
ocuments
requirem
ment during detailed engineering
e
p
by bidder witthout any technical,
t
shall be provided
commerrcial and delivery implica
ations to BH
HEL. Bidder confirmed drawings subbmission schedule as
follows:
wing/docume
ents submis
ssion schedu
ule: First su
ubmission off basic draw
wings/ docu
uments
a. Draw
(Pro
ocess Design
n & Sizing Calculation,
C
R
Resin Data Sheet
S
and P&
&ID shall be within 4 we
eeks from
the date of LOI and Operation & Cont rol Philosophy along with Control S
System Conffiguration
gram, and Eq
quipment Lay
yout within 6 weeks from
m the date of LOI.)
Diag
b. Every revised su
ubmission inc
corporating ccomments within 7 worrking days.
c.
BHE
al within 10 days
EL shall provvide observattion / approva
d
from the date of doccument subm
mission.
18
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
held
d fort nightlyy, for which the bidder sshall depute
e his concerned engineeer along with project
man
nager to BHE
EL PEM office or at custo
omer office. The
T meeting can also be held at site.
ocuments to be submitted
d after award
d of contract::List and schedule off drawings/do
S.No.
D
ocument
Drawing/Do
N
No.
P
PE-V2-392-1
163A-A001
P
PE-V2-392-1
163A-A002
P
PE-V2-392-1
163A-A003
P
PE-V2-392-1
163A-A004
P
PE-V2-392-1
163A-A005
P
PE-V2-392-1
163A-A006
7
8
9
10
P
PE-V2-392-1
163A-A007
P
PE-V2-392-1
163A-A008
P
PE-V2-392-1
163A-A009
P
PE-V2-392-1
163A-A010
11
P
PE-V2-392-1
163A-A011
12
P
PE-V2-392-1
163A-A012
13
14
P
PE-V2-392-1
163A-A013
P
PE-V2-392-1
163A-A014
15
P
PE-V2-392-1
163A-A015
16
17
18
19
P
PE-V2-392-1
163A-A016
P
PE-V2-392-1
163A-A017
P
PE-V2-392-1
163A-A018
P
PE-V2-392-1
163A-A019
20
P
PE-V2-392-1
163A-A020
21
22
23
24
25
P
PE-V2-392-1
163A-A021
P
PE-V2-392-1
163A-A022
P
PE-V2-392-1
163A-A023
P
PE-V2-392-1
163A-A024
P
PE-V2-392-1
163A-A025
26
P
PE-V2-392-1
163A-A026
27
P
PE-V2-392-1
163A-A027
28
P
PE-V2-392-1
163A-A028
29
P
PE-V2-392-1
163A-A029
30
P
PE-V2-392-1
163A-A030
Document Title
Drawing/D
P&I DIAGR
RAM FOR DM
M PLANT
EQUPMEN
NT LAYOUT OF DM PLA
ANT ALONG
G
WITH MEC
CHANICAL GA
G OF DM PLANT
P
BUILDING
PROCESS
S DESIGN AN
ND SIZING
CALCULAT
TIONS , RES
SIN DATA SHEET,
VESSEL T
THICKNESS AND PRESS
SURE DROP
P
CALCULAT
TIONS FOR DM PLANT
SUB-VEND
DOR LIST
OPERATIO
ON & CONTR
ROL PHILOS
SOPHY OF
DM PLANT
T ALONG WITH CONTROL SYSTEM
M
CONFIGUR
AGRAM
RATION DIA
CIVIL ASS
SIGNMENT DRAWING
D
FO
OR DM
PLANT
ELECTRIC
CAL LOAD DATA
D
PIPING LA
AYOUT OF DM
D PLANT
TECHNICA
AL DATA SH
HEET FOR VALVES
V
QAP FOR VALVES
TECHNICA
AL DATA SH
HEET OF HO
ORIZONTAL /
VERTICAL
L CENTRIFU
UGAL PUMPS
S
TECHNICA
AL DATA SH
HEET FOR METERING
M
PUMPS
TECHNICA
AL DATA SH
HEET OF BLO
OWERS
DATA SHE
EET FOR MO
OTOR
QAP FOR HORIZONTA
AL / VERTIC
CAL
UGALPUMPS
S WITH MOT
TOR
CENTRIFU
QAP FOR METERING PUMPS WIT
TH MOTOR
QAP FOR BLOWERS WITH MOTO
OR
DATA SHE
EET OF INST
TRUMENTS
DATA SHE
EET OF ANA
ALYSER
GA DRAW
WING OF ATM
MOSPHERIC
C TANKS OF
F
DM PLANT
T
QAP FOR ATMOSPHE
ERIC TANKS
S
GA DRAW
WING OF PRE
ESSURE VE
ESSELS
QAP FOR PRESSURE
E VESSELS
INSTRUME
ENT SCHED
DULE
VALVE SC
CHEDULE
DATASHE T OF RESIN
N TRAP, CAR
RBON
F
TRAP, ACF
DATA SHE
EET FOR HE
EATER
PLC DOCU
UMENTS FO
OR DM PLAN
NT--GA &
WIRING D ETAILS OF PLC PANEL
L, I/O LIST,
MIC DIAGRAM
M
BOM, MIM
QAP FOR PLC
ARCHITEC
CTURAL DR
RAWING OF DM PLANT
BUILDING
19
No. of weeks
w
for
drawing/document
sion after
submiss
placing LOI/PO
4
6
4
6
8
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
12
12
12
12
12
12
12
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
31
P
PE-V2-392-1
163A-A031
32
P
PE-V2-392-1
163A-A032
33
P
PE-V2-392-1
163A-A033
34
P
PE-V2-392-1
163A-A034
35
P
PE-V2-392-1
163A-A035
36
37
38
39
40
P
PE-V2-392-1
163A-A036
P
PE-V2-392-1
163A-A037
P
PE-V2-392-1
163A-A038
P
PE-V2-392-1
163A-A039
P
PE-V2-392-1
163A-A040
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
CIVIL DBR
R OF DM PLA
ANT BUILDING AND NPIT
GA AND R
RCC DETAIL OF FOUND
DATION
LEVEL, DR
RAIN TRENC
CH AND FLO
OOR
DETAILS,B
BEAM, PLINTH BEAM, ROOF
R
SLAB
AND N-PIT
T OF DM PLA
ANT
GA AND R
RCC DETAIL OF EQUIPM
MENT
FOUNDAT
TIONS INSID
DE AND OUT
TSIDE OF
BUILDING
CABLE TR
RAY/TRENCH
H & CONDUIT
ROUTING DIAGRAM AND
A
EARTH
HING
OF DM PLAN
NT
LAYOUT O
QAP / ICL OF DM PLA
ANT (FOR BA
ALANCE OF
ITEMS)
CABLE SC
CHEDULE OF DM PLANT
T
ERECTION
N PROCEDU
URE
PG test pro
ocedure for DM PLANT
ENGINEER
RING BOQ
O&M MAN
NUAL FOR DM
D PLANT
12
12
12
12
12
16
16
20
20
24
b.
NOTE:Succe
essful bidder shall furnish
h detailed errection manu
ual for each of the equippment supplie
ed under
this contract at le
east 3 months before the schedulled erection of the conncerned equ
uipment /
onent or alon
ng with supply of concern
ned equipme
ent / compone
ent whicheveer is earlier
compo
ment approva
al by custom
mer under Ap
pproval categ
gory or inform
mation categgory shall nott absolve
Docum
the ve
endor of theirr contractuall obligations of completin
ng the work as per spec ification requ
uirement.
Any d
deviation from
m specified requirementt shall be re
eported by th
he vendor inn writing and
d require
written
n approval. Unless
U
any change
c
in sp
pecified requ
uirement has been brougght out by the vendor
during
g detail engineering in writing whille submitting
g the docum
ment to cusstomer for approval,
a
approvved docume
ent (with imp
plicit deviatio
on) will not be cited as
s a reason ffor not following the
speciffication requirement.
(a)
at drawings//documents submission
n shall be through weeb based Document
D
Bidder to note tha
ement System
m. Bidder wo
ould be provi ded access to the DMS for
f drawings/
s/documents approval
Manage
and ade
equate trainiing for the same.
s
Detaiiled methodo
ology would be finalizedd during the
e kick-off
meeting. Bidder to ensure following at their e
end.
x
x
x
x
20
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
13.0
0
SPARES
S
i)
ii)
ality plan an
nd the insp
pection requ irement fina
alized for the main equuipment will also be
The qua
applicab
ble to the corrresponding spares.
s
ndor warrants:
The ven
at all spares supplied will be new an
nd in accordance with th
he contract ddocument an
nd will be
1. Tha
free
e from defectts in design, material and
d workmansh
hip and shall further guarrantee as und
der:
f
in the
e original com
mponent/equ
uipments due
e to faulty deesigns, mate
erials and
2. In ccase of any failure
worrkmanship, the
t corresponding spare parts if any
y, supplied will
w be replacced without any
a extra
cosst to the BH
HEL and cu
ustomer unle
ess a joint examination and analyssis by BHEL and/or
cusstomer of succh spare parrts prove thatt the defect found
f
in the original part that failed can safely
be assured not to be presen
nt in spare pa
arts.
e long term availability of spares tto the BHEL and the customer
c
foor the full liffe of the
3. The
equ
uipment cove
ered under the contract a
ut of producttion of spare
e parts of
and that beffore going ou
the equipment covered
c
under the contra
act, vendor and
a his sub-v
vendors shaall give the BHEL and
Twenty Four)) months adv
vance notice
e so that thee latter may order his
the customer at least 24 (T
nts of spares
s, if he so d esires. The same provis
sion will alsoo be applicab
ble to the
bulkk requiremen
sub
b-vendors. Fu
urther, in cas
se of disconttinuance of manufacture
m
endors or
of any sparres by the ve
his sub-vendorss the vendors and his ssub-vendors, will provide
e the BHEL and the cus
stomer, 2
o) years in advance,
a
witth full manu facturing dra
awings, mate
erial specificcations and technical
(two
info
ormation requ
uired by the BHEL and th
he customer for the purpo
ose of manuufacture of su
uch items
and
d also the right to manufa
acture such sspares for the
eir own requirements.
e of discontin
nuance of s upply of spa
ares by the vendors or his sub-vend
dors, the
4. Furrther in case
ven
ndor will provide the BH
HEL and the customer with
w full inforrmation for rreplacementt of such
spa
ares with othe
er equivalent makes, if so
o required by
y the BHEL and
a the custoomer.
g the above, the vendor sshall be resp
ponsible for supply
s
of spaares for the liifetime of
5. Nottwithstanding
the package at reasonable prices.
p
The p
prices of all future
f
require
ements of sppares shall be
e derived
m the corresponding ex-w
works price a
at which the orders for such
s
spares have been placed
p
by
from
the BHEL and the
t customer as a part o
of the manda
atory or long term or any other kind of
o spares.
e base indice
es for calcula
ating ex-worrks price sha
all be commissioning of llast equipme
ent under
The
main contract.
iii)
iv)
v)
ails to supply
y the manda
atory or long term or any other kind off spares on the
t terms
In case tthe vendor fa
stipulate
ed above, th
he BHEL an
nd the custo
omer shall be
b entitled to
t purchase the same from the
alternate
e sources att the risk an
nd the cost o
of the vendo
or and recov
ver from thee vendor, the
e excess
amount paid by the BHEL and the
t customerr over the ra
ates as per the contract. In the event of such
e BHEL or the customer, the purchas
ses will be as
s per the woorks and proc
curement
risk purcchase by the
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
21
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
policy o
of the BHEL and the cu
ustomer prevvalent at the
e time of su
uch purchasees and BHE
EL & the
custome
er at his optio
on may include a represe
entative from
m the vendor in finalizing tthe purchase
es.
vi)
he final settle
ement betwe
een the partie
es in terms oof relevant clauses of
It is expressly underrstood that th
der documen
nt shall not re
elieve the ve
endor of any of his obliga
ations under the provision of long
the tend
term ava
ailability of sp
pares and su
uch provision
ns shall continue to be en
nforced till thhe expiry of 30
3 (thirty)
years pe
eriod reckoned from the scheduled d
date of comp
pletion of tria
al operation oof the last eq
quipment
unless o
otherwise disscharged exp
pressly in wriiting by the BHEL
B
or the customer.
c
0
14.0
BIDDER
R TO FURNIISH FOLLOW
WING DOCU
UMENTS/INF
FORMATION
N ALONG W
WITH THE BID
B (FOR
ELECTR
RICAL AND C&I PLEAS
SE REFER TH
HE RESPEC
CTIVE SECT
TION OF THE
E SPECIFICATION).
on/Clarificatio
on if any in the enclose
ed deviation
n/clarification schedule oonly with me
ention of
Deviatio
specifica
ation clause for which deviation/clarifification is beiing asked.
Equipme
ent layout of DM Plant.
Electrica
al Load List in BHEL form
mat
Price Scchedule duly filled in.
Followin
ng guarantee
ed chemical consumption
c
n required forr regeneration (in kg) to bbe furnished.
Quantityy of chemicalls required as 100% per day of
x Anyy other chem
mical Propriietary / Speccific Chemica
als shall be based on the suppliers
reco
ommendatio
ons during de
etailed engine
eering
x
x
x
x
0
15.0
MISCEL
LLENEOUS REQUIREMENT
i.
Bidders is advised to
t visit the siite in order tto familiarize
e themselves
s with existi ng conditio
on of site
der to make their offer complete.
c
Du
uring detail eengineering also, the
before submitting the bid in ord
sponsible forr the correc
ctness of de
etails wrt exiisting facility
y at site.
successful bidder shall be res
mer approval on any drrawing havin
ng details of
o existing fa
acility shall not be cited
d by the
Custom
successful bidder a valid reaso
on for any sshortcoming in the work
k by them. BHEL shall also not
mplication fo
or any lack off input data with
w regard to
o site during detail engineering.
entertain any cost im
ii.
The com
mplete system
m shall be proven
p
and n
necessary de
esign docum
mentation in ssupport of prroveness
shall be submitted by the succ
cessful bidd er in support of the sys
stems, if askked by the customer
c
nd delivery im
mplication to
o BHEL and customer.
c
withoutt any price an
iii.
Enginee
ering for this project is be
eing carried o
out in 3D env
vironment at BHEL end. Name of eng
gineering
platform
m on which BHEL is do
oing the pro
oject IS Sma
art Plant Suite. This is being done to have
automa
ated interface checking and therebyy minimising rework at site.
s
Hence bidder, in their
t
own
interestt, is requessted to prepa
are all layoutt drawings us
sing 3D Mod
delling softwaare. These drawings
will also
o be made available
a
to BHEL
B
in soft ffor checking interface with other ageencies in consolidated
layout drawings. Bidders
B
inab
bility to prep
pare drawing
g using 3D Modelling ssoftware willl not be
n for evaluattion of their bid.
b
criterion
iv.
22
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
v.
vi.
vii.
Latest ve
ersion of all codes and standards to b
be followed.
23
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
ANN
NEXUREI
QUA
ALITY PL
LAN
24
25 of 155
DM PLANT
25
26 of 155
26
27
SUB - ITEM
MAIN ITEM
``
CHARACTERISTICS
CHECKED
3
PROJECT
FORMAT OF
RECORD
7
TCE REF.
Q.P.DATE
Q.P. NO.
S SIGN.
NAME
M SIGN.
NAME
T SIGN.
NAME
C SIGN.
NAME
AGENCY
REMARKS /
S M T C
HOLD POINTS (H )
8
H
9
G. INSTRUMENTS FOR LEAK TESTS AND PERFORMANCE TESTS SHALL HAVE VALID CALIBRATION CERTIFICATE WITH TRACEABILITY TO NATIONAL LEVEL.
H. LEGENDS :
S - SUB - VENDOR, M - MAIN VENDOR,
T- TCE, C - TCES CLIENT,
1 - WITNESS,
2 - DOCUMENTS REVIEW,
H - HOLD POINT.
E. THE EXTENT INDICATED IN COLUMN 5 IS IN VENDORS SCOPE. TCE / CLIENT MAY INSPECT AS PER THIS COLUMN OR RANDOM SAMPLES.
F. COLUMN 6 SHALL BE AS PER TCE / CLIENT APPROVED DRAWINGS / DATA SHEETS / SPECIFICATIONS WHEREVER APPLICABLE.
C. FOR STAGES WITNESSED / DOCUMENTS REVIEWED BY TCE, COPIES OF RELEVANT DOCUMENTS SHALL BE FURNISHED TO TCE.
D. TCES IDENTIFICATION STAMP ON MATERIALS SHALL BE PRESERVED / GOT TRANSFERRED BY TCE AT APPROPRIATE STAGES.
COMPONENT / OPERATION
RRVUNL
SUB - VENDOR
Note: This is typical schedule of quality plan. Bidder may incorporate more details.
N
O
T
E
SR.
NO.
1
OWNER
VOL-II;SECTION F-14
SCHEDULE OF QUALITY
PLAN
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
ANNEX
XURE-II
SUB--VENDOR
R LIST
28
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
SUB
B-VENDO R LIST (M
MECHANIC
CAL)
29
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
No
SN
ITEM
PRESSU
URE VESSEL
LS
ACTIVAT
TED CARBO
ON
AIR BLO
OWERS
METERIN
NG PUMPS
AGITATO
OR
SEC
CTION: C1
REV
V NO: 00
SUP
PPLIERS
PLACE
R&C
C
ISGE
EC
MUMBAI
YAMUNAN
NAGAR
ANU
UP ENGG.
AHMEDAB
BAD
FABTECH
SPA
ARK ENGINE
EERS
PUNE
PUNE
Q
QP /
IN
NSPN REMA
ARKS
C
CAT
WITH LLOYDS
APPD
D HEAT
TREA
ATMENT
AGEN
NCY
INDU
USTRIAL CA
ARBON
ANKLESHWAR
VVD
D & SONS
TUTICORIN
GLO
OBAL ABSO RBENT PVT
T
A
KOLKATA
LTD
SWA
AN PNEUMA
ATIC
NOIDA
EVEREST TRAN
NSMISSION NEW DELHI
NEW DELHI /
KAY
Y INTERNAT IONAL
T
SONEPAT
EVE
EREST BLOW
WER
BAHADUR
RGARH
KULKARNI POW
WER TOOLS INDIA
VK PUMPS
P
MILT
TON ROY IN
NDIA
SWE
ELLORE
NASIK
CHENNAI
AHMEDAB
BAD
REM
MI PEOCESS
S PLANT &
M/C
MUMBAI
FIBR
RE & FIBRE
MUMBAI /
SILVASA
KBL
MAT
THER & PLA
ATT
KSB
SAM
M TURBO IND
D LTD
KISH
HOR PUMPS
S
SULZER PUMP INDIA
WPIL
WADI
PUNE
PUNE
COIMBATORE
PUNE
PUNE
GHAZIABA
AD
HORIZONTAL
FUGAL PUM
MPS
CENTRIF
HORIZONTAL
FUGAL PUM
MPS
CENTRIF
(RUBBER LINED)
HOR PUMPS
S
KISH
SU MOTORS
M
PUNE
MUMBAI
NON ME
ETALLIC
HORIZONTAL
FUGAL PUM
MPS
CENTRIF
ENG
GINEERS CO
OMBINE
ANT
TICORROSIV
VE
THANE
VALSAD
30
UPTO
O 15 BHP
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
MISC. PU
UMP VERTIC
CAL
TURBINE
E
10
0
11
1
UNDER B
BED NOZZL
LE
12
2
3
13
RESIN
HEATER
R
CCS VAL
LVES
4
14
5
15
6
16
17
7
BALL VA
ALVE (NON FIRE
SAFE TY
YPE)
SEC
CTION: C1
REV
V NO: 00
KBL
M&P
P
WPIL
JYOTI PUMPS
VOLTAS
PUNE
PUNE
GHAZIABA
AD
VADODRA
A
PUNE
JHONSONS SCR
REEN
AUSTRALIA
JONSONS SCRE
EEN
AUSTRALIA
ROH
HM & HASS
BAY
YERS
DOW
WEX
ESC
CORTS
RAC
COLDS
FRANCE / USA
GERMANY
Y.
JALANDHA
AR
AURANGA
ABAD
COIMBATORE
HUBLI
CHENNAI
PUNE
KONDHAP
PU
C
PEC
FLOWCHEM
BDK
K
MICR
ROFINISH V
VALVES
AK INDUSTRIES
S
LEADER
NASIK
AHEMDAB
BAD
HUBLI
CHENNAI /
URAM
KANCHIPU
HUBLI
HUBLI
JALANDHA
AR
VELA
AN INC
IL
REIN
NEKE
SAM
MPELL AG
CANADA
PALGHAT
T
GERMANY
Y
GERMANY
Y
AN
VELA
BRA
AY
CANADA
USA
FARIDABA
AD
FARIDABA
AD
AUD
DCO
ANGLE V
VALVE
BALL VA
ALVE (HIGH
PRESSU
URE)
SS BALL
L VALVE 150 LBS WEIR BDK
HUBLI
31
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
18
8
9
19
0
20
21
1
AUD
DCO
MICR
RO FINUISH
H
BRA
AY
3
23
REV
V NO: 00
CHENNAI
HUBLI
CHINA
AUD
DCO
TYCO
BUTTER
R-FLY VALVE
E
(MANUA
AL / PNEUMA
ATIC) WEIR BDK
CLASS 1
150
CRA
ANE FLOW P
PROCESS
CHENNAI
HALOL
HUBLI
SATARA
VANCE VALV
VES
LATE TYPE NON- ADV
DUAL PL
RETURN
N VALVE (S
SS & WEIR BDK
CI UPTO
O 100 NB, CL
LASS LEADER
150)
NOIDA
HUBLI
JALANDHA
AR
WEIR BDK
DIAPHRA
AGM VALVE
E
ANE FLOW P
PROCESS
(MANUA
AL / PNEUMA
ATIC) CRA
UPTO 80
0 NB
HUBLI
SATARA
GATE / G
GLOBEVALV
VES
UP TO 30
00 NB PN 10
0
2
22
SEC
CTION: C1
LEADER
H SA
ARKAR
BAN
NKIM & COM
MPANY
MAJESTIC WOR
RKS
WEIR BDK
CHECK V
VALVE / NR
RV
H SA
ARKAR
(LINED / UNLINED), FLAP
LEA
DER (FOR C
CHECK
ZE UPTO 50
0 NB
TYPE SIZ
VE ONLY)
VALV
Y-TYPE S
STRAINER /
STRAINE
ER (WATER
R
SERVICE
E)
OTO
OKLIN
GRA
AND PRIX
JAYP
PEE
GRE
EAVES COTT
TON
SAIL
L
JIND
DAL TUBES
SUR
RYA ROSHIN
NI
TISC
CO
WEL
LSPUN
MSL
L (FOR IS 35
589)
MS PIPE
ES (IS: 1239
9&
3589)
5
25
TNAMANI
RAT
SS PIPES
S (ERW /
SEAMLE
ESS) UPTO 100
1 NB REM
MI
JALANDHA
AR
HOWRAH
HOWRAH
MUMBAI
HUBLI
HOWRAH
JALANDHA
AR
MUMBAI
NEW DELHI
NEW DELHI
MUMBAI
NEW DELHI /
NOIDA
MUL
LTITEX
4
24
UPTO
O 200 NB
UPTO
O 40 NB
ROURKEL
LA.
GAZIABAD
D
BHADURG
GARH
JAMSHED
DPUR
ANJAR
RAIGAD
CHATTRA
AL
TARAPUR
R
32
UPTO
O 350 NB
UPTO
O 300 NB
UPTO
O 150 NB
UPTO
O 400 NB
200 NB TO 500 NB
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: C1
REV
V NO: 00
APEX TUBES PV
VT LTD
(App
proved for SS
S welded
pipes
s up to 150 N
NB & 4.78
BEHROR
mm thick as per A
2 (ALWAR)
ASTM A 312
B
& seamless pipe up to 50 NB
as pe
er ASTM A 3
312)
26
6
7
27
ESS METAL
INDIAN SEAMLE
AHMEDAB
BAD
TUBES
CS PIPE (ASTM A 10
06 GR.
MAH
HARASHTRA
A
RAIGAD
O 400 NB
B) UPTO
SEA
AMLESS
VERTICA
AL TURBINE
E
PUMPS
8
28
MS PIPE
ES ERW AND
D
SEAMLE
ESS PIPES
29
9
SS PIPES
S
30
0
LP VALV
VES AND
SPECIAL
LITIES
31
1
BUTTER
RFLY VALVE
ES
32
2
ATMOSP
PHERIC TAN
NK
(CS/SS)
KBL
WPIL LTD
SAM
M INDUSTRIA
AL PUMPS
FAIR
R BANK MOR
RSE/FLOW
MOR
RE
KISH
HORE PUMP
PS
CO
TISC
JIND
DAL SURYA ROSHANI
PSL
MAH
HARASHTRA
A
SEA
AMLESS
INDIAN SEAMLE
ESS
SAW
W
RAM
MA STEEL TU
UBES
KALY
YANI
PRA
AKASH
SAW
W
L&T AUDCO
FOU
URESS ENG INEERING
LTD.
BDK
K ENGG. IND
DUSTRIES
LTD.
KIRL
LOSKAR BR
ROTHERS
LTD.
CRE
ESCENT VAL
LVES LTD.
R&D
D MULTIPLE
VAG
G
INTE
ERVALVE
URESS LTD.
FOU
I.L PALGHAT
P
KBL
FABTECH
TECHNOFAB
JASM
MINOT POLY
YMERTECH
H
KILOSKAR
RWADI
KOLKOTA
A
COIMBATORE
SAHIBABA
AD
PUNE
CHENNAI
BANGALO
ORE
HUBLI
PUNE
JALANDER
R
HYDERAB
BAD
PUNE
BANGALO
ORE
PUNE
NEW DELHI
PUNE
33
UPTO
O 150 NB
UPTO
O 350 NB
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
33
3
34
4
35
5
36
6
37
7
38
8
39
9
40
0
41
1
PRE
ESSURE VES
SSELS
INDU
USTRY
SPA
ARKON ENG INEERING
BELC
CO POLLUT
TION
CON
NTROL PVT LTD
FABTECH
TECHNOFAB
TANK /PIPING
BELC
CO POLLUT
TION
ATION
FABRICA
CON
NTROL PVT LTD
AQU
UATHERM
INDU
USTRIAL SE
ERVICE
SUN
NRISE
GAN
NDHI & ASSO
OCIATES
TANK (FRP)
MOD
DERN EQUIP
PMENTS
EAG
GLE PLAST
OME
EGA PLAST
V K PUMPS
MET
TACHEM
STROKE
E CONTROLLER
SWE
ELORE
MILT
TON ROY IN
NDIA
MET
TACHEM
YSTONE
SAFETY VALVES/RE
ELIEF KEY
VALVES
V K PUMPS
MILT
TON ROY
REM
MI
FIBR
RE & FIBRE PRODUTS
AGITATO
OR/STIRRER
R
STANDARD ENG
GINEERS
CRO
OMPTON GR
REAVES
OTO
OKLIN
GRA
AND PRIX
STRAINE
ER
AYPEE
MICR
RO PRECIS ION
INST
TRUMENTAIION LTD
ORIFICE
E PLATE
CAR
RLO DYNAM ICS
H SA
ARKAR
SLUICE G
GATE
HI TECH
ADV
VANCE VALV
VES
PVT.LTD
BDK
K
FOU
URESS ENGG
G.INDIA
3 WAY V
VALVE
LTD.
FLUIDLINEVALV
VES
MPANY PRIV
VATE LTD.,
COM
INST
TRUMENTAT
TION LTD.
KIRL
LOSKAR BR
ROTHERS
LTD.
SEC
CTION: C1
REV
V NO: 00
PUNE
GREATER
R NOIDA
PUNE
NEW DELHI
GREATER
R NOIDA
KOLKATA
KOLKATA
BARODA
AHMEDAB
BAD
CHENNAI
PUNE
MUMBAI
NASIK
MUMBAI
AHMEDAB
BAD
CHENNAI
MUMBAI
BARODA
NASIK
CHENNAI
MUMBAI
MUMBAI
AHAMADN
NAGAR
MUMBAI
NEW DELHI
NEW DELHI
FARIDABA
AD
PALGHAT
T
HYDERAB
BAD
KOLKATA
AHMEDAB
BAD
NOIDA
HUBLI
MUMBAI
MUMBAI
PALAKAD
PUNE
34
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
42
2
43
3
44
4
45
5
46
6
PLUG VA
ALVE
FITTINGS
S (CS/SS)
FLANGE
ES (SS/CS)
PIPE (CP
PVC)
VALVES
(GATE/G
GLOBE/NRV//BA
LL)-CPVC
C
47
7
Rubber L
Lining for
Pipes/Ta
anks
48
8
FILTER M
MEDIA
49
9
FLASH M
MIXER
VEN
NUS PUMP & ENGG.
WOR
RKS
Sury
ya Valves and
d
Instruments Man
nufacturing
Com
mpany
STAFFORD CON
NTROLS
LIMITED
MICO
ON VALVES
S (INDIA)
PVT.LTD
FISH
HER SANMA
AR LIMITED
BDK
K
LARSEN & TOU BRO LTD.
LEADER
MICO
ON VALVES
S (INDIA)
PVT.LTD
BHA
ARAT FORGE
E
RELIANCE FOR
RGE
EBY
Y
SIDD
DARTH & GA
AUTAM
MS FITTINGS
F
PRA
ADEEP META
ALS LTD
TUBE PRODUCT
T
INCO
OROPORAT
TION
PRA
ADEEP META
ALS LTD
TUBE PRODUCT
T
INCO
OROPORAT
TION
MS FITTINGS
F
HAW
WA ENGINEE
ERING
ALIA
ANCE PIPE & PLANGES
S
JAI AMBE
A
GER
ROGE FISHC
CHER IPING
G
SYSTEMS
PVT LTD
ASTROL PLYTE
ECHINC LTD
D
ROGE FISHC
CHER IPING
G
GER
SYSTEMS
PVT LTD
ASTROL PLYTE
ECHINC LTD
D
Rishi Industries
Industrial Lining Ltd
MIL
GLO
OBAL ABSOR
RBENT
BHA
ARAT MINER
RALS
GEO
O MILLER
VOLTAS
EIMC
CO KCP
SEC
CTION: C1
REV
V NO: 00
KOLKATA
Chennai
PUNE
MUMBAI
CHENNAI
HUBLI
MUMBAI
JALANDHA
AR
MUMBAI
PUNE
MUMBAI
FARIDABA
AD
KOLKATA
MUMBAI
BARODA
MUMBAI
BARODA
KOLKATA
KOLKATA
MUMBAI
DELHI
AHMEDAB
BAD
DELHI
AHMEDAB
BAD
Sonepat
Baroda
CHENNAI
KOLKATA
35
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
50
0
PAINT
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
REM
MI
BER
RGER
ASIA
AN PAINTS
SHA
ALIMAR
J&N
NOTE:
b vendor list enclosed
e
AN
NNEXURE-II is indicative
e only and is subject to aapproval / acc
ceptance
The sub
by custo
omer (RRUV
VNL). Bidder to propose his sub vendor list with back up doccuments (ex
xperience
list, end user certificcate as appliicable) etc. T
The same sh
hall subject to
t BHEL andd Customer approval
neering stage
e without anyy technical, commercial
c
& delivery im
mplications to
o BHEL.
during detailed engin
36
VENDORLISTFORC&I
ITEMS
MAKE
PLC
ABB/GEFANUC/L&TLTD/ROCKWELL/SIEMENS/SCHNEIDERELECTRIC
CONTROLVALVE
DeZURIK/CONTINENTAL/CONTROLCOMPONENTINC/DRESSER/FOURESSENGG/FISHER
/FORBESMARSHALL/WEIRVALVES/IL/MIL/R.K.CONTROL
LEVELSWITCH
BLISSANAND/CHEMTROLS/HITECHSYS/LEVCON/RAMANINST/SIGMA/SORINC/SBEM/V.
AUTOMAT/WAAREEINST
PRESSURESWITCH
DRESSER/INDFOS/SWITZER/SORINC/VASU
ANALYTICALINSTRUMENTS FORBESMARSHALL/FISHERROSEMOUNT/SIEMENS
PRESSUREGUAGE
A.N.INST/BUDENBERGGAUGE/DRESSERIND/FORBESMARSHALL/GENERALINST
CONSORTIUM/GLUCK/H.GURUIND/H.GURUINST/MANOMETER/WAAREEINSTRUMENTS
TEMPERATUREGUAGE
A.N.INST/BUDENBERGGAUGE/FORBESMARSHALL/H.GURUIND/H.GURUINSTWAAREE
INSTRUMENTS/GOAINST/GOATHERMOSTATICINST/
FLOWELEMENT
BRISTOLBABCOCK/BALIGALIGHTINGEQUIP/ENGINEERINGSPECIALITIES
/IL/MICRO/MINCO/STARMECH
TEMPETAUREELEMENT
GENERALINSTCONSORTIUM/DETRIVEINST&ELECTRONICS/PYROELECTRIC/TOSHNIWAL
BROS/WAAREEINST
TRANSMITTERS
BRISTOLBABCOCK/BIRLAKENTTAYLOR/BLISSANAND/FISHERROSEMOUNT/SIEMENS/SBEM
/SMARTINST/TATAHONEYWELL/V.AUTOMAT&INSTS/
TEMPERATURESWITCH
INDFOSS/DRESSER/SWITZER/SORINC/TOSHNIWALBRO/VASUTECH
SIGHTFLOWINDICATORS
BLISSANAND/CHEMTROLS/INSTRUMENTATIONENGINEERS/SIGMA/TELACEEQUIP
INSTPIPEFITTINGS
AURAINCORPORATED/HYDAIRENGG/METPRESSENGG/PRECISIONENGG/SWITZER
INST/VIKASINDUSTRIAL
DPSWITCH
KAUSTUBAUDYOG/SWITZER/SORINC/VASUTECH
ANUBAR
ENDRESS+HAUSERGmbH+Co.KG/SWITZER/STARMECH
CONTROLPANEL
CONTROL&SWGRCO/INDUSTRIALCONTROLS&APPS/PYROTECH/PROCONINST
JUNCTIONBOXES
BALIGALIGHTINGEQUIP/CREATIVEINST/DEVIPOLY/INFOCONTROL/K.S.INTRUMENTS
/MANISHAENTERPRISE/SUCHITRAINDUSTRIES
INSTTUBEFITTINGS
AURAINCORPORATED/HYDAIRENGG/METPRESSENGG/PRECISIONENGG/SWITZER
INST/VIKASINDUSTRIAL
ROTAMETERS
CHEMTROLSSAMIL/EUREKAIND/IL/TRANSDUCERSANDCONTROLS/
NOTE: The sub vendor list enclosed ANNEXURE-II is indicative only and is subject to approval /
acceptance by customer (RRUVNL). Bidder to propose his sub vendor list with back up documents
(experience list, end user certificate as applicable) etc. The same shall subject to BHEL and
Customer approval during detailed engineering stage without any technical, commercial & delivery
implications to BHEL.
37
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 1 OF 16
The list of acceptable makes for I&C equipment / system are as listed below: AIR FILTER REGULATORS
PLACKA
Shavo Norgan (India) Pvt Ltd.
ABB Ltd.
BELLS CONTROLS LTD.
Schrader Schorill Duncan Ltd., Mumbai.
Vel jan Hydrair Pvt Ltd., Hyderabad.
GAS ANALYSERS
Emerson Process Management
ABB Ltd.
Teledyne
Novatel
Codel
Land Combustion
Fuji.
Yokogawa Bluestar Ltd.
Chemtrols.
Siemens.
NITRIC OXIDE (NOX) ANALYSER
Land Combustion Ltd.
Emerson Process Management
Horiba
Chemtrols
Siemens
ABB Ltd.
OXYGEN MEASUREMENT (ZIRCONIUM PROBE)
ABB Ltd.
H & B (HARTMANN & BRAUN)
Emerson Process Management
Seco Controls
Land Combustion.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 3 OF 16
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 4 OF 16
SILICA
Hach
Polymetron
Braun & Leube
ABB
Emerson Process Management
CONTROL VALVES
Dresser Masoneilan - France,
Fisher
Yamatake
CCI
ABB
Welland & Tuxhorn
Gulde Regal Armtturen.
Pneucon
ELECTRICAL ACTUATORS
Vaas Bernard
Auma India Ltd.
Limitorque
Rotork Controls Ltd.
Antrieb
DIFFERENTIAL PRESSURE INDICATORS
Indfoss
AN Instruments
Switzer Instruments Ltd.
Waaree Instruments Ltd.
General Instruments (GIC)
H.Guru
A N Instruments
DIFFERENTIAL PRESSURE SWITCHES
Indfoss
Switzer Instruments Ltd.
Varma Trafag
Waaree Instruments Ltd
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 5 OF 16
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 6 OF 16
FLOW ELEMENT
Starmech
Micro precision products
Engineering Specialities Pvt Ltd.
Mech Engg
General Instruments (GIC)
Teleflow
Emerson
Dag Process Instruments
Hydropnematic
FLOW GLASSES
Eureka
General Instruments
Levcon
V.Automat & Instrument (p) Ltd.
Bliss Anand
FLOW INTEGRATORS
Lectrotek
Nishko
ABB Ltd.
Rockwin
ILLUMINATED PUSH BUTTONS
EAO
H&B
L&T
Ronan
Honeywell
Siemens
STANDALONE SER
Hathaway (Imported)
Ronan (Imported)
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 7 OF 16
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 8 OF 16
A.N. Instruments
Gauges Bourdon
Industrial Eqpt. co.
Waaree Instruments Ltd.
Odion
Druck India
Wika Instruments
PRESSURE SWITCHES
Indfoss (India) Ltd.
Switzer Instruments ltd.
Varma Trafag
A.N. Instruments
Waaree Instruments Ltd
Dag Process Instruments
Chemtrols
PUSH BUTTONS
Honeywell
Larsen & Toubro ltd.
Siemens ltd.
Tele Mechanic
RECEIVER INDICATOR (BAR GRAPH)
Laxons
Masibus
Industrial Instrumentation
Yokogawa
Teletherm Instruments co.
RECEIVER RECORDER / MULTIPOINT RECORDER
Laxons Engg. & Electronic Pvt. ltd.
Yokogawa.
Tata Honeywell
ABB
Digital Electronics.
Penny & Guile
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 9 OF 16
RELAYS
Jyothi
ABB
Paramount
Omron
SIEMENS
SAMPLE COOLER
Polymetron
Emerson Process Management
Sentry
Lowe
SAMPLING RACK
Emerson Process Management
Polymetron
SOLENOID VALVES
Asco
Avcon
Rotex
Schrader
Herion-Norgren
Schovill Duncan Ltd.
TEMPERATURE INDICATORS
G.I.Consortium
Bells Controls
Waaree instruments ltd
Dresser-USA
TEMPERATURE SWITCH
Ashcroft
Switzer Instruments Ltd.
Waaree Instruments Ltd
Dresser-USA
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 10 OF 16
TEMPERATURE TRANSMITTERS
ABB Ltd.
Emerson Process Management
Camille-Baur
P & F.
THERMO COUPLE ASSEMBLY
Industrial Instrumentation
General Instruments
Nagman Sensors (p) Ltd
Pyro Electric instruments
Toshniwal Industries Pvt. Ltd.
Altop
Temsens
Waaree
THERMOWELL
General Instruments
Nagman Sensors (p) Ltd.
Pyro Electric Instruments
Detriev Instrumentation
Toshniwal Industries ltd.
Altop
Temsens
Waaree
RTD
Industrial Instrumentation
Nagman Sensors (p) Ltd.
Toshniwal Industries Pvt. Ltd
Pyro Electric Instruments
Altop
Temsens
Waaree
UNIT CONTROL PANELS
Industrial Controls & Appliances (P) Ltd.
J&H
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 11 OF 16
Chemin
Rittal
LOCAL CONTROL PANELS
Industrial Controls & Appliances (P) Ltd.
J&H
Pyrotech
Rittal
Chemin
VARIABLE AREA FLOWMETERS
Eureka
Krone Marshall
Scientific Devices
Chemtrols
Trac
Instrument Engineers
CONDITION MONITORING SYSTEM
Bently Nevada
Schenk Avery
SPM Instruments Ltd.
Rockwell Automation.
Shinkawa.
ANNUBAR
Dietrich
Emerson Process Management
ASSIGNABLE TREND RECORDER
Honeywell
Yokogawa
Penny & Guile
DESUPERHEATER
Fisher
Dresser Masoneilan
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 12 OF 16
CCI
FLOAT & CHORD TYPE LEVEL INDICATOR
Jayati
Pune Techtrol
B K Equipment
V Automat
SBEM
Bliss Anand
LEVEL SWITCH (PROBE TYPE)
Level Stat
Solatron
Keystone
Yarway.
LAB INSTRUMENTS
Dead Weight Tester (Pneumatic)
Pressurements
Waaree Instruments Ltd
PRESSURE AND VACCUM GENERATORS WITH FINE REGULATOR
Superb Instruments
HIGH PRECISION REGULATORS FOR PRESSURE & VACUUM
Fairchild
HIGH TEMPERATURE FURNACE
Nagman
Waaree Instruments Ltd
DIGITAL STORAGE OSCILLOSCOPE
Phillips
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 13 OF 16
AC CLAMP ON METER
Extech
DIGITAL STROBOSCOPE
Lutron
SLING SYNCHROMETER
Extech
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 14 OF 16
RF Level Switch.
EIP Bulk Controls Pvt Ltd.
EIP Enviro Controls.
TERMINAL BLOCKS
Phoenix
Weidmueller
Wago
MINIATURE CIRCUIT BREAKERS
Siemens
ABB
L & T.
LARGE VIDEO SCREENS / PLASMA VIDEO WALLS
Barco
Synelec
SONY
SAMSUNG
LG
DCS
ABB
BHEL
Tatahoneywell
Emerson Process Management
Invensys
Siemens
Yokogawa Bluestar Ltd
PLC
AllenBradley
ABB
Honeywell
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 15 OF 16
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION:TABLE17
SHEET 16 OF 16
PADO
STEAG encotec (India) Pvt. Ltd. (Evonics)
Honeywell
Invensys
Emerson
CMMS
Honeywell
InvensysABB
TCS
AAQMS & MMS
Chemtrols
Campbell scientific canda corp
Honeywell (Teledyne)
Techmark engineers and cosultants (Horiba)
Nevco engg pvt. Ltd. (LSI lastern)
NOTE:
The sub vendor list enclosed ANNEXURE-II is indicative only and is subject to approval /
NOTES
acceptance by customer (RRUVNL). Bidder to propose his sub vendor list with back up documents
(experience list, end user certificate as applicable) etc. The same shall subject to BHEL and
1.
The final make selected out of the recommended makes listed above
Customer approval during detailed engineering stage without any technical, commercial & delivery
shall be subject to purchaser / consultants approval during detailed
implications to BHEL.
Engineering.
2.
Wherever the make is not specified for any item, the Bidder shall
indicate 2 or 3 reputed makes, out of which Purchaser /
Consultant shall select any one which is acceptable suggest an
acceptable make. This shall have no price implication.
ISSUE
R1
TCE FORM 329 R5
"4
54
9
$
"'
'
"
"$
*
;<*>
?
#
@
#"
**
;
** '
@ '
#
'
" *
!
53
"4
54
9
$
$
Q
!
'
*
"
#
;
*
*
!
54
"4
54
9
$
Y
'
#
'
*
;
"$
"
"
;
<[\]^_[`[\{`[]|}~]>
<[\]^_[`[\{`[]|}~]>
Y
*
<>
#
"
*
?
!
55
"4
54
9
$
* *#
**
**
*
"*
*
$ '
'
Q
!
56
"4
54
!
9
$
" *
[\`}[{|}
}|}{`'{\
'
${`~{[\
~[}`< $
|]>'"[`['
\~]\'"]\
'|{}|]>
$ '
'
" *
'"
*"
*
'
;
'
' $
*
;
<
>
*
?
# '
"
'
*
; '
@ '
*
';;
# '
!
57
"4
54
9
$
#
" *
$
'
**
#*
#
Q
"
;
!
?
$
?
"*
" *
#
?
$
<
>
?
;
#;
!
58
"4
54
9
$
#
;
#
"
#
#
#
?
#
*
**
#
?
!
59
"4
54
9
$
?Q
*
;;
?!
*#
#
# '
*
NOTE: The sub vendor list enclosed ANNEXURE-II is indicative only and is subject to approval /
acceptance by customer (RRUVNL). Bidder to propose his sub vendor list with back up documents
(experience list, end user certificate as applicable) etc. The same shall subject to BHEL and
Customer approval during detailed engineering stage without any technical, commercial & delivery
implications to BHEL.
!
60
LISTOFSUBVENDORSFORLV&MVMOTORS
Motors
Type
Vendor
Address
MOTORS LV
BHARAT
BIJLEE LTD.
MOTORS LV
CROMPTON
GREAVES
VANDHANA
BUILDING
NEW DELHI-110001
MOTORS LV
ASEA BROWN
BOVERI
IST FLOOR,QUTUB
HOTEL
NEW DELHI-110016
MOTORS LV
MALLESWARAM WEST
BANGALORE
560055
MOTORS LV
KIRLOSKAR
ELECTRIC CO
LTD.
NGEF
BANK OF BARODA
BDG
PBNO.633,16,SANSAD
MARG
NEW DELHI-110001
MOTORS LV
SIEMENS
I.P. ESTATE
NEW DELHI
110002
MOTORS LV
MARATHON
MOTORS LV
GE-POWER
BANGALORE-560017
MOTORS LV
RAJINDRA
ELECT
INDUSTRIES
LAXMI
HYDRAULICS
PVT. LTD
BHEL
(INDUSTRY
SECTOR)
14 SHAH
IND.ESTATE
VEERA DESAI
RD,ANDHERI(W)
INTEGRATED
OFFICE COMPLEX
LODHI ROAD
MOTORS MV
CROMPTON
GREAVES
VANDAHNA
BUILDING
NEW DELHI-110001
MOTORS MV
MALLESWARAM WEST
BANGALORE
560055
MOTORS MV
KIRLOSKAR
ELECTRIC CO
LTD.
NGEF
BANK OF BARODA
BLDG.
PB.NO.633,16,SANSAD
MARG
NEW DELHI-110001
MOTORS MV
GE-POWER
BANGALORE-560017
MOTORS MV
MARATHON
MOTORS LV
MOTORS MV
MUMBAI-400053
NOTE: VENDOR
TO vendor
PLEASE NOTE
THAT FINAL
SUB VENDOR SELECTED
OUT only
OF THE
ABOVE
RECOMMENDED
SUB /
NOTE:
The sub
list enclosed
ANNEXURE-II
is indicative
and
is subject
to approval
VENDORS SHALL SUBJECT TO CUSTOMER APPROVAL DURING DETAILED ENGINEERING WITHOUT ANY
acceptance
by customer& (RRUVNL).
Bidder to propose
his CUSTOMER.
sub vendor list with back up documents
TECHNICAL, COMMERCIAL
DELIVERY IMPLICATIONS
TO BHEL AND
(experience
list, SUB
endVENDOR
user certificate
as applicable)
etc.ALSO
TheSUBJECT
same shall
subject to AND
BHEL
and
Customer
ANY ADDITIONAL
OTHER THAN
ABOVE SHALL
TO CUSTOMER
BHEL
APPROVAL
DURING DETAILED
ENGINEERING
WITHOUT
ANY without
TECHNICAL,
& DELIVERY&IMPLICATIONS
TO BHEL to
approval
during detailed
engineering
stage
any COMMERCIAL
technical, commercial
delivery implications
AND CUSTOMER.
BHEL.
61
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
ANNEX
XURE III
DRAWING DOCUMNT
TS SUBMISSION PR
ROCEDUR
RE
er shall subm
mit soft copy
y/hard copy/C
CD ROMs of
o all the fina
ally approvedd drawings and
a O&M
x Bidde
Manu
uals as required by Custtomer/Custom
mer consulta
ant/BHEL-site/BHEL-PEM
M. The exact number
of ha
ard copies/CD
D ROMs of these
t
docum
ments to be submitted
s
sha
all be notifiedd to the bidd
der at the
time of detailed engineering and bidder shall submiit the same without anyy commercial/delivery
HEL/Customer.
impliccations to BH
x All th
he drawing documents
d
allong with the
e O&M manu
ual (of all the
e revisions) aare necessa
arily to be
subm
mitted in soft copies in addition to hard
d copies.
x Bidde
er to submit soft copies of all the drrawing and document along with quuality plans for
f BHEL
revie
ew and appro
oval.
able copy of all
a the drawin
ngs and docu
d.
uments shall be provided
x Edita
x The date of subm
mission of drawing docu
uments shall be considerred as the ddate of subm
mission of
pes whicheve
er is later.
hard and soft cop
he drawings shall
s
be prep
pared on com
mputer auto cad
c and othe
er documentss (like datash
heet etc.)
x All th
on M
MS office soft
ftware. Bidde
er not compl ying to the requirement
r
shall not bee considered. For the
execution of the contract
c
regu
ular meeting (generally once
o
in 15 da
ays or as perr project requ
uirement)
quired.
is req
x Vend
dor to come
e for meeting with the concerned dealing
d
pers
sons as perr BHEL or customer
c
requiirement in a short notice.
x Bidde
er to submitt instrument schedule, ccable schedu
ule and valve schedule in MS- Exce
el format
durin
ng detailed en
ngineering.
x Bidde
er to also furnish
f
the auto
a
cad co
opy/MS-Exce
el/MS-word (as applicabble) of the following
documents after award of co
ontract. Howe
ever any oth
her auto cad
d copy/MS-E
Excel/MS-worrd of any
a per the in
nsistence of BHEL and customer
c
will also be subbmitted by th
he bidder
otherr document as
witho
out any delive
ery and commercial impl ication to BH
HEL and custtomer.
P&ID.
Equipme
ent lay out of the DM Plan
nt area.
Equipme
ent Cable tray
y layout for D
DM Plant are
ea.
Equipme
ent earthing la
ayout for DM
M Plant area.
Civil scop
pe drawings..
Piping layy out drawing
g for DM Pla
ant area and yard piping layout.
l
Valve sch
hedule
Instrument schedule
Cable Scchedule
ii) Otherr requirements
x Succcessful bidde
er shall furnish detailed erection ma
anual for each of the eqquipment as
s well as
comp
plete system
m supplied un
nder this con
ntract at leas
st 3 months before the sscheduled errection of
the cconcerned eq
quipment / component orr along with supply of co
oncerned equuipment / co
omponent
which
hever is earlier.
x Engin
neering for this project is being ca
arried out in
n 3D enviro
onment at B
BHEL end. Name
N
of
engin
neering platfo
orm on which
h BHEL is do
oing the project IS SmarttPlant Suite. This is being
g done to
have
e automated interface che
ecking and tthereby minimising rework at site. Heence bidder, in their
t prepare a
all layout dra
awings using
g 3D Modell ing software
e. These
own interest, is requested to
wings will also
o be made available
a
to B
BHEL in soft for checking
g interface w
with other agencies in
draw
consolidated layo
out drawings
s. Bidders in
nability to prrepare drawing using 3D
D Modelling software
not be criterio
on for evalua
ation of their b
bid.
will n
x Docu
ument appro
oval by custtomer unde r Approval category orr informationn category shall
s
not
abso
olve the vend
dor of their contractual obligations of completin
ng the work as per spe
ecification
ent shall be reported
r
by the vendor in
i writing
requiirement. Anyy deviation frrom specifie d requireme
and rrequire writte
en approval. Unless any change in sp
pecified requ
uirement hass been broug
ght out by
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
62
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
63
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
ANNEXUREIV
PA
AINTING
GSPECIFICATIO
ON
64
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 1 OF 14
PAINTING REQUIREMENTS
PAINTING
13.0
13.0.1
13.0.2
13.0.3
13.1.0
13.1.0.1
13.1.0.2
The following Indian Standards may be referred to carrying out the painting
job.
IS : 5
IS : 1303
IS : 2379
IS : 1477
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 2 OF 14
PAINTING REQUIREMENTS
IS : 2395
IS : 2338
IS : 158
IS : 2074
IS : 104
IS : 2932
13.2.0
SIS : 55900
IS: 14506
IS: 14209
IS: 14589
SURFACE PREPARATION
The surface shall be prepared in a manner suitable for coatings. Chemical derusters or rust converters shall not be applied. Acid cleaning is subject to
approval of PURCHASER / PURCHASERS representative.
13.2.1
Blasting
ISSUE
R0
TCE FORM 329 R5
66
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 3 OF 14
PAINTING REQUIREMENTS
The surface of the part / component shall be blasted before the coating
material is applied.
Unless otherwise specified in the documents, the surface shall satisfy the
following requirements after blasting:
Primer paint shall be zinc silicate of approved brand. Dry film thickness of
each primer coat shall be 15 25 m
13.2.2
13.2.3
Cleaning
Removal of impurity
Impurity
Removal
(a)
Vacuum-cleaning, brushing
(b)
Adhesive deposits
Power brushing
(c)
(d)
Salt deposits
Rinsing
Organic
solvents
to
manufacturers
specifications e.g., Trichloro- trifluoro -ethane
and solvents containing acetone (renew
solvent and rag frequently).
(e)
13.3.0
PROCESSING
13.3.1
General
13.3.1.1
Application Conditions
The primer shall be applied to properly prepared surfaces only. The
specifications of the coating material manufacturers shall be observed.
The minimum temperature shall be +50C and the relative humidity shall
not exceed 80%. The temperature of the work piece shall be at least 3
0
C above dew point.
ISSUE
R0
TCE FORM 329 R5
67
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 4 OF 14
PAINTING REQUIREMENTS
13.3.1.2
Application Procedure
The primer shall be applied by means of brush or by spray. The top
coats shall be applied by means of brush, roller or by spray.
At points where coating application is interrupted, the individual layers
shall be adequately stepped to ensure proper layer sequence when
coating operations are resumed
13.3.1.3
Touching Up
Before each layer is applied, previous coating shall be touched up where
necessary by way of rust removal and cleaning, according coating
MANUFACTURERS specifications. The final top coat shall be reapplied
completely, if required.
13.3.1.4
Uncoated Surfaces
Moving parts of machines (e.g., stems, shafts, sliding and locating
bearings), nameplates, instruments and sealing surface shall not be
coated. Welds shall be left free of coating up to a distance of 30 mm on
each side of the weld edge until erection and weld examinations, if any,
have been completed.
13.3.1.5
Bond Strength
The pull-off stress determined using the pull-off test method for adhesion
shall be not less than 1.5 N/mm2, according to ISO 4624.
13.3.1.6
13.3.1.7
Coating Systems
13.3.1.7.1
13.3.1.7.2
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 5 OF 14
PAINTING REQUIREMENTS
a)
Steel Structures
i.
ii.
iii.
iv.
v.
b)
All steel structures shall receive two primer coats and two finish
coats of painting. First coat of primer shall be given in shop after
fabrication before dispatch to erection site after surface
preparation as described below. The second coat of primer shall
be applied after erection and final alignment of the erected
structures. Two finish coats shall also be applied after erection.
Steel surface which is to painted shall be cleaned of dust and
grease and the heavier layers of rust shall be removed by
chipping prior to actual surface preparation. The surface shall be
abrasive blasted to Sa-2 finish as per SIS05-5900. Primer paint
shall be zinc silicate of approved brand. Dry film thickness of each
primer coat shall be 40 microns.
Finish paint shall be 2 coats of High built epoxy finish of approved
brand. Dry film thickness of each finish coat shall be 90 microns.
The undercoat and finish coat shall be of different tint to
distinguish the same from finish paint. The total dry film thickness
shall be 300 microns. All paints shall be of approved brand and
shade as per the OWNERS requirement.
Joints to be site welded shall have no paint applied within 100
mm of welding zone. Similarly where Friction grip fasteners are to
be used no painting shall be provided. On completion of the joint
the surfaces shall receive the paint as specified.
Surfaces inaccessible after assembly shall receive two coats of
primer prior to assembly. Surfaces inaccessible after erection
including top surfaces of floor beams supporting gratings or
chequered plate shall receive one additional coat of finish paint
over and above number of coats specified before erection.
Portion of steel member embedded / to be encased in concrete
shall not be painted.
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 6 OF 14
PAINTING REQUIREMENTS
13.3.1.7.2.1
At works
Surface preparation:
Blasting according to SIS 055900: grade SA 2 . Depending on
production flow, a weldable, inorganic ethyl zinc silicate shop primer dry
film thickness 15 25 m, may be used.
Prime coat:
Two (2) layers of zinc phosphate epoxy, total dry film thickness 75 m.
b)
At site
Thorough cleaning to remove oil, grease, dirt and any other
contaminants. De-rusting of all mechanical damages according to SIS
055900 Grade ST3. Touch up with dry film thickness 50 m.
Finish coat:
Application of two finishing coats of Chlorinated rubber paint in approved
shades at 30-40 microns DFT each coat in approved shades.
13.3.1.7.2.2
Remarks:
Equipment coated with a standard application system can be accepted if
the quality of this application system is corresponding with the quality of
the above mentioned system.
13.3.1.7.2.3
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 7 OF 14
PAINTING REQUIREMENTS
Finish Coat:
Application of two finishing coats of Chlorinated rubber paint in approved
shades at 50 microns DFT each coat in approved shades.
13.3.1.7.2.4
a)
At works
Surface Preparation:
Blasting according standard SIS 55900 Grade Sa 21/2 and ISO 8501-1:
1988. Depending on production flow, a weldable, inorganic ethyl zinc
silicate shop primer, dry film thickness 15-25 m, may be used
Prime coat
Inorganic ethyl zinc silicate, dry film thickness 75 m.
b)
At site
Pre-treatment:
De-rusting of all mechanical damages, according to ISO 8501-1: 1989,
grade St 3 Touch-up with 1 pack inorganic ethyl zinc silicate, dry film
thickness 50 m.
Removal of all decontaminants from prime coat.
Intermediate Coat:
1 pack silicon acrylic, dry film thickness 35 m.
Final coat
1 pack silicon acrylic, dry film thickness as 35 m.
Total system dry film thickness 145 m.
Final coat according to colour code.
Parts exposed to temperatures above 2000C, up to 4000C, not
insulated
At works
Surface Preparation:
Blasting according to ISO 8501-1: 1988 grade Sa 21/2. Depending on
ISSUE
R0
TCE FORM 329 R5
71
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 8 OF 14
PAINTING REQUIREMENTS
production flow, a weldable, inorganic ethyl zinc silicate shop primer, dry
film 15-25 m, shall be used.
Prime coat:
Inorganic ethyl zinc silicate, dry film of thickness 75 m.
At site
Pre-treatment:
De-rusting of all mechanical damages, according standard Sa 21/2 to
ISO 8501-1: 1988. Touch-up with coating system according to
MANUFACTURERS recommendations.
Insulated Parts, continuously exposed to condensing water or parts
exposed to temperatures
a)
b)
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 9 OF 14
PAINTING REQUIREMENTS
d)
Water exposure
Surfaces permanently or predominantly in contact with water.
At site / works
Pre-treatment:
ISSUE
R0
TCE FORM 329 R5
73
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 10 OF 14
INTERNAL COATINGS
13.3.1.7.3.1
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 11 OF 14
PAINTING REQUIREMENTS
Finish coats:
2 pack solvent free epoxy paint dry film thickness 150 m per coat.
In case of service or potable water tanks, the coating material selected
shall not taint the water.
QA / QC procedure, including pinhole inspection, for shall be submitted
for approval by Owner / Owners Representative.
13.3.1.7.3.2
At works
Pre-treatment:
Blasting according standard 21/2 to ISO 8501-1: 1988.
Rubber lining:
Hard-rubber 5mm for DM water applications, thickness greater than or
equal to 3 mm for others. In case of failure of rubber lining for both pipes
and vessels, the rubber lining shall be replaced by COROCOAT
13.4.0
13.4.1
13.4.2
13.5.0
Painting for I & C equipment: Epoxy coating required for all I&C
equipment.
Suggested Colour Codes for Painting
13.5.1
Sl. No.
Item / Service
Colour
IS5
Colour
(Band)
IS
-5
ISSUE
R0
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 12 OF 14
13.5.1
Dark
Admiralty
Grey
632
13.5.2
Nut Brown
413
13.5.3
Crane
(a)
Crane structure
Golden
Yellow
356
Black
(b)
Crimson
540
13.5.4
Light Grey
631
13.5.5
(a)
Outdoor
Aluminium
(b)
Indoor
Light Grey
631
13.5.6
631
13.5.7
Switchgear
Light Grey
631
13.5.8
Light Grey
631/
7078 of
IS1650
13.5.9
Turbines
Light Grey
631
13.5.10
Light Grey
631
13.5.11
Transformers
Aluminium
13.5.12
Machinery guards
Signal red
13.5.13
(a)
Water System
537
ISSUE
R0
TCE FORM 329 R5
76
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 13 OF 14
PAINTING REQUIREMENTS
(i)
(ii)
(iii)
(iv)
(v)
Boiler feed
Condensate
DM Water
Soft Water
Bearing cooling water
Sea Green
Sea Green
Sea Green
Sea Green
Sea Green
217
217
217
217
217
Light Brown
Light Orange
French Blue
French Blue
410
557
166
166
(vi)
(vii)
(viii)
(ix)
Sea Green
Sea Green
Sea Green
Sea Green
217
217
217
217
French Blue
French Blue
French Blue
White
166
166
166
-
(b)
(i)
Air system
Station air
Sky Blue
101
(ii)
Control air
Sky Blue
101
White
(c)
(i)
Oil system
Light oil (HSD)
Light
Brown
410
French blue
166
(ii)
Lubricating oil
410
Light grey
631
(iii)
Transformer oil
Light
Brown
Light
Brown
410
Light Orange
557
(d)
(i)
Gas system
Fuel gas (Re-gassified LNG)
(ii)
Carbon dioxide
309
Light grey
631
(iii)
Hydrogen
309
Signal red
537
(e)
Fire Services
Fire red
536
(f)
Effluent pipes
Black
(g)
Vacuum pipes
Sky Blue
101
Black
(h)
Drainage
Black
Canary
Yellow
Canary
Yellow
Canary
Yellow
NOTES
1.
This colour code basically refers to IS: 2379 for piping with necessary
modifications.
ISSUE
R0
TCE FORM 329 R5
77
SPEC NO.
TCE.5750A-H-500-001
VOLUME II
SECTION C 13
SHEET 14 OF 14
PAINTING REQUIREMENTS
2.
Note: Bidder shall furnish his painting specification to suit corrosive atmosphere of
coastal area along with the bid. The specification shall in general be in line with
the above requirements.
ISSUE
R0
TCE FORM 329 R5
78
ANNEXURE-V
2x 660 MW RVUNL SURATGARH TPS UNIT - 7 & 8 PROJECTS
LIST & QUANTITY OF MANDATORY SPARES
S.NO.
DESCRIPTION
LT Motors(AC/DC)
a
b
c
d
Motor
Bearings
Space heaters (if applicable)
Cooling fan
Field Instruments/
Elements/Equipment(Gauges,
Switches, transmitters etc.) (AS
APPLICABLE)
Local gauges
Field Switches
Transmitter
Junction Box
Flow Elements
i
j
I/P Conterter
Position Transmitter
Not Applicable
10 % For each type,size and range or
minimum 2 No. whichever is higher.
k
l
Not Applicable
10 % For each type,size and range or
minimum 2 No. whichever is higher.
Not Applicable
3
a
1
1
1
3
No of each type
Set of each type
No of each type
Nos. of each type
79
SER Cards
g
h
i
j
2
10
100
k
l
m
n
o
p
q
r
Servers
Operator Stations
Printer Cartriges
SMPS for Printers
SVGA cards for printers
Data Bus cable
Data Bus Controller
Fibre Optic Cable Converter/Deconverter Unit(applicable if remote
I/O module is supplied)
VDU Monitor
Keyboard & Mouse/Track Ball with
connecting cable and plugs
Interposing Relay
2
4
10
2
2
2
2
4
Nos.
Nos.
Nos.
10 % of each type, size or minimum 2
Nos. whichever is higher.
No. of each type of server
Nos.
Nos. of each type
No of each type, rating
No. of each type
No. full length
No.
Nos.
2
4
No.
Nos. of each type
s
t
u
a
b
c
d
5
6
a
Gland Packings
10 % of total quantity
2
1
1
1
1
Sets
Set
Set
Set
10 % of total in each type
80
81
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
DATTASHEEETA
82
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
1.0
1.1
1.2
1.3
1.4
1.5
1.6
a
b
c
1.7
1.8
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
M PLANT SU
UPPLY PUMPS
DM
N
Number
S
Service
T
Type
D
Design Temp
perature
S
Suction Cond
dition
M
Material of Co
onstruction
C
Casing
Im
mpeller
sshaft
C
Capacity and
d head
L
Location
DU
UAL MEDIA FILTER
Tyype
Nos. required
Lo
ocation
D
Design Flow/D
DMF (Net)
D
Design Surface Flow Rate
e
a
at design flow
w
B
Backwash flo
ow rate
Supporting Ma
aterial for the
e
fill
2.8
Filter media
2.9
2.10
0
2.11
1
2.12
2
2.20
0
Supporting Be
ed
M
Minimum Bed
d Depth
S
Shell & Dish End Material
Thickness
T
Thickness
to
olerance/Allo
owance
In
nternal Paintting
E
External Pain
nting
M
Manhole
H
Hand hole
S
Sight Window
w
In
ntervals betw
ween two
ssuccessive ba
ackwash
D
Design code
2.21
1
D
Design presssure
2.22
2
2.23
3
D
Design Temp
perature
Free board (M
Minimum)
2.24
4
2.13
3
2.14
4
2.15
5
2.16
6
2.17
7
2.18
8
2.19
9
2.25
5
3.0
3.1
3.2
3.3
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
3X
X70%
Co
ontinuous
Ve rtical centrifu
ugal
60 deg for mec
chanical design
Flo
ooded
2.5
5% Ni CI as per
p IS 210 FG
G 260
SS
S 316
SS
S 410
To suit net DM Plant outputt per stream of 70 cum/hr and Head to
t
eet the system requireme
ent.
me
Ne
ear DM Clariffied Water Sttorage Tank
Ve rtical Cylindrrical with dish
hed ends
3X
X70%
Ou
utdoor
To suit net DM Plant outputt per stream of 70 cum/hr
aximum 15 M3/Hr/M2
M
Ma
Min
nimum 2.5 tim
mes the design inlet flow
w rate
As per manufac
cturer standa
ard
Gra
aded Quartz
z Sand (free from
f
carbonaates & other foreign mattter)
and
d anthracite
Ro
ounded and graded
g
grave
el free from cclay & limesto
one
100
00 mm (excluding supporting bed)
CS
S :- SA516 Gr.70
Sh ell: 6 MM (m
minimum), Dis
shed end: 8M
MM (minimum
m)
As per the code
e requiremen
nt
Sh all be as perr customer approved painnting schedu
ule
Sh all be as perr customer approved painnting schedu
ule
Min
nimum 2 nos
s., each of minimum 500m
mm dia
Min
nimum 1 no. of minimum 150mm dia
Min
nimum two nos
n
18 hrs
As per IS 2825 /ASME Sec. VIII Div I/Eqquivalent
Sh ut-off head of
o DM Plant supply
s
pumpp + Static Head (minimum
m 10
h
m) +5% overalll margin or 10Kg/cm2, whhichever is higher.
60 deg for mec
chanical design
75%
% of total be
ed depth
Sh all be provided at filter ou
utlet and bacckwash wate
er outlet of ea
ach
er.
filte
Suspended so
olids &
turrbidity at the
< 2 ppm and < 2 NTU respe
ectively
ou
utlet
A
AIR BLOWER
R FOR DUAL
L MEDIA FIL
LTER (DMF))
Number
Two (2X100%) [C
Common for all DMF].
Typ
pe
Rota
ary twin lobe oil free
Inter mittent
Duty
83
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
3.4
3.5
3.6
3.7
Ca
apacity & Hea
ad
Ma
aterial of consstruction
De
esign Temperrature
E
External Pain
nting
3.8
Acccessories Re
equired
4.0
4.1
4.2
4.3
AC
CTIVATED CARBON
C
FIL
LTER
T
Type
N
Nos. required
d
D
Design Flow//ACF (Net)
D
Design Surface Flow Rate
e
a
at design flow
w
S
Supporting Bed
4.4
4
4.5
4.6
F
Filter Media
4.7
4.8
S
Shell & Dish End Material
T
Thickness
T
Thickness
to
olerance/Allo
owance
E
External Pain
nting
M
Manhole
H
Hand hole
S
Sight Window
w
In
ntervals betw
ween two
ssuccessive ba
ackwash
D
Design code
4.9
4.10
4.11
4.12
4.13
4.14
4.15
D
Design presssure
4.16
4.17
4.18
D
Design Temp
perature
M
Minimum Bed
d Depth
F
Free board (m
minimum)
F
Filter Media Trap
T
4.19
4.21
4.22
F
Free residuall chlorine,
ccolour & orga
anics at the
A
ACF outlet
L
Location
U
Under Drain System
S
T
Type
M
Material of Co
onstruction
4.20
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
As re
equired
CI ass per IS 210 Gr FG 260
60 de
eg C for mec
chanical design
Sh all be as perr customer approved painnting schedu
ule
Moto rs, V belt witth guard, Flexible Couplinng, Discharg
ge Snubber, Suction
S
V
Instruments, comm
mon base pla
ate etc.
Filterr, Silencer, Valves,
Ve rtical Cylindrrical with dish
hed ends
3X
X70%
To suit net DM Plant outputt per stream of 70 cum/hr
aximum 20 M3/Hr/M2
M
Ma
Ro
ounded and graded
g
grave
el free from cclay & limesto
one
Gra
anular activa
ated carbon as
a per AWW
WA 8604 Dechlorination
gra
ade (Iodine number
n
should be minimuum1000)
The
e media shall work contin
nuously withoout any reac
ctivation or
rep
placement for minimum 1 year.
CS
S :- SA516 Gr.70
Sh ell: 6 mm (m
minimum), Dis
shed End: 8 mm (minimu
um)
As per the code
e requiremen
nt
Sh all be as perr customer approved painnting schedu
ule
Min
nimum 2 nos
s., each of minimum 500m
mm dia
Min
nimum 1 no. of minimum 150mm dia
Min
nimum two nos
n
18 hrs
As per IS 2825 /ASME Sec. VIII Div I/Eqquivalent
Sh ut-off head of
o DM Plant supply
s
pumpp + Static Head (minimum
m 10
m) +5% overalll margin or 10 kg/cm2 whhichever is higher.
60 deg C for mechanical de
esign
100
00 mm (excluding supporting bed)
75%
% of total be
ed depth
Sh all be provided at filter ou
utlet and bacckwash wate
er outlet of ea
ach
er.
filte
No
ot detectable (nil)
Ind
door
He
eader Lateral or strainer on
o plate, dessigned to avo
oid any nonuniiform flow.
Forr header late
eral, Header MSEP and laateral PP/PV
VC
Forr strainer on plate, plate MSEP and sstrainer PP/P
PVC
FIL
LTERED WA
ATER TANK
5.0
5.1
5.2
Number
Purrpose
5.3
Capacity
5.4
5.5
6.0
6.1
Typ
pe
Ma
aterial
DM
MF & ACF BA
ACKWASH PUMPS
Purrpose
For b
backwashing
g ACF and DMF.
One
e (1) no.
Forr backwashin
ng ACF and DMF.
D
Bacckwashing water
w
requirem
ment for onee DMF and on
ne ACF + 20
0%
marrgin
Verrtical cylindric
cal
PVC
C/HDPE.
84
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7.0
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
0
7.11
1
7.12
2
7.13
3
7.14
4
7.15
5
7.16
6
7.17
7
7.18
8
7.19
9
7.20
0
7.21
1
7.22
2
7.23
3
A
7.24
4
A
7.25
5
A
B
8.0
8.1
8.2
8.3
8.4
8.5
8.6
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
Qu
uantity
2X10
00%
Ca
apacity
To su
uit the system
m requireme
ent
Typ
pe
Horizzontal Centrifugal
He
ead
To su
uit the system
m requireme
ent
MO
OC of casing
SS 3
316
Imp
peller
SS 3
316
Shaft
SS 3
316 / SS 410
Seal
Mech
hanical Seal
ST
TRONG ACID
D CATION EXCHANGER
E
R (SAC)
Tyype
Ve rtical Cylindrrical with dish
hed ends
Nos. required
3X7
70%
D
Design Flow/S
SAC (Net)
To suit net DM Plant outputt per stream of 70 cum/hr
D
Design Surface Flow Rate
e
ot more than 40 M3/Hr/M2
2
No
a
at design flow
w
S
Service cycle
e
18 hrs.
CS
S :- SA516 Gr.70 with Rubber Lining ((3x1.5mm thk RL of
S
Shell & Dish End Material
sho
ore hardness
s 65 + 5 Scale A)
T
Thickness
6M
MM (minimum
m) for Shell & 8 MM (minnimum) for Diished Ends
T
Thickness
As per the code
e requiremen
nt.
to
olerance/Allo
owance
E
External Pain
nting
Sh all be as perr customer approved painnting schedu
ule
M
Manhole
Min
nimum 2 nos
s., each of minimum 500m
mm dia
H
Hand hole
Min
nimum 1 no. of minimum 150mm dia
S
Sight Window
w
Min
nimum two nos
n
R
Resin Type
Org
ganic monos
sphere/gel [H
H] form.
R
Regeneration
n
By Hydrochloric
c acid (HCL, as per IS 2665)
M
Mode of rege
eneration
Co
ountercurrentt
M
Minimum Ressin Bed Deptth
1.0
0M
D
Design code
As per IS 2825 /ASME Sec. VIII Div I/Eqquivalent
D
Design presssure
10 kg/cm2
D
Design Tempe
erature
60 d
deg C for me
echanical design
Two
o nos- one at
a service outtlet and otherr at backwas
sh and rinse
R
Resin trap pro
ovided
outle
et.
Free board
50 % of total be
ed depth for SAC
S
D
Derating facto
or to be
co
onsidered on
n selected
10%
%
Exchange Capacity
R
Regenerant Distributor
D
M
Material of Co
onstruction
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
In
nterface Colle
ector
M
Material of Co
onstruction
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
Under drain System
S
He
eader Lateral or strainer on
o plate, dessigned to avo
oid any nonTyype
uniiform flow.
Forr header late
eral, Header MSRL and laateral PP/PV
VC
M
Material of Co
onstruction
Forr strainer on plate, plate MSRL and sstrainer PP/P
PVC
D
DEGASSER TOWER
T
Numbers Req
quired
3X7
70%
Service Cycle
e
18 h
hours
Tyype
Cou
unter Flow,
C
Capacity of to
ower (each)
Suittable to hand
dle 120% of the water floow from SAC on upstream
m.
Normal Flow Rate
R
per
To ssuit net DM Plant output per stream oof 70 cum/hrr
tow
wer
Fill Material
Polyypropylene Rasching
R
ring
gs/Pall Ringss.
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
85
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
8.7
8.8
8.9
8.10
0
8.11
1
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
10.2
2
10.3
3
Duty
C
Continuous
10.4
4
10.5
5
10.6
6
Ca
apacity & Hea
ad
Ma
aterial of consstruction
De
esign Temperrature
A
As required
10.7
7
Acccessories Re
equired
8.12
2
8.13
3
8.14
4
9.0
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
10.0
0
10.1
1
11.0
0
11.1
1
11.2
2
11.3
3
11.4
4
11.5
5
11.6
6
11.7
7
11.8
8
11.9
9
11.1
10
12.0
0
12.1
1
12.2
2
12.3
3
12.4
4
12.5
5
12.6
6
C
CO2 content in
n effluent
D
Design Code
D
Design Pressu
ure
D
Design Tempe
erature
Shell Material
CI IS
S 210 FG 260
0
60 de
eg C for mec
chanical design
Moto
ors, V belt with guard, Fle
exible Coupli ng, Discharg
ge Snubber,
Suct ion Filter, Sillencer, Valve
es, Instrumennts, etc.
DE
EGASSED WATER
W
PU
UMPS
Qu
uantity
3X70
0%
Typ
pe
Horizzontal centriffugal
Conttinuous
Op
peration
Ca
apacity & Hea
ad
To su
uit net DM Plant output per
p stream off 70 cum/hr & TDH as req
quired
Suction Conditiions
Flood
ded
Ma
aterial of consstruction
Ca
asing
AISI--316
Imp
peller
AISI--316
Shaft & shaft slleeve
AISI--316
Packing Seal
Mech
hanical Type
e
WE
EAK BASE ANION
A
EXCHANGER (W
WBA)
Tyype
Ve rtical Shell Type
T
with dished ends
Nos. required
3X
X70%
D
Design Flow/u
unit (Net)
To suit net DM Plant outputt per stream of 70 cum/hr
De
esign Surface
e Flow Rate at
a
ot more than 40 M3/Hr/M2
No
dessign flow
Service cycle
18 hrs.
CS
S :- SA516 Gr.70 with Rubber Lining ((3x1.5mm thk RL of
S
Shell & Dish End Material
sho
ore hardness
s 65 + 5 Scale A)
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
86
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
12.7
7
12.8
8
12.9
9
12.1
10
12.1
11
12.1
12
12.1
13
12.1
14
12.1
15
12.1
16
12.1
17
12.1
18
12.1
19
12.2
20
12.2
21
12.2
22
12.2
23
A
12.2
24
A
12.2
25
A
B
13.0
0
13.1
1
13.2
2
13.3
3
13.4
4
13.5
5
13.6
6
13.7
7
13.8
8
13.9
9
13.1
10
13.1
11
13.1
12
13.1
13
13.1
14
13.1
15
13.1
16
13.1
17
13.1
18
13.1
19
13.2
20
13.2
21
13.2
22
S
Shell thicknesss
T
Thickness
to
olerance/Allo
owance
E
External Pain
nting
M
Manhole
H
Hand hole
S
Sight Window
w
R
Resin Type
R
Regeneration
n
M
Mode of rege
eneration
M
Minimum Ressin Depth
D
Design code
D
Design presssure
D
Design Tempe
erature
R
Resin trap pro
ovided
Free board
D
Derating facto
or to be
co
onsidered on
n selected
Exchange Capacity
R
Regenerant Distributor
D
M
Material of Co
onstruction
In
nterface Colle
ector
M
Material of Co
onstruction
Under drain System
S
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
6M
MM (minimum
m) for Shell & 8 MM (minnimum) for Diished Ends
As per the code
e requiremen
nt
Sh all be as perr customer approved painnting schedu
ule
Min
nimum 2 nos
s., each of minimum 500m
mm dia
Min
nimum 1 no. of minimum 150mm dia
Min
nimum two nos
n
Org
ganic monos
sphere/gel tertiary aminne
By Sodium Hyd
droxide (NaO
OH as per IS 252)
Co
ountercurrentt
1.0
0M
As per IS 2825 / ASME SEC
C VIII DIV I/E
Equivalent
10 kg/cm2
60 d
deg C for me
echanical design
One
e at service outlet
o
and on
ne at backwaash and rinse
e outlet.
75 % of total be
ed depth for SBA
S
10%
%
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
He
eader Lateral or strainer on
o plate, dessigned to avo
oid any nonuniiform flow.
Forr header late
eral, Header MSRL and laateral PP/PV
VC
M
Material of Co
onstruction
Forr strainer on plate, plate MSRL and sstrainer PP/P
PVC
ST
TRONG BAS
SE ANION EX
XCHANGER
R (SBA)
Tyype
Ve rtical Shell Type
T
with dished ends
Nos. required
3X
X70%
D
Design Flow/u
unit (Net)
To suit net DM Plant outputt per stream of 70 cum/hr
De
esign Surface
e Flow Rate at
a
ot more than 40 M3/Hr/M2
No
dessign flow
Service cycle
18 hrs.
CS
S :- SA516 Gr.70 with Rubber Lining ((3x1.5mm thk RL of
S
Shell & Dish End Material
sho
ore hardness
s 65 + 5 Scale A)
S
Shell thicknesss
6M
MM (minimum
m) for Shell & 8 MM (minnimum) for Diished Ends
T
Thickness
As per the code
e requiremen
nt
to
olerance/Allo
owance
E
External Pain
nting
Sh all be as perr customer approved painnting schedu
ule
M
Manhole
Min
nimum 2 nos
s., each of minimum 500m
mm dia
H
Hand hole
Min
nimum 1 no. of minimum 150mm dia
S
Sight Window
w
Min
nimum two nos
n
R
Resin Type
Org
ganic monos
sphere/gel [O
OH] form, Typpe I.
R
Regeneration
n
By Sodium Hyd
droxide (NaO
OH as per IS 252)
M
Mode of rege
eneration
Co
ountercurrentt
M
Minimum Ressin Depth
1.0
0M
D
Design code
As per IS 2825 / ASME SEC
C VIII DIV I/E
Equivalent
D
Design presssure
10 kg/cm2
D
Design Tempe
erature
60 d
deg C for me
echanical design
R
Resin trap pro
ovided
One
e at service outlet
o
and on
ne at backwaash and rinse
e outlet.
Free board
50 % of total be
ed depth for SBA
S
D
Derating facto
or to be
10%
%
Tyype
87
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
13.2
25
co
onsidered on
n selected
Exchange Capacity
R
Regenerant Distributor
D
M
Material of Co
onstruction
In
nterface Colle
ector
M
Material of Co
onstruction
Under drain System
S
Tyype
M
Material of Co
onstruction
14.0
0
14.1
1
14.2
2
14.3
3
M
MIXED BED UNIT
Tyype
Nos. required
D
Design Pressu
ure
D
Design Tempe
erature
D
Design Flow/u
unit (Net)
Service cycle
D
Design Surface Flow Rate
e
a
at design flow
w
13.2
23
A
13.2
24
A
14.4
4
14.5
5
14.6
6
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
He
eader Lateral or strainer on
o plate, dessigned to avo
oid any nonuniiform flow.
Forr header late
eral, Header MSEP and laateral PP/PV
VC
Forr strainer on plate, plate MSEP and sstrainer PP/P
PVC
Ve rtical Shell Type
T
with dished ends
3X
X70%
10K
Kg/cm2
60 d
deg C for me
echanical design
To suit net DM Plant outputt per stream of 70 cum/hr
18X
X5 hrsi.e, 90
0 hrs.
ot more than 60 M3/Hr/M2
2
No
CS
S :- SA516 Gr.70 with Rubber Lining ((3x1.5mm thk RL of
sho
ore hardness
s 65 + 5 Scale A)
6M
MM (minimum
m) for Shell & 8 MM (minnimum) for Diished Ends
14.7
7
S
Shell & Dish End Material
14.8
8
14.1
10
14.1
11
S
Shell thicknesss
T
Thickness
to
olerance/Allo
owance
E
External Pain
nting
M
Manhole
14.1
12
R
Resin Type
14.1
13
14.1
14
14.1
15
14.1
16
14.1
17
14.1
18
H
Hand hole
S
Sight Window
w
R
Regeneration
n
M
Minimum Ressin Depth
D
Design code
R
Resin trap pro
ovided
14.1
19
F
Free board
100
0 % of total bed
b depth for MB
14.9
9
14.2
23
D
Derating facto
or to be
considered on
o selected
E
Exchange Ca
apacity
R
Regenerant Distributor
D
M
Material of Co
onstruction
In
nterface Colle
ector
M
Material of Co
onstruction
Under drain System
S
Tyype
M
Material of Co
onstruction
14.2
20
14.2
21
A
14.2
22
A
15.0
0
15.1
1
15.2
2
15.3
3
15.4
4
10%
%
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
MS RL Header with
w PP/PVC
C laterals com
mplete with PP
P Strainer
He
eader Lateral or strainer on
o plate, dessigned to avo
oid any nonuniiform flow.
Forr header late
eral, Header MSRL and laateral PP/PV
VC
Forr strainer on plate, plate MSRL and sstrainer PP/P
PVC
A
AIR BLOWER
R FOR MIXE
ED BEDS
Number
Two (2X100%) [C
Common for all MB].
Typ
pe
Rota
ary Twin Lobe
e
Inter
mittent
Duty
Ca
apacity & Hea
ad
As re
equired
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
88
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
15.5
5
15.6
6
Ma
aterial of consstruction
De
esign Temperrature
15.7
7
A
Accessories Required
R
15.8
8
16.0
0
16.1
1
16.2
2
16.3
3
E
External Pain
nting
DE
ESCRIPTION
N FOR
CH
HEMICAL UN
NLOADING
PU
UMP
Numbers Requ
uired.
Typ
pe
Service.
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
CI IS
S 210 FG 260
0
60 de
eg C for mec
chanical design
Moto rs, V belt witth guard, Flexible Couplinng, Discharg
ge Snubber, Suction
S
V
Instruments, etc.
Filterr, Silencer, Valves,
Sh all be as perr customer approved painnting schedu
ule
ACID
D UNLOADIN
NG PUMPS
ALK
KALI UNLOA
ADING PUMP
PS
2X10
00%
Horizzontal centriffugal
2X1000%
Horizzontal centriffugal
Inter mittent
Interrmittent
16.4
4
Ca
apacity & Hea
ad
Min. 20 m3/hr an
nd 10 MWC
ectively
respe
Min. 10 m3/hr an
nd 10 MWC
respeectively
16.5
5
Liq
quid to be handled
30-33
3 % HCL
48 % alkali
16.6
6
Suction Conditiion
Flood
ded
Floodded
16.7
7
Suction Straine
er
Y T
Type strainer shall be provvided
(MOC
C-SS).
16.8
8
Ma
aterial of consstruction
Co
ondition
16.9
9
Ca
asing and Imp
peller
PP
16.1
10
We
earing rings
PP
SS
16.1
11
Base plate
Carb
bon Steel
Carbbon Steel.
16.1
12
Shaft
EN8+
+PP
BS:9970 EN8
16.1
13
Shaft sleeve
Cera
amic
16.1
14
Typ
pe of Shaft Sealing
S
Mech
hanical Seal
Mechhanical Seal
16.1
15
Op
perating Rang
ge
20 120 % of de
esign capacity
20 120 % of de
esign capacitty
16.1
16
Acccessories Re
equired for pump
Coup
pling guard, drain
d
plug, vent
valve
e, Y-Strainer
Flexiible coupling
Flexiible coupling
g
Appl icable
Appl icable
16.1
17
16.1
18
Typ
pe of couplin
ng between
mo
otor & pump
He
eliflex hoses with
w coupling
g&
iso
olation valvess
16.1
19
No
o. required
Two (2)
Two (2)
16.2
20
Sizze (mm)
80 m
mm dia
50 m
mm dia
16.2
21
Len
ngth
10 M
10 M
16.2
22
Ma
aterial
Helifflex
Helifflex
D STORAGE
E TANKS
ACID
ALK
KALI STORA
AGE TANKS
Two (2)
As pe
er BSEN 122
285-2:2005
Outd
door
50T e
each
Horizzontal cylindrical with dished
end, Atmospheric
c
Two (2)
As pper BSEN 122
285-2:2005
Outddoor
25T each
Horizzontal cylindrical with disshed
end, Atmospheric
17.1
1
17.2
2
17.3
3
17.4
4
DE
ESCRIPTION
N FOR
CH
HEMICAL ST
TORAGE TA
ANK
Qu
uantity (nos.)
De
esign Code
Loccation
Ca
apacity
17.5
5
Typ
pe & Pressure Class
17.0
0
89
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: C1
REV
V NO: 00
17.6
6
De
esign Temperrature
60 de
eg C for mec
chanical design
17.7
7
17.8
8
Ma
aterials of Co
onstruction
Pro
otection / Lin
ning
17.9
9
Ou
utside
17.1
10
17.1
12
17.1
13
17.1
14
17.1
15
18.0
0
18.1
1
18.2
2
Co
oncentration
Vent, overflow seal pots, drrain
d.
Shal l be provided
& ssample connection
Ma
anhole, stair-case, platforrm
Shal l be provided
d.
Fume absorberr
Shal l be provided
d.
CO
O2 absorber
N/A
Pro
ovision of 1 Spare
S
Nozzle
e
Shal l be provided
d.
AL
LKALI TRAN
NSFER CUM RECIRCUL
LATION PUM
MPS
Numbers Requ
uired.
2X10
00%
Typ
pe
Horizzontal centriffugal
18.3
3
Co
oncentration of
o working media
m
4-50 %
18.4
4
Service
Inter mittent
18.5
5
Ca
apacity & Hea
ad
Min. 10 m3/hr an
nd 10 MWC respectively
r
18.6
6
Suction Conditiion
Flood
ded
18.7
7
Ma
aterial of consstruction
18.8
8
Ca
asing
SS-3
316
18.9
9
Imp
peller
SS-3
316
18.1
10
Shaft
SS-4
410
18.1
11
Shaft sleeve
SS
18.1
12
Stu
uffing Box
SS
18.1
13
Suction Straine
er
Y-typ
pe in each Pump (MOC-S
SS)
19.0
0
TA
ANKS
CH
HEMICAL
HA
ANDLING/PR
REP
AR
RATION
ACID MEASURIN
NG TANK
19.1
1
Qu
uantity
Five nos.
n
(2 for SA
AC, 2 for MB
B
& 1 fo
or N.Pit).
Typ
pe
Vertic
cal Cylindrica
al with top
coverr hinged & fla
at bottom.
The ta
ank shall be fitted with
vent, drain, fume
w seal pots
absorrber, overflow
etc.
17.1
11
19.2
2
Shal l be provided
d.
N/A
Shal l be provided
d.
Shal l be provided
d.
ALKALI PREPN.
FOR
TANK (F
ALKALI
S)
FLAKES
One no
(Commo
on for
SBA, WB
BA and
MB).
Vertical
cal with
Cylindric
top cove
er hinged
& flat bottom.
k shall be
The tank
fitted with vent,
drain, CO
O2
absorber,
w seal
overflow
pots, dissolving
baskets, etc.
90
Shal l be provided
d.
A
ALKALI MEA
ASURING TANK
T
F
Five nos. (2 for
f SBA & WBA,
W
2
ffor MB and 1 for N.Pit).
V
Vertical Cylin
ndrical with to
op
ccover hinged
d & flat bottom
m. The
ttank shall be
e fitted with vent,
ddrain, CO2 absorber,
a
ove
erflow
sseal pots, dis
ssolving baskkets,
eetc.
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
19.3
3
Useful Capacityy
(for each individ
dual
nk)
tan
19.4
4
Ma
aterials and
thicckness
19.5
5
Extternal Protecction
19.7
7
Vent, Overflow,
ain connectio
on
dra
Disssolving Basket
19.8
8
Agitator provide
ed
20.0
0
20.1
1
DO
OSING PUMP
PS
Qu
uantity
20.2
2
Ca
apacity & Hea
ad
(for each individ
dual
dossing pumps)
20.3
3
Ma
aterials of
Co
onstruction
19.6
6
21.0
0
21.1
1
21.2
2
21.3
3
21.4
4
21.5
5
21.6
6
21.7
7
21.8
8
21.9
9
SEC
CTION: C1
REV
V NO: 00
F
For SBA & WBA:
W
To holld
aadequate chemical equal to 120
% of one reg
generation
rrequirement for SBA & WBA
W
uunits.
F
For MB: To hold adequa
ate
cchemical equ
ual to 120 % of one
rregeneration
n requirement for
M
MB units.
F
For N.Pit: To
o hold adequ
uate
cchemical equ
ual to 120 % of
nneutralization
n requiremen
nt for
ttotal wastes of N.Pit.
S
To hold
d adequate
For SAC:
chemical equal to 120 % of
egeneration requirementt
one re
for SA
AC units.
For MB:
M To hold a
adequate
chemical equal to 120 % of
egeneration requirementt
one re
for MB
B units.
For N.Pit:
N
To hold
d adequate
chemical equal to 120 % of
alization requ
uirement for
neutra
total wastes
w
of N.P
Pit.
To hold
adequate
chemical equal
to 120 % of one
regenera
ation
requirem
ment for
SBA, WB
BA and
MB units
s
FRP made
m
of bisp
phenol resin
SA516 Gr.70
G
+
3x1.5mm
m thk RL
(thicknes
ss not
less thatt 6 mm)
S
SA516 Gr.70 + 3x1.5mm thk RL
(tthickness not less that 6 mm)
Shall be as per cu
ustomer
oved painting
g schedule
appro
Shall be as per
er
custome
approved
d
painting
e
schedule
S
Shall be as pe
er customer
aapproved pain
nting schedu
ule
Required
Not re
equired
d
R
Required
Required
SS 316
S
SS 316
Motor drriven
M
Motor driven stirrer
s
of SS 316
stirrer off SS 316
ACID
ALKALI
A
3 sets
s of Two (1W
W+1S); Total=
=6
3 sets of Twoo (1W+1S); Total=6
T
For SAC:
S
Capabl e of meeting
g
For
F SBA & W
WBA: Capab
ble of meetin
ng
regen
neration requ
uirement of SAC
S
units.
regeneration
r
n requiremen
nt of SBA & WBA
W
Head as required..
units.
u
Head aas required.
M Capable of meeting
For MB:
For
F MB: Cappable of mee
eting regenerration
regen
neration requ
uirement of MB
M units.
requirement
r
of MB units. Head as req
quired.
Head as required..
For
F N.Pit: C
Capable of me
eeting
N
Capablle of meeting
g
For N.Pit:
neutralization
n
n requiremen
nt for total wa
astes
neutra
alization requ
uirement for total
of
o N.Pit. Heaad as require
ed.
waste
es of N.Pit. H
Head as required.
SS-316
S
PP
AC
CTIVATED CARBON
C
FIL
LTER FOR A
ALKALI
T
Type
Vertical Cylindrical with dished endds
N
Nos. required
d
One no
D
Design Flow//ACF (Net)
10 cum/hrr
D
Design Surface Flow Rate
e at
Maximum 20 M3/Hr/M
M2
d
design flow
S
Supporting Bed
Rounded and graded gravel free frrom clay & limestone
Granular activated
a
carrbon as per A
AWWA 8604
4
F
Filter Media
Dechlorina
ation grade (Iodine
(
numbber should be
e
minimum1
1000)
S
Shell & Dish End Material
CS :- SA5
516 Gr.70
T
Thickness
Shell: 6 mm
m (minimum
m), Dished Ennd: 8 mm (minimum)
T
Thickness tollerance/Allow
wance
As per the
e code requirrement
91
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
21.1
10
21.1
11
21.1
12
21.1
13
21.1
15
E
External Pain
nting
M
Manhole
H
Hand hole
S
Sight Window
w
In
ntervals betw
ween two
ssuccessive ba
ackwash
D
Design code
21.1
16
D
Design presssure
21.1
17
21.1
18
21.1
19
D
Design Temp
perature
M
Minimum Bed
d Depth
F
Free board (m
minimum)
F
Filter Media Trap
T
21.1
14
21.2
20
21.2
22
21.2
23
F
Free residuall chlorine, co
olour &
o
organics at th
he ACF outle
et
L
Location
U
Under Drain System
S
T
Type
21.2
24
M
Material of Co
onstruction
21.2
21
22.0
0
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
Shall be as
a per custom
mer approvedd painting sc
chedule
Minimum 2 nos., each of minimum
m 500mm dia
Minimum 1 no. of minimum 150mm
m dia
Minimum two nos
18 hrs
As per IS 2825 /ASME
E Sec. VIII Diiv I/Equivalent
Shut-off head of DM Plant
P
supply ppump + Static Head
cm2 whichevver
(minimum 10 m) +5% overall marggin or 10 kg/c
is higher.
60 deg C for mechanic
cal design
1000 mm (excluding supporting beed)
75% of tottal bed depth
h
Shall be provided
p
at fillter outlet an d backwash water outlett of
each filterr.
Not detecttable (nil)
Indoor
Header La
ateral or strainer on platee, designed to avoid any
non-uniforrm flow.
For heade
er lateral, Header MSEP and lateral PP/PVC
P
For straine
er on plate, plate
p
MSEP aand strainer PP/PVC
HO
OT WATER TANK
T
22.1
1
22.2
2
Qu
uantity
Typ
pe
22.3
3
Typ
pe of Heaterr/ Capacity
22.4
4
22.5
5
22.6
6
Ma
aterial of Con
nstruction of tank
t
22.7
7
22.8
8
E
External Pain
nting
M
Manhole
NE
EUTRALISAT
TION PIT
23.0
0
SPE
EC NO: PE-TS-3392-163A-A001
24.0
0
Ne
eutralization Pit
25.0
0
Airr blowers fo
or Neutraliza
ation Pit
26.0
0
Efffluent Dispo
osal Pumps
One
Vertical, cylindrical with dished endss
Electric Hea
ater with 2 X 50 % electriccal heating coil
c / 120 % of
o
water requirred for regen
neration SBA
A, WBA, MB units
u
and N.P
Pit
To obtain te
emp of 50O C at alkali ejeector outlet within
w
2.5 hou
urs.
Shall be Pro
ovided
Shell CS to
t IS 2062 Gr.B, Dished E
End CS to IS 2062 Gr. B
Inside lined with Natural rubber (8 m
mm thick in six
s layers) suitable
perature of 70
7 deg C.
up to a temp
Shall be as
s per custom
mer approvedd painting sch
hedule
Minimum 2 nos., each of minimum
m 500mm dia
92
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
27.0
0
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
DM
M REGENER
RATION PUM
MPS
27.1
1
27.2
2
Numbers Requ
uired.
Typ
pe
27.3
3
Ca
apacity (each
h)
27.4
4
He
ead
As Required
d.
27.5
5
Suction Conditiion
Flooded
27.6
6
Ma
aterial of consstruction
27.7
7
Ca
asing
SS 316
27.8
8
Imp
peller
SS 316
27.9
9
Shaft
SS-410
27.1
10
Shaft sleeve
SS-410
27.1
11
Typ
pe of Shaft Sealing
S
Mechanical Seal
27.1
12
Pump Speed
As per syste
em requirement
28.0
0
29.0
0
29.1
1
29.2
2
29.3
3
29.4
4
29.5
5
29.6
6
29.7
7
29.8
8
29.9
9
30.0
0
30.1
1
30.2
2
30.3
3
30.4
4
30.5
5
30.6
6
30.7
7
30.8
8
30.9
9
31.0
0
31.1
1
31.2
2
31.3
3
31.4
4
31.5
5
31.6
6
31.7
7
31.8
8
31.9
9
32.0
0
UL
LTRAFILTER
RATION SYS
STEM
UF
F feed Pump
ps
Qu
uantity
Ca
apacity
Typ
pe
He
ead
MO
OC of casing
Imp
peller
Shaft
Seal
De
esign Temperrature
UF
F fast flush pumps
p
Qu
uantity
Ca
apacity
Typ
pe
He
ead
MO
OC of casing
Imp
peller
Shaft
Seal
De
esign Temperrature
UF
F backwash pumps
Qu
uantity
Ca
apacity
Typ
pe
He
ead
MO
OC of casing
Imp
peller
Shaft
Seal
De
esign Temperrature
UF
F Skid
3X70%
To suit the system
s
requirement
Horizontal Centrifugal
C
To suit the system
s
requirement
SS 316
SS 316
SS 316
Mechanical Seal
60 deg C for mechanical design.
2X100% (co
ommon for all the three sstreams)
To suit the system
s
requirement
Horizontal Centrifugal
C
To suit the system
s
requirement
SS 316
SS 316
SS 316 / SS
S 410
Mechanical Seal
60 deg C for mechanical design.
2X100% (co
ommon for all the three sstreams)
To suit the system
s
requirement (min imum 70m3//hr each)
Horizontal Centrifugal
C
To suit the system
s
requirement
SS 316
SS 316
SS 316 / SS
S 410
Mechanical Seal
60 deg C for mechanical design.
93
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
32.1
1
32.2
2
MO
OC (Membrane)
32.3
3
32.4
4
32.5
5
32.6
6
32.7
7
32.8
8
32.9
9
33.0
0
33.1
1
33.2
2
33.3
3
33.4
4
33.5
5
33.6
6
33.7
7
Backwash Freq
quency
Typ
pe
Mo
olecular weig
ght cut off
No
o. of UF Modu
ules
Ho
ousing
Chemical Dosin
ng System fo
or UF
De
esign Temperrature
UF
F Feed tank
Ca
apacity
Position
Qu
uantity
MO
OC
De
esign Code
Thickness
Acccessories
34.0
0
SA
AFETY EQUIIPMENTS
35.0
36.0
36.1
Ma
aterial of Co
onstruction
PIP
PING
De
emineralized water
Insstrument air
36.2
2
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
3X70%
Polysulfone (60 inch in size)
s
/ As perr manufacturrers
dation.
recommend
As per manufacturers re
ecommendattion
Hollow Fibe
er
1,00,000
As per System Requirem
ment
UPVC
As per PID of DM PLAN
NT (PE-DG-3392-163A-A001)
60 deg C for mechanical design.
To meet the
e system requirement
Vertical cylin
ndrical Atmospheric with flat bottom
1X100%
SA 516 Gr 70
7 with 4.5 mm
m rubber linning.
IS 803
Shell Plate: 8mm, Bottom
m Plate: 8mm
m, Roof Plate: 6mm
Platform, lad
dder, handra
ail, overflow, drain, CO2 absorber,
a
etcc.
Two sets of safety equip
pment comprrising PVC protection suits with
ber boots, fac
ce visors andd thick PVC gauntlets
g
sha
all also
hoods, rubb
be provided. A personne
el water drennch safety sh
hower and eyye bath
shall be provided near acid
a alkali un loading/hand
dling area.
36.3
No
ormal service
e
ASTM A53 Gr.B
Co
orrosive Servvice (except DM
D
36.4
4
SS/MSRL
Wa
ater)
36.5
Accid and alkali service
CSRL for Acid
A
Service and
a SS304 fo
for alkali serv
vice
Efffluent dispossal piping from
m
36.6
HDPE as pe
er IS 4984 PN10
P
N-pit to Blow down Tank
Notte: All SS Pip
pes shall be of minimum Schedule 10
0S.
37.0
VA
ALVES
Notte: All valvess shall be dou
uble flanged type. The tyype of valves shall be as per the type shown in P&
&ID only.
x
x
x
37.1
37.2
2
No
on return valvve
Ebo
onite lined diaphragm vallves for corro
osive service
es
Elastomer lined butterfly vallves for norm
mal services
All automatic op
perated valvees shall be solenoid assissted
eumatic actuated.
pne
These valve
es shall be swing check ttype or dual plate type
Swing chec
ck type (non corrosive
c
appplication)
Body and disc : Cast iro
on
a door/disc
c pin: Cast stteel ASTM A216 Gr.WCB
B
Hinge pin and
Disc facing ring: stainles
ss steel
r
Stainles
ss steel
Body Seat ring:
c
waater (DM water, decationised
For applicattion of lime, corrosive
/deanionise
ed water), and air,thebodyy,cover and disc shall be
e lined
with naturall rubber,PTFE or Viton. B
Bolting shall be stainless steel.
94
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
PUM
MPS AND PIIPE SELECT
TION CRITERIA.
Pu
ump and Pip
peline carry
ying water and
a
chemic
cals shall generally be sized on th
he following
g velocities
s.
Ho
owever wherever minim
mum pipe siz
zes are defi ned in the drawing/data
d
asheets, thee selected size
s
shall no
ot
be
e less than the specified
d size.
VELOCITY
V
IN
N m/sec.
BELOW 30
30-130 MM
200 MM AND
D ABOVE
MM.
Pu
ump Suction for water
-----1.2-1.5
1.2-1.8
Pu
ump discharg
ge for water
1.2-1.8
8
1.8-2.4
2.1-2.5
He
eader for watter
-------
1.5-2.4
1.8-2.4
Pu
ump Suction for chemicall
1.0-1.2
2
1.1-1.3
------solution
Pu
ump discharg
ge for chemiccal
1.2-1.4
4
1.3-1.5
-------solution
Grravity flows
1.0 (maxim
mum).
No
ote 1- TDH o
of all pumps
s shall be de
ecided assum
ming the following C values
v
in Haazen & Willia
ams
eq
quation for c
calculation of
o friction lo
oss.
a) Carbo
on steel pipe
es 100
b) C.I pip
pes 100
c) Rubbe
er lined stee
el pipe 120
0
d) PVC/H
HDPE pipes 120
gin shall be taken
t
over the
t pipe fric
ction losses for calculatting the pum
mp head.
10% marg
GUARA
ANTEE PARA
AMETERS
quality of DM water at the
t outlet off mixed bed units at des
sign flow raate shall be
The q
guarranteed by the bidder as
s follows:
x
x
x
x
x
x
x
x
x
95
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
96
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C1
REV
V NO: 00
P
P&ID
D
97
98
99
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C2
REV
V NO: 00
S
SECTION
N C2
SPEC
CIFIC TEC
CHNICAL SPECIFICATIO
ON
E
ELECTR
RICAL
100
SPECIFICATION NO.
ELECTRICAL EQUIPMENT SPECIFICATION
FOR
DM PLANT
VOLUME NO. :
II-B
SECTION:
C
REV NO. : 00 DATE: 20/09/2013
SHEET: 1 OF
1
SCOPE OF ENQUIRY
General technical requirement of LT motors are indicated in specification no. PE-SS999-506-E101_Rev00. Project specific technical requirement for motors are listed
in customer specification for motor & actuators. Stipulations of Customer
Specifications (inclusive of Datasheet-A for motors & actuators) shall prevail, in case
of conflicts between Customer specification and General technical requirements for
LT Motors.
2.0
a)
b)
The same shall be provided by the bidder without any technical, commercial, delivery
implications to BHEL/Customer.
c)
d)
e)
f)
g)
h)
i)
j)
3.0
4.2
No technical submittal such as copies of data sheets, drawings, write-up, quality plans, type
test certificates, technical literature, etc, is required during tender stage. Any such
submission even if made, shall not be considered as part of offer.
101
SPECIFICATION NO.
ELECTRICAL EQUIPMENT SPECIFICATION
FOR
DM PLANT
5.0
VOLUME NO. :
II-B
SECTION:
C
REV NO. : 00 DATE: 20/09/2013
SHEET: 1 OF
1
LIST OF ENCLOSURES
102
2
3
5
6
415V MCC
DETAILS
S.NO
PROJECT :
Vendor
BHEL
Vendor
103
PAGE 1 OF 3
Vendor
BHEL
Vendor
Vendor
BHEL
Vendor
BHEL
BHEL
BHEL
BHEL
Vendor
BHEL
BHEL
SCOPE E&C
BHEL
BHEL
SCOPE
SUPPLY
REMARKS
Lighting
Equipment grounding & lightning protection
Below grade grounding
LT /HT Motors with base plate and foundation hardware
Mandatory spares
Recommended O & M spares, E & C spares, erection &
maintenance tools & tackle.
Any other equipment/material/service required for
completeness of system but not specified above (to
ensure trouble free and efficient operation of the system).
a) Input cable schedules (C & I)
b) Cable interconnection details for above
c) Cable block diagram
Equipment layout drawings
8
9
10
11
12
13
17
16
15
14
DETAILS
S.NO
Vendor
Vendor
Vendor
Vendor
104
PAGE 2 OF 3
Vendor
Vendor
Vendor
BHEL
BHEL
BHEL
Vendor
-
SCOPE E&C
BHEL
BHEL
BHEL
Vendor
Vendor
Vendor
SCOPE
SUPPLY
Cable listing for C & I systems for vendor supplied equipment shall be
furnished during detail engineering by vendor in soft copies in the BHEL
cable schedule format.
1. For ensuring cabling requirements are met, vendor shall furnish
layout drawings (both in print form as well as in AUTOCAD) of the
complete plant (including electrical area) indicating location and
identification of all equipment requiring cabling, and shall
incorporate cable trays routing details marked on the drawing as
per PEM interface comments. Electrical equipment layout drawing
shall be subjected to BHEL/ customer approval.
2. Layout drawing preparation wherever in vendors scope: the
cabling arrangement of the same (wherever overhead cable trays,
trenches, cable ducts etc) shall be decided during contract stage,
and the arrangement philosophy/ approval of the same shall be
subject to BHEL/Customer approval without any commercial implications
to BHEL.
For necessary interface review.
REMARKS
DETAILS
SCOPE
SUPPLY
SCOPE E&C
REMARKS
105
PAGE 3 OF 3
1. Make of all electrical equipments/items supplied shall be reputed make & shall be subject to approval of BHEL/customer after award of contract.
2. All QPs shall be subject to approval of BHEL/customer after award of contract without any commercial implication.
3. For skid mounted system, 2 nos. (1W+1S) supply feeders of 415 V, 3 phase, 3 wire AC shall be provided by BHEL. Complete skid including changeover between
feeders/starters/LCP/ inter-locks/protection devices /any other supply etc. shall be in bidders scope only. Bidder to also provide 24 V AC supply and suitable
arrangement for switching it on automatically for heating of motor stator winding during motor's idle time.
NOTES:
S.NO
NOTES:
NAME
PLATE
MAX.
CONT.
DEMAND
(MCR)
VOLTAGE CODE*
7
FEEDER CODE**
8
CONT.(C)/ INTT.(I)
11
STARTING TIME
>5 SEC (Y)
12
LOCATION
13
BOARD
NO.
14
SIZE
CODE
15
NOs
CABLE
16
17
CONTROL
CODE
18
REMARKS
LOAD DATA
(ELECTRICAL)
2. ABBREVIATIONS
19
LOAD No.
ELECTRICAL
ORIGINATING AGENCY
NAME
SIGN.
SHEET 1 OF 1
REV. 00
PEM (ELECTRICAL)
DATA FILLED UP ON
DATA ENTERED ON
DES SIGN. & DATE
JOB NO.
PROJECT TITLE
SYSTEM / S
DEPTT. / SECTION
: ** FEEDER CODE (8):- U=UNIDIRECTIONAL STARTER, B=BI-DIRECTIONAL STARTER, S=SUPPLY FEEDER, D=SUPPLY FEEDER (CONTACTER CONTROLLED)
: * VOLTAGE CODE (7):- (ac) A=11 KV, B=6.6 KV, C=3.3 KV, D=415 V, E=240 V (1 PH), F=110 V
1. COLUMN 1 TO 12 & 18 SHALL BE FILLED BY THE REQUISITIONER (ORIGINATING AGENCY); REMAINING COLUMNS ARE TO BE FILLED UP BY PEM (ELECTRICAL)
LOAD TITLE
RUNNING
Nos.
STANDBY
RATING (KW / A)
BLOCK CABLE
DRG. No.
SCOPEMATRIXFORCONTROLOFSWITCHGEARBREAKERSFROMPLCFOROFFSITEAREAS
CONTROL
REV
SYSTEM
Sno.
OFFSITESYSTEM/
PACKAGE
Switchgeartobecontrolledfrom
Vendor'sPLC
Totalno.ofbreakers
No.ofoutgoingtie
No.of
tobecontrolledfrom
No.ofIncomer&
breakers(Otherthan
switchgearsto
PLC(Otherthan
Buscouplerbreakers
motorfeeder)
becontrolled
motorfeeder)
TYPE
EffluentTreatment
1.ETPMCC
Plant
PLC
1.ElectroChlorinationMCC,
ElectroChlorination
2.AdminMCC&
Plant
3.CanteenMCC
PLC
CompressedAir
system
1.ElectricalMCC
PLC
1.DMPlantMCCand
2.FilterwaterMCC
12
PLC
1.CPUMCC
PLC
1.PTPlantMCC
1.HydrogenPlantMCCand
2.STPMCC
PLC
PLC
4 DMWaterPlant
Condensate
5
PolishingUnit
6 PreTreatment
7 HYDROGENPLANT
Tentativeno.ofsignalstobe
consideredfor"eachbreaker"
Nos.
Approx.No.ofBinaryInputs:
Approx.No.ofBinaryOutputs:
Approx.No.ofAnalogInputs:
40
8
5
Remarks:
DetailsoftheswitchgeartobecontrolledfromrespectivePLCisgiveninscopematrixabove.Tentativenumberofsignalsperbreaker(Tobeconsideredforeach
1 breakerseperately)isalsoprovidedabove.
MimicforSingleLineDiagramoftheswitchgearlocatedinoffsiteareashallbeprovidedbyPLCvendorintheOWES.Itshallbepossibletoprovideclose&open
2 commandstotheapplicablebreakersoftheswitchgearapartfrommotorfeeders.SLDinputforthemimicshallbeprovidedduringdetailengineering.
PLCshallprovidethestatusindications,metering&AlarmsignalsfortheswitchgearlocatedintheoffsiteareaaspertheTCEspecificationVolumeIVsectior:D9
3 sheet13to15.
4 PLCshallalsoprovidestatusindications&alarmannunciationsfortransformerslocatedintheoffsitearea.
5 PLCvendorshallprovidedrawingspertainingtoelectricalcontrolsystemforreview&approvalduringdetailengineering.
107
'$ "#
(
*# )! *
'(#"
'( #
* '+(&
'(&)(#"
#&'
!
{
;0<:2?
B0<B=92?
(62 3?<:
A<A52 C.?6<B 'D6A05/<.?1 D6A5.;1
! . 6;0<:2? 96A21 6; 9.B2 5.99 /2 0<;A?<9921 3?<: '
$
..==960./92 .;1$ .2=9.6;216;09.B2;<
<320A6<;
;A2?0<;;20A6;40./92A<'.;1?2>B6?216;A2?=<6;4?29.
*.?2
6;*2;1<? 0<=2 ;A2?=<6;4?29..?2A</29<0.A216;A52'D6A0542.?
.05 $ 5.99 5.C2 .99 A52 6;A?B:2;A . 2=9.6;21 6; 09.B2 ;<
<3
20A6<;
A 5.99 /2 =<6/92 A< 0<;A?<9 2C2? /?2.82? 6; A52 A2A =<6A6<; /<A5 3?<:
'D6A0542.?.D299.?2:<A2 '3<? A2A6;4 =B?=<2
!~
99 A52 :<A<?
*.9C2 .;1 <A52? 2>B6=:2;A 5.99 /2 0<;A?<9921 3?<:
?2=20A6C2 =?<020<;A?<9=.;29
'A< /2B==9621/ *2;1<?
:2?42;0 A<= =B5/BAA<; 5.99 /2 =?<C6121 ;2.? .99 1?6C2 202=A
2:2?42;01?6C2.;15.99/2D6?2116?20A9A<! ;0.2<32:2?42;0
1?6C22:2?42;0A.?A$ <;9 5.99/2=?<C6121
(52 0<;A?<9 ?<<: 5.99 =?<C612 6;160.A6<; .9.?: 3<? A52 * .B696.?
B==9 . 46C2; /29<D ; .116A6<;.9 6;160.A6<;
.9.?: 0<;612?21
;202.?1B?6;412A.69212;46;22?6;4.9<5.99/2=?<C6121 '<:2<3A522
5.99 /2 2920A21 3<? 2>B2;A6.9 2C2;A ?20<?16;4 <? 2.05 /?2.82? .;1 /B
4?<B=21 .9.?: 3<? .; ./;<?:.9 0<;16A6<; 5.99 /2 =?<C6121 6; A52 0<;A?<9
128 <?.99/?2.82?
! 321D6A0542.?A.AB6;160.A6<;5.99/2
.C.69./92<;&(6;3<?:<3'
{
z{
.
;0<:2?B0<B=92?/?2.82?
!32212?
?2.82?#"
?2.82?#
?2.82?6;9<0.9
?2.82?6;?2:<A2
?2.82?6;2?C602
?2.82?6;A2A
B==952.9A5
'')
&
(#&!"#
&
*# )! *
'(#"
/
{
?2.82?=?6;405.?421
(?6=&29.B=2?C66<;
!<A<?#"
!<A<?#
!<A<?BA<A?6=
!<A<? <0.9:2?42;0$=?221
2212?.B9A
?2.82?6;&2:<A2
?2.82?6;6291
?2.82?6; <0.9
?2.82?6;2?C602
?2.82?6;A2A
?2.82?=?6;405.?421
(?6=&29.B=2?C66<;
?2.82?.BA<A?6==21
#&29.<=2?.A21
'<B?02=.?.9921/2<;1=?22AA6:2
<::<;<BA4<6;432212?3.B9A
;0<:6;4 *0<;A?<9B==93.6921
;0<:2?B0<B=92?/?2.82?')
32212?
;0<:2?
B0<B=92? #"
0
'( #
* '+(&
'(&)(#"
#&'
!
!<A<?2212?
1
2
;0<:2?B0<B=92?/?2.82?
!32212?
;0<:2?B0<B=92?/?2.82?')
'')
&
(#&!"#
&
*# )! *
'(#"
'( #
* '+(&
'(&)(#"
#&'
!
{
32212?
;0<:2?
B0<B=92? B2/9<D;
3
4
BB;12?C<9A.42
B$(3B23.6921
)'$(;<A6;2?C602
#C2?9<.1.9.?:
2212? 3.B9A
09<6;4 =2?:66C2 ;<A
.C.69./92
?2.82?A?6=06?0B6AA?<B/92
(?6=A5?<B45=?<026;A2?9<08
)'
6;2$(
!<A<?2212?
<0.9=B5/BAA<;=?221
?2.82?=?6;4;<A05.?421.9.?:
(52 0B??2;A C<9A.42 $<D2? :2.B?2:2;A 3<? 2.05 /B 5.99 /2 .C.69./92
/<A5 <; 0<;A?<9 ?<<: . 6;160.A21 6; A56 20A6<; .;1 292D52?2 6; A52
=206360.A6<; 9< 3<? =206360 :<A<? D52?2 A52 0B??2;A A?.;1B02? .?2
6;160.A21A52:2.B?2:2;A5.99/2.C.69./92.AA52'
.05?2:<A20<;A?<992132212?6;09B16;4=.?232212?5.99/2=?<C6121D6A5
;<6;A2?=<6;4?29.3<?A.?AA<=
(52 <=2?.A6<; 6;160.A6<; .;1 3.B9A .9.?: 3<? A52 :<A<? <3 A52 .B696.?62
5.99/216=9.21.0<C2?216;A52=206360.A6<;.=.?A<3?2>B6?2:2;A
'D6A0542.? 5.99 /2 B/720A21 A< .99 ?<BA6;2 A2A . =2? ?292C.;A A.;1.?1
.9<;4D6A53<99<D6;4A2A
.
!205.;60.9<=2?.A6<;A2A
/
;B9.A6<;?26A.;02.;1*!2442?/23<?2
.3A2?:6;BA2*
A2A
0
920A?60.90<;A?<96;A2?9<08.;12>B2;A6.9<=2?.A6<;A2A
'')
&
(#&!"#
&
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: C3
REV
V NO: 00
S
SECTION
N C3
SPEC
CIFIC TEC
CHNICAL SPECIFICATIO
ON
CO
ONTROL
L & INSTR
RUMENT
TATION
111
C & I SPECIFICATIONS
FOR
DM PLANT
(PLC BASED)
;0:683(5&5,7,&$/736685$7*$5+67$*(981,7
5$-$67+$15$-<$9,'<87873$'$11,*$0/7'
5(900
-2%12392
'$7(24.10.13
112
'(6*
&+.
$33'
AW
6./ATy
%6
1.0.0
SCOPE OF WORK
113
PROJECT TITLE
SPECIFIC TECHNICAL REQUIREMENTS
FOR DM PLANT (PLC BASED)
Bidder'sScopeforC&IforDMPlant
1.ThecontrolsforDMplantshallberealizedinPLCbasedcontrolsystem.PLCshallbeinBidder's
scope&specificationofPLCshallbeasperPart2.2.0oftheC&Ispecification.
2.TherequirementsgivenbelowaretobereadinconjunctionwithdetailedTechnicalspecification
enclosedinthespecification.Furtherincaseofanydiscrepancyintherequirementwithinthesame
sectionnotedbythebidderinthespecification,thesamewillbebroughttothenoticeofBHELinthe
formofprebidclarification.Inabsenceofanyprebidclarification,themorestringentrequirementas
perinterpretationofcustomershallprevailwithoutanycommercialimplication.
3.BiddershallprovidePLCSystemtrainingforhardware&softwaretoCustomerfor1weekfor2
persons.
4.AlltheInstrumentationasshowninP&IDshallbeinbidder'sscope.AllPrimaryandSecondary
Instrumentsforthepackageshallbesupplied,alongwithaccessorieslikeimpulsepipe,fittings&valve
manifoldsetcasperInstallationdiagram.(Part2.4.0ofC&ISpecification)Necessaryracksrequiredfor
mountingoftheseinstrumentsshallbesuppliedbybidder.
5.InadditiontoPLCbasedsystem,Biddershallprovide2nos.OWES,keyboard,mouse&2nos.A3
ColourlaserjetprintersinDMplantlocalcontrolroom.OWES,Keyboard,ColourlaserjetPrintershallbe
asspecifiedinPart2.2.0oftheC&Ispecification.
6.Plantschematicformonitoring&operationshallbeavailableonalltheOWES.Biddertofurther
submitlistofsignals(inBHELformatenclosedinPart5.0.0ofC&Ispecification)alongwithapplicable
schematicformonitoringinDCS.
7.TimesynchronizationofPLCwithMasterClockSystemistobecarriedout.Biddertoprovide
necessarysoftware/hardwareforthesameatPLCend.
8.RedundantBidirectionalOPCcommunicationlinkwithEthernetTCP/IPProtocolshallbeprovidedby
BidderbetweenPLC&DCSthroughOFCforControl&monitoring.
9.BiddershallprovidespareI/Ochannels:AlltypesofI/Omodulesshallbeprovidedwith10%Spare
channels.Sparechannelsshallbewiredandshallbedistributedamongthecontrolprocessors,10%hot
spareI/Omodules(installed)shallbeprovided,10%spareslotsforI/Omodulesdistributedamongthe
controlprocessors.
10.EachPLChastobeaccompaniedbyaLIU(LightInterfaceUnit/Fibrepatchcord,converter)which
hasmultimodeSCcouplers/adapters.
114
PROJECT TITLE
SPECIFIC TECHNICAL REQUIREMENTS
FOR DM PLANT (PLC BASED)
11.Allbidirectionaldrivesarenonintegralstartertype,typicalHookUpdiagramofdrivesisincluded
forreference(subjecttoCustomerapproval).
12.Biddertoprovide230VUPSforDMplantsystemPLC&itsassociatedHMIasperUPSsingleline
diagram&UPSspecificationenclosedinPart2.2.0ofC&Ispecification.Further24VDCrequiredfor
operationofanyinstrument/equipment/systemshallbederivedbyBidderfrom230VUPS.
13.Allinstruments/drivesshallbeterminatedonJB/PanelbyBidder.Instruments/Drives,JB/Panel,
Connectinginstrumentcable&controlcableareinBidder'sscope.
14.ThescopeofcableshallbereferredinElectricalscopesplitsheetinElectricalportionofthe
specification.
16.Biddershallprovidethenecessarycushionedrevolvingindependentlyadjustableseat/backchairs
andGlasstopTeakwoodtablesforeachLocalOperatorstation(2Nos.OWES)andPrintertableforeach
printer(2nos.printers)inLocalcontrolrooms.
17.BiddertoprovideTemperaturetransmittersalongwithitscompensatingcable,JB/rack&other
erectionhardware.
18.415VACsupplyshallbeprovidedbyBHELatasinglepoint,furtherdistributiontovarious
instruments/EquipmentsoftheDMplantsystemshallbeinBidder'sscope.Biddertoincludethe
necessarypowerdistributionboardinhisscope.Anypowersupplyotherthantheabove,ifrequiredfor
anyinstrument/equipmenthastobederivedfromtheabovesupply&allthenecessaryhardwarefor
thesameshallbeinBidder'sscope.
19.BiddertoperformtestsofC&Iitems/instruments/systemsasperPart3.0.0oftheC&Ispecification.
20.BiddertonotethatallthetransmitterssuppliedbyBiddershallberackmounted.Thetransmitter
racksshallbeinBidder'sscope.Alsonoinstruments/analyzers&JBs/Racksshouldbeprotrudingonthe
walkway.
21.Biddertoprovidesystemcabinets&marshallingcabinetsforallthesystemsinBidder'sscope.
22.InstrumentinstallationandaccessoriesrequiredforthesameshallbeinBidder'sscopeandshallbe
aspertheattachedinstrumentinstallationdiagrams.Howeveranyinstrument/analyzerinstallationnot
coveredinspecification,thesameshallbesubjecttocustomerandBHELapprovalduringdetailed
engineering.
115
PROJECT TITLE
SPECIFIC TECHNICAL REQUIREMENTS
FOR DM PLANT (PLC BASED)
23.AlltemperaturesensorsprovidedbyBiddershallbeDuplextypeandBiddershallprovidefield
mountedtemperaturetransmitters(SMARTTYPE)foralltemperaturemeasurementapplications.Direct
wiringofRTDorT/CtoPLCisnotacceptable.
24.Cablesizeforinstrumentationcableshallbe0.8sq.mm.andforControlcable,cablesizeshallbe1.5
sq.mm.
25.BiddertofollowMeasurement&ControlPhilosophy(Part2.5.0ofC&ISpecification)fordesigning
logics.Redundancyofsensors(tobeprovidedbyBidder)shallalsobeasperMeasurement&Control
philosophy.
26.DMplantPLC(inDMplantbidder'sscope)istobehardwiredinterfacedwithPTplantPLCforcontrol
&monitoring.Allthenecessaryhardware&softwarerequiredforthesameatDMplantPLCendshall
beinDMplantBidder'sscope.Tentativeno.ofI/Ostobeexchangedshallbe20(Analog/Binarytobe
decidedduringdetailedengineering).Also,Cableschedule&interconnectionforthesignalexchange
betweenDMplantPLC&PTplantPLCshallbefurnishedbyDMplantbidder.Erection&commissioning
ofcables,whereoneendisinDMplantbidder'sscopeistobedonebyDMplantBidder.Thisinterfacing
requirementisinadditiontointerfacingofDMplantPLCwithDCS(asmentionedatS.No.8).
Note:
1.Allequipmentitemsshallbeoflatestdesignwithprovenontrackrecord.
2.Theabovegivenscopeisminimum.Anyitem/equipmentnotindicatedabovehoweverrequiredfor
thecompletenessofthesystemistobesuppliedbybidderwithoutanytechnical,commercialand
deliveryimplicationtoBHEL.
116
DM Plant Instrumentation
The plant instrumentation shall be as per following:
x
x
x
x
x
x
x
x
x
x
x
x
x
Inlet and outlet pressure indicators for vessels and discharge pressure indicators for
various pumps.
Inlet (rate of) flow indicators and outlet flow totalizers.
Conductivity transmitter at outlet of each ion exchange unit. Conductivity
comparators & online sodium analyzers shall be provided for SAC units.
Flow transmitters at outlet of each ion exchange unit
Differential pressure switches
Residual chlorine analyzers (Online) at outlet of ACFs
pH recorders and transmitters
Pressure switches
Flow switches at filter outlet.
Outlet silica analyzer cum recorder at outlet of Anion & MB units with multipoint
recorder.
Density indicators for regenerant chemical solutions.
Tanks including filtered water tank, degassed water storage tank and UF feed tank level indicators and level switches with protection interlocks for associated pumps.
Instrumentation & control cables and erection hardware.
Note: Please note that the details given above are minimum requirements, however the requirements of
P&ID, Datasheet-A and the technical specification to be fulfilled completely. In addition to above any
other instruments required to complete the system requirement, shall be provided by bidder without any
technical, commercial and delivery implications to BHEL and customer.
117
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D
REV
V NO: 00
SEECTIOND
G
GENERA
ALTECH
HNICALREQUIR
REMEN
NT
118
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
SEC
CTIOND1
GEENERALLTECHN
NICALR
REQUIR
REMENT
TMECCHANICA
AL
119
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
TECHNICALSSPECIFICATION
NFOR
&STOR
RAGEVE
ESSEL
PRESSSURE&
120
$!%
!"#"!
!"
#"
#!
##
'"
'!
'#
''
-0223460706890:;6:<4=29-4>4;4=8?@420>;3=438=890:;:7@4980?4@78G=06890:;
@=8J0;>27:==4<04J8;@833=:<8?2K33?Q:7W894=08?278G=06890:;298>4J024
0;234690:; 70;8? 0;234690:; 94290;> 386Z0;> 7:=J8=@0;> 9=8;23:=9890:; 8;@
@4?0<4=Q892094:7J4?@4@K;70=4@3=422K=4<4224?2
-4 @420>; W894=08?2 78G=06890:; 0;234690:; 94290;> 8;@ 34=7:=W8;64 :7
J4?@4@ K;70=4@ 3=422K=4 <4224?2 2-8?? 6:W3?Q J09- 8?? 6K==4;9?Q 833?068G?4
@420>; 6:@42 8;@ 298;@8=@2 2989K942 =4>K?890:;2 8;@ 28749Q 6:@42 0; 9-4
?:68?09Q J-4=4 9-4 4[K03W4;9 02 9: G4 0;298??4@ -4 4[K03W4;9 2-8?? 8?2:
6:;7:=W 9: 9-4 ?89429 833?068G?4 ;@08; := 4[K0<8?4;9 298;@8=@2 9-4=
0;94=;890:;8?298;@8=@28=48?2:8664398G?4079-4248=44298G?02-4@9:G44[K8?
:= 2K34=0:= 9: 9-4 ?0294@ 298;@8=@2 :9-0;> 0; 9-02 23460706890:; 2-8?? G4
6:;29=K4@9:=4?04<49-4\&:79-02=423:;20G0?09Q
7 2989K9:=Q 833=:<8?2 8=4 23460704@ 0; @898 2-449 * 9-4 \& 2-8?? G4
=423:;20G?4 7:= :G980;0;> 8?? 833=:<8?2 :; @420>; W894=08?2 298>4J024
0;234690:;70;8?0;234690:;8;@94290;>:79-4<4224?
*??W894=08?2K24@0;9-478G=06890:;:73=422K=4<4224?22-8??G48223460704@0;
9-4 @898 2-4492 [K0<8?4;9 W894=08?2 8=4 8664398G?4 :;?Q J-4; 833=:<4@ GQ
9-4+&$*&0;J=090;>
*??3?89422-8??G4K?9=82:;068??Q94294@827:??:J2
8
%:=;:W0;8?9-06Z;422#"WW8;@-0>-4=J-4;K24@7:=78G=06890:;:7
@02-4@4;@2
%:=;:W0;8?9-06Z;422"WW8;@-0>-4=J-4;K24@7:=78G=06890:;:7
2-4??2
%:=;:W0;8?9-06Z;422("WW8;@-0>-4=J-4;K24@7:=G?0;@7?8;>42
*??9-06Z;42242J-4;K24@7:=G:@Q7?8;>42
-4 \& 2-8?? 4;2K=4 9-89 6:@4 W8;@89:=Q =4[K0=4W4;92 :7 0W3869
94290;>8=4W490;866:=@8;64J09-9-4W0;0WKW@420>;94W34=89K=4223460704@
0;9-4@8982-4492
+
&'
%)*!"#"!&'
%&'#&(
121
!"#"!
'
'(
'^
$#%
*;Q;:;3=422K=438=922K6-826?489238@2892K33:=9?K>2:=?4>2J48=3?8942
89 28@@?42 8;@ 38@2 89 3034 2K33:=92 496 J4?@4@ @0=469?Q :; 9: 9-4 3=422K=4
38=922-8??G4:79-428W4W894=08?829-43=422K=438=92
&40;7:=64W4;938@289;:]]?428;@:9-4=?:8@G48=0;>?:6890:;22-8??G4:79-4
28W4W894=08?8;@;:W0;8?9-06Z;422829-43=422K=438=9
894=08?7:=2Z0=90;6824:78??:Q2944?<4224?28;@6:?KW;22-8??G49-428W4
829-89:73=422K=438=989?48297:=8W0;0WKW?4;>9-:7(""WW7=:WG:99:W
98;?0;4
'_ *))`)&\)a*)*a
'_! )0;0;> 02 @470;4@ 82 ?::24 29=03 ?0;0;> 8;@ GK2- ?0;0;> ?8@@0;> W8Q G4 GQ
J4?@@43:209:<4=?8Q:=4b3?:20:;G:;@0;>:==:??G:;@0;>
'_# ?8@3?894:=?0;0;>2-8??6:;7:=W9:9-47:??:J0;>=4[K0=4W4;92
8
?8@ 3?894 9-06Z;422 2-8?? G4 W0;0WKW ' WW K;?422 23460704@
:9-4=J024
G
6
@
?8@3?894W8@4409-4=GQ9-44b3?:20:;G:;@0;>3=:6422:==4@K690:;
=:??G:;@0;>3=:6422028664398G?4
?8@3?8942-8??W4499-4*6:@4=4[K0=4W4;92:7*#^'*#^
*#^(0;6?K@0;>G:;@9429:=*4=ZG?8994=cd-42-48=G:;@9429
2-8??G44b46K94@8234=*#^%0>K=4!+?9=82:;060;234690:;2-8??G4
68==04@:K90;866:=@8;64J09-*(_d8664398;64?4<4?^
%:= 9-4 3K=3:24 :7 4;2K=0;> 9-89 6?8@@0;> 9-06Z;422 :7 =4@K690:;
=:??G:;@4@ 6?8@ 3?8942 02 ;:9 ?422 9-8; ' WW 486- 3?894 2-8?? G4
0;234694@899-4W0??K20;>86:890;>>8K>4?89422-8??G4268;;4@
:;89?48299-=444@>428;@:;486=:229-4J0@9-:79-43?894-06Z;422
2-8??G43?:994@893:0;92;:9W:=49-8;^""WW838=9-4\&
2-8??7K=;02-8W0??64=907068942-:J0;>8;:K9?0;4:79-43?8948;@9-4
3:0;9289J-06-=48@0;>2J4=498Z4;9:>49-4=J09-9-4=42K?92
;2948@:7?0;0;>J4?@@43:209:<4=?8QW8Q8?2:G46:;20@4=4@
7
*9 J4?@ @43:209 :<4=?8Q := 6?8@=429:=0;> J4?@2 89 ?4829 9-4 28W4
6-4W068? 6:W3:2090:; 2-8?? G4 3=424;9 89 ' WW @439- 9: G4 8;8?Q24@
GQ9-4J4?@0;>3=:64@K=4[K8?0706890:;0;8@<8;64
>
c4?@ @43:209 :<4=?8Q 8;@ 6?8@=429:=0;> J4?@2 2-8?? G4 @Q4 34;49=8;9
94294@8;@6=86Z7=44
+
&'
%)*!"#"!&'
%&'#&(
122
!"#"!
-
$'%
c4?@@43:209:<4=?8Q8;@6?8@=429:=0;>J4?@2828W0;0WKW2-8??G4
[K8?0704@8234=*4690:;e
'_' *??:Q 2944? ?0;0;> 2-8?? ;:9 G4 K24@ J-4; 6?8@@0;> 02 23460704@ *??:Q 2944?
?0;0;> J-4; 23460704@ 2-8?? G4 2: @420>;4@ 9-89 9-4 @0298;64 G49J44;
89986-W4;92@:42;:94b644@!("WW
'_ -4 W0;0WKW =4[K0=4@ 9-06Z;422 :7 3=422K=4 38=92 2-8?? 4b6?K@4 6?8@@0;> :=
?0;0;>
'_( ?8@@0;>:=?0;0;>=4[K0=4W4;92@026K224@0;9-0223460706890:;8=4K20;>?:J
8;@-0>-8??:Q2944?2:;?Q%:=6?8@@0;>:=?0;0;>K20;>;:;74==:K28;@:9-4=
W894=08?2 J-4; 23460704@ 9-4 \& 2-8?? 7K=;02- :; -02 @=8J0;>2 8??
@4980?2 0;6?K@0;> c4?@0;> =:64@K=4 3460706890:; c 7:= =4<04J 8;@
833=:<8?
"
! -49-06Z;42242:79-43=422K=438=92822-:J;0;9-4@8982-4492:=@=8J0;>2
8=4 9-4 W0;0WKW 8664398G?4 9-06Z;42242 8794= W8;K7869K=4 4<4; 9-:K>- 9-4
6:@4 W8Q 34=W09 8 ?4224= 9-06Z;422 -4 W0;0WKW 8664398G?4 9-06Z;422
0;6?K@4223460704@6:==:20:;8??:J8;64
# -4 \& 2-8?? G4 =423:;20G?4 7:= 3=:34= 24?4690:; :7 3?894 9-06Z;422
6:;20@4=0;>9-478G=06890:;8;@7:=W0;>8??:J8;642W0??K;@4=9:?4=8;642496
9:W4499-4W0;0WKW9-06Z;422=4[K0=4W4;928223460704@
("
-4?? 6:K=242 2-8?? G4 :7 9-4 ?8=>429 3:220G?4 @0W4;20:;2 9: W0;0W024 9-4
;KWG4=:7J4?@248W2
^"
^! $48@22-8??G4:7#!4??032:0@8?:=4[K0<8?4;94??032:@08?9Q346=:J;=8@0K2
& f " Z;K6Z?4 =8@0K2 = f"!_ K;?422 23460704@:9-4=J024 J-4=4 02
9-40;20@4@08W494=:79-42-4??
^# &4@K60;>24690:;2:=6:;068?G:99:W22-8??-8<48Z;K6Z?4=8@0K2:7=f""^
K;?42223460704@:9-4=J024$:J4<4=Z;K6Z?4=8@0K22-8??;:9G4?4229-8;
("WW
+
&'
%)*!"#"!&'
%&'#&(
123
!"#"!
^'
_"
_!
_#
_'
_
_(
_^
__
_d
_
d"
d!
$%
02-4@ 4;@2 2-8?? G4 248W?422 := !""=8@0:>=83-4@ J-4; W8@4 7=:W W:=4
9-8;:;430464
*>0989:= 8224WG?Q 2-8?? G4 6:W3?494 J09- @=0<4 W:9:= W46-8;068? 248? J09-
248? -:K20;> G48=0;>2 >48= G:b 8>0989:= 2-879 J09- 0W34??4=2 7::92943
G48=0;> J09- 2K33:=9 =0>0@ 6:K3?0;> G49J44; 8>0989:= 2-879 8;@ >48= G:b
:K93K9 2-879 J09- 23::? 30464 7?4b0G?4 6:K3?0;>2 G49J44; >48=G:b 8;@ @=0<4
W:9:= 2K098G?4 G824 3?894 8;@ 2K33:=90;> 29=K69K=4 7:= 8>0989:= @=0<4
8==8;>4W4;9 8;@ ;464228=Q 78294;4=2 496 2: 82 9: W8Z4 09 6:W3?494 0; 8??
=4234692
=0<4W:9:=8;@>48=G:b2-8??G4W:K;94@:;86:WW:;G8247=8W48;@@K?Q
6:K3?4@8;@8?0>;4@9-=:K>-7?4b0G?46:K3?0;>2
*>0989:= 2-879 8;@ >48= G:b :K93K9 2-879 2-8?? G4 6:K3?4@ 9-=:K>- 8 =0>0@
6:K3?0;> J09- 23?09 =0;> ?:6Z0;> 8==8;>4W4;9 0; :=@4= 9: 4;2K=4 9-89 8>0989:=
2-879@:42;:978??0;9:9-4<4224?@K=0;>:34=890:;
*>0989:= 2-879 8;@ 0W34??4= 8224WG?Q 2-8?? G4 2989068??Q 8;@ @Q;8W068??Q
G8?8;64@
-4 \& 2-8?? :G980; ;464228=Q 833=:<8?2 7=:W 9-4 248? W8;K7869K=4=
=4>8=@0;>8==8;>4W4;9:78224WG?Q8;@833?06890:;:7*6::?0;>3?8;4967:=
9-4W46-8;068?248?
-4 >48= G:b 2-8?? G4 =894@ 7:= -48<Q @K9Q 8>0989:= 24=<064 6:;90;K:K2?Q
J:=Z0;> 7:= # -:K=2 8 @8Q 8;@ 2-8?? G4 2K098G?4 9: J09-298;@ 298906 8;@
@Q;8W06?:8@28;@G4;@0;>W:W4;9:;9-4>48=G:b@K49:8>0989:=2-879
=0<4 W:9:= 8;@ >48= G:b K;09 2-8?? G4 3=:<0@4@ J09- 8 2K098G?4 ?0790;> 4Q4
-::Z
-4=42-8??G4;::0?230??8>47=:W>48=G:b:;9:9-4<4224?
g824 7=8W4 2-8?? G4 3=:<0@4@ J09- 2K098G?4 ?0790;> ?K>2 2K098G?Q @420>;4@ 7:=
?0790;>6:W3?4948>0989:=8224WG?Q
:]]?4278G=06894@7=:W3?89428=48664398G?47:=20]42?8=>4=9-8;#("WWg
0;6824:768=G:;8;@?:J8??:Q2944?28;@!("WWg0;6824:7-0>-8??:Q
+
&'
%)*!"#"!&'
%&'#&(
124
!"#"!
d#
d'
d
$(%
2944?2$:J4<4=9-02029:G4@:;4J09-3=0:=833=:<8?8;@2KGh4699:8??J4?@2
G40;>!""=8@0:>=83-4@
*??;:]]?420]428;@[K8;9090420;@06894@0;9-4@8982-44928=494;9890<48;@7:=
G0@3K=3:24:;?Q%0;8?20]428;@[K8;9090428=42KGh4699:6:;70=W890:;@K=0;>
=4<04J :7 @=8J0;>2-4 g& 2-8?? 0;6?K@4 8;@ 6:;70=W 0; -02 g 9-89
6-8;>42 9: 9-4 4b94;9 :7 :;4 20]4 ?:J4= := -0>-4= 7:= 486- ;:]]?4 8;@
[K8;9090423?K2:=W0;K2:;4;KWG4=7:=486-20]48=48664398G?489;:4b9=8
6:299:9-4+&$*&
*??;:]]?42J09-GK99J4?@0;>4;@6:;;4690:;22-8??-8<44@>43=438=890:;82
34=*g!^#(2K098G?47:=6:;;4694@3030;>0;20@4@08W494=K6-;:]]?42
2-8??-8<4!""WW4b9=829KG?4;>9-J09-303468327:=-Q@=:94293K=3:24
*?? ;:]]?42 :7 20]42 " WW g 8;@ G4?:J 2-8?? G4 >K22494@ 82 34= 9-4
6:W38;0:;23460706890:;!"#'
d(*??:34;0;>20;3=422K=438=922-8??G46:W34;2894@7:=9-48=48:7:34;0;>82
34=6:@40;0WKWJ0@9-:738@2-8??G4("WW
d^ *???:8@G48=0;>8=4820;3=422K=438=922-8??G4<4=0704@7:=GK6Z?0;> 8;@ ?:68?
29=42242*@4[K894=40;7:=64W4;92-8??G43=:<0@4@
d_ :]]?4 8;@ W8;-:?4 ;46Z2 2-8?? G4 7?K2- J09- 9-4 0;20@4 2K=7864 :7 <4224?
K;?422 23460704@ :9-4=J024 ;20@4 4@>42 :7 W8;-:?42 2-8?? G4 2W::9- 8;@
=:K;@4@:77J09-8=8@0K2:7'WW
"
! +;?422 23460704@ :9-4=J024 8?? ;:]]?42 2-8?? G4 3=:<0@4@ J09- =894@ 7?8;>42
:;?Q 7=:W 6:;20@4=890:; :7 0;94=6-8;>48G0?09Q 82 34= 9-4 @0W4;20:;8?
298;@8=@20;@06894@0;9-4@8982-4492
# g:?9-:?422-8??29=8@@?49-4W80;<4224?8b42K;?42223460704@:9-4=J024
' *??7?8;>42:;;:]]?422-8??G4:77:=>4@6:;29=K690:;J09-0;94>=8?-KG2?894
:=3?8949Q347:=>4@7?8;>428=4;:98664398G?40;3?864:77:=>4@7?8;>42J09-
0;94>=8?-KG2
*??2?03:;9Q347?8;>42:720]42?8=>4=9-8;("WWg8;@>0=9-7?8;>422-8??
G43=:<0@4@J09-8@4[K894<4;90;>8==8;>4W4;9@K=0;>J4?@0;>
+
&'
%)*!"#"!&'
%&'#&(
125
!"#"!
(
^
_
d
$^%
a0=9- 7?8;>42 07 W8@4 :K9 :7 WK?903?4 3?8942 2-8?? G4 8 W8b0WKW :7 9-=44
24>W4;92 *?? J4?@2 2-8?? G4 !"" =8@0:>=83-4@ =4-4890;> 8;@ 3:29J4?@
-4899=489W4;92-8??G468==04@:K98234=6:@4
:W38;0:;7?8;>4223460704@J09-8??:Q2944??0;4=2-8??G42K33?04@J09-!""
WW ?:;> 8??:Q 2944? 29KG 4;@2 J09- GK99J4?@0;> 4@>4 3=438=890:; 9: 2K09
6:;;4694@30349-06Z;422
c-4; 6:W38;0:; 7?8;>428=4 :7 J4?@0;> ;46Z 9Q349-428W4 2-8??G49:2K09
G:=4 :7 6:;;4694@ 3034$:J4<4=9-02 0;7:=W890:; 2-8?? G4 3=:<0@4@ GQ 9-4
+&$*&@K=0;>=4<04J:7@=8J0;>2
g?0;@ 7?8;>42 8;@ 6:<4=2 0;94;@4@ 7:= 0;234690:; := 866422 :34;0;>2 2-8?? G4
3=:<0@4@J09-8@4[K8948==8;>4W4;99:7860?09894:34;0;>8;@6?:20;>J09-:K9
K;@K4477:=9
+;?422 23460704@ :9-4=J024 24890;> 2K=78642 7:= ;:;W498??06 >82Z492 2-8??
-8<4 29:6Z := 24==894@ 70;02- %:= :9-4= 9Q342 :7 >82Z492 9-4 9Q34 :7 70;02-
2-8??G47K=;02-4@GQ9-4\&:;9-4@=8J0;>27:==4<04J8;@833=:<8?
!" c-4; 7?8;>42 23460704@ 8=4 :7 9:;>K4 8;@ >=::<4 := W8?4 8;@ 74W8?4 9Q34
>=::<4:=74W8?478642-8??G4:;9-4;:]]?47?8;>428;@9:;>K4:=W8?47864
:;9-46:W38;0:;7?8;>42
!""
!"! *?? 2Z0=9 2K33:=92 2-8?? -8<4 89 ?4829 :;4 866422 :34;0;> 8;@ 8@4[K894 <4;9
-:?42899-49:3:72Z0=9
!"# Z0=9 2-8?? G4 3=:<0@4@ J09- 8@4[K894 -:?@0;> 8;@ 6?0WG0;> =K;>2 0;20@4
8G:<48;@G4?:J9-42Z0=9:34;0;>4980?22-8??G47K=;02-4@GQ9-4\&
:;9-4@=8J0;>27:==4<04J8;@833=:<8?
!!"
!!! -4 20]0;> :7 <4224? 0;94=;8?2 2-8?? G4 2K6- 9-89 8?? =4W:<8G?4 38=92 68; G4
=4W:<4@9-=:K>-W8;-:?42
!!# c-4=4<4=833?068G?48;@K;?42223460704@:9-4=J0240;@8982-44928??2K33:=9
=0;>2G:?90;>G8=7:=0;94=;8?22K6-829=8Q29:J4=386Z0;>2@:J;6:W4=2496
2-8??G40;9-426:34:79-4\&
+
&'
%)*!"#"!&'
%&'#&(
126
!"#"!
!!'
!!
$_%
;94=;8? G877?42 9=8Q 2K33:=9 G48W2 :7 :9-4= 0;94=;8?2 238;;0;> 8 6-:=@ :=
@08W494=:79-4<4224?2-8??G43=:<0@4@J09-8W48;27:=8??:J0;>@0774=4;908?
4b38;20:;G49J44;9-438=98;@9-4<4224?2-4??
+;?42223460704@:9-4=J024G877?42:=J40=3?89422-8??;:9G4J4?@4@@0=469?Q
9: 9-4 2-4?? := @02-4@ 4;@ :7 9-4 <4224? -424 2-8?? G4 G:?94@ 9: 9-4 2K33:=9
89986-W4;92J-06-8=4J4?@4@9:9-42-4??:=@02-4@4;@
!!( -4g&2-8??0;6?K@49J:#;KWG4=22980;?4222944?;8W43?89420;-02
26:34-02=4[K0=4W4;9024b6?K20<4:7W8;K7869K=4=
2;8W43?894-4@4980?2
:;;8W43?8942-8??G47K=;02-4@@K=0;>=4<04J:7@=8J0;>2
!!^ )0790;>?K>22-8??G43=:<0@4@7:=8??<4224?24980?28=42KGh4699:=4<04J8;@
833=:<8?
!!_ 8=9-0;> 6?4892 82 34= 6:W38;0:; 23460706890:; !"#' 2-8?? G4
3=:<0@4@899-4833=:<4@?:6890:;2
!!d *??38@289;:]]?422K33:=924962-8??G43=:<0@4@J09-894??98?4-:?4899-4
G:99:WW:29 ?:6890:; J-06- 2-8?? G4 94294@ J09- 80= 89 !" Z>i6Wj> 8;@
6-46Z4@ J09- 2:83 2:?K90:; 7:= ?48Z8>4 K6- 98??98?4-:?42 2-8?? G4 3?K>>4@
8794=289027869:=Q94290;>
!! %:=0;2K?894@:=70=43=::74@<4224?20;2K?890:;:=70=43=::70;>2K33:=928234=
4;6?:24@6:W38;0:;23460706890:;2-8??G43=:<0@4@GQ9-4\&
!!!" c-4=4<4= 3?897:=W2 8;@ ?8@@4=2 8=4 23460704@ 0; 9-4 @898 2-4492 ;464228=Q
2K33:=922-8??G43=:<0@4@GQ9-4\&8234=@4980?2J-06-2-8??G4W8@4
8<80?8G?4@K=0;>=4<04J:7@=8J0;>2
!!!!
@8982-4499-4g&2-8??7K=;02-8?:;>J09-9-4946-;068?g870=Wg0??
J8298>48??:J8;642G:9-866:K;98G?48;@K;866:K;98G?4
!#"
*;6-:=G:?928=4;:90;6?K@4@0;9-426:34:72K33?Q:79-4\&K;?422
23460704@:9-4=J0240;9-4@8982-4492
!'"
!'! *??J4?@4=2c8;@=:64@K=4kK8?0706890:;&46:=@2k&2-8??W4499-4
+
&'
%)*!"#"!&'
%&'#&(
127
!"#"!
$d%
=4[K0=4W4;92 :7 9-4 23460704@ 6:@4 0==4234690<4 :7 3=422K=4 24=<064 :=
;:;3=422K=424=<064
!'# g47:=4 J4?@0;> 4@>42 2-8?? G4 6-46Z4@ 0; :=@4= 9: 8264=980; 9-4 8G24;64 :7
7?8Z0;>0==4>K?8=09042:=24=0:K2@474692
!'' 980;?422 2944? 8;@ -0>- 8??:Q 2944? 78G=06890:; 2-8?? -8<4 0;@434;@4;9 249 :7
9::?2>=0;@0;>J-44?28;@J0=4G=K2-42496
!' c4?@0;>2-8??G44b46K94@GQ[K8?0704@J4?@4=2
!'( gK99J4?@2 2-8?? -8<4 7K?? 34;49=890:; 0;>?4 20@4@ J4?@2 2-8?? G4 6-0334@
G86Z9:2:K;@W498?8;@=4J4?@4@7=:W9-4:9-4=20@4c-4=4<4=6-0330;>02
;:93:220G?4=::9=K;2-8??G4GQag86Z0;>29=032-8??;:9G4K24@J09-:K9
3=0:=833=:<8?
!'^ 34;0;>2 =40;7:=60;> 38@2 8;@ 89986-W4;92 2-8?? 6?48= ?:;>09K@0;8? 8;@
60=6KW74=4;908?J4?@248W2
!'_ 0=6KW74=4;908? J4?@2 2-8?? G4 209K894@ !"" WW 8G:<4 := G4?:J 9-4 2K33:=9
=0;>28;@386Z0;>2K33:=9=0;>2W48;97:=2K33:=90;>0;94=;8?20723460704@
!'d 0=6KW74=4;908? 8;@ ?:;>09K@0;8? J4?@ 248W2 2-8?? 6?48= 28@@?42 8;@ 2K33:=9
?K>2):;>09K@0;8?248W20;6824:7-:=0]:;98?<4224?22-8??G489?4829
!("WW8G:<428@@?4J48=3?894
!' :]]?4 8;@ =40;7:=64W4;9 38@2 J-4=4 833?068G?4 2-8?? G4 2490; 9Q34 8;@
89986-4@9:9-4<4224?GQ7K??34;49=890:;J4?@2
!'!" Z0=9 9: <4224? -48@2 h:0;92 2-8?? -8<4 6:;90;K:K2 7?897864@ J4?@ W896-0;>
J09-:K94=@08W494=:79-4<4224?-4J0@9-:79-4J4?@2-8??G44[K8?9:2Z0=9
9-06Z;4228;@-40>-9:7J4?@2-8??G49J0649-4J0@9-
!'!! *??J4?@22-8??G4@4GK==4@7=447=:WK;@4=6K92:<4=?83=0@>428;@<8??4Q2
!'!# : J4?@0;> 2-8?? G4 68==04@ :K9 8794= 29=422 =4?04<0;> 8;@i:= 3:29J4?@ -489
9=489W4;9*??7?8;>4786422-8??G42K098G?Q3=:94694@8>80;29:b0@890:;@K=0;>
-4899=489W4;9
!"
!! c-4=4 20]4 := 2-834 :7<4224?W8Z42090W3:220G?49:2-03090;:;4304647:=
4=4690:;GQ:9-4=29-4\&2-8??2-03?8=>4292-:378G=06894@24690:;2
+
&'
%)*!"#"!&'
%&'#&(
128
!"#"!
!#
!'
$%
2K098G?4 7:= 2-03W4;9 8;@ 4824 :7 -8;@?0;> 7:= 704?@ 4=4690:; 8;@ 8224WG?Q
%8G=06890:;8;@4=4690:;2-8??G46:W3?494@899-42094GQ9-4\&
*?? 304642 2-8?? G4 2-:3 709K3 0;9: 24690:;2 8;@ 486- 24690:;2 2-8?? G4 709 9:
8@h864;924690:;8;@8??3046422-8??G4W896-W8=Z4@
-4 J0@9- :7 34=W0220G?4 >83 @K=0;> 709K3 2-8?? G4 0; 866:=@8;64 J09-
833=:<4@ @=8J0;>2 8;@ J4?@0;> 3=:64@K=42 8;@ 2-8?? >4;4=8??Q G4 ' WW
W8b0WKWJ09-89:?4=8;64:73?K2"dWW9:W0;K2""WW
! %?8W46K94@>422-8??G4>=:K;@GQ9-4\&82=4[K0=4@9:=4W:<42?8>
@49=0W4;98?@026:?:=890:;8;@;:;K;07:=W09Q:74@>42
! *?? =8@0:>=83-06 =4[K0=4W4;92 7:= J4?@2 6:W3?494@ 0; 2-:3 2-8?? G4W8@4 GQ
9-4\&G47:=49-438=92:724690:;?48<49-42-:3
!("
*??68=G:;2944?4b94=0:=22-8??G4@4268?4@4@>42@4GK==4@8;@J0=4G=K2-4@
KG24[K4;9?Q 8?? 2K6- 2K=78642 2-8?? G4 380;94@J09-9J:6:892:7=4@:b0@4
3=0W4=
!^"
!^!-4g&2-8??0;6?K@47:??:J0;>4224;908?238=420;-0226:34:72K33?Q
8
J:#>82Z49282238=427:=486-;:]]?4
G
!" 238=4 78294;4=2 :7 486- 20]4 8;@ ?4;>9- $:J4<4= 9-4 W0;0WKW
[K8;909Q2-8??G47:K=7:=486-20]48;@?4;>9-
!^# ; 8@@090:; 9: 4224;908? 238=42 82 0;@06894@ 0; 38=8 !^! 9-4 g& W8Q
=46:WW4;@ 8@@090:;8?238=42 6:;20@4=4@ ;464228=Q GQ-0W 7:=9-=44 'Q48=
9=:KG?47=44:34=890:;
!^' -4 g& 2-8?? 0;6?K@4 4224;908? 238=42 82 0;@06894@ 0; 38=8 !^! 8;@
=46:WW4;@4@ 238=42 82 6:;20@4=4@ ;464228=Q GQ -0W 0; '"!
2-8??;:9G40;6?K@4@0;9-4[K:94@3=0647:=2K33?Q:74[K03W4;9-02<8?K4
2-8??G46:;20@4=4@7:=9-43K=3:24:7g4<8?K890:;
+
&'
%)*!"#"!&'
%&'#&(
129
!"#"!
$!%!
! 6-4@K?4 :7 6:W3?494 @420>; 68?6K?890:;2 @=8J0;>2 8;@ @:6KW4;92 9: G4
2KGW0994@8?:;>J09-2KGW0220:;@8942
# kK8?09Q*22K=8;64?8;k*
' :W3?494@420>;68?6K?890:;2
a4;4=8?8==8;>4W4;9@=8J0;>0;@06890;>:<4=8??@0W4;20:;26:W3?494@420>;@898
>4;4=8? ;:942 g 23460706890:;2 :7 486- :7 9-4 3=422K=4 8;@ ;:;3=422K=4
38=92 ;:]]?4 26-4@K?4 J09- ;:]]?4 98> ;KWG4= 24=<064 20]4 ;:]]?4 J8??
9-06Z;422 6:W3?494 4;@ 6:;;4690:; @4980?2 ;:]]?4 4?4<890:;2 ?:6890:;2 8;@
:=04;9890:; 2K33:=9 @4980?2 ?:6890:;2 8;@ :=04;9890:; 496 34=890;> J40>-9
4=4690:;J40>-98;@J40>-970??4@J09-J894=2-8??G40;@06894@
( 4980?4@78G=06890:;@=8J0;>7:=486-38=98;@J4?@0;>@4980?2
^ 4980?2:70;94=;8?2
_ 4980?2:74b94=;8?6?48928;@29=K69K=8?2
d c4?@0;>3=:64@K=4
+
&!
%)*!"#"!&'
%&'#&(
130
!"#(!
)
!#
$!%#
#!
!"
)
#
!#
!!
'
!
!'
!'
##
^
_
#'
!(
d
(
!^
)*
*+
)
!d
!_
l!i#m
)*
*+
)
#"
!
#(
#
#
+
&'
%) * !"#(!&' ca
131
!"#(!
)
n!#""
)&*
*\&*a)&*
l"(%W8bl(
!#""nn#!""
l(
#!""nn("""
l^(
of("""
ld
'
%*%pp)+$))%\)l(
*)a%%)*a%*%pp)$*))gc$"(m%%)*
)*%$))pp)%&*+)$*))gl^
)*%$))pp)%&&*`+&a&a$*))gl'
%*%*$)+$))%\)l!#
*)a%%)*a%*%*$)$*))gc$!m%%)*
!"
)*%*$)%&*+)$*))gl!#
%*%pp)$$*))gc$l^%&*a)
!!
$a$%c&*g\&*`)*l!(
!#
%c&c&"*'
!'
$#%#
*gc*a)l!(iW&!#c$$\&*))&
$))
!#
$a$%%g+gg)*)*g\&*`l!(qg%c&
*g\&*`+&&al!(
!
*gc*r*+&&al'
\)*&
!(
)&*
&*`+&&a+%
n!#""
'
)\)\&*`*&
!#""nn#!""
(
o#!""
("
!^
%&g&*s+&)**g\*+))&*(
!_
g%\)+&*+)(
!d
)*%gpp)%&*+)$*))gl^
$))*&
!
#"
g)&)*&
)&*
g*)*+%)\)
\&*`*&
#!
)&*
n#!""
l'
of#!""
l^
\)*&
)&*
n!#""
l'
!#""nn#!""
l(
of#!""
l_
\*%pp)&*l!i#m
##
&*%%)*a%&$**+&*$c!(W8b
#'
*)a%`)&*)$))$*))g&+*&*a$c$_WW
i^&%$a$%&$*+)g+$*))e#"WW
#
)&*gcg)+&i+&**a)l'
#(
g%\)+&&)"*(
!*))*pWW
#$&%*g&*)&*$*))g*&%ai**&
+
&'
%) * !"#(!&' ca
132
!"#'
)
!"
$!%!
("
)
!#
*sc)
$%*
&)*&
c)
+
)\*
'^WW$s*e
k+*))`*cg
cg$s**
$))%$))$s
)$*^WW
*&*)**
$))*&*)
'"
'"
)*
! *))*p*&WW
+
&'
%) * !"#'&' ca
133
!"#'
)
!!
$!%!
_(b_(b!"
*a)c)*s&
!t$)
_^"%&\)c$s&
'""%&*s
s&%\)
*&*)***s&
s&%\)
*))\*
!#$&*&ia*)\*
"
("
g)*+
("
)*
!*))*p*&WW
#$*`*)*)%&*s&\)c$s&)**`gc)
)+a)a&*)+&%&)+a)a&*)+&\)
+
&'
134
SPEC NO.
TCE-M4-185-25
SECTION : D
SHEET 1
OF 2
INSPN
CATEGORY
1.
2.
PLATES FOR
SHELL, ETC.
DISHED ENDS
Mechanical properties,
Chemical Composition
Review of test
certificates
UT on plates
100%
Mechanical Properties,
Chemical Composition
Review of test
certificates
100%
100%
3.
4.
NOZZLES
ASSEMBLY
100%
Mechanical Properties,
Chemical Composition
Review of test
certificates
100%
RT of longitudinal and
circumferential butt joints
100%
100%
100%
100%
100%
100% MT/PT
ISSUE
R3
TCE FORM 329 R3
135
SPEC NO.
TCE-M4-185-25
SECTION : D
SHEET 2
OF 2
INSPN
CATEGORY
4.
ASSEMBLY
Hydro Test
NOTES:
(A) INSPN CATEGORY :
A - WITNESSED BY TCE/PURCHASER
B - WITNESSED BY TCE/PURCHASERS DISCRETION
C - CERTIFICATES REVIEW BY TCE/PURCHASER
(B) ACCEPTANCE NORMS:
(1) MATERIALS
(2) WELDING
ISSUE
R3
TCE FORM 329 R3
136
SPEC NO.
TCE-M4-185-49
SECTION : D
SHEET 1 OF 2
INSPN
CATEGORY
1.0
RAW MATERIALS:
PLATES, SECTIONS,
BARS, FORGINGS,
PIPES, BOLTS,
NUTS
2.0
100%
IN PROCESS
INSPECTION:
WELDING
RT
RT
RT
10% RT
FINAL INSPECTION
c) Dimensional inspection
ISSUE
R3
TCE FORM 329 R3
137
SPEC NO.
TCE-M4-185-49
SECTION : D
SHEET 2 OF 2
NOTES:
(A) INSPN CATEGORY:
A - WITNESSED BY TCE/PURCHASER
B - WITNESSED BY TCE/PURCHASERS DISCRETION
C - CERTIFICATES REVIEW BY TCE/PURCHASER
(B) ACCEPTANCE NORMS:
(1) MATERIALS
(2) WELDING
: As per Section-IX
ISSUE
R3
TCE FORM 329 R3
138
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
TE
ECHNICAL SPECIFICA
ATION FOR
R
PR
RESSURE & STORAG
GE VESSEL
L
(CONTINUED)
139
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
1.00.00
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
GENE
ERAL
The following
f
prrincipal presssure and atmospheric vessels ffor the systtem has
been covered in this part of specificatio
on.
1.
Dual Med
dia Filter
2.
3.
Regenera
ation Vesse
els
4.
Mixed Be
ed
5.
Alkali dilu
uent Heating
g cum Stora
age Vessel.( hot waterr tank)
6.
Activated
d carbon filte
er
7.
Alkali Pre
eparation Ta
ank
8.
Alkali Day
y/Measuring
g Tank
9.
Acid Mea
asuring Tan k.
1.01.00
1.01.01
1.01.02
Proce
ess requirem
ments of th
hese vessels shall be governed
g
bby the requirements
of the
e DM Plant System, wh
hich will dettermine their design coonditions. Following
sectio
ons only ind
dicate some
e of the min
nimum requ
uirements w
which must be met,
and the
t
actual design
d
of tthese vesse
els shall be
e better thaan these, if that is
requirred from pro
ocess cons iderations.
2.00.00
GENE
ERAL DESIGN FEATU
URES
2.01.00
Desig
gn
2.01.01
Desig
gn of all pressure
p
vvessels sha
all conform
m to ASME
E Section VIII or
accep
ptable equivalent interrnational sttandard. Design
D
presssure shall be the
maxim
mum expec
cted pressu
ure to which
h the vesse
els may bee subjected to plus
10% additional margin.
m
Ma
aximum exp
pected pres
ssure for veessels place
ed in the
discharge line off pumps sha
all be based on the sh
hut-off headd of the pum
mps plus
static head at pumps suctiion if any. Design pre
essure of alll pressure vessels
shall be at least 10 Kg/cm ((g).
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
140
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
2.01.02
Desig
gn of all ve
ertical cylind
drical atmo
ospheric sto
orage tankss containing
g water,
acid, alkali and other
o
chemiccals shall conform to IS
S: 803.
2.01.03
Desig
gn of all horizontal cyl indrical atm
mospheric storage
s
tankk containing
g water,
acid, alkali and other
o
chemiccals shall conform to BS
B EN122855-2:2005.
2.01.04
Desig
gn temperatture of all p
pressure vessels and storage
s
tankks shall be 10 deg.
C hig
gher than th
he maximu
um tempera
ature that any
a part of the vessel/tank is
likely to attain du
uring operattion.
2.01.05
s
to
o vacuum; the
t same sh
hall be takeen care in de
esigning
In casse, tank is subjected
the ta
ank.
2.02.00
All ve
essels / tank
ks without i nside rubbe
er lining sha
all have a ccorrosion allowance
of min
nimum 2 mm
m and mill allowance (minimum 0.3 mm) foor shell and
d dished
ends. Thinning allowance of 2 mm (m
minimum) shall
s
be connsidered for dished
end. Vessel ends shall b
be of dishe
ed design and consttructed by forging,
presssing or spin
nning proce
ess. Conica
al or flat ends shall noot be accep
pted. All
dished ends shall be stress relieved.
2.03.00
All th
he atmosph
heric tanks shall have
e sufficient free boardd above the
e Level
High/Normal Le
evel as the
e case may
y be. The overflow
o
levvel shall be
e kept at
least 20 cm or 10% of vesssel height above
a
the L
Level High/Normal Le
evel for
all the
e tanks. Fu
urther, a miinimum 100
0 mm free board
b
shall be provided above
the to
op of overflow level to
o the top of the tank. Wall
W thickneess of atmo
ospheric
tanks shall not be less than 6 mm.
2.04.00
Vesse
els coming under previiew of IBR shall
s
be des
signed accoordingly.
2.05.00
Interio
or surfaces
s of all tankks shall be
e clear of stiffeners
s
a nd other structural
suppo
orts. Tanks
s shall be re
einforced an
nd stiffened externally aas required.
2.06.00
All we
elds on inner tank surrface shall be free of voids,
v
gapss craters, pits,
p
high
spots, sharp edg
ges, abrupt ridges and
d valleys or undercut eedges. High spots,
irregu
ularities and
d sharp ed
dges shall be remove
ed by grindding. Insid
de weld
seam
ms shall be ground flu
ush and sm
mooth applicable for corrosion resistant
r
coatin
ng or lining.
2.07.00
2.08.00
2.09.00
All we
elding shall be perform
med by ASM
ME qualified
d welders uunder Section-IX of
ASME
E Boiler and
d Pressure Vessel cod
de and weld
ding electroddes shall be
e as per
releva
ant Codes/S
Standards vviz. AISC Se
ection 1.17 etc.
141
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
2.10.00
The plates
p
for cy
ylindrical tan
nks shall be
e accurately
y formed in bending rollls to the
diame
eters called for, and th
he complete
ed shells be
e concentricc and plump
p. Plates
shall be cold-rolled by platte bending machine in
n a numberr of passes
s to true
curva
ature and joiined by wel ding.
2.11.00
Vesse
els seam shall
s
be so
o positioned
d that they do not paass through
h vessel
conne
ections.
3.00.00
MATE
ERIAL OF CONSTRUC
C
CTION
3.01.00
4.00.00
APPU
URTENANC
CES
4.01.00
Manh
holes
4.01.01
4.01.02
The vertical
v
type
e storage ta nks shall be
e provided with
w a manhhole of 500 mm dia
on the
e top coverr, if the diam
meter of the
e tank is 12
200 mm or more. For the DM
waterr storage tan
nks, manho
oles shall be
e provided as
a per IS:8003.
4.01.03
4.01.04
The required
r
lin
ning/coating
g for the in
nside surface of the manhole/ha
andhole,
nozzle and cove
er plate of tthe manhole/handhole shall be ssame as tha
at of the
respe
ective vesse
el/tank.
4.01.05
Sightt Glasses
All the
e vessels mentioned
m
sshall be prov
vided with pad
p type sigght glasses on their
verticcal sides. Lo
ocations of tthese sight glasses sha
all be as folllows:
4.01.06
One with
w the centre line att the norma
al level of th
he bed top,, and one near
n
the
bottom
m of the straight side, ffor each of these vesse
els.
4.01.07
In addition, item
m no. 1.00.0
00 shall be
e provided with sight glasses, with
w
their
cente
er lines at ea
ach of the n
normal sepa
arated resin interfaces.
4.02.00
Liftin
ng Lungs
All vessels
v
of diameter 12 00mm or greater
g
shall be provideed with a minimum
m
of 4 liftting
lug
gs. Smallerr vessels sh
hall be provided with att least 2 lifting lugs.
4.03.00
Vesse
els Supporrts
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
142
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
Adequate suppo
orting arrang
gements lik
ke straps, saddles,
s
skkirt rings, orr legs of
steel shall be pro
ovided to tra
ansfer all lo
oads to the respective
r
sskid structures.
4.04.00
Vesse
el Internals
s
The in
nternals forr pressure V
Vessels sha
all be design
ned for a loow pressure
e drop to
promo
ote uniform
m distribution
n and flow through
t
the
e vessels annd to withsttand the
full de
esign pressure of the vvessel in both directions.
Speciification req
quirements ffor vessel in
nternals are
e as follows :
4.05.00
Inlet water
w
and Regeneran
nt Distributtors
Hub and
a laterals
s with diffusser splash plates or he
eader and perforated laterals.
Materrial of consttruction sha
all be type 316
3 stainless
s steel, exccept for acid
d service
which
h shall be off Hastelloy B
B.
4.06.00
Unde
erdrains
Same
e as above
e with scre
eened laterrals with in
nternal perfforated pipes, and
rubbe
er-lined false
e bottom.
4.07.00
4.08.00
nal Fastene
ers
Intern
All in
nternal faste
eners shalll be of typ
pe 316 sta
ainless steeel and hea
avy duty
locknuts shall be
e used throu
ughout.
4.09.00
ng Connecttions
Pipin
All lin
ned vessel connection
ns and con
nnections in
n unlined vvessels 25 NB and
largerr shall be to
o minimum ANSI 300 lb class. Flat face flannges shall be used
throug
ghout. Nozz
zle materia
al shall be ASTMA-106
A
6. Grade B.. schedule 80 pipe.
All fla
anged connections sh
hall be supplied com
mplete with matching counter
flange
es, nuts, bo
olts and full--face gaskets.
4.10.00
All ve
essel conne
ections in un
nlined tanks
s smaller than 25 NB sshall be scrrewed to
ANSI 2.1 for sch
hedule 80 p
pipe.
5.00.00
SPEC
CIFIC DETA
AILS
5.01.00
143
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
requirrement. The
e cold wate
er feed line shall enterr the tank thhrough or near
n
the
top he
ead and ex
xtend down ward to witthin 15 cm of the tankk bottom. Recovery
R
time shall
s
not exceed 4 to 5 hours.
All tank internals
s, including the inlet water
w
tail pip
pe, shall bee fabricated
d of type
304 stainless
s
ste
eel.
5.02.00
Atmo
ospheric Ta
anks
Wall thickness
t
off these tankks shall not be less tha
an 6mm.
5.04.00
Chem
mical preparation and day tanks
These
e shall be
e vertical ccylindrical tanks. The
ey shall bee of carbo
on steel
fabriccation, lined
d and provvided with full
f
height level gaug es right up
p to the
overfllow levels.
The alkali
a
prepa
aration tankk shall be provided
p
witth a dissolvving baskett of type
316 stainless
s
ste
eel construcctions, and a motorize
ed slow speeed stirrer mounted
m
eccen
ntrically to the
t
tank byy a brackett fixed to th
he side waall. The stirrrer shall
have impellers of type 316 sstainless ste
eel.
The alkali
a
day tank shall b
be provided
d with an airtight
a
coveer complete
e with a
breath
her arrangement, to prevent absorption
a
of carbon dioxide frrom the
atmossphere by the alkali so
olution conta
ained in it. The overfloow connectiion shall
also be
b provided with a suita
able seal fo
or this purpo
ose.
The tanks
t
for ammonia
a
s olution (if applicable) shall alsoo be provid
ded with
simila
ar arrangem
ments to pre
event escape of ammon
nia vapor too outside.
5.05.00
LININ
NG
All intternal lining
g of vesselss provided under
u
this specificationn shall be off natural
rubbe
er, meeting the followin
ng minimum
m requirements.
5.05.01
Hardn
ness
Lining
g used may
y be soft ru bber having
g a shore durometer
d
rreading or 4070
4
on
the D scale, or semi-hard
s
ru
ubber havin
ng a durometer readingg of 4570 on
o the D
scale. Variations
s in hardnesss of the rub
bber lining between th e different areas
a
of
a spe
ecific tank sh
hall be with in +/-5 duro
ometer read
ding.
5.05.02
Chem
mical Resis
stance
The lining
l
mate
erial shall b
be suitable for prolon
nged servicce in the chemical
c
enviro
onment des
scribed belo
ow:
a)
Hydrochlo
oric acid, 2 to 8% concentration, at temperatture from 10 deg C
to 50 deg
g C.
144
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
b)
Sodium hydroxide,
h
1 to 4% con
ncentration, at temperaature from 30
3 deg C
to 50 deg
g C.
c)
100 to 50
00 mg /l of sulphuric and
a hydroch
hloric acid ccombined. Ratio of
concentra
ation of the
ese two acid
d 1 : 5 to 5 : 1 and tem
mperatures from 10
deg C to 40 deg C.
d)
1 to 10m
mg/l of sodiu
um hydroxide at temp
perature froom 10 deg C to 40
deg C.
b subjected
d to the con
ndition (a) or
o (b) for inteermittent pe
eriods of
The liinings will be
appro
oximately one
o
hour o
out of eigh
ht hours, and
a
to connditions (c)) or (d)
remaiinder of the time.
5.05.03
Thick
kness
The lining shall be applied in three layers, resultting in a tottal thicknes
ss of not
less than
t
4.5 mm
m anywhere
e on the intternal surfa
aces of the vessels. Th
he lining
shall extend ove
er the full face of all flanged connections and shall have a
minim
mum thickne
ess of 3 mm
m in all such
h external arreas.
5.05.04
Surfa
ace Prepara
ation
Prior to rubber lin
ning all surffaces must be prepared in he folloowing mann
ner.
5.05.05
a)
Degrease
e surface prrior to blasting.
b)
The surfa
ace is to be blasted witth steel grit or sharp sillica sand to
o a white
and brigh
ht metal surf
rface.
c)
All traces
s if grit and dust shoulld be remov
ved with a vacuum cle
eaner or
by brushing. Care m
must be take
en to avoid contaminati
c
ing the surfa
ace.
d)
ection
Prote
After the lining is
s completed
d the vessels shall not be subjecteed to any prrolonged
expossure to dire
ect sunlightt in course of its transportation eerection, ettc. They
shall not also be stored in d
direct sunlig
ght. No furth
her welding or burning shall be
carrie
ed out on the vessel, affter applicattion of the lining.
All lin
ning projectting outside
e of the ves
ssel, shall be
b protecteed adequate
ely from
mech
hanical damages during
g shipment,, handling, storage
s
etc..
Suitab
ble warning
g, indicating
g the specia
al care that must be ta ken with re
espect to
these
e lined vesse
els, shall be
e stenciled on their outtside surfacces with the letter at
least 12mm high.
mple:
Exam
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
145
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: D1
REV
V NO: 00
Warn
ning Tank
k is lined
Do not
n weld or Burn
B
Do not
n Store in Direct Sunl ight etc.
6.00.00
ES AND ST
TANDARDS
S
CODE
The design,
d
man
nufacture, s hop testing, site fabrica
ation and eerection, testing and
comm
missioning of
o the presssure and sto
orage vessels shall coonform to th
he latest
revisions of the following sstandards, in addition to
t other staandards me
entioned
elsew
where in the
e tender doccument sub
bject to any modificatioon and requirement,
as specified here
e in after.
a)
IS: 803
b)
IS: 816
c)
IS: 817
d)
IS: 822
Code of procedure
p
for
f inspectioon of welds..
e)
IS:1363
Black hex
xagonal bolts, nuts andd locknuts (dia 6 to
39 mm) and black hexagon screws (dia to 24
mm).
f)
IS:1367
Technica
al
fasteners
s.
g)
IS:2062
Specifica
ation for weld able strucctural steel.
h)
IS:2002
Steel pla
ates for pres
ssure vesseels for interrmediate
and High
h temperature service inncluding bo
oilers.
i)
IS:2825
Code of unfired
u
pres
ssure vesseels.
j)
IS:3133
k)
IS:4049
Specifica
ation for fo
ormed endds for tan
nks and
pressure vessels.
l)
IS:4682
m)
BS:2594
Specifica
ation for ca
arbon steel welded ho
orizontal
supply
conditionns
146
for
threaded
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
cylindrica
al storage ta
anks.
n)
ASME
o)
ASTM
American
n Society for Testing annd Materials.
7.00.00
FABR
RICATION
7.01.00
The vessel
v
ends
s for storage
e tanks of vertical
v
type shall have dished end
ds at top
& botttom. Howe
ever, the en
nds of horiz
zontal storag
ge tanks, aand all the pressure
p
vesse
els shall be dished dessign of Tori-s
spherical ty
ype designeed.
7.02.00
The plates
p
to be
e used for fa
abrication shall
s
prefera
ably have a minimum width of
1500 mm.
7.03.00
7.04.00
Weldiing sequen
nce shall b
be adopted in such a way so aas to minim
mize the
distorrtion due to
o welding sshrinkage. Bidder shall indicate in his draw
wing the
seque
ence of wellding propo sed by him
m which should meet prrior approva
al of the
BHEL
L and custo
omer. Weld
ding shall no
ot be carrie
ed out whenn the surfac
ce of the
parts to be welde
ed are wet from any cause
c
and during
d
perioods of rain and
a high
windss unless the
e welder and
d work are properly shielded.
7.05.00
7.06.00
Tank Connectio
ons
7.06.01
7.06.02
All fla
anged conn
nections sh
hould be su
upplied com
mplete withh matching counter
flange
es, nuts bo
olts and gassket materiials. The flange
f
desi gn, (thickne
ess and
drilling etc.) shall match with
h the interco
onnected piiping flangees.
Bolts and nuts to
o be used e
externally to
o the vesse
els shall be of hexagon
nal head
confo
orming to IS
S:1367. Ho
owever, inte
ernal fasten
ners if any, shall be of IS:316
/SS-3
304 or Hasta
alloy-B as p
per the duty
y conditions.
7.06.03
7.06.04
Gaskets shall be
e of full face
e type.
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
147
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
7.06.05
7.07.00
Vesse
els Supporrting Lifting
g Lugs
7.07.01
7.07.02
All ve
essels of intternal, diam
meter of 1200 mm or greater
g
shaall be provid
ded with
minim
mum four (4
4) lifting lug
gs for safe
e and effective handlinng during erection.
e
Smalller vessels shall be pro
ovided with at least two
o (2) lifting l ugs.
7.07.03
7.08.00
7.08.01
7.08.02
7.08.03
7.08.04
Various instrume
entation and
d the fittings
s required for
f the sam
me shall be supplied
s
as ela
aborated in data sheetss.
7.08.05
The vent
v
and ov
verflow line
es of alkali preparation
n /measurinng / day tanks and
vent line of DM storage
s
tankks shall be provided with Carbon ddioxide abs
sorber of
prove
ontaminatio
en design to
o prevent co
on from atm
mospheric aair. Carbon
n dioxide
absorrber shall preferably
p
b
be located at
a ground level. The vent and overflow
o
lines of Acid measuring ta
anks shall be provide
ed with fum
me absorbe
er using
suitab
uch as pall rings/raschig rings.
ble packing material, su
148
PIPING &
VALVES
*
149
PART B
VOLUME: III
SECTION: D7
SHEET 1 OF 22
This Section covers the basic requirements for the all the piping systems,
valves and specialties and thermal insulation to be provided for the power
plant.
1.0
LINE SIZING
1.1
Sizes of pipelines shall be selected such that the velocity of fluid in pipes
does not exceed the following limits under conditions of maximum
possible volumetric flow:
Steam
Saturated steam
Wet steam/Exhaust steam
40 m/s
30 m/s
Water
Pump suction
Pump delivery
Service/Potable water
1.5 m/s
3.0 m/s
1.5 m/s
Oil
LDO
HFO
2.0 m/s
1.5 m/s
Gas
Compressed air
15 m/s
1.2
1.3
The design flows considered in line sizing shall not be less than the rated
capacities of equipment to which the piping is connected such as pumps,
blowers, compressors, valves, flow limiting orifices, etc., or, the system
heat and/or mass balance diagrams.
1.4
Sizes of Boiler feed pump suction piping shall be selected to meet the
NPSH requirements of the pumps under transient conditions prevailing
on loss of steam supply to feed water tank. Similarly for all pumps,
NPSH requirements shall be satisfied in line sizing.
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 2 OF 22
2.0
MATERIALS
The material specifications of pipelines of various systems shall be as
specified in Data Sheet - A attached to this specification.
3.0
WALL THICKNESS
3.1
3.2
4.0
FLEXIBILITY ANALYSIS
4.1
(b)
ISSUE
R1
VOLUME: III
SECTION: D7
PART B
SHEET 3 OF 22
of
the
4.2
5.0
5.1
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
Insulation details
5.1.10
Tolerances, if any
5.1.11
5.1.12
design
parameters,
shop
and
field
test
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 4 OF 22
5.3
Detailed bill of material shall be prepared for all piping systems. In case
of shop fabricated piping, the bill of material shall correspond to the
layout drawing prepared.
5.4
5.4.1
All piping shall be routed so as to avoid interference with other pipes and
their hangers and supports, electrical cable trays, ventilation ducting,
structural members, equipment, etc. Adequate clearances shall be
ensured with respect to the above to accommodate insulation and pipe
movements.
5.4.2
5.4.3
5.4.4
5.4.5
5.4.6
5.4.7
Drains shall be provided, at all low points and vents at all high points as
per actual layout regardless of whether the same have been shown in the
flow diagrams or not. Pipelines shall be sloped towards the drain points.
5.4.8
Besides at low points, tell tale drains shall be provided at other points as
necessary to remove on-line valves and specialties from piping for repair
and replacement. Wherever spray water is introduced into steam piping,
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 5 OF 22
5.4.10
5.4.11
At all points where pipes pass through concrete floors or brick or other
walls, suitable floor collars or wall boxes shall be provided. The
CONTRACTOR shall design and furnish the details of the floor collars to
the ENGINEER/OWNER.
5.4.12
In the case of flanged pipe work, boxes shall be large enough to permit
the passage of the flange.
5.4.13
5.4.14
5.5
5.5.1
5.5.2
5.5.3
5.5.4
The CONTRACTOR shall ensure that the location of the hangers and
supports shall not increase the forces and moments on the equipment
beyond their allowable values.
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 6 OF 22
5.5.6
5.5.7
5.5.8
5.5.9
5.5.10
5.5.11
5.5.12
All components for hangers such as turn buckles, clamps, etc. shall be of
forged steel.
5.6
5.6.1
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 7 OF 22
5.6.2
Wherever pipe bends are employed for change of direction the same
shall be to a radius of 5 times the pipe diameter.
5.6.3
Mitred bends may be adopted for piping systems upto a design pressure
10 bar (g) only. Mitre angle shall not exceed 22.5 degrees.
5.6.4
5.6.5
5.7
Dimensional Standards
5.7.1
5.7.2
Nominal pipes sizes and pipe outside diameters shall generally be as per
ANSI B36.10. In case of deviation CONTRACTOR shall bring it to the
specific attention of ENGINEER for prior approval stating reasons for the
deviation.
5.8
Instrument Connections
5.8.1
Unless otherwise called for by OWNER all thermowell stubs shall have
an internal threading to M33 x 2.
5.8.2
All stubs for pressure or flow measurement for pipelines with a maximum
working pressure equal to or above 62 bar (g) or with a maximum
working temperature equal to or above 350 C shall be NPS 25 mm and
double root valves shall be used.
5.8.3
5.8.4
5.9
5.9.1
5.9.2
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 8 OF 22
7.0
7.1
All pipes shall be hydro tested at shops for pressures as per standards
and all erected piping shall be tested 1.5 times the design pressure. All
other inspection requirements shall be as per the enclosed data sheet
A1.
7.2
All hot bent, forged formed, fabricated and straight pipes shall be
chemically cleaned, pickled or wire brushed and purged with air blast or
shot/grit blast to remove all sand and scale from the inner surface as
applicable.
7.3
The Contractor shall carryout the following cleaning after hydro test.
(a)
(b)
(c)
(d)
(e)
(f)
8.0
8.1
All un insulated piping systems, hangers and supports shall have two
coats of red oxide Zinc Chromate primer (conforming to IS 2074) with
minimum dry film thickness (DFT) of 25 microns per coat and two coats of
finish paints using enamel paint to give a minimum total DFT of 100
microns (after two coats of primer and two coats of finish paint). Shades
shall be as per IS 5 or as indicated by Owner /Engineer. Service of the
pipe/line designations shall be painted on all pipes at visible locations.
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 9 OF 22
Before application of paint, Contractor shall clean the pipes of all mill
scale, dirt dust, soot, grease, rust etc.
8.3
9.0
UNDERGROUND PROTECTION
9.1
Coal tar primer, coal tar enamel, inner wrap of fibreglass, final
outer wrap of enamel impregnated fibreglass. Total thickness of
coating shall not be less than 4.0 mm.
(b)
9.2
9.3
Bond/Adhesion test
(b)
Holiday test
10.0
11.0
11.1
CONTRACTOR shall provide thermal insulation for all hot piping and
equipment with fluid temperatures greater than 60 C.
11.2
11.3
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 10 OF 22
12.0
VALVES
12.1
12.1.1
All gate and globe valves shall be of rising stem, outside screw and yoke
type. The design of valves shall ensure a streamlined passage and gate
valves shall have low pressure drop. The seats and discs shall be easily
renewable and/or shall be suitable for easy refracting and grinding. Valve
discs shall be of such design as to keep the seats tight when the valve
body is subjected to pressure, temperature variations and piping
stresses. Gate valves shall close in both flow directions.
12.1.2
12.1.3
All valves end details shall be as specified in Data Sheet-A3. In the case
of all end-welded valves, the stub ends of the valves shall project from
the valve body a sufficient amount to ensure that the welding process will
not distort the valve body and internal parts.
12.1.4
Valves for regulating duties shall be of the globe type with tapered plug
type disc.
12.1.5
12.1.6
Check valves of sizes 400 mm NB and larger shall have dash pot
arrangement.
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 11 OF 22
12.1.7
12.1.8
12.1.9
Piston lift check valves shall have accurately guided pistons so that the
pistons are cushioned in their cylinders as they move up.
12.1.10 All gate, globe, Y-type and angle valves intended for manual operation
and falling under the following categories shall be equipped with a gear
operator for ease of operation and to ensure fast and tight closure:
ANSI PRESSURE RATING
----------------------------------Class 300 and below
Class 600 and above
--------------------------------------12.1.11
All gate valves falling in the following categories shall be provided with
integral bypass valve. Bypass size shall conform to MSS-SP-45 as a
minimum standard unless otherwise specified in Data Sheet-A3. The
bypass valve shall be hand operated unless otherwise specified in Data
Sheet-A3. Pipe for bypass shall be at least Schedule 80 seamless and
of a material of the same nominal chemical composition and physical
properties as that used for the main line. Orientation of bypass
arrangement shall be subject to the approval of OWNER/ENGINEER.
ANSI PRESSURE RATING
12.1.13
12.1.14
All gate valves of ANSI pressure-rating class 150 and 300 shall have
solid or flexible wedge and ANSI pressure rating class 600 and above
shall have flexible or parallel slide type of wedge.
Valves with flexible wedge shall have provision for relieving the pressure
in the neck of the valve when the valve is in the closed position.
All valves of ANSI pressure rating upto class 600 shall have bolted
bonnet construction and class 900 and above shall have bonnet
construction of the pressure seal type. Pressure seal valves shall have
ISSUE
R1
PART B
VOLUME: III
SECTION: D7
SHEET 12 OF 22
All carbon steel valves of ANSI pressure rating upto class 150 and 300
shall have stainless steel trim (13% Cr) unless otherwise specified in
Data Sheet and ANSI pressure rating class 600 and above shall have
stellited trim.
12.1.16
12.1.17
All valves of ANSI pressure rating upto class 900 and higher shall have
yoke with anti-friction bearing arrangement.
12.1.18
12.1.19
Valves operating under vacuum conditions shall have glands with water
sealing. The inlet and outlet connections shall be NB 15mm. The
CONTRACTOR shall indicate the maximum and minimum sealing water
pressure and the required flow rate.
12.1.20
12.1.21
12.2
CLEANING
Prior to factory inspection, all manufacturing waste, such as metal chips
and filings, welding rods and stubs, rags, debris and all other foreign
matter shall be removed from the interior of each valve. All mill scale,
rust, oil, grease, chalk, crayon, paint marks and other deleterious
material shall be removed from the interior and exterior surfaces. At the
time of shipment, valves shall be clean inside and outside.
12.3
12.3.1
12.3.2
PART B
VOLUME: III
SECTION: D7
SHEET 13 OF 22
12.3.4
12.3.5
12.3.6
12.3.7
All valves except check valves shall be tested for seat tightness by air at
a pressure of 6-bar (g) on both sides of seat.
12.3.8
All check valves shall also be hydro tested at 25% of the seat hydro test
pressure.
12.3.9
12.4
ISSUE
R1
TCE FORM NO. 329 R5
VOLUME: III
SECTION: D7
PART B
SHEET 14 OF 22
SL.NO.
SIZES
PIPES
FITTINGS
FLANGES
GASKETS
LINE
JOINT
HOSES FOR
HFO TANKER
HEATING
(STEAM/
CONDENSATE)
ALL
CARBON
STEEL
ELECTRO
ZINC
PLATED
NA
NA
NA
NA
HOSES FOR
FUEL
OIL UNLOADING
ALL
NEOPRENE
NA
NA
NA
NA
> NB65
ASTM A106
Gr.B
ASTM A
234 WPB
ASTM
A105
SPIRAL
WOUND
SS
BW
< NB50
ASTM A106
Gr.B
ASTM
A105
ASTM
A105
SPIRAL
WOUND
SS
SW
> NB65
ASTM A106
Gr.B
ASTM A
234 WPB
ASTM
A105
SPIRAL
WOUND
SS
BW
< NB50
ASTM A106
Gr.B
ASTM
A105
ASTM
A105
SPIRAL
WOUND
SS
SW
SERVICE
STEAM LINES
CONDENSATE
LINES
FUEL OIL
UNLOADING
LINES
ALL
ASTM A 234
IS1239 PT-1
WPB
FOR < NB 150/
(FOR >
IS3589
NB65)
FABRICATED
FROM IS 2062 ASTM A 105
PLATES FOR
(FOR <
> NB65
NB50)
ASTM
A105
BW FOR
> NB65
GRAPHOIL
SW FOR
< NB50
> NB65
API 5L Gr.B
(ERW)
ASTM A
234 WPB
ASTM
A105
GRAPHOIL
BW
< NB50
API 5L Gr.B
(ERW)
ASTM
A105
ASTM
A105
GRAPHOIL
SW
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 15 OF 22
INSTRUMENT
AIR &
POTABLE
WATER
DEMINERALISE
D WATER
(Refer Note:6)
CONDENSER
COOLING /
AUXILIARY
COOLING
WATER AND
SERVICE
WATER
SYSTEM
(FRESH WATER
APPLICATION)
> NB65
< NB50
ASTM A
IS1239
234 WPB
GALVANISED
GALV.
ASTM
IS1239
A105
GALVANISED
GALV.
ASTM
A105
GALV.
ASTM
A105
GALV.
TEFLON
(Asbestos
free)
TEFLON
(Asbestos
free)
TEFLON
ASTM A 182 ASTM A 182
(Asbestos
F304
F304
free)
TE
SE
NB 50 &
BELOW
ASTM A312
TP 304
(ERW)
NB 65 TO
NB 150
ASTM A312
TP 304
(ERW)
BW
NB 200 &
ABOVE
ASTM A312
TP 304
(ERW)
SAME AS
PIPE
BW
UPTO NB
150
IS 1239 PT-1
HEAVY
GRADE
NB 200 TO
NB 350
IS 3589
(ERW)
ASTM A
234 WPB
BW
400 NB &
ABOVE
IS3589
PLATE
FORMED
ASTM A
234 WPB
OR
MITRES
ASTM A 105
BW
SW
BW
Notes:
1.
All pipes shall be preferably shop fabricated. However large dia pipes (> 500
mm) shall be site fabricated.
2.
3.
Blind flanges on SS Pipe lines shall be to ASTM A 240 TP 304. Stub ends shall
be used at flanged connections.
4.
5.
6.
Cast iron valves shall be provided for water system and cast steel valves shall
be provided for compressed air system.
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 16 OF 22
Ball valves or Plug valves shall be provided for oil and air system.
8.
All painting with primer coats (2 coats each) shall be provided for the piping and
all hangers.
ESSENTIAL SPARES FOR PIPING SYSTEM
1. Pipes
2. Gaskets
5. Pipe clamps
ISSUE
R1
TCE FORM NO. 329 R5
PART B
VOLUME: III
SECTION: D7
SHEET 19 OF 22
Temp
51100
PIPE DIA
451500
501550
551575
15 mm (1/2)
25
25
40
40
50
65
80
90
100
115
125
20 mm (3/4)
25
25
40
50
50
65
80
90
100
125
125
25 mm (1)
25
40
40
50
65
80
90
100
115
125
140
32 mm (1-1/4)
25
40
40
50
65
80
90
100
115
140
140
40 mm (1-1/2)
25
40
40
50
65
80
90
115
125
140
150
50 mm (2)
25
40
40
50
65
80
100
115
125
150
165
80 mm (3)
25
40
50
50
80
90
100
125
140
165
170
100mm (4)
40
50
50
65
80
90
115
125
150
165
190
150 mm (6)
40
50
50
65
80
100
115
140
165
190
200
200 mm (8)
40
50
50
65
80
100
125
140
165
190
215
250 mm (10)
40
50
50
65
90
115
125
150
175
200
215
300 mm (12)
40
50
65
75
90
115
140
150
190
215
225
350 mm (14)
50
65
75
75
90
115
140
165
190
215
225
400 mm (16)
50
65
75
75
90
115
140
165
190
215
240
450 mm (18)
50
65
75
75
90
115
140
165
190
215
240
500 mm (20)
50
65
75
100
115
115
140
165
200
225
240
600 mm (24)
50
65
75
100
115
115
140
175
200
240
250
625 mm (25)
50
65
75
100
115
115
140
175
200
240
250
650 mm (26)
50
65
75
100
115
115
150
175
200
240
250
700 mm (28)
50
65
75
100
115
115
150
175
215
240
300
800 mm (32)
50
65
75
100
115
125
150
175
215
240
300
900 mm (36)
50
65
75
100
115
125
150
175
215
240
300
950 mm (38)
1000 mm (40)
& above flat
surfaces
50
65
75
100
115
125
150
175
215
240
300
50
65
75
100
115
140
170
215
250
300
350
ISSUE
R1
TCE FORM NO. 329 R5
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
TECHN
NICAL SPECIF
FICATION FO
OR
PIPIN
NG, VALVES & FITTINGS
167
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
1.00.00
0
CO
ODE & STANDARDS
0
1.01.00
Th
he Design, ma
anufacture, sh
hop testing, errection, testing
g and commisssioning of pip
ping and valve
es
sh
hall conform to
o the latest re
evisions of the
e following co
odes and Indiaan Standards
s, in addition to
t
otther standards
s mentioned e
elsewhere in the tender do
ocuments subjject to any modification
m
an
nd
re
equirement as specified here
einafter.
IS
S : 778
IS
S : 1239
IS
S : 1536
entrifugally ca
ast (spun) iron pipes for wate
ter, gas and se
ewage.
Ce
IS
S : 1537
Ve
ertically cast iron pressure pipe
p
for water,, gas and sew
wage.
IS
S : 1538
Ca
s for pressure pipes for watter, gas and se
ewage.
ast iron fittings
IS
S : 1703
Ba
all valves (ho
orizontal) plung
ger type incluuding floats fo
or water supply
pu
urposes.
IS
S : 2379
Co
dentification of pipe line.
olour for the id
IS
S : 2685
Co
ode of practic
ce for erection
n, installation,, and mainten
nance of sluicce
va
alves.
IS
S : 14846
IS
S : 3042
IS
S : 3589
Ellectrically weld
ded steel pipe
es for Water ggas & sewage
e (200 to 200
00
m
mm).
IS
S : 4038
Fo
oot valve for water
w
works pu
urposes.
IS
S : 4984
Hiigh Density po
olyethylene pip
pes.
IS
S : 4985
Un
nplasticised PVC
P
Pipes.
IS
S : 5312
Sw
wing check type reflux (non-return) valve Part-I.
IS
S : 458
IS
S : 3952
Ca
ast Iron butterrfly valves for general purpooses.
AS
STM-A 106
G r.C Seamless
s carbon steel pipe.
AS
STM - 53
Se
eamless carbo
on steel.
AW
WWA-C-504 - Standard fo
or butterfly valve.
BS
S : 5156
IS
S : 554
IS
S : 1363
IS
S : 1364
IS
S : 2062
IS
S : 4736
Ho
ot dip zinc coa
ating on steel tubes.
168
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
IS
S : 2825
Co
ode of unfired
d pressure ves
ssels.
IS
S : 2712
G askets.
IS
S : 4192
IS
S : 3006
IS
S : 783
Co
ode of practice for laying RC
CC pipes.
IS
S : 3114
BS
S : 5142
AN
NSI:B 16.5
AN
NSI:B 31.1
Po
ower Piping co
ode.
2.00.00
0
DE
ESIGN, CONS
STRUCTION AND ERECT
TION ((Please
e note that th
he details giv
ven below arre
ge
eneral require
ements, howe
ever the requ
uirement of Datasheet-A
D
to
o be fulfilled completely)
0
2.01.00
2.01.01
De
esign
Alll piping systems shall be ccapable of withstanding the maximum prressure in the correspondin
ng
lin
nes at the rele
evant temperattures. The minimum thickne
ess for pipes aand fittings sh
hall be adhere
ed
to. Higher thick
kness in equivvalent materia
al is acceptab
ble. However,, no credit will be given fo
or
hig
gher thickness
s.
2.01.02
2
3
2.01.03
2.01.04
4
manufactured
Piiping and fittin
ngs shall be m
d by an appro
oved firm of reepute. They should
s
be truly
cyylindrical of cle
ear internal dia
ameter speciffied, of uniform
m thickness, ssmooth and strong, free from
m
de
ents, cracks and
a
holes and
d other defectts. They shall allow ready cutting, chipp
ping or drilling
g,
we
elding etc.
5
2.01.05
6
2.01.06
Inspection hole
es shall be prrovided at suitable location
ns for pipes 8800 mm NB and above as
a
re
equired for perriodic observattions and insp
pection purpos
ses.
2.01.07
7
Material of cons
struction for piipes carrying various
v
fluids shall be as beelow: -
--------------------------------------------------------------------------------------------------------------------S..No. Servic
ce
Material
M
-------------------------------------------------------------------------------------------------------------------1.
Raw water
w
Carboon Steel
2.
Clarifie
ed water/Filterred Water
Carboon steel
169
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: D1
REV
V NO: 00
3.
Acidic Water
4.
Demin
neralised Wate
er
5.
Acid (h
hydrochloric)
6.
Alkali (Sodium
(
Hydrroxide)
a)
Strong (5%
% and above)
b)
Dilute
(b
below 5%)
7.
S
ensions
Lime Solution/Suspe
Galvannized Steel
8.
Air
Galvannized
0.
10
Steel to
39
IS 123
HDPE
e-304
Stainleess steel Type
8
2.01.08
2.01.09
9
Pump discharge
c)
Heade
er
d))
1.2
1 - 1.8
1.8 - 2.4
2.1 - 2.5
2
1.5 - 2.4
2.1 - 2.4
2
15
1 - 20
20 - 30
25 - 35
5
20
2 - 30
25 - 40
35 - 45
5
Comprressed air
below 2 Kg/cm2(g)
e))
Comprressed air
2 Kg/c
cm2 & above
7-8
Suction to compresssor/
Blowerrs
-------------------------------------------------------------------------------------------------------------------f)
2.01.10
0
2.01.11
Th
he following " C" Value sha
all be used in WILLIAM & HAZEN
H
formuula for calculating the frictio
on
losss in piping sy
ystems.
I)
Carbon
n Steel pipe
100
ii)
C.I Pip
pe / Ductile Iro
on
100
iii))
Rubbe
er lined steel p
pipe
120
170
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: D1
REV
V NO: 00
iv))
140
v)
e
Resin Transfer Pipe
100
2.02.01
2
2.02.02
Th
he Steel pipes
s (Welded typ
pe) for the se
ervices of raw
w water/clarifieed water/Filterred water sha
all
co
onform to the following
f
stand
dard or codes
s.
i)
ii)
iii))
Pipes up to 150 NB
a)
IS:1239 Pa
art-I
b)
ASTM-A-53
3 Grade B
Type-E
(Heavy
vy grade-Black
k)
(Welded),
IS:3589 - G
Grade 410
b)
ASTM - A5
53, Type-E Gra
ade B (Welded) - Sch. 40
Pipe 500
5 NB and ab
bove-In this case pipes sha
all be rolled annd butt welded. These pipe
es
may be
b fabricated by the bidde
er at site. The
e plates connforming to IS
S:2062 (Teste
ed
quality
y) or SA-285 G
Gr.C. or equiva
alent.
Howev
ver, condense
er polisher pip
pelines shall be
b of seamlesss carbon stee
el ASTM A 10
06
Gr.B all
a welded consstruction with minimum 300 lb flange connnection.
3
2.02.03
4
2.02.04
Piipes to be use
ed for the rub
bber-lined con
nstruction shall conform thee above claus
se 2.02.02 an
nd
insside surface shall
s
be complletely de-bead
ded and made suitable for linning.
2.02.05
5
Otther piping ma
aterials shall cconform to the
e following stan
ndards.
6
2.02.06
i)
IS:498
84 - Class-5-H igh density po
olyethylene pip
pes.
ii)
IS:498
85 - Class-4 - P
PVC Pipes.
iii))
iv))
v)
Fittings
(a
a)
Fittings
s to be used w
with carbon ste
eel pipes shall conform to IS
S:1239 Part-II (Heavy grade
e)
for size
es up to 150 N
NB.
(b
b)
For siz
zes 200 NB & above steel fittings shall conform to ASTM A 234
2
Gr. WPB
B.
Howev
ver for sizes above 350 NB
N fabricated fittings (meteer bends etc) may be used
d.
171
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
Forged
d elbows of lo ng radius shall be used.
(cc)
Howev
ver inside surfface of all the fittings used fo
or the rubber llined applicatiion shall be de
ebeaded and made ssuitable for rub
bber lining.
(d
d)
For Ga
alvanized pipe
e application all
a the fittings shall
s
be galvannized as per IS
S:4736.
(e
e)
Fittings
s to be used
d in other ty
ype of piping shall conforrm to relevan
nt IS/BS ANS
SI
Standa
ards and in co
onformity with the parent pip
pe standard.
(f))
Unless
s otherwise sh
hown eccentric
c reducers sha
all be installedd with straight side at the to
op
of pipin
ng connection
n.
0
2.03.00
De
esign of Pipin
ng Systems
2.03.01
F water, air and other serrvices where steel pipes arre used, jointss of this size range shall be
For
b
sccrewed/flanged
d type.
2.03.02
2
2.03.03
3
2.03.04
4
5
2.03.05
6
2.03.06
Fo
or easy handling & remova
al of equipmen
nts, valves etc
c. and for mainntenance purp
pose, break up
u
fla
anges for 65 NB
N and above
e sizes and su
uitable type of compression flexible coupling for flange
ed
joints of 50 NB and below sizze shall be pro
ovided. The over
o
ground ppiping whereve
er routed insid
de
bu
uilding, shall have
h
a clear he
ead room of minimum
m
2.1 meter
m
from opeerating floor.
2.03.07
7
8
2.03.08
Bu
utt-welding ed
dge preparatio n shall be don
ne as per ANS
SI B 16.25.
9
2.03.09
0
2.03.10
Ha
angers and su
upports shall b
be capable of carrying the sum
s
of all con currently actin
ng loads. The
ey
sh
hall be design
ned to provide
e the required
d supporting effects
e
and alllow pipeline movements as
a
ne
ecessary. All guides, anch
hors, braces, dampener, expansion
e
joinnt and structu
ural steel to be
b
atttached to the building/strructure, trenches etc. sha
all be provideed. Type off hangers an
nd
co
omponents forr all piping sha
all be selected
d and approval obtained from
m the ENGINE
EER.
2.03.11
Fo
or rubber lined
d pipe, lining should be applied in two (2
2) layers, givinng a total thic
ckness not lesss
than 3 mm. Surrface hardnesss of rubber lining shall be 65
5 r 5o Shore A
2.03.12
2
Piipe coming un
nder purview of IBR should meet its req
quirements annd getting the
e IBR approva
al
sh
hall be under Vendors
V
scope
e.
172
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
3.00.00
0
VA
ALVES & GA
ATES (Please
e note that the
t
details given
g
below aare general requirements
s,
ho
owever the re
equirement o
of Datasheet-A to be fulfilled and typess of valves shall
s
be as pe
er
P&
&ID)
0
3.01.00
Va
alves will be used
u
to start/sttop or control flow. Gates will
w be primarilyy used for isolation of flow in
i
op
pen channels although thesse should be capable
c
of thro
ottling the flow
w too. Sample
e valves will be
b
ussed in sample collection line
es.
0
3.02.00
(a
a)
(b
b)
All the
e actuators off the valves shall be desiigned to handdle the maxim
mum expecte
ed
pressu
ure differentiall across the valves
v
and to overcome fririction forces and
a
unbalancce
forces due to the flo w through valve.
0
3.03.00
Va
alves in Raw water, Clarifiied & Filtered
d water applic
cation
3.03.01
2
3.03.02
Slluice/gate valv
ve shall confo
orm to IS 1484
46 of rating PN 1.6 (min.). Stem, seat ring and wedg
ge
facing ring shalll be of stainle
ess steel cons
struction. Oth
her parts shalll be as per IS
S:780. Flange
es
hall be designe
ed as per ANS
SI B 16.5 Cl. 300
3 (min.) to meet
m
with the piping flanges
s. Valves sha
all
sh
be
e of outside sc
crew and rising
g stem type.
Slluice valves fo
or sizes below
w 50 NB and below shall conforms
c
to I S:778 Class-2
2/ANSI B16.3
34
straight, rising stem;
s
without sside screw.
3
3.03.03
Slluice valves sh
hall be provide
ed with the following access
sories in additiion to the stan
ndard items.
a))
Hand wheel
w
b))
Manua
al Gear reducttion unit opera
ator for valves 250 NB and aabove.
c)
d))
Drainin
ng arrangeme
ent wherever re
equired.
e))
f)
on indicator.
Positio
3.03.04
4
5
3.03.05
Bu
utterfly valves
s shall be of d
double flanged
d type of low leakage rate confirming to AWWA-C-50
04
cla
ass 300 (min.) or BS:5155 P
PN 10 (min.)
3.03.06
6
Th
he various com
mponents of b
butterfly valves
s shall be of th
he following
i)
Body
Cast Iron
I
- ASTM A 48 Cl.40; BS:1452 Gr.220 SG Iron BS:2789. Cast Iron IS:210 Gr.FG2260
Cast Steel
S
- ASTM. A 216 GR. W
WCB; BS:1504 Eq.Gr.
Fabric
cated Steel as per ASTM A5515 Gr.60/80
IS:206
62, Gr.B/IS:2002.
ii)
Disc.
173
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
Cast Steel
S
- ASTM A 216 Gr. WC
CB; BS:1504 Eq.Gr.
E
Fabric
cated Steel as per ASTM A5515 Gr.60/80
IS:206
62, Gr.B/IS:2002.
iii))
Shaft
iv))
Seat riings
7
3.03.07
Bu
utterfly valves
s shall be fitte
ed with sleeve
e type bearing such as PTF
FE. Valves of
o size 350 NB
an
nd above shall be provided with one or tw
wo thrust beariings to hold thhe disc secure
ely in the centrre
off valve seat without hydraul ic or external axial shaft loa
ads. Sleeve aand other bea
arings fitted intto
the valves body shall be off self lubricate
ed materials that do not hhave any effe
ect on the fluiid
andled and oth
her componen
nts of the valve
es.
ha
8
3.03.08
9
3.03.09
3.03.10
0
Ba
all valves or Globe
G
Valves may also be provided for the
t applicationn of Raw/ Cla
arified / Filtere
ed
wa
ater services for
f sizes 40 N B and below conforming
c
to the following specifications
s.
a))
Ball Valves
i)
andard
Design Sta
ii)
Type
iii)
on
Material off Constructio
Body
Ball
Seat ring
PTFE
Stem
Seats
iv)
Valves sha
all be designed
d to be directly
y operatable bby a wrench / Hand
H
lever.
v)
Suitable sto
ops shall be provided
p
for bo
oth the fully oppen & close co
ondition.
vi)
174
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
b))
SEC
CTION: D1
REV
V NO: 00
Globe Valves 50 NB
B and Below
i)
Design Sta
andard
IS:7788 Class-2
ii)
Type
iii)
on
Material off Constructio
i)
ii)
Body, Bon
nnet,
stuffing Bo
ox
& seat ring
gs
Stem
iii)
Disc
SI-316
IS
S:318 Gr. 2/AIS
iv)
v)
vi)
vii)
3.03.11
i)
Design Sta
andard
IS
S:780/IS:2906 rating PN
1.0 min. or E
Equivalent/BS 5150 PN 10
0.
(m
min.)
ii)
Type
iii)
Material o
of constructio
on
Body
Stem
Sttainless steel A
AISI 410/
13
3% chrome steeel.
Disc
Packing
PT
TFE
at rings
Seat & sea
13
3% chromium steel
AISI 420
Hand whee
el
Ba
ack seat shall be provided o
on the stem orr on the disc.
Ren
newable disc assembly
a
shalll consist of disc holder, disc
c, disc guide, check nut and
d disc retainin
ng
n with washe
nut
er.
D of globe va
Disc
alve may be p
provided with renewable
r
rub
bber seating ri ng.
Ha
and wheels sh
hall be marke
ed with the wo
ord. OPEN or SHUT with aarrow to indica
ate direction of
o
o
opening
or clos
sing.
Ho
owever, valve
es in the flusshing water lines shall be
e of type andd material sp
pecified for th
he
ch
hemicals which is being flusshed by the line.
0
3.04.00
Va
alves for Dem
mineralised w
water applicattion
3.04.01
Bu
utterfly valves
s or Saunderrs patented diaphragm va
alves shall bee used for th
he services of
o
de
emineralised water
w
applicatiion for isolatio
on purposes.
175
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
SEC
CTION: D1
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
3.04.02
2
Th
he diaphragm valves shall cconform to the
e following requirements.
a))
Design
n Standard
b))
Type
c)
Materiial of Constru
uction
Body/B
Bonnet
3.04.03
3
0
3.05.00
REV
V NO: 00
I)
II)
Body lining
Diaphrragm
Hand wheel
w
Comprressor
Stem & Bush
:
:
:
Cast Iron
Sttainless Steel
Sttainless Steel
d))
Flange
es shall conforrm to ANSI B 16.5 Cl.300 and shall be caast/integral witth the body.
e))
Hand wheels
w
shall b
be marked with
h the direction
n of closure.
f)
Valves
s shall be provvided with a po
osition indicato
or to show thee open and clo
osed condition
n.
g))
Valves
s provided wiith pneumatic
c actuators sh
hall be providded with a hand
h
wheel fo
or
manua
al operation. T
The valves op
perators shall be designed as per relevant Internationa
al
Standa
ard.
Th
he butterfly valves
v
shall cconform to Cl.3.03.05 to Cl.3.03.09
C
aboove except to
o the followin
ng
re
equirements.
a))
Body shall
s
be lined ((minimum 3 mm)
m with naturral rubber, eboonite,
polypro
opylene or PV
VDF.
b))
Disc sh
hall be lined w
with PVDF, polypropylene, or
o natural rubbber.
c)
Va
alves for Acid
d & Alkali Serrvices
Va
alves shall be
e saunders p
patented diaph
hragm type. The valves sshall conform to Cl. 3.04.0
02
ab
bove except to
o the following
g requirements
s.
a))
0
3.06.00
Va
alves for Lime Slurry / Sollutions
3.06.01
3.06.02
2
Th
he plug valves
s shall conform
m to the follow
wing requireme
ents.
a))
Design
n Standard
b))
Type
BS:5353 Class
C
300 or
Equivalent.
:
Fllanged and noon lubricated,
176
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: D1
REV
V NO: 00
re
egular pattern,, plug valves.
c)
0
3.07.00
Material of Construcction
i)
Body
B
ii)
Plug
P
iii)
Body
B
Sleeve orr Seat :
PTFE
iv)
Seat
S
PT
TFE
v)
Gland
G
vi)
Cover
C
vii) Gland
G
Nut
d))
Valves
s shall be ope
erated by perm
manently fitted
d wrench or H
Hand lever. Wrench
W
shall be
b
mounted so that the
ey are parallel to the valve bore axis whhen the valve is in fully ope
en
conditiion.
e))
All valv
ves shall be p
provided with an
a indicator for the position oof the plug pa
art.
f)
g))
Valves
s of size of 250
0 NB and abo
ove shall be provided with a suitable reduc
ction gear unitt.
Re
esin Transferr Line
In resin transfe
er line in CPU
U two way eccentric
e
plug valve as maanufactured by
b De Zurik or
o
pproved equal shall be use
ed. Ball valve may also be used
u
for this aapplication. The valves sha
all
ap
ha
ave type 316 stainless stee
el body and bearings,
b
resilient faced plug and flan
nged ends. Fo
or
se
ervice vessel area pressurre rating shou
uld be in line with system
m requirement. All automatic
va
alves shall be provided with
h double actin
ng pneumatic cylinder actuuators controlled by solenoiid
va
alves, manual over ride featture & local po
osition indicato
ors.
0
3.08.00
Bu
utterfly valves in the conden
nsate polisherr service vesse
els.
3.08.01
Th
hey shall be lu
ugged wafer tyype.
2
3.08.02
Th
he material of construction sshall be as be
elow:
i)
Body
Cast Steel
S
(Please
e refer note wrritten below)
ii)
Disc
SS-316
iii))
Shaft
SS-316
iv))
Seal
Teflon
v)
Seat
No
ote: - the bod
dy material sh all be SS 316
6 for all the butterfly valvess coming at th
he outlet of th
he
se
ervice vessels.
3
3.08.03
Flan
nges shall corrrespond to AS
SA 300 lb clas
ss (min).
4
3.08.04
Alll automatic va
alves shall be
e provided with
h double actin
ng pneumatic cylinder actua
ators controlle
ed
byy solenoid valv
ves, manual o
over ride feature & local position indicatorss.
0
3.09.00
Va
alves for Air pipe line app
plication
3.09.01
Fo
or Air services
s, globe valvess or Ball valve
es may be used for sizes 50 NB and below
w.
177
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
SEC
CTION: D1
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
REV
V NO: 00
3.09.02
2
Fo
or sizes higher than 50 NB, either Butterfly valve or Ball valves shall be used.
3
3.09.03
Globe valves sh
hall generally cconform to Cl. 3.03.10 (b) above.
a
4
3.09.04
Ba
all valves shall conform to tthe requireme
ents stipulated
d in Cl.4.03.100 (a) above. However,
H
Bod
dy
material shall be
e leaded Tin B
Bronze (IS:318
8 Gr.2) or stainless steel (A
AISI:304/316).
3.09.05
5
Bu
utterfly valves
s shall conform
m to the Cl.3.0
03.05 to 3.03.09 of this secction. Howev
ver, the body &
Diisc shall be either
e
cast iro
on lined with elastomer such as PVDF or PTFE or stainless stee
el
co
onstruction (AIISI 304/316).
3.10.00
0
No
on-return valves (Check v
valves)
3.10.01
No
on return valves shall be of swing check (reflux) type or dual plate tyype.
2
3.10.02
Th
he valves shall conform to t he following specifications.
s
i)
Design
n Standard :
ii)
Type
iii))
Swing chec
ck Type and F
Flanged ends.
a)
Body
B
& Cover
Hinge
H
Disk/Do
oor
b)
Hinge
H
Pin and
Door/Disc
D
Pin
c)
Disc
D facing rin g
Sttainless steel
d)
Body
B
Seat ring
g
Sttainless steel
e)
Bearing
B
bushe
es
Le
eaded Tin Broonze IS:318 Gr.2
f)
Bolts
B
Carbon Steel
iv))
For the
e application o
of lime, corro
osive water (D
DM water), andd air, the body
y, cover & Dissc
shall be
b lined with na
atural Rubberr, PTFE or Vito
on. The Hingee, Hinge Pin & Disc Pin sha
all
be coa
ated with PVD
DF, or suitable elastomer. The bearing buushes shall be
e PTFE or Eqvvt.
material. Bolting sshall be of stainless steel. In the abssence of linin
ng/coating, th
he
comple
ete valve sh all be of sta
ainless steel construction (AISI 316) for the abovve
applica
ation.
v)
For ac
cid services, th
he valves sha
all be of lined construction aas specified in
n (iv) above, or
o
of Has
stalloy B consstruction and Body/Disc
B
facing ring shall bbe of resilient materials succh
as natu
ural rubber, P
PTFE or Viton.
vi))
For alk
kali services, tthe complete valve
v
shall be stainless steeel construction
n (AISI-316).
3
3.10.03
3.10.04
4
Bo
ody shall be permanently
p
m
marked with an
n arrow inscrription indicatiing the directio
on of motion of
o
the fluid for all the check valvves.
5
3.10.05
Ch
heck valves fo
or Raw / Clariffied / Filtered water may be
e offered in Guun metal cons
struction & witth
178
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: II-B
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SEC
CTION: D1
REV
V NO: 00
Th
he safety valves / relief valvves at the dow
wnstream of po
ositive displaccement type metering
m
pump
ps
sh
hall be of the
e standard tyype manufactu
ured by the pump manufaacturer and the
t
material of
o
co
onstruction sha
all suit to the ffluid handled.
0
3.12.00
Gates
3.12.01
esign standard
d for gates sh all be IS:3042
2 or Eqv.
De
2
3.12.02
Th
he gates shall be rectangu
ular or square sluice, risin
ng spindle typpe conforming
g to class-1 of
o
IS
S:3042.
3.12.03
3
Material of Construction
3.12.04
4
i)
e and Door
Frame
ii)
iii))
Cast Iron IS
S:210 Gr. 20
:
M.S.
M to IS:20622
3.12.05
5
Ea
ach of the gate
es shall be pro
ovided with ha
and wheel, and a position inndicator.
3.12.06
6
Th
he gates for DM
D plant drainss shall be rubb
ber lined to a minimum thickkness of 4.5 mm.
m
0
3.13.00
ST
TRAINERS
3.13.01
Ba
asket Straine
ers
a))
2
3.13.02
Bo
ody
ii)
Strrainers
iii)
Drrain Plug/Nuts
Gun metal
b))
c)
d))
Screen
n (strainer) flo
ow area shall be
b at least fou
ur times pipe ssectional area
a. Flow area in
i
any po
ortion of Baskket strainer as
ssembly shall not be less thhan the pipe cross
c
sectiona
al
area.
e))
Pressu
ure drop in cle
ean condition shall
s
not be more than 1.0 M
MWC.
f)
g))
For DM
M water serviice, body sha
all be rubber lined to minim
mum 4.5 mm thickness (so
oft
rubberr of shore Hard
dness 65 5A).
Y--Type Straine
er
a))
Y-Type
e strainer for w
water application shall be co
onstructed of ffollowing mate
erials :
179
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
i)
Body
ii)
Strainers
iii)
Drain Plug//Nuts
Gun metal
m
(threadedd construction
n)
b))
Y-Type
e strainers sha
all also conforrm to Cl. 3.14.01 (b), (d), (e)) and (f).
c)
Body of
o the Y-type
e strainers of alkali, and de
emineralised water shall be
b of Cast Iro
on
(IS:210
0, Gr.FG 260)) and lined with soft or hard rubber to a thhickness of 4.5
5 mm.
d))
For ac
cid services, ap
part from the rubber
r
lined body material, the screen ma
aterial, shall be
b
Polyprropylene or HD
DPE wire cloth
h of suitable mesh
m
and thickkness.
3.14.00
0
Ge
eneral Requirements for V
Valves, Gates
s, Strainers
3.14.01
2
3.14.02
3
3.14.03
Va
alves coming under the purv
rview of IBR if any shall mee
et its requirem
ments and the approval of th
he
e contractor.
sa
ame shall be obtained
o
by the
3.14.04
4
Siizes of the valves shall be ssame as that of the interconnected pipe sizes exceptt for the contro
ol
va
alves.
5
3.14.05
Th
he various equipments sha
all be installed so that they are easily appproachable fo
or the operatin
ng
an
nd maintenanc
ce personnel. Generally Va
alves shall be located aboutt 1.2 meter to 1.5 meter from
m
the operating platform and allso they shall not be located
d below the grround level su
uch as beneatth
the trenches ettc. In such ca
ases, extende
ed spindle sha
all be provideed with chain operating from
m
perating floor. Valves whicch are installed below the ground
g
floor s hall be provid
ded with a floo
or
op
mounted pedes
stal at the top of the operatiing floor. The position indica
cator for such valves shall be
b
alsso provided along with the sstand.
6
3.14.06
Ho
owever valves
s which are p
provided (in th
he burried pipe line) with a valves cham
mber shall havve
manual operato
or/Hand whee
el inside the valve
v
chamber. The valvee chamber sha
all be provide
ed
dders/staircase
es and sufficiient operating space withinn the chamber shall also be
b
wiith built in lad
prrovided for eas
sy operation o
of such valves.
180
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
TECHN
NICAL S
SPECIF
FICATION FOR
H
HORIZO
ONTAL C
CENTRIFUGAL
L PUMPS
S
181
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
1.0
00.0
SCOPE
1.0
01.0
Th
his specifica
ation covers the design, material, co
onstruction fe
eatures, mannufacture, inspection,
te
esting the pe
erformance at
a the Vendo rs/Sub-Vend
dors Works and deliveryy to site of Horizontal
H
Centrifugal Pu
umps.
2.0
00.00
C
CODES AND
D STANDARDS
2.0
01.0
Th
he design, material, construction,
c
manufacturre inspectio
on and perfformance te
esting of
Horizontal Centrifugal Pum
mps shall com
mply with all currently ap
pplicable stattutes, regulattions and
afety codes in the loc
cality where the Equipm
ment will be installed. Nothing in these
sa
sp
pecifications shall be co
onstrued to rrelieve the Vendor
V
of this responsibbility. The Eq
quipment
su
upplied shalll comply with
h the latest a
applicable In
ndian Standa
ards listed bbelow. Other National
Sttandards are acceptable, if they a
are establish
hed to be equal
e
or su perior to the Indian
Sttandards.
2.0
02.0
L
List of Applica
able Standarrds.
1
IS
S : 1520
Horizontal Centrifugal
C
Pumps
P
for cleear cold fresh
h water.
IS
S : 5120
AP
PI : 610
Technical re
equirements of roto dynaamic special purpose
pumps.
Centrifugal pumps for general refineery service.
IS
S : 5639
Pumps Han
ndling Chemiicals & corroosion liquids.
IS
S : 5659
HIIS
Hydraulic In
nstitute Stand
dards, USA
AS
STM-1-165-6
65
Standards Methods
M
for Liquid Penettration Inspe
ection.
2.0
03.03
In
n case of anyy contradictio
on with afore
esaid standa
ards and the stipulationss as per the technical
sp
pecifications as specifie
ed hereinafte
er the stipulations of th
he technicall specificatio
ons shall
prrevail.
3.0
00.00
D
DESIGN REQUIREMEN
NTS
3.0
01.00
Th
he Pump shall be cap
pable of devveloping the
e required to
otal head aat rated cap
pacity for
co
ontinuous op
peration. Als
so the pump
ps shall be capable of be
eing operatedd to give satisfactory
pe
erformance at
a any point on the HQ ccharacteristics curve ove
er the operaating range of
o 40% to
12
20% of the duty
d
point. Th
he maximum
m efficiency of
o pump shalll be preferabbly be within
n +/- 10%
off the rated de
esign flow as
s indicated in
n the data sheets.
182
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
3.0
02.00
Th
he total hea
ad capacity curve
c
shall b
be continuou
usly rising frrom the opeerating point towards
sh
hut-off withou
ut any zone of instability and with a minimum
m
shu
ut-off head oof 15% more than the
de
esign head.
3.0
03.00
Pumps of a pa
articular cate
egory shall be
e identical and shall be suitable
s
for pparallel opera
ation with
qual load divvision. The head Vs cap
pacity and BHP Vs capa
acity characteeristics shou
uld match
eq
to
o ensure eve
en load sharing and troub
ble free operation throug
ghout the rannge. Compo
onents of
identical pump
ps shall be in
nterchangeab
ble.
3.0
04.00
Sleeeve Bearin
ng
75.0
0 micron
75..0 micron
SPEED
1500 rpm and
a below
3.0
05.00
Th
he noise levvel shall nott exceed 85
5 dBA. Ove
erall sound pressure levvel reference
e 0.0002
m
microbar (the standard prressure refe rence for airr sound mea
asurement) aat a distance
e of 1 M
fro
om the equip
pment.
3.0
06.00
Th
he pumps shall be capa
able of startiing with disc
charge valve
e fully open and close condition.
c
M
Motors shall be selected to suit to th
he above re
equirements. Continuouss Motor ratin
ng (at 50
de
eg.C ambien
nt) shall be atleast ten p
percent (10%
%) above the
e maximum load deman
nd of the
pu
ump in the entire
e
operating range to take care off the system frequency vvariation and
d no case
le
ess than the maximum po
ower require
ement at any condition off the entire ccharacteristic
c curve of
th
he pump.
3.0
07.00
Th
he kW rating
g of the drive
e unit shall be
e based on continuously
c
quipment
driving the cconnected eq
fo
or the condittions specifie
ed. Howeve
er, in cases where para
allel operatioon of the pu
umps are
sp
pecified, the actual motor rating is to be selected by the Bidder considerinng overloading of the
pu
umps in the event
e
of tripp
ping of opera
ating pump(s
s).
3.0
08.00
Pumps shall be
b so design
ned that pum
mp impellers and other accessories
a
oof the pumps
s are not
amaged due to flow reversal.
da
3.0
09.00
Th
he Contracto
or under this specification
n shall assum
me full respo
onsibility in thhe operation of pump
an
nd motor as a unit.
4.0
00.0
D
DESIGN CO
ONSTRUCTION
4.0
01.00
DESIGN AND
D CONSTRU
UCTION OF
F VARIOUS COMPONE
ENTS OF T
THE PUMPS
S SHALL
T THE FO
OLLOWING GENERAL SPECIFICA
ATIONS. F
FOR MATER
RIAL OF
CONFORM TO
TION OF THE
E COMPONE
A SHEETS SHALL
S
BE R
REFERRED TO.
T
CONSTRUCT
ENTS, DATA
4.0
02.0
Pump Casin
ng
4.0
02.01
4.0
02.02
183
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
4.0
03.00
Im
mpeller
4.0
03.01
Im
mpeller shall be closed, semi-closed
d or open typ
pe, and it sh
hall be desiggned in confformance
w
with the detailed analysis of
o the liquid b
being handle
ed.
4.0
03.01
Th
he impeller shall be se
ecured to th
he shaft, an
nd shall be retained aggainst circum
mferential
m
movement by keying, pinn
ning or lock rings. On pumps with overhung
o
shaaft, impellers
s shall be
se
ecured to th
he shaft by a lockout o r cap screw
w which tighttness in thee direction of
o normal
ro
otation.
4.0
04.00
Im
mpeller/Cas
sing Wearing Rings
4.0
04.01
R
Replaceable type
t
wearing
g rings shal l be provide
ed at suitable locations of pumps. Suitable
m
method of loccking the we
earing ring s hall be used
d. Wearing rings shall bbe provided in pump
ca
asing and/or impeller as per manufaccturers stand
dard practice
e.
4.0
05.00
Shaft
4.0
05.01
Th
he critical sp
peed shall be
e well away ffrom the ope
erating speed
d and in no ccase less than 130%
off the rated sp
peed.
4.0
05.02
Th
he shaft sha
all be ground
d and polish
hed to final dimensions
d
and
a shall bee adequately sized to
w
withstand all stresses
s
from
m rotor weigh
ht, hydraulic loads, vibrattion and torq ues coming in during
peration.
op
4..06.00
Shaft Sleeve
es
4.0
06.01
R
Renewable tyype fine finish
hed shaft sle
eeves shall be
b provided at the stuffinng boxes/me
echanical
eals. Length
h of the shaftt sleeves mu st extend be
eyond the outer faces of ggland packin
ng of seal
se
en
nd plates so
o as to distinguish betwe
een the leaka
age between
n shaft and sshaft sleeve and that
pa
ast the sealss/gland.
4.0
06.02
4.0
07.00
B
Bearings
4.0
07.01
4.0
07.02
Th
he bearings offered shall be capable of taking bo
oth the radial and axial thhrust coming into play
du
uring operattion. In cas
se, sleeve b
bearings are
e offered add
ditional thrusst bearings shall be
prrovided. Anttifriction bearrings of stand
dard type, if provided, sh
hall be selectted for a minimum life
16
6,000 hrs. off continuous operation at maximum axial and radial loads andd rated speed
d.
4.0
07.03
Proper lubrica
ating arrange
ement for the
s
be prov
vided. The ddesign shall be such
e bearings shall
hat the bearin
ng lubricating
g element do
oes not conta
aminate the liquid pumpeed. Where there
t
is a
th
po
ossibility of liquid enterin
ng the bearin
ngs suitable arrangement in the form
m of deflectors or any
otther suitable arrangemen
nt must be prrovided ahea
ad of bearings assembly.
4.0
07.04
Be
earings shalll be easily accessible
a
w
without disturrbing the pum
mp assemblyy. A drain plug
p
shall
be
e provided att the bottom of each bea rings housing.
4.0
08.00
Stuffing Box
xes
4.0
08.01
184
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
4.0
08.02
4.0
09.00
M
Mechanical Seals
4.0
09.01
W
Wherever spe
ecified in pum
mp data shee
et, mechanic
cal seals sha
all be provideed. Unless otherwise
o
re
ecommended
d by the ten
nderer, mech
hanical seals shall be of
o single typpe with eithe
er sliding
ga
asket or bello
ows between
n the axially moving face
e and shaft sleeves or anny other suita
able type.
Th
he sealing fa
aces should be highly la
apped surfac
ces of materrials known ffor their low frictional
co
oefficient and
d resistance to corrosion against the liquid being pumped.
4.0
09.02
Th
he pump supplier shall coordinate w
with the sea
al maker in establishing
e
amber of
the seal cha
circulation rate
e for maintaiining a stable
e film at the seal face. The
T seal pipiing system shall
s
form
n integral pa
art of the pum
mp assemblyy. For the seals
s
under vacuum serv
rvice, the sea
al design
an
m
must ensure sealing agaiinst atmosph
heric pressure even whe
en the pumpps are not operating.
o
Necessary provision for seal
s
water ssupply along with comple
ete piping fi ttings and valves
v
as
equired shall form integra
al part of pum
mp supply.
re
4.1
10.00
4.1
10.01
Th
he pump and motor sha
afts shall be connected with
w an adeq
quately sizedd flexible co
oupling of
prroven design
n with a spac
cer to facilita
ate dismantling of the pu
ump without disturbing th
he motor.
Necessary coupling guard
ds shall also b
be provided..
4.1
11.00
B
Base Plate
4.1
11.01
A common ba
ase plate mou
unting both ffor the pump and motor shall
s
be provvided. The ba
ase plate
hall be fabriccated steel and
a of rigid construction, suitably rib
bbed and reiinforced. Ba
ase plate
sh
an
nd pump supports shall be so consstructed and the piping unit so mouunted as to minimize
m
misalignment caused by mechanical forces such as normal piping strainn, internal differential
th
hermal expan
nsion and hydraulic pip ing thrust. Suitable dra
ain troughs aand drip lip shall be
prrovided.
4.1
12.00
A
Assembly and Disman
ntling
4.1
12.01
Asssembly and
d dismantling
g of each pu
ump with driv
ve motor sha
all be possibble without disturbing
d
th
he grouting base plate or alignment.
4.1
13.00
D
Drive Motorr (Prime Mo
over)
4.1
13.01
Th
he kW rating
g of the drive
e shall be ba
ased on conttinuously driv
ving the connnected equip
pment for
th
he conditionss specified. In case, w
where paralle
el operation of the pumpps are specified, the
acctual motor rating
r
is to be
b selected b
by the tende
erer considering overloadding of the pumps
p
in
th
he event of trripping of ope
erating pump
ps.
5.0
00.00
TESTING FO
OR HORIZO
ONTAL CEN
NTRIFUGA
AL PUMPS
Th
he manufactturer shall co
onduct all tessts required to ensure th
hat the equippment furnish
hed shall
co
onform to th
he requireme
ents of this sspecification
n and in com
mpliance withh the require
ement of
ap
pplicable Co
odes and Sta
andards. Th
he particulars
s of the prop
posed tests sshall be submitted to
th
he Owner for approval be
efore conductting the tests
s.
5.0
01.00
Hydrostatic Tests
185
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
5.0
02.00
Performance Tests
5.0
02.01
5.0
02.02
Th
he test shall be preferablly conducted
d with the acttual motor be
eing furnisheed.
5.0
02.03
O
Only those pumps
p
shall be subjeccted to strip
p down exa
amination viisually to check for
m
mechanical da
amages after testing at sshop in case abnormal no
oise level an d excessive vibration
is observed du
uring the perrformance te
est. Otherwise strip down examinationn is limited to
o bearing
nspection only.
in
5.0
02.04
Th
he pump acccessories e.g
g. the thrust bearing, cou
uplings etc. shall
s
be subjjected to tests as per
m
manufacturers standards.
5.0
03.00
M
Mechanical Balancing
All rotating components
c
of the pum
mps shall be statically balanced. IIn addition to static
ba
alancing, rottating compo
onents of th
he pumps sh
hall be balan
nced dynam
mically at or near the
op
perating speed. Tendere
er shall furnissh acceptanc
ce norm for this test.
5.0
04.00
V
Visual Inspe
ection
Pumps shall be
b offered forr visual inspe
ection by the
e bidder before shipment.. The compo
onents of
he pumps sha
all not be painted before inspection.
th
5.0
05.00
NPSH Test
NPSH test sha
all be conducted with wa
ater as mediu
um if required. NPSH shhall not be mandatory
m
n case type te
est certificate
es are furnish
hed for the similar
s
rating of pumps.
in
5.0
06.00
5.0
06.01
Th
he noise levvel shall nott exceed 85
5 dBA. Nois
se level measurement w
will be made
e as per
ap
pplicable internationally acceptable standard. The
T
measurrement shalll be carried out with
ca
alibrated inte
egrating sou
und level me
eter meeting the require
ement of IEC
C:651 or BS
S:5969 or
IS
S:9779. Sou
und pressurre level will be measure
ed all round
d the pump and motor set at a
diistance of on
ne meter from the neare
est surface of
o the machin
ne and at a height of 1.5
5 m from
he floor leve
el. A minim
mum of six (6) points should
s
be covered
c
for measurement. The
th
m
measurementt shall be don
ne with a slo
ow response on the A-weighted scalee. The average of the
A--Weighted sound
s
press
sure measurrements exp
pressed in decibels
d
to a reference
e 0.0002
m
microbars sha
all not exceed
d the specifie
ed value.
Th
he tests shall be carried out on the m
machine operrating at rate
ed speed andd as near as possible
to
o the rated power. Co
orrections forr backgroun
nd noise and
d correctionn on accoun
nt of test
en
nvironment will
w be cons
sidered in li ne with app
plicable stan
ndard. For this purpose all the
ad
dditional data
a required sh
hould necesssarily be colle
ected during the test.
BHEL PS- PEM-PPE
EI: NOIDA, SEC
CTOR 16A, UP--201301
186
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
5.0
06.2
5.0
07.00
M
Material Tes
st Certificatte
5.0
07.01
M
Material of th
he various pump
p
compo
onents shall be tested in accordancce with the relevant
sttandards. Te
est certificate
es for these sshall be furnished for the Owners ap proval.
5.0
07.02
W
Where stage inspection is desired b
by BHEL/cus
stomer all material
m
test certificates shall be
co
orrelated and
d verified witth the actuall material used for construction beforre starting fa
abrication
byy BHEL/custtomers inspe
ector who w
will stamp the
e material. In
n case mill ttest certificatte for the
m
material are not
n available, the supplie
er shall carry
y out physica
al and chem
mical tests att his own
co
ost from a te
esting agenc
cy, approved by BHEL/Customer, as per the requuirement of specified
m
material stand
dard. The sa
ample for phyysical and ch
hemical testing shall be ddrawn up in presence
p
off BHEL/Customers inspe
ector who sh all also witne
ess the testin
ng.
5.0
08.00
Non Destruc
ctive Testin
ng
(a)
UT shall be ca
arried out on shafts of dia
ameter more than 50 mm
m.
(b)
o on shaft a
and impeller..
DP tests shall be carried out
(c)
N
No weld repa
air shall be allowed on ca st iron.
5.0
09.00
Field Testing
5.0
09.01
5.0
09.02
Ba
ased on obsservation of the trial op
peration, if modifications
m
sary, the
and repairss are necess
sa
ame shall be
e carried out by the contrractor to the full satisfacttion of the e ngineer and then the
pe
erformance and guaran
ntee tests to
o be repeatted at site as per releevant clauses of the
sp
pecification.
187
TITLE: TECHN
NICAL SPECIF
FICATION FOR
CONDEN
NSATE POLISH
HING UNIT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
TECHN
NICAL S
SPECIF
FICATION FOR
METERING PUMPS
P
188
TITLE: TECHN
NICAL SPECIF
FICATION FOR
CONDEN
NSATE POLISH
HING UNIT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
1.0
00.0
G
GENERAL
1.0
01.01
Specification cover
c
the de
esign, materia
al, constructtion features,, manufacturre, inspection
n, testing
he performan
nce at the ve
endor's/sub-vvendor's works, delivery to site, erecction, comm
missioning
th
an
nd testing of metering pu
umps.
2.0
00.0
G
GENERAL DESIGN
D
FE
EATURES
2.0
00.01
Pumps shall be
b simplex positive displa
acement hyd
draulically op
perated diaphhragm desig
gn, driven
ugh suitable speed reduc
ction unit. Maaximum pum
mp stroke
byy squirrel cage induction motor throu
sp
peed shall no
ot exceed 10
00 per minute
e.
2.0
00.02
Th
he stroke shall be continuously adjusstable to give
e a capacity variation 0-1100% range while the
pu
ump is running or stopp
ped. Adjustm
ment of capa
acity shall be
e done by m
manual control facility
(m
micrometric adjusting
a
type
e) to be provvided locally for each of the pump.
2.0
00.03
Th
he stroke shall be continuously adjusstable to give
e a capacity variation 0-1100% range while the
pu
ump is running or stopp
ped. Adjustm
ment of capa
acity shall be
e done by m
manual control facility
(m
micrometric adjusting
a
type
e) to be provvided locally for each of the pump.
2.0
00.04
Capacity varia
ation may be
e effected byy changing eccentricity
e
of
o the drivingg crank or by
y suitable
uit. Pump acc
curacy shall be industry standard
s
1% of capacitty setting.
hyydraulic circu
2.0
00.05
Pumps shall be
b provided with
w an integ
gral relief valv
ve, spring op
perated to reelease pressu
ure when
elivery line blockage occurs.
de
2.0
00.06
2.0
00.07
G
Guided, contro
olled travel, double-ball ccheck valves
s or equivale
ent, shall be provided both on the
uction and diischarge side
e.
su
2.0
00.08
M
Material of co
onstruction off the variouss parts shall be as per th
he details fu rnished else
ewhere in
th
he specification. However all parts co
oming in con
ntact with acid shall be oof Haste alloy 'B' and
fo
or alkali it sho
ould be of SS
S-316 only.
2.0
00.09
Suitable gland
d seal shall be
b provided tto prevent lea
akage.
2.0
00.10
3.0
00.00
TESTING
3.0
01.00
Te
esting and
d Inspection
n at Manufa
facturer's Works
W
3.0
01.01
Th
he manufaccturer shall conduct
c
all tests require
ed to ensurre that the eequipment furnished
f
co
onforms to th
he requireme
ents of this S
Specification and is in com
mpliance withh requiremen
nts of the
ap
pplicable cod
des. The particulars of th
d tests and the procedurres for the te
ests shall
he proposed
be
e submitted to
t Owner forr approval be
efore conduc
cting the tests
s.
3.0
01.02
Th
he Owner's representativ
ves shall be given full access to all tests for wh ich the Manufacturer
sh
hall inform the Owner allowing a
adequate tim
me so that if the Ownner so des
sires, his
re
epresentative
es can witnes
ss the test.
3.0
01.03
189
TITLE: TECHN
NICAL SPECIF
FICATION FOR
CONDEN
NSATE POLISH
HING UNIT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D1
REV
V NO: 00
3.0
01.04
Th
he pump casing shall be
e hydraulica lly tested at 200% pump
p operating ppressure or 150% of
de
esign pressu
ure whicheve
er is higher. The test pre
essure shall be maintainned at least for an
ho
our.
3.0
01.05
Th
he rotating parts
p
of pump
p drive shall b
be subjected
d to static balancing.
3.0
01.06
3.0
01.07
Th
he pump acccessories e.g
g. gear box, speed reduc
ction unit etc. will be subjjected to tes
sts as per
m
manufacturer's standards. The test ressults shall be
e furnished to
o the Owner..
3.0
01.08
Th
he combined
d variation of
o the pump and motor should
s
be re
estricted withhin limits spe
ecified by
Hydraulic Institute Standard, USA whe
en the pump operated sin
ngly or in parrallel.
3.0
01.09
3.0
01.10
3.0
01.11
Pe
erformance test
t
shall be carried out ffor the setting
g of pressure
e relief valvee.
3.0
01.12
Te
est reports and
a certificate
es of all the a
above-mentioned tests to
o ensure sattisfactory ope
eration of
th
he system sh
hall be submitted to the O
Owner for app
proval before
e dispatch.
3.0
02.00
Te
est at Site
Affter erection
n at site pum
mps as deta
ailed under different gro
oups shall bee operated to prove
sa
atisfactory pe
erformance as
a individual equipment as
a well as a system.
s
If thee performance at site
is found to be
e not to the re
equirementss, then the eq
quipment shall be rectifieed or replace
ed by the
endor at no extra
e
cost to the Owner.
Ve
190
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D2
REV
V NO: 00
SEC
CTIOND2
G
GENERA
ALTECH
HNICALREQUIREMEN
NTELE CTRICA
AL
191
SPECIFICATION NO.
PE-SS-999-506-E101
VOLUME NO. :
II-B
FOR
REV NO. : 00 DATE : 29/08/2005
SHEET : 1 OF 1
LV MOTORS
FOR
LV MOTORS
192
1.0
SPECIFICATION NO.
PE-SS-999-506-E101
VOLUME NO. :
II-B
SECTION
:
D
REV NO. : 00 DATE : 29/08/2005
SHEET : 1 OF 4
INTENT OF SPECIFIATION
The specification covers the design, materials, constructional features, manufacture, inspection and
testing at manufacturers work, and packing of Low voltage (LV) squirrel cage induction motors
along with all accessories for driving auxiliaries in thermal power station.
Motors having a voltage rating of below 1000V are referred to as low voltage (LV) motors.
2.0
DESIGN REQUIREMENTS
3.1
Motors and accessories shall be designed to operate satisfactorily under conditions specified in data
sheet-A and Project Information, including voltage & frequency variation of supply system as defined
in Data sheet-A
3.2
Motors shall be continuously rated at the design ambient temperature specified in Data Sheet-A and
other site conditions specified under Project Information
Motor ratings shall have at least a 15% margin over the continuous maximum demand of the driven
equipment, under entire operating range including voltage & frequency variation specified above.
3.3
Starting Requirements
3.3.1
Motor characteristics such as speed, starting torque, break away torque and starting time shall be
properly co-ordinated with the requirements of driven equipment. The accelerating torque at any
speed with the minimum starting voltage shall be at least 10% higher than that of the driven
equipment.
3.3.2
Motors shall be capable of starting and accelerating the load with direct on line starting without
exceeding acceptable winding temperature.
193
SPECIFICATION NO.
PE-SS-999-506-E101
VOLUME NO. :
II-B
SECTION
:
D
REV NO. : 00 DATE : 29/08/2005
SHEET : 2 OF 4
The limiting value of voltage at rated frequency under which a motor will successfully start and
accelerate to rated speed with load shall be taken to be a constant value as per Data Sheet - A during
the starting period of motors.
3.3.3
Two starts in succession with the motor being initially at a temperature not exceeding the
rated load temperature.
ii)
Three equally spread starts in an hour the motor being initially at a temperature not exceeding
the rated load operating temperature. (not to be repeated in the second successive hour)
iii)
Motors for coal conveyor and coal crusher application shall be suitable for three consecutive
hot starts followed by one hour interval with maximum twenty starts per day and shall be
suitable for mimimum 20,000 starts during the life time of the motor
3.4
Running Requirements
3.4.1
Motors shall run satisfactorily at a supply voltage of 75% of rated voltage for 5 minutes with full load
without injurious heating to the motor.
3.4.2
Motor shall not stall due to voltage dip in the system causing momentary drop in voltage upto 70% of
the rated voltage for duration of 2 secs.
3.5
3.5.1
Motors shall withstand the voltage, heavy inrush transient current, mechanical and torque stress
developed due to the application of 150% of the rated voltage for at least 1 sec. caused due to vector
difference between the motor residual voltage and the incoming supply voltage during occasional auto
bus transfer.
3.5.2
Motor and driven equipment shafts shall be adequately sized to satisfactorily withstand transient
torque under above condition.
3.6
Maximum noise level measured at distance of 1.0 metres from the outline of motor shall not exceed
the values specified in IS 12065.
3.7
The max. vibration velocity or double amplitude of motors vibration as measured at motor bearings
shall be within the limits specified in IS: 12075.
4.0
CONSTRUCTIONAL FEATURES
4.1
Indoor motors shall conform to degree of protection IP: 54 as per IS: 4691. Outdoor or semi-indoor
motors shall conform to degree of protection IP: 55 as per IS: 4691and shall be of weather-proof
construction. Outdoor motors shall be installed under a suitable canopy
4.2
Motors upto 160KW shall have Totally Enclosed Fan Cooled (TEFC) enclosures, the method of
cooling conforming to IC-0141 or IC-0151 of IS: 6362.
Motors rated above 160 KW shall be Closed Air Circuit Air (CACA) cooled
4.3
Motors shall be designed with cooling fans suitable for both directions of rotation.
194
4.4.
4.5
SPECIFICATION NO.
PE-SS-999-506-E101
VOLUME NO. :
II-B
SECTION
:
D
REV NO. : 00 DATE : 29/08/2005
SHEET : 3 OF 4
Motors shall not be provided with any electric or pneumatic operated external fan for cooling the
motors.
Frames shall be designed to avoid collection of moisture and all enclosures shall be provided with
facility for drainage at the lowest point.
4.6
In case Class F insulation is provided for LV motors, temperature rise shall be limited to the limits
applicable to Class B insulation.
In case of continuous operation at extreme voltage limits the temperature limits specified in table-1 of
IS:325 shall not exceed by more than 10qC.
4.7
4.7.1
Terminals, terminal leads, terminal boxes, windings tails and associated equipment shall be suitable
for connection to a supply system having a short circuit level, specified in the Data Sheet-A.
Unless otherwise stated in Data Sheet-A, motors of rating 110 kW and above will be controlled by
circuit breaker and below 110 kW by switch fuse-contactor. The terminal box of motors shall be
designed for the fault current mentioned in data sheet A.
4.7.2
unless otherwise specified or approved, phase terminal boxes of horizontal motors shall be positioned
on the left hand side of the motor when viewed from the non-driving end.
4.7.3
Connections shall be such that when the supply leads R, Y & B are connected to motor terminals A B
& C or U, V & W respectively, motor shall rotate in an anticlockwise direction when viewed from the
non-driving end. Where such motors require clockwise rotation, the supply leads R, Y, B will be
connected to motor terminals A, C, B or U W & V respectively.
4.7.4
Permanently attached diagram and instruction plate made preferably of stainless steel shall be
mounted inside terminal box cover giving the connection diagram for the desired direction of rotation
and reverse rotation.
4.7.5
Motor terminals and terminal leads shall be fully insulated with no bar live parts. Adequate space
shall be available inside the terminal box so that no difficulty is encountered for terminating the cable
specified in Data Sheet-A.
4.7.6
4.7.7
Separate terminal boxes shall be provided for space heaters.. If this is not possible in case of LV
motors, the space heater terminals shall be adequately segregated from the main terminals in the main
terminal box. Detachable gland plates with double compression brass glands shall be provided in
terminal boxes.
4.7.8.
Phase terminal boxes shall be suitable for 360 degree of rotation in steps of 90 degree for LV motors.
4.7.9
Cable glands and cable lugs as per cable sizes specified in Data Sheet-A shall be included. Cable lugs
shall be of tinned Copper, crimping type.
4.8
Two separate earthing terminals suitable for connecting G.I. or MS strip grounding conductor of size
given in Data Sheet-A shall be provided on opposite sides of motor frame. Each terminal box shall
have a grounding terminal.
4.9
General
195
SPECIFICATION NO.
PE-SS-999-506-E101
VOLUME NO. :
II-B
SECTION
:
D
REV NO. : 00 DATE : 29/08/2005
SHEET : 4 OF 4
4.9.1
4.9.2
4.9.3
Motors shall be provided with eye bolts, or other means to facilitate safe lifting if the weight is 20Kgs.
and above.
4.9.4
Necessary fitments and accessories shall be provided on motors in accordance with the latest Indian
Electricity rules 1956.
4.9.5
All motors rated above 30 kW shall be provided with space heaters to maintain the motor internal air
temperature above the dew point. Unless otherwise specified, space heaters shall be suitable for a
supply of 240V AC, single phase, 50 Hz.
4.9.6
Name plate with all particulars as per IS: 325 shall be provided
4.9.7
Unless otherwise specified, the colour of finish shall be grey to Shade No. 631 and 632 as per IS:5 for
motors installed indoor and outdoor respectively. The paint shall be epoxy based and shall be suitable
for withstanding specified site conditions.
5.0
5.1
All materials, components and equipments covered under this specification shall be procured,
manufactured, as per the BHEL standard quality plan No. PED-506-00-Q-006/0 and PED-506-00-Q007/2 enclosed with this specification and which shall be complied.
5.2
LV motors of type-tested design shall be provided. Valid type test reports not more than 5 year shall
be furnished. In the absence of these, type tests shall have to be conducted by manufacturer without
any commercial implication to purchaser.
5.3
All motors shall be subjected to routine tests as per IS: 325 and as per BHEL standard quality plan.
5.4
Motors shall also be subjected to additional tests, if any, as mentioned in Data Sheet A.
6.0
OGA drawing showing the position of terminal boxes, earthing connections etc.
Arrangement drawing of terminal boxes.
Characteristic curves:
(To be given for motor above 55 kW unless otherwise specified in Data Sheet).
i)
ii)
iii)
iv)
196
MOTORS
& ACTUATORS
197
Efficiency class IE2 as per latest revision of IS 12615 along with amendments ( 2nd
IE*rev:2011).
efficiency
class will be IE3 for these motors.
$
"#
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)%
#
$
!# # #
*!
:<A<? <3 ?.A6;4 ./<C2
8" 5.99 /2 B6A./92 3<?
8 =5.2
=<D2? B==9
!<A<? ./<C2
8" .;1 B= A<
8" 5.99 /2 B6A./92 3<?
8=5.2
!<A<??.A21
8".;1/29<D5.99/2B6A./923<?
=5.2 =<D2?B==9
52:<A<??.A6;45.99/2.??6C21.A0<;612?6;4
:.?46;<C2?A521BA=<6;A
6;=BA <?
<C2?A52:.6:B: 12:.;1<3A521?6C2; 2>B6=:2;A D56052C2? 6
56452? 0<;612?6;4 56452A A2: 3?2>B2;0
!<A<? 5.99 /2 0.=./92 <3
A.?A6;4 .;1 .00292?.A6;4 A52 9<.1 D6A5 A52 .==960./92:2A5<1 <3 A.?A6;4D6A5<BA
202216;4 .002=A./92 D6;16;4 A2:=2?.AB?2 D52; B==9 C<9A.42 6 <3 A52
?.A21 C<9A.42 3<? :<A<? .;1 3<? :<A<?
:<A<? 5.99 .9< /2
0.=./92 <3 .A63.0A<? <=2?.A6<; .A 3B99 9<.1 .A . B==9 C<9A.42 <3 <3 A52
?.A21 C<9A.42 3<? :6;
0<::2;06;4 3?<: 5<A 0<;16A6<;
:<A<? 5.99 /2
B6A./92 3<? A52 A2: C<9A.42 <3
!<A<? 5.99 /2 0.=./92 <3 A.?A6;4
.;1 .00292?.A6;4 A52 9<.1 D6A5 A52 .==960./92 :2A5<1 <3 A.?A6;4 D6A5<BA
202216;4 .002=A./92 D6;16;4 A2:=2?.AB?2 D52; A52 B==9 C<9A.42 6 6; A52
?.;42<3A<
<3?.A21:<A<?C<9A.42
!<A<? 5.99 D6A5A.;1 3<?
20<;1 A52 C<9A.42 .;1 A<?>B2 A?22 12C29<=21
1B2A<A52C20A<?16332?2;02/2AD22;A52:<A<??261B.9C<9A.42.;1A526;0<:6;4
B==9 C<9A.42 2>B.9 A<
<3 A52 ?.A21 C<9A.42 1B?6;4 3.A 05.;42<C2? <3
/B2
529<0821?<A<?D6A5A.;1A6:2B;12?5<A0<;16A6<;.A
?.A21C<9A.425.99
/2 :<?2 A5.; A52 A.?A6;4 A6:2 .A :6;6:B: =2?:66/92 C<9A.42 =2063621 ./<C2
/ .A 92.A A5?22 20<;1 <?
<3 A52 .00292?.A6;4 A6:2 D56052C2? 6 4?2.A2?
$?<C66<;<3=221D6A055.99/2.C<6121A<A522A2;A=<6/92
522:<A<?5.99/21264;21A<D6A5A.;1.A92.A5.?:<;606;A52B==9
C<9A.42
52124?22<3=?<A20A6<;3<?A52:<A<?2;09<B?26;09B16;4A2?:6;.9/<5.99/2
$ 3<?<BA1<<?
<?6;4920<?20./92A2?:6;.A6<;49.;1=9.A25.99/2<3;<;
:.4;2A60 :.A2?6.9
99 :<A<? 9<0.A21 6; 5..?1<B .?2. 5.99 5.C2 39.:2 =?<<3
2;09<B?2
#!
"!
#
198
$
"#
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)% #
$
!# # #
99 :<A<? 5.99 /2 =?<C6121 D6A5 C6/?.A6<; =.1 3<? :<B;A6;4 C6/?.A6<;
12A20A<?
6/?.A6<;:<;6A<?6;412C6025.99/2=?<C6121<;.;1"6126;
Y#16?20A6<;D6A5?2:<A2:<;6A<?6;4.9.?:.;1A?6==6;4
!<A<? ?.A21 8" .;1 ./<C2 5.99 /2 =?<C6121 D6A5 16332?2;A6.9 =?<A20A6<;
522:<A<?5.99/2=?<C6121D6A5A.?0<;;20A21A.A<?D6;16;4
52;<
0B??2;A A?.;3<?:2? <;2 3<? 2.05 =5.2 5.99 /2 :<B;A21 6; . 2=.?.A2
0<:=.?A:2;A 6; A52 ;2BA?.9 612 A2?:6;.9 /<
52 A5?22 =5.2 5.99 /2
0<;;20A21A<3<?:A52A.?=<6;A.3A2?A52=.A5?<B45A52
52 5.99
/2 <3 ?29. .00B?.0 .;1 A52 05.?.0A2?6A60 5.99 /2 0<:=.A6/92 D6A5 A52
16332?2;A6.9 ?29.
52 .116A6<;.9 ;<
<3 612;A60.9 05.?.0A2?6A60 5.99 /2
=?<C61216;A52
8
8D6A0542.?=.;29
52 A2?:6;.9 /< <3 :<A<? 5.99 /2 <3 B6A./92 62 B6A./92 A< A2?:6;.A2 .;1
:.6;A.6;A520./922.69
2?:6;.9/<5.99/2B6A./92A<?<A.A2.A124?22
52?6;4<696;4A2:5.99/2.12>B.A23<?A.?A6;4.;10<;A6;B<B<=2?.A6<;<3
A52:<A<?3<?.A92.A<;2 5.935<B?D6A5<BA=?2B?2<696;4A2:6;<=2?.A6<;
<?
8
8:<A<? ;<
1B=92 3<?D6;16;45.99/2=?<C61213<?
?2:<A2:<;6A<?6;4 .9.?: .;1 A?6==6;4 .A
.05 /2.?6;4 5.99 /2 =?<C6121
D6A5 <;2 1B=92 3<? A2:=2?.AB?2 ?2:<A2 :<;6A<?6;4 .9.?: .;1 A?6==6;4 .A
;<
=.?2 5.99/2=?<C61213<?D6;16;46; :<A<?
52:.6:B:1<B/92.:=96AB12C6/?.A6<;3<?:<A<?5.99/2.=2?
!.6:B:;<6292C29:2.B?21.A.16A.;02<3
:2A2?3?<:A52<BA2?B?3.02
<3A52:<A<?5.99;<A202211/
./92/<2<3.99
8
8:<A<?5.99/2$5.224?24.A215.99/2
=?<C6121 D6A5 >B608 160<;;20A6;4 A=2 A2?:6;.9 0<;;20A<? A< 3.0696A.A2 2.
160<;;20A6<;.;1?2:<C.9<3A52:<A<?D6A5<BA?2>B6?6;4 B;2.96;4<?<A52?D62
16AB?/6;4 A52 2A2?;.9 0./92 0<;;20A6<; .;1 92.C6;4 A52 =5.2 24?24.A21
A2?:6;.9/<6;A.0A
52A2?:6;.9/<25.995.C23.B9AD6A5A.;10.=.06A2>B.9
A< .A 92.A ?.A21 5<?A 06?0B6A 92C29 <3 A2: C<9A.42 3<?
20
52 A2?:6;.9
/<2 5.99 /2 ?2C2?6/92 A<B6A 0./92 2;A?3?<:A<= <? /<AA<:.;1 B6A./923<?
A2?:6;.A6<;<3 Y $.?:<B?210./92
52 A.? 0<;;20A6<; 612 A2?:6;.9 /< 5<B91 5.C2 B336062;A 0.=.06A A<
.00<::<1.A2 3<?16332?2;A6.9=?<A20A6<;3<?:<A<?./<C2
8"
!<A<?/2.?6;45.99/26;B9.A21D52?2C2??2>B6?21
99 :<A<?5.99/2D6A5$6;B9.A6<;<?/2AA2?
#!
"!
#
199
$
"#
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)% #
$
!# # #
99 :<A<? :<A<?
8" .;1 ./<C2 5.99 /2 =?<C6121 D6A5 2A2?;.9
4?2.6;4.??.;42:2;A
":<A<? 5.99 /2 =?<C6121 D6A5 D.A2? 92.8.42 12A20A<? D6A5 ?2:<A2.9.?:
.;1A?6==6;4
99:<A<?/29<D 8"5.99/2=?<C6121D6A52.921--/2.?6;4
.05:<A<?5.995.C2AD<2.?A56;4A2?:6;.9
99:<A<?3<?<BA1<<?1BA 5.995.C212A.05./92:2A.90.;<=
:<A<?5.99/21264;213<?<=2?.A6<;.3<99<D
.
/
0
99:<A<?5.99/2B6A./923<?# A.?A6;4
2=.?.A2 A2?:6;.9 /<2 A< /2 =?<C6121 3<? =.02 52.A2? 3<?
D6;16;4/2.?6;4 C6/?.A6<; :<;6A<? 2A0
99 A2?:6;.9 /<2 5.99 /2 =?<C6121
D6A5 AD< 2.?A5 AB1 3<? A2?:6;.A6<; <3 =?<A20A6C2 2.?A5 0<;1B0A<?
<B/92
0<:=?26<; A=2 /?. 0./92 49.;1 .;1 0?6:=6;4 A=2 0<==2? 9B4 5.99 /2
=?<C61213<?A2?:6;.A6<;
$?<C66<;5.99/2:.12.AA<:<;6A<?6;A24?.A2?B;;6;45<B?;<
<3A.?A
.;1A<=?20<?16;43<?.99:<A<?
52A2?:6;.9<3.99:<A<?5.99/2B6A./923<?A2?:6;.A6;49B:6;6B:0<;1B0A<?
Y $ 6;B9.A21 .?:<B?21 0./92 A52 62 <3 D5605 D699 /2 6;A6:.A21 / A52
$B?05.2?
!"!
0AB.A<?5.99/2D2.A52?=?<<3A=2D6A52;09<B?20<;3<?:6;4A<$ 124?22<3
=?<A20A6<;
A5<B91/2B6A./923<?<BA 1<<?B2D6A5<BAA52;221 3<?0.;<=
3
A52 $ 124?22 <3 =?<A20A6<; 6 ?2>B6?21 1B2 A< <00.6<;.9 B/:2?42;02 A52
=B?05.2?5.99=2063A5212=A5.;11B?.A6<;<3B05B/:2?42;02
52 .0AB.A<? 5.99 /2 B6A./92 3<? 6;A.99.A6<; 6; .; =<6A6<; D6A5<BA 9B/?60.A6<;
92.8.42<?<A52?<=2?.A6<;.9163360B9A
99 .0AB.A<? 5.99 /2 B==9621 D6A5 ;<; 6;A24?.9 A.?A2? 3<? <=2; 09<2
52
:.6;42.?/<<3A52.0AB.A<?5.99/2=206.94?2.2369921
.05 .0AB.A<? 5<B91 5.C2 . 5.;1 D5229 3<? 2:2?42;0 :.;B.9 <=2?.A6<;
9<08D62 <=2?.A6<; <3 5.;1 D5229 5.99 0.B2 09<08D62 :<C2:2;A <3 A52
#!
"!
#
200
SPEC.NO.
TCE.5750A-H-500-001
VOLUME IV
SECTION: D13
RRVUNL, 2 x 660 MW, Super-Critical TPS, StageV, Units 7 & 8, at Suratgarh, Rajasthan
SHEET 4 OF 7
PART B
2.2.1. Independent torque and limit switches shall be provided in the actuator. A
minimum of two position limit switches and two torque switches, one each for
each direction of travel, having 4 NO + 4 NC potential free contacts, shall be
supplied. If called for in the data sheet, two additional limit switches shall be
provided for intermediate positions.
2.2.2. Torque switch dial shall be graduated directly in kg-m for easy setting to desired
value within the range specified. Separate dials shall be provided for CLOSE and
OPEN torque switches.
2.2.3. Two additional limit switches with 2NO + 2NC contacts, each adjustable at any
intermediate position, shall be provided in the actuator.
2.2.4. The rating of both torque and limit switches shall be 240 V AC, 5 Amps. The
switches shall individually be enclosed to a minimum of IP-64 protection class.
2.2.5. Torque and limit switches shall have only stainless steel flaps for better
protection against environmental condition.
2.2.6. Limit switches shall be operated by gear driven cams, which are mechanically
linked to the driving devices. The counter gear used for counting and tripping the
limit switches shall be of metallic construction like brass etc. No plastic gearing
shall be allowed.
ISSUE
R1
TCE FORM 329 R5
201
$
"#
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)% #
$
!# # #
<4B.?.;A22=?<=2?3B;0A6<;B;12?5645.:/62;AA2:=2?.AB?2A<?>B2.;196:6A
D6A052;6;45.99/2<3:205.;60.9A=2
99 :<A<? 5.99 /2 =206360.99 1264;21 3<? C.9C2 .0AB.A<? <=2?.A6<; D5605 6
05.?.0A2?621 / 5645 A.?A6;4 A<?>B2 9<D A.99 A<?>B2 9<D 6;2?A6.
99 :<A<?
5.99/25645A.?A6;4A<?>B2A=2A<3.0696A.A2B;2.A6;4<3C.9C2
!<A<?5.99/2B6A./923<?=<D2?B==9<3
=5
!<A<?5.99/2>B6??290.426;1B0A6<;A=2.;15.9942;2?.990<;3<?:A<
!<A<?5.995.C2:6;6:B:09.6;B9.A6<;D6A5A2:=2?.AB?2?62?2A?60A21A<
09.B;12?A521264;.:/62;AA2:=2?.AB?2
!<A<? 5.99 /2 <3 A<A.99 2;09<21 B?3.02 0<<921 A=2 D6A5 $
=?<A20A6<;09..3A2?:<B;A6;4<;.0AB.A<?
!<A<? 5.99 5.C2 A5?22 A52?:<A.A 0<;;20A21 6; 2?62 <;2 6; 2.05 =5.2 <3
A.A<?D6;16;43<?=?<A20A6<;.4.6;A<C2?52.A6;4
!<A<?5.99/2B6A./923<?<=2?.A6<;B;12?C<9A.42C.?6.A6<;<3
3?2>B2;0
C.?6.A6<;<3.;10<:/6;21C<9A.423?2>B2;0C.?6.A6<;<3
./<9BA2
!<A<? 5.99 /2 B6A./923<? 16?20A <; 96;2# A.?A6;4 .;1 A.?A2? 5.99 /2 ;<;
6;A24?.9A<A52:<A<?
A5<B91/2=<6/92A<2=.?.A2A52:<A<?3?<:A529B/?60.;A36992142.?6;4<3A52
.0AB.A<? .99<D6;4 2. ?2=9.02:2;A <3 :<A<? D6A5<BA 9<<6;4 .; 9B/?60.;A
?24.?192<3:<B;A6;4=<6A6<;
6;5 5.99/2=?<C6121<;A52:<A<?/<1A<2;B?2/2AA2?52.A166=.A6<;
A 5.99 /2 =<6/92 A< 05.;42 A52 <BA=BA ?=: <3 A52 .0AB.A<? 63 ?2>B6?21 .A A52
6A2.A.9.A2?1.A2D6A5<BA5.:=2?6;4A52:<B;A6;4.??.;42:2;A.;19<<3.;
9B/?60.;A
* !
99 A52 2>B6=:2;A =2063621 52?26; 5.99 0<:=9 D6A5 A52 ?2>B6?2:2;A <3 A52 9.A2A
6B2<3A52?292C.;A".A6<;.9;A2?;.A6<;.9A.;1.?1
52 1264; .;1 :.A2?6.9 B21 3<? A52 0<:=<;2;A 5.99 .9< 0<:=9 D6A5 A52
?292C.;A".A6<;.9;A2?;.A6<;.9A.;1.?1
.:6;6:B:?2>B6?2:2;AA523<99<D6;4A.;1.?15.99/20<:=9621D6A5
920A?60:<A<?<=2?.A21.0AB.A<?
#!
"!
#
202
$
"#
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)% #
$
!# # #
24?22<3=?<A20A6<;=?<C6121/2;09<B?2.A9<D
C<9A.42D6A0542.?.;10<;A?<942.?
9.:2$?<<32;09<B?2.A2920A?60.9.==.?.AB
=206360.A6<;3<?A5?22=5.26;1B0A6<;:<A<?
0<;A.0A<?3<?C<9A.42;<A202216;4
24?22<3=?<A20A6<;=?<C6121/2;09<B?23<?
<A.A6;42920A?60.9:.056;2?
=206360.A6<;3<??<A.A6;42920A?60.9:.056;2
<?<A52?0<12?232?20A6<;
<::<;=<A2;A6.93?220<;A.0A5.99/2.C.69./92A<.;;B;06.A2A52 3.B9A 0<;16A6<;
A< A52?2:<A20<;A?<9A.A6<; <?
52 3<99<D6;4 6;16C61B.9 ?29. =<A2;A6.9 3?22 0<;A.0A 5.99 /2 =?<C6121 3<? A52
?2:<A2 6;160.A6<;
0AB.A<?#$"
0AB.A<? #
0AB.A<?3.B9A3221 /.08
52?:.9<C2?9<.1?29.5.99/2=?<C6121A<A?6=A52.0AB.A<?6;0.2<3<C2?9<.1
52 .;1 .0AB.A<? 5.99 /2 =?<C6121 D6A5 .002<?62 C6
<?>B2 96:6A
D6A05 2;1 <3 A?.C29 D6A05 .17BA./92 96:6A D6A05 5.;1 D5229 :<A<?
A52?:<A.A2A0
<:=92A2.0AB.A<? 5.99/2A2A21.A3.0A<?.=2?
99
.0AB.A<? 5<B91 5.C2 :6;6:B: 96:6A D6A052 3<? 2.05 =<6A6<; .;1 5<B91
5.C2=<6A6<;A?.;:6AA2?D52?2C2??2>B6?21
! !
99?<BA6;2.002=A.;02A2A.=2??292C.;A5.99/20<;1B0A21<;:<A<?
<?.99.;1:<A<?<3?.A6;4/29<D
8"A=2A2A02?A6360.A25.99/2
3B?;6521
3A52A2A?2=<?A.?2;<A3<B;16;<?12?/$B?05.2?A52;A522A2A
5.99/20<;1B0A21/A522;1<?D6A5<BA.;0<A6:=960.A6<;
#!
"!
#
203
# !
#"
#"
$ .'//*1*&%,! 1%('
#"-*10*%1 /%1(%/)%+%01)% #
$
!# # #
336062;0.;19<:2.B?2:2;A5.99/21<;23<?.99 :<A<?.=2??292C.;A
A.;1.?126;42;2?42336062;A:<A<?
.?<BA6;2A2A
"<6292C29:2.B?2:2;AA2A5.99/20<;1B0A21<;<;2:<A<?<32.05A=2
6/?.A6<;:2.B?2:2;A5.99/2A.82;3<?2.05:<A<?<38"./<C2
<?A205;60.9=.?A60B9.??232?1.A.522A
#!
"!
#
204
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
$"%*)'""*"&%
??;820C8>=B
#0=D502CDA4A
A0<4)8I4
'D0=C8CH
#>34;$>
>5<>C>A
)D??;H>=38C8>=B
0;;>F01;4E0A80C8>=8=
8,>;C064
C>
88A4@D4=2H
888><18=43
1&4A<8BB81;4D=10;0=248=BD??;HE>;C064
)?443
A?<
(0C43E>;C064
0 , ,
0*<>C>AB
1 ,
1"*<>C>AB
2,
2+&)BD??;843
3,
3)8=6;4?70B4
4,
4<>C>AB
$D<14A>5?70B4
(0C435A4@D4=2H5>A<>C>A
I
$>A<0;F8=38=62>==42C8>=
)C0A
4;C0
#4C7>3>5BC0AC8=6
&70B4
0<>C>AB
0%"?A454A01;H
1<>C>AB
1(4B8BC0=24BC0AC
*4<?4A0CDA4A8B401>E40<184=C>5346
46
*<>C>AB J )70;;14;8<8C43
1H(4B8BC0=24<4C7>3
C>;0BB
"*<>C>A J ;0BB
(,
$%
&&
/
!
/
*
(
+#
#),#
$%,
(
)!
#),#
+$
%$%
*
"$* ((,+$"
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
$"%*)'""*"&%
*H?4>5A>C>A);8?A8=6B@D8AA4;2064
)@D8AA4;2064
*H?4>53DCH
DCH34B86=0C8>=
)H=27A>=>DBB?443
0 >=BC0=CB?443
1 ,0A801;4B?4435>A,
)C0AC8=6C8<40CB?4285843<8=8<D<BC0AC8=6 )42
E>;C064
)C0AC8=6C>A@D4
>5
"*
&D;;>DCC>A@D4
>5
"*
;0BB>58=BD;0C8>=
*<>C>AB ;0BB
"*<>C>AB8=2;D38=602CD0C>A
<>C>AB ;0BB
(45
<184=CC4<?4A0CDA4
346
">20C8>=2>=B834A43 J 0I0A3>DB0A40
38E8B8>=
=BC0;;0C8>=
">20C8>=
0I0A3>DB0A4038E8B8>=
=3>>A%DC3>>A
) >A4@D8E0;4=C
C<>B?74A42>=B834A43
74<820;DBCH)0;C;034=
*H?4>52>>;8=6)
"*<>C>AB
*
*<>C>AB
***,
-
(,
$%
&&
/
!
/
*
(
+#
#),#
$%,
(
)!
#),#
+$
%$%
*
"$* ((,+$"
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
46A44>5?A>C42C8>=
$"%*)'""*"&%
& J %DC3>>A
& =3>>A
(>C0C8>=0BB44=5A><
$>= 3A8E44=3
#08=C4A<8=0;1>G
*4A<8=0;1>G
)7>ACC8<4A0C8=6
0 *5>A
B42
!
<8=8<D<
1 "*5>A
B42
!
<8=8<D<
!
?40:
<8=8<D<
H=0<82A0C8=6
0 *
!
?40:
1 "*
<8=8<D<
">20C8>=0BB44=5A><=>=
3A8E44=3
&70B4)46A460C43
*4A<8=0;1>G346A44>5A>C0C8>=
-40C74A<>C>A8BBD8C01;45>A,3A8E4
4C08;B>5140A8=6
>;>AB7034>5?08=C
-74C74A*5>A38554A4=C80;?A>C42C8>=
A4@D8A43
*
&(*+"()
*B >=48=C74=4DCA0;;403>54027
?70B4
(0C8>
;0BB
(,
$%
&&
/
!
/
*
(
+#
#),#
$%,
)7034
>5)
&)
(
)!
#),#
+$
%$%
*
"$* ((,+$"
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
$"%*)'""*"&%
!=44?>8=CE>;C064
!&,
#.
(
*
B42>=30AHF8=38=6A4B8BC0=24 %#)
#.
4G28C8=62DAA4=C *
!&,
;0BB>5=BD;0C8>=
-74C74AE81A0C8>=34C42C>ABA4@D8A43
4C08;B>5F8=38=6B?024740C4AB
D0A0=C443558284=2H>5<>C>A
0 C5D;;;>03
1 C3DCH?>8=C
2 C=>;>03
D0A0=C443&>F4A502C>A>5<>C>A
0 C5D;;;>03
1 C3DCH?>8=C
2 C=>;>03
DAA4=C0C
0 )C0AC8=6
1 D;;;>03
2 DCH?>8=C
3 D;;;>03>5A0C43BD??;H
E>;C064
'D0=C8CHCH?4>5C4<?4A0CDA434C42C>AB
5>A0;;*<>C>AB
0 -8=38=67>CB?>C
#8=8<D<D?;4G(*
#8=8<D<CF>C74A<>2>D?;4
?4A140A8=6
1 40A8=6
4C08;B>50224BB>A84B
0 0=B
(,
$%
&&
/
!
/
*
(
+#
#),#
$%,
(
)!
#),#
+$
%$%
*
"$* ((,+$"
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
$"%*)'""*"&%
1 *4<?4A0CDA460D64
2 40A8=6
3 >>;8=6<>C>AB
4 >>;8=6F0C4A?0A0<4C4AB
5
40C4AB
6 "D14>8;BHBC4<34C08;B
#0G8<D<B8I4=D<14A>5201;4BC70C20=
14022><<>30C438=<>C>AC4A<8=0;1>G
*74A<0;20?018;8CH2DAE4C>140CC02743
(4;0H2> >A38=0C8>=6D834C>140CC02743
#8=
E>;C064A4@D8A43D=34ABC0AC8=6
2>=38C8>=BC>0224;4A0C43A8E4=4@D8?<4=C
C>A0C43B?443
">2:43A>C>A2DAA4=CF8C7BC0=3C8<4B054
BC0;;C8<40C
A0C43E>;C064
,>;CB
0 CA0C43C4<?
7>C
B42
1 -74=2>;3
B42
)C0C>AC74A<0;C8<42>=BC0=C
B42
&4A<8BB81;4=>
>54@D0;;HB?A403BC0ACB?4A
7>DA
0 $>A<0;B4AE8242>=38C8>=B
1 =@D82:BD224BB8>=F8C72>;3#0C
A>><C4<?
2 >CA4BC0ACB
#4C7>3>5)C0AC8=60=3<0G8<D< BC0AC8=6
2DAA4=C8=2;DB8E4>5C>;4A0=24B
*#>C>AB
0 %"
(,
$%
&&
/
!
/
*
(
+#
#),#
$%,
(
)!
#),#
+$
01>E4
:-
0;;>C74A
%$%
*
"$* ((,+$"
,%"+# ,
*
)*%$
&(*
*)*
#%*%(*+*%(
(4&4
)("'*"&%)
%"*
1 )>5CBC0AC4AB
$"%*)'""*"&%
"*#>C>AB
2 %"
3 )C0A4;C0
4 )C0A4;C0F8C7B4A84BA4B8BC0=24
5
)>5C)C0AC4AB
#>C>AB
(,
$%
&&
/
!
/
*
0 (4B8BC0=24BC0AC8=6
1 )>5CBC0AC4AB
2 =H>C74A
(
+#
#),#
$%,
(
)!
#),#
+$
%$%
*
"$* ((,+$"
THIS
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
C
4
4
::64.,{498
,81,.{`0`
98{`^91`4248
::64.,-60{,8/,`/
114.408.^,{029`^9`80`2^114.408{
9{9`986^
,{0/
,{:{
5"
-:00/
.`,704D0
^:091{^ 9`0;4@,608{
::6^98/4{498
,669,-60@,`4,{49848
496{,20
44`0;08.^
44497-480/
- 0`744-60 8-,6,8.0 48 ::6^
@96{,20
+ +
" +
223
211
THISIS
ISAAPART
PARTOF
OFTECHNICAL
TECHNICALSPECIFICATION
SPECIFICATIONPE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
C
,`,8{00/114.408.^9179{9`
, {16669,/
- {/{^:948{
{8969,/
,`,8{00/90`1,.{9`9179{9`
, {16669,/
- {/{^:948{
{8969,/
``08{,{
, {,`{482
- 6669,/
. {^:948{
6669,/
91`,{0/::6^@96{,20
,{0/@96{,20
, 79{9`
- 79{9`
.::640/
/48260:3,0
079{9`
7-0`91:3,0
,{0/1`0;08.^19`79{9`
D
9`7,648/482.9880.{498
{,`
06{,
+ +
" +
224
212
THIS
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
C
0{39/91{,`{482
,79{9`
-79{9`
07:0`,{`0`40,-9@0,7-408{91
/02-^04{,8.070{39/
^:091/{^
{^/0428,{498
^8.3`989:00/
,98{,8{:00/
-,`4,-60:00/19`
0.
{,`{482{470,{:0.4140/748477
{,`{482@96{,20
{,`{482{9`;0,91
9.,{498.984/0`0/ E ,D,`/9,`0,
/4@4498
{79:30`0.984/0`0/
3074.,6 {^ ,6{6,/08
"0,{30`79{9`44{,-6019`/`4@0
0{,4691-0,`482
+ +
" +
225
213
THIS
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
C
"30{30`@4-`,{498/0{0.{9``0;4`0/
0{,469148/482 :,.030,{0`
0{,4691,..09`40
, ,8
- 07:0`,{`02,20
. 0,`482
/ 99648279{9`
0 996482,{0`:,`,70{0`
1 0,{0`
2-0946^{07/0{,46
,4774D087-0`91.,-60{3,{
.,8-0,..9779/,{0/4879{9`{0`748,6
-9
30`7,6.,:,-464{^.`@0{9-0,{{,.30/
06,^.99`/48,{49824/0{9-0,{{,.30/
48@96{,20`0;4`0/8/0`{,`{482
.98/4{498{9,..060`,{0/`4@08
0;4:708{{9`,{0/:00/
9.50/`9{9`.``08{4{3{,8/{470,10
{,66{470,{
`,{0/@96{,20
, {`,{0/{07:39{
-"308.96/
0.
0.
{,{9`{30`7,6{470.98{,8{
0.
96{
+ +
" +
226
214
C
0`744-6089910;,66^:`0,/{,`{
:0`39`
, 9`7,60`@4.0.98/4{498
- 8;4.5..04984{3.96/ ,{
`997{07:
.9{`0{,`{
0{39/91{,`{482,8/7,477
{,`{482.``08{48.64@091{960`,8.0
9{9`
,
,-9@0
5"
,669{30`
- 91{{,`{0`
9{9`
.
/ {,`06{,
0 {,`06{,4{3 0`40`04{,8.0
1 {,`06{,4{3`9{9``04{,8.0
2 91{{,`{0`
9{9`
, 91{{,`{0`
- 8^9{30`
+ +
" +
227
215
6 6
$
/4/2/54,*.&%*-&.3*/.%2"7*.(
90&4&34$&24*'*$"4&3
0&&%4/215&$526&"42"4&%$-*.*-5-34"24*.(6/,4"(&350&2*-0/3&%7*4)
4)&30&&%/215&
$)"2"$4&2*34*$/'4)&,/"%
522&.4 30&&%$526&
522&.4 4*-&$526&
''*$*&.$90/7&2'"$4/23,*0$522&.4"("*.34/54054$526&
)&2-",7*4)34".%$)"2"$4&2*34*$'/2-/4/23/'+!$"#/6& /4$/,%
&("4*6&3&15&.$&$522&.4 34*-&$526&'/2-/4/2/'+!$"#/6&
/4/2"4"3)&&4
/'",,&2-*.",/8&3
228
216
THIS
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
217
THIS IS
IS AA PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
4
#
4
$ '"#
(GAB3;1/0:3AA6/::03
9+ * /<2
9+*5@/23AC7B/0:34=@CA37<
;327C; @3A7AB/<13 3/@B632 AGAB3; AB@/<232 1=;>/1B32 /:C;7<7C;
1=<2C1B=@3FB@C232A3;71=<2C1B7<5A1@33<=D3@1=<2C1B=@-!%7<AC:/B32
A3;7 1=<2C1B7<54=::=E320G1=>>3@B/>3A1@33<323FB@C232%+)G>3() I
7<<3@ A63/B632 /:C;7<7C;( E7@3 /@;=C@32 =D3@/:: '!( %+ =CB3@
A63/B632 1=<4=@;7<5 B= ( %/@B 4=@ 1=<AB@C1B7=</: 23B/7:A
/<2B3ABA
4
$ '"#
!+ %=E3@ /0:3A A6/:: 03
+ 5@/23 A7<5:3 ;C:B7 1=@3 AB@/<232
/:C;7<7C;1=<2C1B=@-!%7<AC:/B32E7B6%+7<<3@A63/B6/@;=C@32/<2
=CB3@A63/B6;/23=4'!(%+1=;>=C<253<3@/::G1=<4=@;7<5B=(
4=@ -!%
)63 1/0:3A CA32 4=@ AGAB3; A6/:: 03 =4 A7<5:3 1=@3 BG>3
4
$"#
=<B@=:1/0:3AA6/::03
+5@/23;C:B71=@3;7<7;C;
A?
;;1@=AA
A31B7=< AB@/<232 1=>>3@ 1=<2C1B=@ 6/D7<5 ;7<7;C; AB@/<2A %+
7<AC:/B32 %+ 7<<3@ A63/B632 5/:D/<7A32 AB33: E7@3 /@;=C@32 =D3@/::
'!( %+ =CB3@ A63/B632 53<3@/::G 1=<4=@;7<5 B= (
%/@B
<
A7BC/B7=<A E63@3 /11C@/1G =4 ;3/AC@3;3<B =@ D=:B/53 2@=> 7< 1=<B@=: 17@1C7B
E/@@/<BA67563@1@=AAA31B7=<A/A@3?C7@32A6/::03CA32
4
#$"%$$#
)63 7<AB@C;3<B/B7=< 1/0:3A A6/:: 03 <<3/:32 B7<<32 AB@/<232 1=>>3@
1=<2C1B=@
A? ;; BE7AB32 7<B= >/7@A =D3@/:: A1@33<32
BG>3 4=@
2757B/: A75</:A 7<27D72C/: /<2 =D3@/:: A1@33<32 4=@ BG>3 4=@ :=E :3D3:
/</:=5 A75</:A 7<27D72C/: B@7>:3B /<2 =D3@/:: A1@33<32 BG>3 %+
7<AC:/B327<<3@%+A63/B632(E7@3/@;=C@32/<2=D3@/::A63/B632E7B6
'!( %+
)63 7<AC:/B7=< A6/:: 03 AB@7>>/0:3 ;/<C/::G /A E3:: /A 0G
;316/<71/:AB@7>>7<523D713AE7B6=CB2/;/53B=B631=<2C1B=@
4
/0:3AA6/::1=<4=@;B=(@3?C7@3;3<BA/<2/<G=B63@/>>:71/0:3AB/<2/@2A
4
%=E3@ /<2 1=<B@=: A7<5:3;C:B7 AB@/<232 1=>>3@ 1=<2C1B=@ 47@3 AC@D7D/:
1/0:3A 1=;>:G7<5 E7B6
A6/::03>@=D72324=@4=::=E7<5 AGAB3;A/A
>3@5C723:7<3A
((*
'
)$'"#$
'
!#"'
$
218
THIS
THISIS
ISAAPART
PARTOF
OFTECHNICAL
TECHNICALSPECIFICATION
SPECIFICATIONPE-TS-392-163A-A001
PE-TS-392-155A-A001
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
/
3;3@53<1G:C03=7:>C;>A
0
A3/:=7:>C;>A
1
3;3@53<1G:756B7<51/0:3A4=@;/7<0C7:27<5
2
/BB3@73AB=16/@53@A/<227AB@70CB7=<0=/@2A
3
)C@07<3:C03=7:>C;>A
4
/197<5=7:>C;>A
5
;3@53<1GBC@07<3B@7> 0G>CA60CBB=<7<1=<B@=:@==;
6
=7:3@)C@07<33<3@/B=@7<B3@B@7>E67167<1:C23AB637<B3@1=<<31B7<5
1/0:3A03BE33<
=7:3@;/AB3@4C3:B@7>/<2BC@07<3B@7>@3:/GA
3<3@/B=@B@7>@3:/GA/<2BC@07<3B@7>@3:/GA
3<3@/B=@B@7>@3:/GA/<29+0@3/93@A
3<3@/B=@B@7>@3:/GA/<253<3@/B=@473:20@3/93@A
3<3@/B=@B@7>@3:/GA/<2 ()/<2*)0@3/93@A
(1/0:3AA6/::6/D34=::=E7<5>@=>3@B73A
/
F13::3<B47@3@3A7AB/<1316/@/1B3@7AB71A
0
/0:3AA6/::6/D343/BC@3A=4<=<B=F71/<2:=EA;=9353<3@/B7=<
1
:/;3<=< >@=>=5/B7=<>@=>3@BG
2
07:7BGB=E7B6AB/<20C@<7<51=<B7<C3B=4C<1B7=<2C@7<5/<2/4B3@47@3
3
=<AB@C1B7=<=4(1/0:3A
/
=<2C1B=@ =>>3@AB@/<232
0
7@3>@==4:/G3@ 63/B0/@@73@0/A32
1
<AC:/B7=< 3:/AB=;3@@C003@
2
3
7::3@ AC7B/0:347::3@=>B7=</:
4
7<23@B/>3 I BE=:/G3@A=45:/AA470@3B/>3
5
<<3@A63/B6 $''!(3:/AB=;3@63/B=7:4:/;3@3B/@2/<B
6
7
$D3@/::A63/B6 I $''!(
((*
'
)$'"#$
'
!#"'
$
219
THIS
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
4
/0:3A 4=@ B63 47@3 23B31B7=< /<2 /:/@; AGAB3; /<2 1=;;C<71/B7=< AGAB3;
A6/::03/A23A1@70323:A3E63@3
4
:: A7<5:3 1=@3 >=E3@ 1/0:3A A6/:: 6/D3 E7@3 AB@7> /@;=C@7<5 =4 /:C;7<7C;
E63@3/A ;C:B7 1=@3 >=E3@ 1/0:3 A6/:: 6/D3 5/:D/<7A32 AB33: E7@3 AB@7>
/@;=C@7<5
)63 A63/B6 A6/:: 03 @3A7AB/<B B= E/B3@ *+ @/27/B7=< 4C<5CA B3@;7B3 /<2
@=23<B/BB/19
)63 =CB3@ A63/B6 =4 '!( %+ 1=;>=C<2 A6/:: ;33B B63 4=::=E7<5
>3@4=@;/<13@3?C7@3;3<BA
/
)63 1@7B71/: =FG53< 7<23F D/:C3 A6/:: 03 ;7<7;C; E63< B3AB32 /B
/A>3@()" /<2B63B3;>3@/BC@37<23FA6/::03
;7<7;C; /B =FG53< 7<23F D/:C3 =4
E63< B3AB32 /A >3@
()"
0
)63;/F7;C;/1725/A53<3@/B7=</A23B3@;7<320GB7B@/B7=<;3B6=2
A6/:: 03 :3AA B6/< 0G E3756B E63< B3AB32 /A >3@
/:=53</1721=<B3<B7<=CB3@A63/B67<(1/0:3AA6/::<=B03
;=@3B6/<
1
:/;;/07:7BG
7
77
777
7@3 AC@D7D/: 1/0:3A 7< /227B7=< B= B3ABA 7 /<2 77 /0=D3 A6/::
>/AAB3ABA/A >3@
2
)63A;=9353<3@/B7=<C<23@47@3A6/::6/D3;/F7;C;A;=9323<A7BG
@/B7<5 =4 E63< B3AB32 /A >3@ ()"
(;=93
23<A7BG7<(1/0:3AA6/::<=B3F1332
3
)631/0:3AA6/::>/AAB63C:B@/D7=:3BB3ABA/A>3@#
4
)63 1/0:3A A6/:: >/AA B63 B3ABA 4=@ ,/B3@ /0A=@>B7=< B3ABA /A >3@ (
)63 47<7A632 1/0:3 A6/:: >/AA B63 4:/;;/07:7BG B3AB /A >3@
/<2
</227B7=<7BA6/::/:A=>/AA4:/;;/07:7BGB3AB/A>3@:/AA
=4(E327A6(B/<2/@2((
< /227B7=< 1/0:3A 4=@ 23D713A ;=C<B32 =< =@ <3/@ 6=B AC@4/13A =4 (B3/;
3<3@/B=@A )C@07<3 3<3@/B=@A "/7< AB3/; 3B1 A6/:: 6/D3 63/B @3A7AB/<13
BG>3=CB3@A63/B6
::!)1/0:3A6/::6/D33;0=AA7<5/B7<B3@D/:=4
;3B3@4=@=E<3@</;3A7H3
1=@3 BG>3/<2:3<5B6
((*
'
)$'"#$
'
!#"'
$
220
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
::1/0:3AA6/::033;0=AA32E7B6B63</;3 =4'+*#!7</227B7=<B=E6/B7A
A>31747327<B63AB/<2/@2A
'"#
%=E3@1/0:3A7H3AA6/::03A3:31B32=<B634=::=E7<50/A7A
%=E3@1/0:3AA6/::1/@@GB634C:::=/21C@@3<B=4B6317@1C7B1=<B7<C=CA:GC<23@
A7B31=<27B7=<A1=<A723@7<5B631=<27B7=<:7AB3203:=E
/
;073<B23A75<B3;>3@/BC@3235
0
"/F7;C;/::=E/0:3B3;>3@/BC@3C<23@<=@;/:4C:::=/21=<27B7=</<2
C<23@A6=@B17@1C7B1=<27B7=<0/A32=<;/B3@7/:A3:31B32-!%
1
"/F7;C;A6=@B17@1C7B4/C:B1C@@3<B
2
;073<BB3;>3@/BC@34=@C<23@5@=C<21/0:3A235
3
%=E3@1/0:3AA6/::E7B6AB/<2B634/C:B1C@@3<B=4B6317@1C7B4=@B63 2C@/B7=<<=B
:3AAB6/<B63;/F7;C;B7;3B/93<0GB63>@7;/@G>@=B31B7D3AGAB3;B=7A=:/B3
B634/C:B
/C:B1:3/@7<5B7;3A4=@B73A03BE33<BE=
9+AE7B1653/@AA6/::03
1=<A723@32 /A
A31
/C:B 1:3/@7<5 B7;3A 4=@ B73A 03BE33< BE=
+
AE7B1653/@AA6/:: 031=<A723@32/A
A31
=@ B63 1/0:3A B=
+ ;=B=@A /<2 43323@A >@=B31B32 0G 4CA3A B63 1@=AA
A31B7=< A6/:: 03 16=A3< /11=@27<5 B= B63 1CB =44 1C@@3<B =4 B63 4CA3 /<2 7BA
4CA7<5B7;3
+=:B/532@=>4@=;B@/<A4=@;3@A31=<2/@GB=;=B=@B3@;7</:A2C@7<5 AB/@B7<5=4
;=B=@AE7::03:7;7B32B=B634=::=E7<5D/:C3A
/
0
=@"%;=B=@A I =4B63@/B32D=:B/53
1
=@!+;=B=@A I =4B63@/B32D=:B/53
=@>=E3@AC>>:GB=D/:D3/1BC/B=@;=B=@A/1BC/B=@A=4D/@7=CA7A=:/B7<5/<2
@35C:/B7<5 2/;>3@A /<2 3F6/CAB 4/<A 1=@3
A?
;; AB@/<232 1=>>3@
1=<2C1B=@ 1/0:3 ;/G 03 CA32 7< D73E =4 3/A3 =4 B3@;7</B7=<
)63A3 1/0:3A
A6/::037<=B63@@3A>31BAA7;7:/@B=1/0:3A23A1@70327<:/CA3
/0=D3
3A75</:1C:/B7=<4=@/@@7D7<5/B1/0:3A7H3A6/::03AC0;7BB324=@>C@16/A3@A
/>>@=D/:
(GAB3;/0:3A
((*
'
)$'"#$
'
!#"'
$
221
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
+5@/23A7<5:31=@31/0:3A/AA>31747327<!)>=E3@1/0:3AA6/::03
CA32 4@=; 0/BB3@73A 0/BB3@G 16/@53@A B= ;/7< 03BE33< ;/7<
7AB@70CB7=< =/@2 4@=; ;/7< 7AB@70CB7=< =/@2 B= AC0 27AB@70CB7=< 0=/@2
;/7<AC>>:GB=D/@7=CAAGAB3;1/07<3BA>/<3:A(E7B1653/@A3B1/<24=@
1@7B71/:/CF7:7/@73A
:3F70:31/0:3AE7B6%+7<AC:/B7=<A6/::03CA32E63@3
B3@;7</B7=<=4-!%%+7<AC:/B321/0:3A7A274471C:B
+=:B/53 2@=> 7< 1/0:3A 03BE33< 0/BB3@G B= /<2 0/BB3@G 16/@53@ B=
A6/:: 03 :7;7B32 B=
+=:B/53 2@=> 7< 1/0:3A 03BE33< /<2
:=/2AA6/::03:7;7B32B=
3A75< /:1C:/B7=< 4=@ /@@7D7<5 /B 1/0:3 A7H3 A6/:: 03 AC0;7BB32 4=@
>C@16/A3@A/>>@=D/:
$"#
C@@3<BB@/<A4=@;3@:3/2AA6/::0316319324=@B63:3/20C@23<D7A / D7AB63
1C@@3<B B@/<A4=@;3@ + 1/>/17BG
< 1/A3
A?
;; 1=<2C1B=@ 7;>=A3
C</113>B/0:G67560C@23<=<)A
A?
;;1=<2C1B=@A6/::03CA32
)63
1=<2C1B=@;/B3@7/:A6/::031=>>3@
+=:B/53 B@/<A4=@;3@ :3/2A A6/:: 03 1631932 4=@ D=:B/53 2@=> E6716 A6/:: 03
:7;7B32B=E7B67<
4=@/::1/A3A=B63@B6/<B/@744;3B3@7<5
=@B/@744;3B3@7<5
B63 D=:B/53 2@=> A6/:: 03 :7;7B32 B=
< 1/A3 B63 D=:B/53 2@=> E7B6
A?
;;1=<2C1B=@A3F1332B67AD/:C367563@1=<2C1B=@A7H3AA6/::03CA32
#$"%$$
:3;3<B723<B7471/B7=<
A>3@
=@3E@/>>7<5
G<=< 6G5@=A1=>71;/B3@7/:0GB/>7<5=@0G3FB@CA7=<
:3;3<BA1@33<7<5
G1=>>3@B/>3=4;7<7;C;
;; B6719<3AA=@0G
1=>>3@:/;7</B32>:/AB71B/>3
'7>1=@2
#=< ;3B/::71@7>1=@2C<23@B631=@3E@/>>7<5
@/7<E7@3
B7<<321=>>3@2@/7<E7@3=4;7<7;C;
;; 1@=AA
A31B7=<7<1=<B/1BE7B63/16A1@33<=41/0:7<53:3;3<B
/0:7<53:3;3<BAA6/::03 /<G=<3=4B634=::=E7<5
%/7@ =4 BE= 7<AC:/B32 1=<2C1B=@A BE7AB32 B=53B63@ 23A75</B32 0G /:>6/03B
>>@7<B32=</07<27<5B/>3/B;;7<B3@D/:A
"/F7;C;:3<5B6=4:/G7<B6347<7A6321/0:3A6/::03 ;;
*<7BA
/0:3AA6/::030C<1632B=53B63@7<C<7BA=4BE3<BG1/0:7<53:3;3<BA=@AC0
C<7BA=447D3=@B3<3:3;3<BAAB@/<2327<1=<13<B@71:/G3@A
)63C<7BA=@AC0
((*
'
)$'"#$
'
!#"'
$
222
+$!*" +
)
()$#
() $
!!'''(.()"
C<7BAA6/::0323A75</B320G>
>>
B
BB
? ??
=@&
&
&
3B1
23>3<27<5=<B631=;07</B7=<
$D3@/::A1@33<7<5/<2/@;=C@7<5
/0:3A A6/:: 6/D3 /< =D3@/:: A1@33< ;/23 C> =4 1=>>3@/:C;7<7C; B/>3 =4
;; B6719<3AA =@ 1=>>3@/:C;7<7C; =4
;; B6719<3AA :/;7</B32
E7B6>:/AB71B/>3E7B6/;7<7;C;=D3@:/>=4
2@/7<E7@3=4B7<<321=>>3@
E7B6;7<7;C;
;; 1@=AAA31B7=<A6/::03>@=D72327<1=<B7<C=CA1=<B/1B
E7B6B63A1@33<
<<3@/<2$CB3@(63/B6
)637<<3@/<2=CB3@A63/B6AA6/::1=<A7AB=40:/19%+1=;>=C<2
<AC:/B7=<'3A7AB/<13
"7<7;C;7<AC:/B7=<@3A7AB/<13>3@9;A6/::03;35/$6;
"CBC/:/>/17B/<13
"CBC/:1/>/17B/<13=4/<G>/7@=41=<2C1B=@AA6/::<=B3F1332
<9;
/>/17B/<13*<0/:/<13
)63 1/>/17B/<13 C<0/:/<13 03BE33< /<G BE= >/7@A A6/:: <=B 3F1332 >
4=@;3B@3:3<5B6=41/0:3
)63 1=<AB@C1B7=< >3@4=@;/<13 /<2 B3AB7<5 =4
1/0:3A 3F13>B /A;3<B7=<32 /0=D3 A6/:: 53<3@/::G 1=;>:G E7B6 B63 4=::=E7<5
AB/<2/@2A
%/@B
!=E 4@3?C3<1G 1/0:3A /<2 E7@3A E7B6 %+ 7<AC:/B7=<
/<2A63/B6
3<3@/:B3AB/<2;3/AC@7<5;3B6=2A
%/@B
2= /0:3A7<>/7@A/<2B@7>:3A
$"$#
/0:3A A6/:: 03 :/72 7< B@/GA B@3<163A 1=<2C7BA 0G B63 7223@
:A= 8=7<B
;/@93@AA6/::03>@=D7232/B3/168=7<B
$#
/0:38=7<BA A6/::03/D=7232B=B633FB3<B>=AA70:3
48=7<BA/@3C</D=72/0:3
2C3 B= 17@1C7B :3<5B6 7< 3F13AA =4 >3@;7AA70:3 ;/F7;C; 2@C; :3<5B6 B63G
A6/::0363/BA6@7<9/0:3BG>3A6/D7<5/A6=@B17@1C7BE7B6AB/<21/>/17BGD/:C3
/AA>31747327<1:/CA3
/0=D3
!C5AA6/::0363/DG2CBGB7<<321=>>3@
:=<50/@@3:BG>3
::1/0:35:/<2AA6/::032=C0:31=;>@3AA7=<E3/B63@>@==4
((*
'
)$'"#$
'
!#"'
$
223
THIS IS
IS AA PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
>6/A3 >7< >=E3@ @313>B/1:3A E7B6 AE7B16 A6/:: 03 >@=D7232
)63
@313>B/1:3A6/::037<2CAB@7/:63/DG2CBGBG>3/<2A6/::6/D3AC7B/0:37<B3@:=19
4/17:7BG4=@A/43BG
)63@313>B/1:3A6/::1=<4=@;B=(
/<2B63AE7B16B=
(
)631/0:31/@@73@AGAB3;A6/::0323A75<321=<A723@7<5B634=::=E7<5
/
/17:7BG4=@3/AG:/G7<5=41/0:3A
0
113AAB=;/7<B3</<13
1
#3/B/<2/3AB63B71/>>3/@/<13
2
(/43BG=43?C7>;3<B>3@A=<<3:
3
@=C<2E/B3@A33>/53
4
@/7</53AGAB3;4=@=7:/<2E/B3@
/0:3A A6/:: 03 :/72 7< >@34/0@71/B32 :/223@ 4=@ >=E3@ /<2 1=<B@=:
>3@4=@/B32 7<AB@C;3<B/B7=< BG>3 B@/GA /<2 7< 1=<2C7BA
:A= 8=7<B ;/@93@A
A6/::03>@=D7232/B3/168=7<B
)631/0:3B@/GAA6/::03:/72 D3@B71/:7< 0=7:3@
/<2 (%/@3/1=/:6/<2:7<5/<2/A66/<2:7<5/@3/
/0:3B@/GA/<2AC>>=@B7<5AB@C1BC@3A7<163;71/::G1=@@=A7D3/@3/:7930/BB3@G
@==; /<2E/B3@B@3/B;3<B>:/<BA6/::03;7:2AB33:>/7<B32B@/GA47<7A632E7B6
16:=@7</B32@C003@0/A32>/7<B3>=FG>/7<B
/0:3 B@3<163A E7:: 03 /D=7232 B= B63 3FB3<B >=AA70:3 7<A723 C3: =7: >C;>
6=CA3E/B3@B@3/B;3<B>:/< E63@3 >=AA707:7BG=4=7:/<2 E/B3@ 1=::31B7=<
3F7ABA/<2 =7:3@(%/@3/A
#=27@31BC<23@5@=C<20C@7/:1/0:3AA6/::03:/723F13>B:756B7<5B=E3@AB@33B
:756B7<5
=@A=;33F13>B7=</:1/A3:7937A=:/B327<27D72C/:3?C7>;3<BA7BA6/::
03/::=E32/4B3@/>>@=D/:0GB63=E<3@1=<AC:B/<B
:: ;/B3@7/: /<2 /113AA=@73A @3?C7@32 4=@ 1/0:3 7<AB/::/B7=< :793 1/0:3 B@/GA
B@/G 1=D3@A AC>>=@B AB33: 3B1
A6/:: 03 6=B 27> 5/:D/<7H32
=<2C7BA>7>3A
A6/:: /:A= 03 6=B 27> 5/:D/<7H32 AB33:
)63 @/19AB@/GA 1=<2C7BA>7>3A
B@3<163A @3?C7@32 B= @=CB3 B63 1/0:3A B= 7<27D72C/: 3?C7>;3<B A6/:: 03
AC>>:732/<27<AB/::320GB63'
(3>/@/B3 B@/GA A6/:: 03 >@=D7232 4=@ !+ %=E3@ =<B@=:
<AB@C;3<B/B7=<1/0:3A
4B3@:/G7<5/::B631/0:3A'A6/::2@3AA/::1/0:3A0G1:/;>7<5/B3D3@G
;3B@3A=B6/BB631/0:3A/@3A31C@3:G63:2/<2/3AB63B71/::G5==2
/0:3B@/GAA6/::03/D=7232D3@G1:=A3B=B63>7>3A1/@@G7<56756B3;>3@/BC@3
AB3/;
,63<B63G/@37<3D7B/0:37BA6/::03:/72/4B3@$,#'/>>@=D/:/<2
((*
'
)$'"#$
'
!#"'
$
224
THISIS
ISAAPART
PARTOF
OFTECHNICAL
TECHNICALSPECIFICATION
SPECIFICATIONPE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
AC7B/0:3 7<AC:/B7=< ;/B3@7/: A6/:: 03 >@=D7232 03BE33< B63 1/0:3 B@/GA /<2
>7>3A
$<3 A>/@3 1=<2C7B A6/:: 03 >@=D7232 4=@ 1/0:3 =4 13<B3@ =CB3@ 2@7D3 7<
1:/@7473@
:: 1/0:3 3<B@73A B= B63 0C7:27<5A B= 03 A3/:32 0G 47@3 >@==4 E/B3@ >@==4
13;3<B/4B3@1/0:37<AB/::/B7=<
$<3 2@C; ; A>/@3 !) >=E3@1=<B@=: =4 3/16 A7H3 =4 1/0:3 A6/:: 03
7<1:C232
4
::=CB2==@1/0:3B@/GA/@3B=03>@=D7232E7B61=D3@A
::D3@B71/:1/0:3B@/G
@/13 E/GA /@3 B= 03 >@=D7232 E7B6 1=D3@A /:: @=C<2
/0:3 B@/GA A6/:: 03 =4
:/223@ >3@4=@/B32 BG>3 1=;>:3B3 E7B6 /:: <313AA/@G 1=C>:3@ >:/B3A 3:0=EA
B33A03<2A@32C13@AAB7443<3@A/<2=B63@/113AA=@73A
/0:3B@/GA=4:/223@
/<2>3@4=@/B32BG>3A/<2B63/AA=17/B32/113AA=@73AAC16/A1=C>:3@ >:/B3A
B33A3:0=EA3B1
A6/::034/0@71/B324@=;
5/C53
;;B6719;7:2AB33:
A633BA
/0:3B@/G1=D3@AA6/::03>@=D72324=@/::1/0:3B@/GA/<2@/13E/GA
)631/0:3B@/G/113AA=@73A:793B@/GA3:0=EA03<2A3B1
A6/::034/0@71/B32
/<25/:D/<7H32034=@30@7<57<5B=A7B3
/0:3B@/G1=D3@AA6/::034/0@71/B32
4@=;
5/C53
;;B6719"(A633BA
::B63A633BAB33:A6/::036=B27>
5/:D/<7H32
)63A7H7<5=41/0:3B@/GA4@=;)0C7:27<5B==B63@/@3/AA6/::1=<A723@>/@/
/0=D3 /< /227B7=</::G B= /D=72 1@=E27<5 /<2 1@7AA 1@=AA7<5 =4 1/0:3A
3A>317/::G 7< 0=7:3@ /@3/ E63@3 D3@B71/: @7A3@A /@3 B= 03 >@=D7232 4=@ D/@7=CA
>=E3@1=<B@=:/<27<AB@C;3<B/B7=<1/0:3AB=67563@3:3D/B7=<A=40=7:3@
(:=BB32/<5:3AA6/::<=B03CA324=@1/0:7<5
</:::=1/B7=<AA;/::3@A7H31/0:3
B@/GA=4;;
;;E723A6/::03CA324=@=<3=@BE=1/0:3A
!#"'
$
225
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
(%
#$
+$!*" +
)
()$#
() $
!!'''(.()"
/
%((A6/::6/D3/47@3@/B7<5=4BE=6=C@A
0
)63%((A6/::03AC0831B32B=47@33<2C@/<13B3AB6=A3AB@3/;B3AB
B3;>3@/BC@3 ;3/AC@3;3<B =4 <=< 4:/;7<5 A723 /A >3@ ()"
(B/<2/@2;3B6=2=447@3B3ABA=40C7:27<51=<AB@C1B7=</<2 ;/B3@7/:A
1
)63%((E7::/:A=1=<4=@;B=B637< 1=;0CAB707:7BGB3AB1/@@732=CB7<
/11=@2/<13E7B6(
2
*<23@ 47@3 1=<27B7=< B63 %(( ;/B3@7/: A6/:: <=B 3;7B 3F13AA7D3
A;=93=@/<G1=@@=A7D3=@B=F714C;3A
3
%((A6/::6/D3;7<7;C;:743=4G3/@A
4
""
7@3 0@3/9 A6/:: 03 >@=D7232 0G />>:G7<5 / AC7B/0:3 47@3 @3A7AB/<B 1=/B7<5 =<
1/0:3A4=@B63@3?C7@32:3<5B6B=;33BB6347@3@/B7<5=4 ;7<CB3A
7@30@3/9A6/::03>@=D7232/B/<7<B3@D/:=4
;3B@3A7<B63AB@/756B>=@B7=<
=4 3/16 =4 B63 1/0:3 B@/G /0=D3 5@=C<2 /B 7<B3@D/:A =4 ;3B@3A 7< 1/0:3
B@3<163A /<2 /B "4=@/:: D3@B71/: B@/GA
:: 1/0:3 7<B3@ A31B7=< /<2 B33 =44A
A6/::03>@=D7232E7B647@30@3/9A
,63< >7>3 A:33D3A /@3 >@=D7232 4=@ 1/0:3A 4@=; =CB2==@ /@3/A B= 7<2==@
/@3/A B63 >7>3 =>3<7<5 /B B63 =CB2==@ A723 A6/:: 03 A3/:32 0G 47@3 >@==4
A3/:7<5 ;/B3@7/: E6716 7A /:A= 1=<B7<C=CA:G E/B3@>@==4
)63 7<2==@ A723 =4
B63 >7>3 =>3<7<5 A6/:: /:A= 03 A3/:32 0G 1=<B7<C=CA 47@3 >@==4 A3/:7<5
;/B3@7/:A
)632C1B0/<9A7<=CB2==@/@3/A/:A=<332B=03A3/:320GE/B3@
>==4 A3/:A
B 7A <313AA/@G B= 3F>:=@3 >=AA707:7BG =4 />>:G7<5 E/B3@>@==4
1=/B7<5=<47@3>@==4A3/:7<5
4
$#$#
::@=CB7<3B3ABA/<2'!(B3ABA/A>3@@3:3D/<BAB/<2/@2A6/::03>3@4=@;32
=<3/16A7H3=41/0:3
4A/;3A7H37AAC>>:7327<27443@3<B:=BA7<A>31B7=<A6/::
032=<34=@3/16:=B
4A/;31/0:37AAC>>:7320G27443@3<B/53<173AB3ABA6/::
03 1/@@732 =CB =< 1/0:3A AC>>:732 0G 3/16 /53<1G
)63A3 B3ABA A6/:: 03
1/@@732=CB/A>3@@3:3D/<BAB/<2/@2A/A/>>:71/0:3
'=CB7<3/<2/113>B/<13B3ABA6/::031/@@732=CB=<%((
)G>3B3AB13@B7471/B3A4=@BG>3B3ABA1=<2C1B32=<723<B71/:23A75</<2A7H3=4
B63/0:3AA6/::03AC0;7BB324=@@3D73E
4BG>3B3ABA6/D3<=B033<2=<3=@
B6313@B7471/B3A/@34=C<2B=03<=B7<=@23@0G>C@16/A3@B63<B63A3BG>3B3ABA
A6/::031=<2C1B32=</0:3AB=03AC>>:7324=@B67A>@=831B/B<=3FB@/1=ABB=
%C@16/A3@
=@B316<71/:>/@B71C:/@A@343@2/B/A633B
((*
'
)$'"#$
'
!#"'
$
226
THIS
THIS IS
IS AA PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-163A-A001
PE-TS-392-155A-A001
$ "#
# !
#"
$
+ !
(4
)("'*"&%
+%"*
$"%*)'""*"&%
&4
",0[1,\@1,.?@=0=
!,0[1.,-]0
[\/@.?[=
"[ .[=0C4E0
[= .4=.@],=
>020\?0/
110.?4A0.=[>>>0.?4[\,],=0,><
"30?30=.[=0>4/0\?414.,?4[\\@-0=>1[=.,-]0>B4?3
.[=0>,\/,-[A0?[-0=[A4/0/
+0>
"30?30=4\.=00\?,]=@\\4\2]0\2?3>,=0,=0/[\
.,-]0
+0>
4\4>30/.,-]0
,
4,0?0=@\/0=,=[@=4\
-
4,0?0=[A0=,=[@=4\
.
#A0=,]]/4,0?0=4\
,-]0/=@>
,
"30?30=.,-]0/=@>.[\14=
?[
-
0\2?3[1.,-]0>4\/=@
?[]0=,\.0
.
"0423?[1.,-]0/=@B4?3[@?
.,-]0>
/
"0423?[1.,-]0/=@B4?3
.,-]0>
0
D0[10\/>0,]4\2
.,-]0>
,
01 ],@>0
=4?4.,][CD20\4\/0CA,]@0,?
/02B30\?0>?0/1[=
?00=,?@=04\/0C?0>?,>0= !
"#
$$ +
+
!
!!
!!
"#H
"H
#"#
" "
$#
C!"@0==4?4.,] $
?,20 \4?>,?@=,?2,=3,5,>?3,\
#!"#
227
THIS IS
IS A
A PART
PART OF
OF TECHNICAL
TECHNICAL SPECIFICATION
SPECIFICATION PE-TS-392-155A-A001
PE-TS-392-163A-A001
THIS
$ "#
# !
#"
$
+ !
(4
)("'*"&%
+%"*
$"%*)'""*"&%
",??
&4
-
[?,],.4/2,>20\0=,?4[\-D
B0423?B30\?0>?0/,>0=
F 4\
.
$0=.0\?,20[1]423?
?=,\>4>>4[\@\/0=14=01[=
,>>0>>0\? [1>[0
20\0=,?4[\B30\?0>?0/,>
0= ! F F
/
"4]]?30.,-]0>[110=0/,2,4\>?
?34>>0.414.,?4[\,>>?30
1],,-4]4?D?0>?>,>0=
],>> F F B0/4>3>?,\/,=/
F
F
!,C4@/40]0.?=4.][>>[1.,-]00=!,?\[=,]
A[]?,20,\/1=0<@0\.D
!,C4@/40]0.?=4.>?=0>>,?.[=0>.=00\
.
!,C [A0=,]]/4,0?0=[1.,-]0>
!4\4@,\/
1[= ,\/
=0>0.?4A0]D ,\/
>3,]]-04\]4\0B4?3
=0<@4=00\?>[1?30
>B4?.320,=,\/
=[?0.?4[\
GH4\/4.,?0/,-[A0>3,]]-014]]0/-D
"#
$$ +
+
!
!!
!!
"#H
"H
#"#
" "
$#
C!"@0==4?4.,] $
?,20 \4?>,?@=,?2,=3,5,>?3,\
#!"#
228
229
1.0
GENERAL
1.1
This specification covers the manufacture, inspection & testing at vendors works and delivery to site of conduits,
pipes and their fittings for electrical installation.
2.0
2.1
The material, constructional features and various processes involved in manufacture shall comply with currently
applicable Indian Standards.
2.2
The following Indian Standards shall be applicable, in general. However if Data Sheet A specifies conformance to
other international standards, the equivalent IEC/BS/other standards shall be considered.
3.0
b) IS:3480
c) IS:6946
d) IS:1239
e) IS:2667
f) IS:3837
g) IS:3419
h) IS:6005
i) IS:2629
j) IS:4759
Specification for hot dip zinc coatings on structural steel and allied
products.
k) IS:6745
3.1
3.1.1
Rigid conduits shall generally conform to the requirements of IS:9537 (Part I & Part II). However conduits above
63mm diameter shall conform to the requirements of IS:1239. Unless specified otherwise in Data Sheet A, all
conduits and pipes shall be of medium duty.
230
3.1.2
The rigid conduits shall be hot dip galvanized inside and outside. Weight of zinc shall be as per IS:4759. Conduits
shall be thoroughly cleaned and pretreated, conforming to IS:6005.
3.1.3
Rigid Conduits
5 metres
b)
3.1.4
Each end of conduit length shall be threaded. The ends of conduits shall be sealed with protective caps to prevent
damage to threaded portions and entrance of moisture and foreign material.
3.1.5
The inside surface of all conduits shall be smooth and suitable for pulling insulated cables and wires without
damage.
3.1.6
Conduit fittings shall be made out of tube or cast to the shape as to match with corresponding conduit sizes and
meet their purpose without any special adjustment.
3.1.7
All fittings shall be screwed type and hot dip galvanized inside and outside.
3.2
3.2.1
3.2.2
Flexible conduits shall be made of strip steel which shall be of cold rolled mild steel. The strip shall be of uniform
width and thickness throughout.
3.2.3
The strip shall be electro galvanized to a minimum thickness of 25 microns as specified in IS:3480. The surface of
the strip shall be thoroughly cleaned before application of protective coating. Pretreatment, before galvanization,
shall conform to IS:6005.
3.2.4
The strip for making flexible conduit shall be wound tightly and so overlapped in subsequent helicals that no
openings are seen in normal position.
3.2.5
Flexible conduits shall be lead coated for application in high temperature zones, if specifically mentioned in Data
Sheet A.
3.2.6
The conduit shall have uniform diameter throughout its length. The internal surface of all conduits shall be smooth
and suitable for pulling insulated cables and wires without damage.
3.3
PVC Conduits
3.3.1
PVC conduits shall generally conform to the requirements of IS:9537(Part I & Part III).
4.0
INSPECTION
4.1
4.1.1
The following stages of manufacture shall be stage inspected by Purchaser or his duly authorized representative.
4.1.2
Inspection of manufacturing processes such as shearing, punching, bending, welding, galvanizing etc.
231
4.1.3
4.2
5.0
TESTING
5.1
Rigid Conduits
a)
b)
5.2
i)
Dimension checks
ii)
iii)
Compression test
b)
5.3
Acceptance Tests
Acceptance Tests
- as per IS:3480
i)
Dimension checks
ii)
iii)
iv)
v)
crushing test
PVC Conduits
a)
Type Tests
i)
Dimension checks
ii)
Bending test
iii)
Compression test
iv)
Impact test
v)
Collapse test
vi)
Resistance test
vii)
Resistance to burning
232
viii)
b)
Electrical Characteristics
Dimension checks
ii)
Bending test
iii)
Compression test
iv)
Collapse test
v)
Resistance to burning
vi)
Electrical characteristics
5.4
Sampling for the tests shall be done as per applicable standards mentioned above.
5.5
6.0
PACKING
6.1
The material shall be packed as per manufacturers standard. Packing procedure shall be to the purchasers
approval.
7.0
7.1
The following information shall be furnished within two weeks of award of contract, for purchasers approval.
7.3
a)
Manufacturing drawings/details.
b)
Recommended Field quality plan covering site handling, storing, laying etc.
c)
233
DATASHEET A
SPECIFIC TECHNICAL REQUIREMENTS
1.0
APPLICABLE STANDARDS:
2.0
3.0
4.0
a)
Material:
b)
Applicable standard
IS:1239
c)
Surface treatment:
d)
Wt. of zinc:
as per IS 4759
e)
Duty:
Medium
f)
Fittings:
FLEXIBLE CONDUITS:
a)
Material:
b)
Standard applicable:
IS: 3480
c)
Surface treatment:
d)
YES
e)
Minimum thickness:
of zinc coating
25 microns
PVC CONDUITS
a)
Material:
PVC
b)
Applicable standard:
234
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D2
REV
V NO: 00
QUALIT
TY PLAN
N (MOTORS)
235
236
237
238
239
240
241
242
243
244
245
246
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: II-B
SEC
CTION: D3
REV
V NO: 00
SE CTION D3
HNICAL REQUIR
GENER
RAL TECH
REMENT
CON
NTROL & INSTRU
UMENTAT
TION
247
2.0.0
MEASUREMENT&CONTROLSPECIFICATION
2.1.0GENERALTECHNICALREQUIREMENTS
2.2.0SPECIFICATIONOFPLCSYSTEM&UPS
SYSTEM
2.3.0MEASURINGINSTRUMENTS
2.4.0INSTRUMENTSTUBDETAILS&INSTALLATION
DIAGRAMS
2.5.0MEASUREMENT&CONTROLPHILOSOPHY
2.6.0CODES&STANDARDS
248
2.1.0
GENERALTECHNICALREQUIREMENTS
249
SPECIFICATION NO.:
SPECIFICATION FOR
CONTROL & INSTRUMENTATION FOR AUX
PACKAGES
VOLUME
SUB SECTION
REV. NO.
SHEET
DATE :
OF
GENERAL REQUIREMENT
1.0 Bidder shall provide complete and independent control & instrumentation system with all
accessories, auxiliaries and associated equipments for the safe, efficient and reliable operation of
auxiliary systems.
2.0 The quantity of instruments for auxiliary system shall be as per tender P &ID wherever provided
of the respective system as a minimum, for bidding purpose. However, Bidder shall also include
in his proposal all the instruments and devices that are needed for the completeness of the plant
auxiliary system/ equipment supplied by the bidder, even if the same is not specifically appearing
in the P & ID. During detail engineering if any additional instruments are required for safe &
reliable operation of plant, bidder shall supply the same without any price implication.
3.0 Measuring instruments/equipment and subsystems offered by the bidder shall be from reputed
experienced manufacturers of specified type and range of equipment, whose guaranteed and
trouble free operation has been proven. Further all the instruments shall be of proven reliability,
accuracy, and acceptable international standards and shall be subject to employers approval. All
instrumentation equipment and accessories under this specification shall be furnished as per
technical specification, ranges, makes/ numbers as approved by the employer during detail
engineering.
4.0 The necessary root valves, impulse piping, drain cocks, gauge-zeroing cocks, valve manifold and
all the other accessories required for mounting/ erection of these local instruments shall be
furnished, even if not specifically asked for, on as required basis. The contacts of equipment
mounted instruments; sensors, switches etc for external connection including spare contacts shall
be wired out to suitably located junction boxes.
5.0 The customer specification attached as Specific Technical Requirement will supercede the Data
sheets, if there is any mismatch.
250
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 16 OF 55
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
14.0
EHTC
HPBP
LPBP
ATRS-1
ATRS-2
ATRS-3
TSE/TSI
ATT
Misc turbine integral controls
Generator auxiliaries
Stream-A equipment IDF, PAF,FDF,APH, etc.
Stream-B equipment IDF, PAF,FDF,APH, etc.
Coordinated master control
SH/RH/FW controls
Stream-A equipment of CEP, BFP, ACWP, CWP, etc.
Stream-B equipment of CEP, BFP, ACWP, CWP, etc.
Stream-C equipment of CEP, BFP, ACWP, CWP, etc.
Electrical system-A
Electrical system-B
Common system
Common system
14.1
14.2
Pressure indicators shall be provided wherever indicating type Pressure transmitters are
not envisaged. The applications include:
(a)
Suction and discharge lines of pumps / fans, including on header section, if two
or more pumps / fans are employed for the same service.
(b)
(c)
Inlets and outlets of heat exchangers (both the fluid media) and desuper
heaters.
Pressure Switches shall be avoided as far as possible and in place, smart pressure
transmitters with soft limit value monitoring in DCS/PLC shall be provided. Pressure
Switches applications will include the following:
(a)
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 17 OF 55
14.3
14.4
(b)
(c)
(d)
(e)
Differential Pressure Switches (indicating type) shall be provided for the following
applications:
(a)
(b)
(b)
14.5
SMART Differential Pressure Transmitter shall be provided for all the requirements of
Diff. pressure, flow, level measurement. Pressure stubs with isolating valves shall be
provided for mounting differential Pressure Transmitters.
14.6
14.7
(a)
On all process lines where local indication is warranted by the system either for
monitoring or testing.
(b)
(c)
Differential temperature
and discharge service.
indicator
shall
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 18 OF 55
(b)
(c)
The elements shall be duplex type with integral thermowell (except for metal
thermocouples). K Type Thermocouples shall be used. For metal
thermocouples suitable MS pads, clamps, flexible extension lengths etc. shall
be provided. Temperature elements in boiler and air ducts shall be in protective
tubes.
(d)
(e)
(f)
14.8
Level gauges shall be provided on all tanks and the maximum length of one gauge glass
shall not exceed 1 meter. The gauge glasses shall be stacked to cover the complete
height of the tanks including over flow level. There shall be an overlap of minimum
100mm, when more than one level gauge is required.
14.9
Level switches: The instrument shall be provided for the following applications:
14.10
(a)
(b)
(c)
The instrument shall be external cage type with SW connection with isolation
facility for surface mounted tanks and top mounted with still pipe for all sumps.
Still pipes shall be provided with adequate supports.
(d)
Conductivity type level switches shall be used for all heaters and drain pots.
(e)
Radar type level switches shall be used for bulk material bunkers.
(f)
Displacer type level switches shall be provided for level measurements of the
vessel under vacuum or low pressure applications viz for condensate and feed
water system.
Level Transmitters Stubs with impulse pipes, root valves for mounting Level transmitters
shall be provided on process equipments where continuous remote monitoring and/or
control of level is envisaged. Wherever necessary standpipes or float chambers shall be
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 19 OF 55
provided and also makeup line for filling up the constant level vessel shall be provided.
14.11
(a)
The instrument shall be Radar type for all low pressure and vacuum
applications involving two phase media viz: condenser, hotwell and LP heaters
level measurements.
(b)
The instrument shall be differential pressure type or Ultrasonic type for other
applications.
(c)
Radar type level transmitter shall be used for fuel oil storage tanks.
(d)
Flow Glasses shall be provided at the outlet of the pipe lines of cooling water side of
coolers / heat exchangers and shall meet the following requirements:
(a)
The instrument shall be rotary type with glass mounted for indication
(b)
Upto 6 inch on-line flow glasses shall be supplied and above 6 inch bypass
type flow glasses shall be provided.
14.12
14.13
14.14
Digital Display Unit (DDU) shall be provided for main steam pressure, temperature, fuel
flow, MW Export, MW Target, MVAR and frequency, condenser vacuum, Instrument air
pressure, GPS Time, Weather Report (Room Temperature, Humidity, Barometer, Air
purity etc).
14.15
14.15.1
Pneumatically Operated Control Valves shall be provided for all control application. If
the process demands any other control, then control valves shall be provided for those
applications also. Where a single control valve can not meet the turn down ratio as
dictated by the process, control valves with split range application shall be provided.
All bypass valves of control valves shall be motor operated valves suitable for
inching operation provided with position transmitters. All integrated bypass valves
shall be motor operated. Electro-pneumatic positioners shall be used for all pneumatic
control valves.
Pressure test points & drains shall be provided across each control valve .
14.15.2
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 20 OF 55
The pneumatically operated control valves shall be provided with Smart Positioners,
diagnostics and HART compatibility. Control Valve diagnostics shall be transmitted
through this HART Protocol to DCS/PLC.
14.16
Solenoid Valves shall be provided for all pneumatic control valves hooked up with
process
interlock requirements and where direct tripping is involved. All solenoid
valves shall be uniformly rated for 24VDC. The number of ways for solenoid valve shall
be provided as indicated below :
(a)
On line two (2) way solenoid valves shall be provided, where process line
of less than 2 inch with low pressure & temperature application is involved.
(b)
Three (3) way solenoid valves shall be provided commonly, where the
pressure is admitted or exhausted from a diaphragm valve or single acting
cylinder. E.g.: Pneumatic operated spray water block valve.
(c)
Four (4) way solenoid valves shall be provided for operating double acting
cylinders. If applicable. E.g.: Pneumatically operated on-off type dampers.
(d)
Dual coil, latch/unlatch type Solenoid valves shall be supplied for equipment
trips/critical applications.
(e)
Five-way, dual coil solenoid valves shall be used for Oil guns.
14.17
Position Transmitters shall be provided for all motorised inching valves .Position
transmitters shall be 24 VDC, 2 wire, non-contact type.
14.18
14.19
Air Filter Regulators along with gauges shall be provided in each of the:
14.20
(a)
(b)
(c)
Transmitter Racks
Interposing relay (To be mounted in Control room cabinet) for interface to the following:
(a)
Solenoid valve (two relays per valve) - Relays with contact rating of 2 Amps.
(b)
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 21 OF 55
(c)
14.21
14.22
Provision for mounting the above analyzer shall be made at the condenser hot
well along
with
necessary
mounting
arrangements/ accessories as
required.
(b)
For other analytical measurements, the sampling tapping points as called for,
shall be provided.
14.23
14.23.1
All JBs /FTCs shall be SS. Junction Boxes shall be provided for
14.23.2
14.24
(a)
(b)
(c )
(b)
FTC shall be designed to provide multiple units in Boiler and Turbine areas.
FTCs reduce the number of cables entering the control room. Depending on
the size of the multi core cable, one or two cables shall link to marshalling
cabinet in the control room.
and
(a)
(b)
(c)
Compensating cable shall be supplied for connection between the element and
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 22 OF 55
14.25
(d)
(e)
(f)
All cables between Bidders equipment and Others supplied equipment from
where signals have been specified to be acquired / provided by/from Bidder
for processing in his system.
14.26
14.27
14.28
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 23 OF 55
14.29
System cabinets & marshalling cabinets shall be provided for all the systems in Bidders
scope.
14.30
Stand pipes required for hot well, deaerator, heaters, GSC, drain pot, etc. shall be
provided by Bidder.
14.31
14.31.1
Separate cable tray shall be provided for instrumentation cables extension cables, flame
scanner cables, pre fabricated cables etc. Instrumentation cables shall run through the
top most cable tray
14.31.2
14.31.3
14.31.4
Inside the control room the PLC system cables and Bus cables shall run only through
cable trays or conduits. Also the PLC cables through the false flooring shall also be
through dedicated closed cable trays and conduits.
14.32
All the control room cabinets, field JBs /FTCs etc. shall have bottom Cable entry.
15.0
15.1
The ranges of the instruments shall be selected based on the following philosophy
indicated below:
15.2
For pressure and draft measurements, the maximum operating pressure will be within
70 to 80% of the maximum scale range. All pump suction measurement and steam
pressure measurements in extraction steam and in heaters will cover the negative
pressure range also and all draft gauges will cover the negative pressure as well as the
positive pressure as the case may be.
15.3
15.4
For pressure switches and temperature switches, the set points shall fall within 40% to
70% of the scale range selected.
15.5
For level measurement, the maximum of the range will cover the overflow point or six
inches from the top of the vessel and the minimum of the range will be six inches above
the bottom of the vessel. Also, the gauge glasses will be stacked with overlap to cover
permissive, alarm and trip levels.
ISSUE
R1
TCE FORM 329 R5
TCE.5750A-H-500-001
VOLUME V
SECTION : D5.3
SHEET 24 OF 55
Package: EPC
15.6
For flow measurement, the maximum range shall be fixed at about 10 to 15% above
the maximum operating flow.
15.7
For electro-chemical measurements (conductivity, pH, dissolved O2, Silica etc.), the
maximum range will be around 10 to 15% higher than the recommended alarm
settings.
15.8
For gas analysers (if included in scope), the maximum range will be around 10 to 15%
higher than the recommended alarm settings.
16.0
PG TEST POINTS
16.1
Pressure, temperature and flow test points shall be provided in line with latest
performance test code requirements.
16.2
In addition, pressure and temperature test points shall be provided for the following
services:
(a)
(b)
At the inlet and outlet of the heat exchangers for the fluid media involved
(c)
(d)
16.3
Pressure test points shall be complete with root valves and shall terminate with a
nipple.
16.4
Temperature test points shall be provided with thermowell with a cap and chain.
17.0
SIZE OF TAPPING POINT STUB, NO. AND SIZE OF ROOT VALVES FOR
DIFFERENT TYPE OF MEASUREMENTS
Sl. No
25 NB
(ii)
15 NB
B. Level Measurement
ISSUE
R1
TCE FORM 329 R5
TCE.5750A-H-500-001
VOLUME V
SECTION : D5.3
SHEET 25 OF 55
Package: EPC
25 NB
(ii)
15 NB
40 NB
(ii)
40 NB
80 NB
(ii)
80 NB
C-Flow Measurement
(i)
25 NB
(ii)
25 NB
25 NB
(ii)
25 NB
18.0
18.1
Central control room shall be common for both the units. However, each unit shall have
its own separate area/ desk for control & monitoring of SG, STG & BOP auxiliaries i.e
control room shall have distinct sections, one for each unit though not physically
separated but clearly distinguishable.
18.2
The control room shall be partitioned to different rooms to house the following
equipment:
(a)
Unit Control Desk (UCD) and Unit Control Panel in the main control room.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 52 OF 55
diagram ,along with Tag numbers, functional description of the signals ,control loop
references for both OLCS and CLCS , Legend etc.,.Also bidder shall indicate all Field
mounted, Local Panel monted, and DCS/PLC displayed Measurements using Standard
symbols along with alarm, protection, interlock and control functions based on the
Redundancy Philosophy mentioned in the specification.
30.17
Bidder shall include all the measurements necessary for the safe, efficient, reliable and
fully automatic operation of the entire plant including all fail-safe requirements and
recommendations of each equipment manufacturer.
31.0
31.1
The general engineering and calculations shall be made as per prevailing Indian,
International standards acceptable to Owner / Project Manager. Wherever such
standards are not available, they shall be as per the best practice in India and abroad.
31.2
31.3
All the electronic circuitry shall be built-up with plug in modules providing maximum
flexibility and easy servicing.
31.4
Anti-vibration mountings and shock absorbers shall be provided for cabinets, desk and
panels.
31.5
The cabinets surface shall be thoroughly degreased, smoothed, filled and painted with
rust resistant primer to present a smooth and flat finish. Front of cabinets shall be
primed and filled as required at least two coats of primer and minimum two coats of
final colour above the primer coating to present a smooth and mat finish.
31.6
SS Legend plates shall be provided on the cabinet front and back, desk face, unit
control panel, local panels, junction boxes, transmitter racks, FTCs, Remote I/O rack,
instruments, Control valves etc., for all items supplied to identify the equipment. Overall
dimensions of the nameplates shall be decided by the text of legend, maintaining
overall consistency and clarity and avoiding size variations.
31.7
The cabinets shall be upright; floor mounted, front open type with removable door and
shall have ventilation with steel mesh. The outside colour of all instrumentation
cabinets, control desks, consoles, local cabinets, marshalling cabinets, system
cabinets, junction boxes, Transmitter racks, FTCs etc. shall be of light grey shade no.
631 of IS: 5, 1978 or equivalent international code. The inside colour of all these
cabinets shall be brilliant white. This shall hold good for instrumentation cabinets of all
auxiliary units also.
31.8
The cabinets shall be made from CRCA Steel sheet with a minimum thickness of 2
mm. Removable eye lifting lugs shall be furnished and installed on all cabinets.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 53 OF 55
31.9
For all HT drives alarm and trip signals for bearing and winding temperatures shall be
considered through soft LVM from temperature element signal only. No temperature
transmitters are required for these signals.
31.10
All Critical control valves shall be provided with anti-cavitation trim. Control valves /
dampers shall be supplied with all accessories including non-contact type position
transmitters and E/P Positioners. Combination of I/P + Pneumatic positioner is not
acceptable. All inching valves shall be supplied with position transmitters integral with
the valve positioner.
31.11
All transmitters shall be SMART type with integral local LCD indication and HART
protocol.
31.12
All Temperature sensors shall be Duplex type and field mounted temperature
transmitter shall be provided for all temperature measurement applications. Direct
wiring of RTD or T/C to DCS or PLC is not preferred. (Except for Winding and bearing
temperature sensors ).
31.13
Switches (pressure, temperature, level & flow etc.) shall be provided only for critical
equipment trip such as BFP/ CEP trip etc. Wherever possible, transmitters shall be
provided with required redundancies for all other purposes.
31.14
Similar make and model shall be provided for same type of I&C system equipment.
This shall specifically apply for field transmitters, control valves etc.
31.15
31.16
Where multiple functions like monitoring /control/alarm etc. are sought to be performed
based on a parameter value, in minimum dual sensor shall type be provided.
31.17
31.18
Individual continuous purging shall be provided for all Air and Flue gas transmitters.
The tap points for these services shall be Y shaped. The purging line shall be
connected near the root valve only and not at the Transmitter end.
31.19
All local cabinets / utility plant control panels with bottom cable entry shall be provided
with suitable pedestals for easy cabling. The panels shall be designed for ease of
operation of operating hardware and monitoring the indicators.
31.20
All local panel indicating lamp/indicating type Push button should be of cluster LED
type only. All local panels shall be of double door type instead of double leaf type to
avoid ingress of dust in dust prone areas.
31.21
All motorised bypass valves shall be inching type and shall be provided with position
transmitters of non-contact type.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 54 OF 55
31.22
When floor openings are considered for LP heaters and HP heaters, the corresponding
stand pipe and level transmitter dimensions (along with impulse piping and root valve)
shall be added radially. The standpipe and mounted instruments should not foul with
the civil structures or any mechanical system part.
31.23
Conductivity type dedicated level switches shall preferably be used for heater level
applications.
31.24
31.24
31.25
Cable number tags and markings will be provided at every 30 meters along the entire
length of cable.
31.26
Instrumentation cable trays will be run on the top in the cable gallery.
31.27
All JBs, FTCs and similar equipment in Boiler, STG and other areas shall not have top
entry to avoid dust entry. No equipment shall have top entry for cables.
31.28
All the switches, wherever provided shall be provided with 2nos. changeover contacts
and both shall be wired upto Junction Boxes.
32.0
STATION BLACKOUT
Availability of all equipment, drives, emergency power supplies, controls, logics
required for the protection/safe operation of the Boiler/Turbine and auxiliaries during
Emergency blackout shall be ensured. All the related drives shall operate automatically
on the occurrence of blackout. All such drives required during emergency and blackout
shall be 220 V DC (solenoid operated) to ensure availability and shall be designed for
fail-safe mode. All the required controls shall be available as the system to be powered
from UPS. The UPS sizing shall consider this requirement.
33.0
33.1
All equipment, systems, software and services covered under this specification shall
comply with all currently applicable statutes, regulations and safety codes in the locality
where the equipment will be installed.
All codes and standards referred in this
specification shall be understood to be the latest version on the date of offer made by
the Bidder, unless otherwise specified. If such standards are not existing for any
equipment or system, the same shall comply with the applicable recommendations of
the following professional institutes:
ISSUE
R1
TCE FORM 329 R5
2.2.0
SPECIFICATIONOF PLC SYSTEM & UPS SYSTEM
264
VOLUME V
SECTION :TABLE 15
SI. No.
DESCRIPTION
1.0
1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.4
1.4.1
1.4.2
1.4.3
1.5
1.5.1
1.5.2
1.6
1.6.1
1.6.2
1.6.3
1.7
1.7.1
1.7.2
1.7.3
1.7.4
1.7.5
1.7.6
1.7.7
REQUIREMENT
BIDDER RESPONSE
ISSUE
R1
VOLUME V
SECTION :TABLE 15
SI. No.
1.7.8
1.7.9
1.7.10
1.7.11
1.7.12
1.7.13
1.8
1.9
1.10
1.11
1.11.1
1.11.2
1.11.3
1.11.4
1.11.5
1.11.6
1.11.7
1.11.8
1.11.9
1.12
1.13
1.14
1.15
1.16
1.17
DESCRIPTION
for OLCS
Updating rate of Analog
display
Updating rate of Analog
display
Updating rate of Digital
value
Updating rate of Digital
value
Time for display in VDU
screen
Keyboard
command
execution time
Control processor loading
considering spare I/O
channels and future I/O
modules to be located in
the spare I/O slots
Data Bus Loading
Overall system availability
Self diagnostics
Processor
Module
diagnostics
I/O Module diagnostics
Open-wire circuit detection
Short-circuit detection
Reverse polarity detection
Processor
changeover
indication
Communication
bus
changeover indication
Power supply changeover
indication
Any other channel level
diagnostics
Module replacement
Output status on power
supply failure
Status indication for each
channel in DI/ DO card
Power supply healthiness
status in all modules
Optical Isolation for DI/ DO
Galvanic isolation for AI/
AO
REQUIREMENT
BIDDER RESPONSE
Max. 50 %
99.7 %
Required
Required
Required
Required
Required
Alarm in HMI Required
Alarm in HMI Required
Alarm in HMI Required
Bidder to indicate
All modules shall be replaceable Online online under power-up condition
Configurable for switching to fail safe
mode
LED indication required
LED indication required
Channel to channel & channel to
ground isolation required
Channel to channel & channel to
ground isolation required
ISSUE
R1
VOLUME V
SECTION :TABLE 15
SI. No.
DESCRIPTION
REQUIREMENT
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.25.1
1.25.2
1.25.3
1.26
1.26.1
1.26.2
1.27
1.28
1.29
1.30
1.31
BIDDER RESPONSE
8 Channels
8 Channels
16 Channels
Bidder to specify
Required
Required
ISSUE
R1
VOLUME V
SECTION :TABLE 15
SI. No.
DESCRIPTION
REQUIREMENT
1.32
1.33
1.33.1
Communication
Communication
between CPU
Modules
Communication
processor and
station
and
processors
Communication
PLC and DCS
1.33.2
1.33.3
1.34
1.35
speed
and I/O
2 MBPS
between
Operator
across
between
2.0
2.1
2.2
2.3
2.4
2.4.1
Hardware Requirements:
Processor
Core i7 Processor, 3.2 GHz or
better
RAM
4 GB DDR2 RAM
Mother board
Intel Express chipset
Graphics
Onboard with min 512 MB Video
Memory
Hard Drives
1 no. x 500 GB SATA HDD @
7200 RPM or Higher
DVD R/W
1 no. 52X CD RW & 16X DVD
RW IDE Combo
Ethernet Card
2 nos. x 10/10/1000MB
Network Controller
1 GbE NIC upgradable to 10 GbE
Serial Port (RS232)
2 nos.
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
2.4.7
2.4.8
2.4.9
BIDDER RESPONSE
ISSUE
R1
VOLUME V
SECTION :TABLE 15
SI. No.
DESCRIPTION
REQUIREMENT
2.4.10
2.4.11
2.4.12
Parallel Port
USB Port
Peripherals
1 no.
4 nos.
1 no. USB Optical Mouse
1 no. USB Multimedia QWERTY
Keyboard
1 no. 21 Colour TFT/LCD
Monitor
2.5
Software Licenses
2.6
2.7
2.8
Alarm Annunciation
Hierarchical protection for
operator
&
engineer
functions
Displays on HMI monitor
2.9
Min. configurable
2.10
BIDDER RESPONSE
ISSUE
R1
VOLUME V
SECTION : D5.4
SHEET 22 OF 42
Package: EPC
2.2
(p)
USB Port
4 nos
(q)
Peripherals
(r)
Operating System
Processor
(b)
RAM
4 GB DDR2 RAM
(c)
Mother board
(d)
Graphics
(e)
Hard Drives
(f)
DVD R/W
(g)
Ethernet Card
2 nos. x 10/10/1000MB
(h)
Network Controller
(i)
(j)
Parallel Port
1 no.
(k)
USB Port
4 nos.
(l)
Peripherals
(m)
Operating System
2.3
Keyboard
2.3.1
Keyboard for OS
Qwerty type Keyboard shall be provided for operator interface with process for plant
control and display functions to access plant data in conjunction with Operator station
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 23 OF 42
VDUs. Assignable function keys shall be provided for execution of most frequenctly used
displays...
2.3.2
Keyboard for ES
Qwerty type Keyboard shall be provided to enable the maintenance engineer to develop
graphic displays, control system software and system configuration for the DCS. It shall
be possible to perform OS functions from VDU of ES. Assignable function keys shall be
provided for execution of command, program etc. Pass- word protection facility shall be
provided to set ES in engineer or operator mode.
2.4
Printers
2.4.1
132 column width with minimum speed 400 cps for printing operator requested functions
and graphics. Print colours shall be black and red. The operator shall be able to direct
logs, reports etc. to any printer assigned to his console. The interface shall be either
RS232C or RS422A. All printers shall be of A3 size. Noise levels for the Printers at 1
meter distance shall be < 45 dB
2.4.2
3.0
3.1
Time synchronisation equipment shall be complete with all hardware and software to
receive the synchronising signals from remote satelite and provide outputs to synchronise
plant wide all programmable control systems like DCS system equipment, SER, all utility
plant control systems PLCs, Boiler & Turbine protection system and any other control
systems to ensure a common time reference.
3.2
The system shall be based on Global Positioning system reference and shall include GPS
antenna, GPS receiver, signal processing unit etc. Time accuracy shall be 1 PPM.
3.3
Global Positioning System to which the Master Clock gets synchronised, shall be an
absolute system to provide continuously 3 dimensional position fixing, velocity
measurement and Time reference generation.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 37 OF 42
(a)
(b)
(c)
(d)
The unit shall be equipped with a 48X or better CD ROM, 3.5 Floppy Drive.
(e)
(f)
(g)
(h)
8.15
9.0
QUALITY ASSURANCE
Bidder shall furnish a detailed Quality Assurance / Quality Control Plan (QA/QC) for each
Instrument/System covered under this specification for OWNER/ Consultant review and
approval.
10.0
10.1
10.1.1
The PLC system shall comprise of the processor, I/O cards, communication modules,
power supply modules, racks, mounting accessories fully wired and tested. The system
shall have the specified redundancies.
10.1.2
The PLC hardware shall include all electronics required to perform signal conditioning
functions required to process the various types of input / output signals such as 4-20 mA,
RTD & T/C inputs, etc. It shall also be capable of implementing closed and open loop
controls.
10.1.3
The PLC system features shall include but not be limited to the following:
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 38 OF 42
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
10.1.4
The PLC system shall have system monitoring features but not be limited to the following:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
10.1.5
Scan time for digital and pulse inputs not greater than 250msec.
Scan time for all analog inputs not greater than 500msec.
Execution time not greater than 120msec.
Max. system loading of 60% under worst loading conditions.
Independent measurement circuit for each measurement.
Grouping of signals in each card is subject to approval at the time of detailed
engineering.
Failure of one logic shall not result in failure of the other logics.
Overall accuracy of measurement signals shall be 0.5%.
Extensive self diagnostic alarms and power supply failure alarm.
The PLC system shall support the following design features for hardware:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 39 OF 42
xii.
xiii.
xiv.
xv.
xvi.
xvii.
10.1.6
The PLC system processor shall support the following functions and capabilities:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
xv.
xvi.
10.1.7
Data acquisition.
Logic functions.
Closed loop control functions.
Generation of boolean functions.
Self diagnostic functions.
Monitoring of ADC / DAC performance and alarming for analog inputs.
Digital filtering.
Validation of all inputs and outputs.
Point identification by 8 character long tagno.
Point description with min. 24 character long identification.
Redundant communication with all I/O modules.
Redundant communication with all MMI equipment.
Communication control and monitoring.
Battery back-up of not less than 72 hrs.
Minimum 32 bit processor with floating point capability.
Volatile memory to store dynamic plant data, control programs and self
diagnostic routines.
The following general design and construction requirements shall be fulfilled by the PLC
system:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
Proven design.
Reputed make.
Shock proof design.
Vibration proof design.
Maximum interchangeability of parts.
Use of components which have higher rating than required for operation
conditions.
Design of equipment to avoid overheating of electronic components.
Ruggedness of equipment / components.
ISSUE
R1
VOLUME V
SECTION : D5.4
SHEET 40 OF 42
Package: EPC
10.1.8
iii.
iv.
v.
vi.
10.2
No two identical / similar equipment shall be grouped in the same I/O module.
Any one card shall have I/O related to only one equipment and auxiliaries. If
any equipment and auxiliaries requires more than one card, I/O related
auxiliaries shall be different cards.
Inputs and Outputs shall not be combined in a single module.
Whenever, 2/3 logic is involved, each of these inputs shall be connected to
different input cards and all the corresponding conditioned outputs shall be
taken to one processor or more than one processor depending on the grouping
for performing 2/3 logic.
I/O assignment shall be identical for similar / redundant equipment, i.e., if
Pump-A run is assigned to channel 4 of a card, Pump-B run shall be
assigned to channel 4 of another card. Also, these cards shall be located in
identical slots in different racks.
I/O modules of one equipment and associated auxiliaries shall be located in
the same rack, in different racks or even in different cabinets to increase
availability.
10.3
The operator station shall serve as operator and engineering station and shall have
independent electronics and shall have the following functions: The operator and
engineering functions can be combined in a single stations
i.
ii.
iii.
Plant control displays to facilitate normal plant operations. These displays shall
be organised in the form of plant displays, individual I/O point displays and
logic function displays. It shall be possible to perform open loop and closed
loop controls from these screens. Auto / manual selection, local / remote
selection etc. shall be possible from these screens.
Plant schematics.
Alarm notifications / actions.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 41 OF 42
iv.
v.
vi.
vii.
viii.
ix.
x.
10.4
10.4.1
The Real Time operating System (RTOS) supplied shall be proven, able to support all the
equipment/peripherals execute the entire task as stipulated in this specification. The
background executive shall enable software development in time sharing mode by two or
more programme simultaneously and shall run/Test any program without making it into an
online program.
10.4.2
The data acquisition, processing and alarm monitoring/ reporting software resident in
each DPU shall enable processing of raw process data including Engineering unit
conversion and process alarm time checking. The control software resident in each DPU
shall enable the execution of both modulating and sequential control without interrupts to
ensure security of controls software for performing mathematical function
routines/algorithms and logic functions for control loops as specified. The generation of
control software shall be based on logic blocks and ladder diagrams and no programming
knowledge is necessary.
10.4.2
Utilities like report and display generation, data base management, file handling unit,
communication, online system back up, on line diagnosis, `screen editor, soft ware
development, on line debugger and down loader, man machine interface software, log
generator, data transfer from magnetic tape to disk and vice versa, test and maintenance
program, anti virus vaccine/detection utility, full scale steam/water property routines
conforming to ASME 1967 steam table and software for information management system
shall be supplied. Licensed copies of operating system and system software shall be
supplied.
10.4.4
For all Software supplied by main Bidder or Sub Bidders shall provide access to
Purchaser at all levels.
10.4.5
The workstation hardware shall meet the specification under clause 2.0 above.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 42 OF 42
10.5
ANNUNCIATION SYSTEM
10.5.1
10.5.2
A set of annunciation push buttons (Sound Cancel, Reset, Acknowledge, Lamp Test etc.)
shall be provided on Local Control panel. The alarm response shall be less than 30 m
sec. The no of windows required for the electrical system in the main control room shall
be around 180 nos.
10.5.3
System features of Annunciation System: ISA sequence for non first up with time delay
adjustable for each point, reflash facility and auxiliary output.
10.5.4
Audible Devices: One hooter for first up alarm points, second hooter for mains supply
failure, buzzer for non first up alarm points. Audible devices shall be redundant with
selector switches.
10.5.5
Push buttons for sound cancel (Silence), acknowledge (first up), acknowledge (Non first
up), reset, lamp test, system test, earth test, reset (main supply failure alarm), test (main
supply failure alarm) and four sets of first four push buttons and one set of balance push
buttons shall be provided.
ISSUE
R1
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
1
1. SCOPE
This specification covers the Design, Manufacture, Assembly, Inspection and Testing at
manufacturers works, proper packing and delivery to site, erection and commissioning
of the PLC Control & Monitoring System comprising PLC Control panel/Remote I/O
panel (housing Processors, I/O cards, power supply packs etc.), Operator
workstations(OWS), Printers, Annunciation system, UPS, cables and all other
equipments and accessories required for completeness of the system as mentioned in
different sections of this specification.
2. GENERAL
2.1.
The PLC shall perform protection logic, interlock and sequential control functions
such as binary logic operation, set/reset operation, timers, counters, logic blocks,
math functions, input quality checking engineering unit conversion, Boolean
functions & PID control (Analog logic function).
2.2.
2.3.
The system shall have facility for connecting to Main Plants Distributed control
system (DCS) using hardware / software interface for two-way transfer of signals.
2.4.
The mimic shall be displayed on the OWS screen and may also be provided on the
control desk/panel (as per Data sheets).
2.5.
In case OWS is provided, HMI functions like Trends, Curves, Bar charts, Historical
storage of Data, Logs and reports etc. shall be provided in addition to Plantschematics. The necessary catalogue / literature elaborating the features of HMI
shall be supplied along with the bid.
2.6.
2.7.
The PLC system shall be sized to meet process/system requirements as per the
approved P&IDs and Control write-up.
2.8.
The PLC system shall be designed to ensure that no single device failure should
result in failure of any other device.
2.9.
Signal multiplication where required shall be done in PLC. Use of relays for
multiplication of contacts (for control, monitoring and alarm) is not acceptable. The
control/ monitoring components on the control panel/ desk shall be driven through
I/O modules.
3. TECHNICAL REQUIREMENTS
Details of various PLC system components shall be inclusive of but not limited to the
following:
3.1. CODES AND STANDARDS
3.1.1. The equipment covered under this specification shall meet the requirements of
latest edition of all applicable codes and standards like ANSI, NEMA, IEEE, IEC,
NEC & IS.
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
2
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
3
3.3. PROCESSORS
3.3.1. The microprocessors shall be 32 bit, and Hot redundant.
3.3.2. Hot redundancy: PLC shall be provided with two processors (Main processing unit
and memories) one for normal operation and one as hot standby. In case of failure
of working processor, there shall be an appropriate alarm and simultaneously the
hot standby processor shall take over the complete operation automatically. This
transfer from main processor to standby processor shall be bump less and shall not
cause any disturbance whatsoever. In the event of both processors failing, the
system shall revert to fail safe mode. It shall be possible to keep any of the
processor as master and other as standby.
3.3.3.
An authorized forcing facility shall be provided for changing the status of inputs and
outputs, timers and flags to facilitate fault finding and other testing requirements.
3.3.4. The standby processor shall be updated automatically in line with the changes
made in the working processor.
3.3.5. In the event of any replacement of the processor, synchronization of the replaced
processor shall be automatic upon live insertion.
3.3.6. The cycle time for input scanning, execution of logics, overheads and output scan
shall not exceed 120 m sec.
3.3.7. The processor & memory shall be loaded up to 50% at normal conditions and
maximum up to 60% under worst loading conditions.
3.3.8. The memories shall be field expandable.
3.4. INPUT / OUTPUT Modules
3.4.1. Input/output card assignments shall be modular i.e. no single card shall be assigned
with more than one drive of a particular sub-system. The maximum number of
channels per I/O module shall be as follows.
x
3.4.2. On line I/O replacement: All I/O cards shall have quick disconnect terminations
allowing for card replacement without disconnection of external wiring and without
switching off the power supply.
3.4.3.
10% spare capacity shall be ensured in each card channel assignment. Overall
minimum 20% spare channels shall be provided.
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
4
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
5
Each OWS and associated HMI peripherals shall be provided with a feeder from
either one of the UPS
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
x
x
x
x
x
x
x
x
x
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
6
x
x
x
x
x
x
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
x
x
x
x
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
7
TITLE:
SPECIFICATION FOR
PROGRAMMABLE LOGIC
CONTROLLER SYSTEM
VOLUME
II-B
SECTION D
REV. NO. 02
SHEET
8
- PE-DC-999-145-I036-2
286
63(&,),&$7,2112
92/80(,,
%
6(&7,21'
5(912
'$7(
2)
'DD6KHH1PES-145-36-DS1-0
6+((7
Data Sheet A & B
'$7$6+((7$)253/&6<67(0
(TO BE FILLED BY PURCHASER)
'$7$6+((7%
72%(),//('%<%,''(5
352-(&7
GENERAL
6(59,&(
48$17,7<
81,7,6('
&20021
287'225
/2&$7,21
,1'225
PLC
EQUIPMENT
0$.(02'(/12
%,''(572,1',&$7(
PROCESSOR
5('81'$17:,7++2767$1'%<
'$7$%86+0,
&233(5:,5( ),%5(237,&
'$7$%86,2&38
&233(5:,5( ),%5(237,&
'$7$%865(027(,2&38
&233(5:,5( ),%5(237,&
),(/'&217$&76,17(552*$7,21
92/7$*(
9 9
/2&$7,212)&283/,1*5(/$<6
0&& 3/&3$1(/
'(6.7232:648$17,7<
'(6.723021,7257<3(
7)7/&'021,725
35,17(5$48$17,7<
,1.-(7
/$6(5%:
&2/25,1.-(7
&2/25/$6(5
BBBBBBBBBBBBB
BBBBBBBBBBBBB
BBBBBBBBBBBBB
B2126
35,17(5$02'(/
,1.-(7
/$6(5%:
&2/25,1.-(7
&2/25/$6(5
BBBBBBBBBBBBB
BBBBBBBBBBBBB
BBBBBBBBBBBBB
BB2 126BBBBBBB
352*5$00,1*&21),*85$7,21
)$&,/,7<
$ +$1'+(/'
%(1*,1((5,1* 62)7:$5(
21(2:6
$//2:6
BBBBBBB
6$)(7<67$1'$5'
BBBBBBBBBBBBB
&20387(5)851,785(
<(6
48$17,7<
%,''(572,1',&$7(
&/$662)3527(&7,21
5(027(,23$1(/
COMMUNICATION
TO OTHER
SYSTEM
POWER SUPPLY
INPUT FEEDER
12
,3BBBBBBBBBB
<(6
12
PANEL
%$&.83'(6.
<(6
12
0,0,&
<(6
12
&21752/+$5':$5(
3% ,1',&$7256
)$&,$6BBBBBBB1
+$5':,5('
<(6
27+(56
12
385326(
&21752/
0(',80
873 ),%5(237,&27+(56
7,0(6<1&521,=$7,216,*1$/
)250$7
38/6(
56,5,*%
62)7/,1.
02'%86
23&
6(5,$//,1.
&20081,&$7,2132577<3(BBBBBBBBBB
3/&3$1(/
%,''(572,1',&$7(/2$''$7$
5(027(,23$1(/
%,''(572,1',&$7(/2$''$7$
021,725,1*
63(&,),&$7,2112
92/80(,,
%
6(&7,21'
5(912 '$7(
2)
'DD6KHH1PES-145-36-DS2-0
6+((7
Data Sheet C
'$7$6+((7&
72%(),//('%<%,''(5$)7(5$:$5'2)&2175$&7
352-(&7
6(59,&(
GENERAL*
48$17,7<
/2&$7,21
PLC
EQUIPMENT
0$.(02'(/12
PROCESSOR
'$7$%86+0,
'$7$%86,2&38
'$7$%865(027(,2&38
),(/'&217$&76,17(552*$7,21
92/7$*(
/2&$7,212)&283/,1*5(/$<6
'(6.7232:648$17,7<
'(6.723021,7257<3(
35,17(5$48$17,7<
35,17(5$02'(/
352*5$00,1*&21),*85$7,21
)$&,/,7<
6$)(7<67$1'$5'
&20387(5)851,785(
48$17,7<
PANEL
&/$662)3527(&7,21
5(027(,23$1(/
&2/285
%$&.83'(6.
0,0,&
&21752/+$5':$5(
COMMUNICATION
TO OTHER
SYSTEM
+$5':,5('
385326(
0(',80
7,0(6<1&521,=$7,216,*1$/
)250$7
62)7/,1.
6(5,$//,1.
POWER SUPPLY
INPUT FEEDER
3/&3$1(/
5(027(,23$1(/
288
SPEC.NO.
TCE.5750A-H-500-001
SHEET 1 OF 4
1.0
SPECIFIC REQUIREMENTS
1.1.
The Uninterruptible power supply system (UPS System) shall cater to the complete
DM plant instrumentation and control system loads and
PLC system loads.
The UPS shall be sized considering full load plus spare loops plus
25% margin. The output shall confirm to stringent requirements in respect of
voltage & frequency regulation, harmonic content & transient recovery.
1.2.
The UPS shall be of parallel redundant with static bypass to regulated supply
type with 2 x 100% chargers and inverters and 2X100% battery bank, bypass line
transformer and voltage stabiliser, AC distribution board, other necessary
protection devices and accessories. UPS shall derive power from auxiliary
switchgear as shown in the UPS Single Line Diagram.
UPS Battery shall be of Plante Type with 60 min back up.
1.3.
The UPS shall include AC distribution board with air break switch, fuses, current
transformers, meters, alarm and indications. It shall incorporate complete circuit
protection against all types of abnormal conditions, the system is likely to
encounter while in service.
1.4.
Requirement of the 24V DC or any other voltage level system for PLC and other
system if any shall be derived from the UPS supply. The UPS shall be sized for
the same. A separate 24V DCDB shall be provided for distributing feeders to the
24V DC system.
1.5.
The UPS system offered shall be suitable for normal operation, emergency
operation with required protections for Thyristor, Automatic synchronisation etc.
The UPS system shall be provided with necessary meters (accuracy class 1.0 or
better), mimic diagram, status of operation, indications and alarms. Group alarms
and analog parameters of each branch of parallel redundant UPS shall be made
available on PLC. The UPS shall be suitable for PC connectivity and necessary
hardware and software shall be included.
1.6.
The UPS system shall be based on latest generation technology having proven
performance of satisfactory operation for similar applications.
2.0
SYSTEM REQUIREMENTS
2.1.
The UPS system shall be of the static type, composed of static inverters, static
switches for added protection and transfer of loads with no break or with minimum
interruption of the order of a fraction of a cycle during undervoltage condition to the
healthy inverter or to standby regulated supply. The components of UPS shall
isolate power line voltage transients, frequency variations and high/low voltage
conditions from the critical load and act as a line filter and voltage regulator, apart
from providing no-break power at constant frequency during normal power
outages.
ISSUE
R1
TCE FORM 329 R5
SPEC.NO.
TCE.5750A-H-500-001
SHEET 2 OF 4
2.3.
Mode of Operation
2.3.1. The system shall have a combination of two inverters (UPS modules) operating in
synchronism, each having isolating facility from the critical bus by a static switch.
Power supply to UPS shall be as shown in the sketch for UPS Single Line
Diagram.
2.3.2. In addition to the two inverter systems, a back-up from a regulated AC supply
through transformer and voltage stabilizer derived from a standby AC supply shall
be provided. The system shall have a selector switch. In the `Normal' position,
both the inverters share 50% load each, with output of both inverters being
automatically synchronized with each other. If one inverter fails, the healthy
inverter shall supply the full 100% load by the operation of the static switch. When
any one of the UPS is under maintenance, the selector switch shall be suitably
changed and the branch circuit supplying 100% load shall be synchronised with
the frequency of the standby source.
2.3.3. If the frequency of the standby source is beyond the preset limit, the inverter
frequency control shall get disconnected from the standby synchronising signal.
The operating inverter shall continuously monitor the frequency of standby source
and upon restoration of proper frequency of the standby source, the inverter shall
use the frequency of the standby source as the synchronising signal.
2.3.4. When the selector switch is in bypass position the standby source shall cater
100% load, isolating both inverters from the critical load bus.
2.3.5. The output of the UPS shall feed all the essential loads through the ACDB. The
connection from the UPS to ACDB shall be through a switch and fast acting
semiconductor fuses, trip fuses and micro switch with alarm contacts. The feeders
shall be designed by the Contractor to suit the load requirements.
2.4.
Inverter
2.4.1. Inverter shall be of the CVT (Constant Voltage Transformer) or PWM (Pulse Width
Modulation) type, adequately designed to meet the requirements as specified.
2.5.
2.5.1. Inverter output shall be connected to the AC bus through a static switch and fast
acting fuses. The static switch comprises an interrupter and transfer switch,
enabling loads to be connected to the standby regulated AC supply.
2.5.2. Automatic initiation of the transfer from a faulty branch circuit to the standbyregulated source shall be accomplished during following conditions:
a)
b)
ISSUE
R1
TCE FORM 329 R5
SPEC.NO.
TCE.5750A-H-500-001
SHEET 3 OF 4
2.6.1. Regulated standby AC supply shall be derived from standby supply through a stepdown transformer of appropriate rating and a servo controlled voltage stabiliser
with isolation transformer and power conditioning equipment viz., spike arrester,
etc.
2.7.
Protection
2.7.1. The UPS system components and assemblies shall be provided with the
necessary protection associated with all components.
3.0
3.1
UPS shall be of unitized construction, free standing, floor mounted, indoor type,
dust and vermin proof.
3.2
Forced Cooling
3.2.1
3.2.2
The panel enclosure shall confirm to IP-32 degree of protection. The panels
shall be provided with illumination lamps, door switches, space heaters and
power sockets.
4.0
4.1
4.2
The enclosure cold rolled steel thickness shall be 2.0 mm minimum for load
bearing and 1.6 mm for other non-load bearing members and enclosure class
protection shall be IP 54.
4.3
The DB shall have two sections with sectionalising switch (ACB/MCCB) & shall
be protected by semiconductor fuses with fuse monitoring device, bus healthy
lamps, Voltmeters & Ammeters. Each load shall be fed by two independent
feeders. Each feeder shall have double pole isolation switches & semiconductor
fuse (on both phase & neutral side) and feeder ON LED indication with glass
fuse.
ISSUE
R1
TCE FORM 329 R5
SPEC.NO.
TCE.5750A-H-500-001
SHEET 4 OF 4
Incoming to ACDB from static switch shall be MCCB or ACBs of draw out
module.
4.5
All outgoing switches shall be air insulated load break type with suitable LED
indications. Cable entry shall be decided during detail engineering stage. The
gland plate of the distribution board shall be non-magnetic type.
4.6
UPS distribution board shall be provided with individual feeders for each load.
25% spare feeder of each type and rating shall be provided for purchasers use.
4.7
4.8
b)
c)
5.0
TESTS
5.1
Type and routine test certificates for all components made use in the UPS
system shall be furnished. Tests for components shall be as per relevant
standards.
5.2
AC Distribution Board
5.3
5.4
5.5
Endurance test on static switches shall be performed for not less than 10
transfer/ retransfer cycles at full load.
5.6
The complete assembled UPS system shall be operated at rated load under
relevant ambient conditions for not less than 96 hours continuously prior to
release for shipment.
6.0
ISSUE
R1
TCE FORM 329 R5
VOLUME IV
TCE.5750A-H-500-001
SECTION: D11
PART B
DATA SHEET-A
UNINTERRUPTIBLE POWER SUPPLY SYSTEM
Sl. No.
Description
1.0
Type
2.0
Application
3.0
Number required
4.0
Ambient temperature
5.0
Output Voltage
6.0
7.0
Degree of protection
IP 32
8.0
Cable entry
9.0
10.0
11.0
Material of Enclosure
12.0
Inverters
12.1.
Type
Static
12.2.
Number required
12.3.
Yes
REV. NO.
PPD. BY :
CKD. BY :
R0
UM
MSVM
R1
SK
MSVM
DATE
NOV2009
JUN2012
Unit
Specification Requirement
50
230V, 1phase
kVA
JOB NO.
TCE 5750A
CLIENT : RRVUNL
PROJECT : 2 x 660 MW, Super-Critical TPS,
Stage- V, Units 7 & 8, at Suratgarh, Rajasthan
TCE FORM NO. 329 R5
293
VOLUME IV
TCE.5750A-H-500-001
SECTION: D11
PART B
DATA SHEET-A
UNINTERRUPTIBLE POWER SUPPLY SYSTEM
12.4.
Service
Indoor
12.5.
12.6.
Output Voltage
12.7.
Voltage regulation
12.8.
Frequency regulation
8%
12.9.
50
b)
Time to recover from
transient- to normal voltage
ms
12.10.
12.11.
Duty
Continuous
12.12.
Overload capacity
12.13.
12.14.
12.15.
Efficiency
REV. NO.
PPD. BY :
CKD. BY :
R0
UM
MSVM
R1
SK
MSVM
DATE
NOV2009
JUN2012
JOB NO.
TCE 5750A
CLIENT : RRVUNL
PROJECT : 2 x 660 MW, Super-Critical TPS,
Stage- V, Units 7 & 8, at Suratgarh, Rajasthan
TCE FORM NO. 329 R5
294
VOLUME IV
TCE.5750A-H-500-001
SECTION: D11
PART B
DATA SHEET-A
UNINTERRUPTIBLE POWER SUPPLY SYSTEM
12.16.
Cooling
12.17.
Yes
13.0
13.1.
Capacity Continuous
13.2.
Type
13.3.
Voltage
13.4.
13.5.
Frequency
13.6.
Transfer time
13.7.
Retransfer
13.8.
Hz
13.9.
13.10.
50
I.
Protection of all
semiconductor devices
against short circuit and
transients.
13.11.
REV. NO.
PPD. BY :
CKD. BY :
R0
UM
MSVM
R1
SK
MSVM
DATE
NOV2009
JUN2012
JOB NO.
TCE 5750A
CLIENT : RRVUNL
PROJECT : 2 x 660 MW, Super-Critical TPS,
Stage- V, Units 7 & 8, at Suratgarh, Rajasthan
TCE FORM NO. 329 R5
295
VOLUME IV
TCE.5750A-H-500-001
SECTION: D11
PART B
DATA SHEET-A
UNINTERRUPTIBLE POWER SUPPLY SYSTEM
a) Static switch connected to
alternate source
5
14.0
Bypass Switch
14.1.
Capacity Continuous
14.2.
Type
14.3.
15.0
15.1.
Number
15.2.
Rating
15.3.
15.4.
Type
15.5.
15.6.
Type of cooling
15.7.
15.8.
Location
15.9.
Voltage regulation
15.10.
15.11.
5% of nominal voltage
15.12.
1% of nominal freq.
REV. NO.
PPD. BY :
CKD. BY :
R0
UM
MSVM
R1
SK
MSVM
DATE
NOV2009
JUN2012
JOB NO.
TCE 5750A
50
CLIENT : RRVUNL
PROJECT : 2 x 660 MW, Super-Critical TPS,
Stage- V, Units 7 & 8, at Suratgarh, Rajasthan
TCE FORM NO. 329 R5
296
VOLUME IV
TCE.5750A-H-500-001
SECTION: D11
PART B
DATA SHEET-A
UNINTERRUPTIBLE POWER SUPPLY SYSTEM
15.13.
16.0
ACDB
16.1.
16.2.
16.3.
Degree of protection
17.0
BATTERIES
17.1.
Type
17.2.
Capacity
17.3.
Rated Voltage
17.4.
Back up time
17.5.
Redundancy
**
**
IP52
*
*
60 mins
2 X 100%
REV. NO.
PPD. BY :
CKD. BY :
R0
UM
MSVM
R1
SK
MSVM
DATE
NOV2009
JUN2012
JOB NO.
TCE 5750A
CLIENT : RRVUNL
PROJECT : 2 x 660 MW, Super-Critical TPS,
Stage- V, Units 7 & 8, at Suratgarh, Rajasthan
TCE FORM NO. 329 R5
297
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 1 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
BIDDER:
S.NO
.
ITEM
BIDDER
1.0
GENERAL PARTICULARS
1.1
Name / Manufacturer
1.2
Quantity Offered
1.3
Type of UPS
1.4
kVA
1.5
kVA
1.6
Nos.
Voltage
Frequency
Combined
1.7
Environment
1.7.1
1.7.2
For Operation
For Storage
Relative Humidity
C
C
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 2 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
BIDDER:
S.NO
.
1.7.3
BIDDER
2.0
ENCLOSURE
2.1
2.2
2.3
Mode of Cooling
2.4
2.5
Cable Entry
ITEM
m
mm
Dimensions of
LxDxH
(mm)
Mimic Diagram
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 3 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
S.NO
.
BIDDER:
BIDDER
ITEM
indication LED
2.8
2.9
Colour of Paint
dBA
Exterior
Interior
2.10
kg
3.0
RECTIFIER
3.1
Ripple
3.2
3.3
3.4
3.5
Rectifier Efficiency
% rms
Yes / No
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 4 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
S.NO
.
BIDDER:
BIDDER
ITEM
( At Full Rated Load of the System
b
)
3.6
4.0
INVERTER SYSTEM
4.1
4.2
4.3
kVA
4.4
V DC
4.5
Output
4.5.1
Voltage
4.5.2
+%
4.5.3
+%
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 5 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
S.NO
.
BIDDER:
BIDDER
ITEM
4.5.4
+%
4.5.5
ms
4.6
Frequency
4.6.1
Nominal frequency
Hz
4.6.2
+%
4.6.3
+ Hz
4.6.4
Hz/Sec.
4.7
Overload Capability
- for 10 min.
% full
load
- for 10 secs.
% full
load
5.0
BATTERY
5.1
Nos.
5.2
Min.
5.3
5.4
Nos.
SIGNATURE OF BIDDER & DATE
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 6 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
BIDDER:
S.NO
.
ITEM
BIDDER
5.5
6.0
STATIC SWITCH
6.1
6.2
Load Transfer
7.0
7.1
Yes / No
7.1.1
V+%
7.1.2
Output volts
7.1.3
+%
7.1.4
+%
7.1.5
kVA
7.1.6
Yes / No
LXWXH
A
Bidder to furnish a detailed write
up on load transfer /. Switching
arrangement
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
SPEC.NO.
SECTION:D11
TCE.5750A-H-500-001
PART B
SHEET 7 OF 7
DATA SHEET B
UPS
ENQUIRY/SPECIFICATION NO.:
S.NO
.
BIDDER:
BIDDER
ITEM
provided
9.0
DISTRIBUTION BOARD
9.1
SF /DF
9.2
Modular construction
Yes / No
9.3
9.4
NOTES TO BIDDER
1
.
2
.
ISSUE
R1
TCE FORM NO. 294 R3
305
2.3.0
MEASURING INSTRUMENTS
306
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 1 OF 42
1.0
1.1
1.2
1.3
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 2 OF 42
1.4
Thermometers
Bimetallic below 80 deg.C. and inert gas actuated for above 80 deg.C. of SS bulb and
capillary. Body material-Die-cast aluminium. Dial size-150 mm with white dial and black
numerals and process connection-1/2NPT (F). Accuracy-+/- 1% of span. IP 65
protection class. Accessories include nameplate, mounting brackets and SS Thermo
well. Process connection- M33 x 2 thread /1 Socket welded/ 1 flanged.
1.5
Thermo wells
Pipe/equipment mounted temperature test wells of 316 SS with a process connection of
M33x2 thread /1 socket welded/ 1 flanged. Accessories like name plate, plug with
chain, etc. shall be provided. Material of accessories shall be SS. Thermowell shall be
hex head of barstock assembly. In case flanged wells are required for any specific
application, the same shall be supplied as required. The thermo well construction shall
meet the ANSI 19.3 (latest) requirements. Thermo well shall be designed such that the
resonant frequency is above the exciting frequencies generated by vortex shedding in
the process fluid. All Test thermo well shall have the plug of SS316.
1.6
Thermocouple Assembly
Duplex, K Type, 16 AWG or R type, 24 AWG with accuracy as per ANSI-C-96.1/IEC
60584, ungrounded type depending on operating temperature range. Response time of
2 to 6 sec, Spring loaded mineral insulated thermocouple assembly with 316 SS
thermo well housed aluminium casing (epoxy coated) having a process connection
of M33 x 2 thread / 1 Socket welded. Material of accessories (name plate, etc.) shall be
SS. IP 65 or equivalent degree of protection for enclosure. Thermo well with hex
head (with screwed cover & SS chain) bar stock assembly with ungrounded junction. For
metal temperature measurement, thermocouple pads weldable to M.S pipes shall be
provided with 15 m thermocouple extension wires. Element size shall be 18 AWG.
Insulation resistance at 540 Deg C shall not be less than 5 M ohms. Temperature
devices provided with thermo wells shall be calibrated with the associated thermo well as
an assembly. The thermo well construction shall meet the ANSI 19.3 (latest)
requirements. All pent house thermocouples shall be supplied with 15mts flexible
extension length.
1.7
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 3 OF 42
than 5M ohms. Repeatability over full range shall be better than 0.02%. RTDs shall be
ungrounded. RTD shall be supplied as an assembly complete with thermo wells meeting
ANSI 19.3 (latest) requirements.
1.8
Level Gauges
Tubular type level gauges for low pressure upto 7 kg /sq.cm & reflex type for high
pressure water & steam services & vacuum services with automatic ball check
valves, illuminator (240 AC), pyrex/ tempered toughened borosilicate glass, mica
shield, brass guard rods & brass holders. Body material: Forged carbon steel/304SS.
Accuracy- +/- 2% with vertical scale.4 Material of accessories (name plate, etc.) shall be
SS. Tubular glass OD shall be 5/8. Vent & drain valves shall be provided. Connection
shall be screwed or flanged (ANSI class 150 RF).
1.9
Level Switches
External cage magnetic float operated level switches for tanks and vessels and top
mounted level switches for sumps and underground tanks. The top mounted level
switches shall be supplied with still tubes to suit the requirement. Micro switch with 2
SPDT contacts rated for 0.2 A, 220 V DC. Material of float & float chord shall be 316 SS
& cage material shall be fabricated steel and the material of accessories shall be SS.
IP65 or equivalent degree of protection for enclosure.
Accessories like name plate, drain valve for external case type level switches,
mating flange, gaskets (asbestos), fasteners, bolts & nuts, etc. shall be supplied.
Conductivity type electronic Probe type level switches shall be supplied for Drain pots.
The required pressure vessel assembly for mounting probes are included in the scope.
1.10
Level Transmitter
Ultrasonic type level transmitters top mounted with integral local LCD indicator, IP-65
protection; 2 wire type transmitter with 4-20mA output with HART protocol; Accuracy
0.25%; Resolution 1mm; Repeatability 0.1%; Linearity 1%; Response time 150ms;
Beam angle <12; Auto false echo-suppression; Accessories like integral cable between
sensor and transmitter unit with connectors on both side, gasket and cable gland, digital
panel meter, name plate & metal tag; the material of accessories will be SS.
Radar type level transmitters top mounted with LCD indicator,IP-65 protection; 2 wire
type transmitter with 4-20mA output with HART protocol; Accuracy 1%; Resolution
1mm; Repeatability 1 mm; Linearity 0.01%; Beam angle <20; Accessories like
integral cable between sensor and transmitter unit with connectors on both side, gasket
and cable gland, digital panel meter, name plate & metal tag; the material of accessories
will be SS.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 4 OF 42
1.11
Flow Glasses
Online flow glasses for pipe size up to 6 with a rotary wheel (not a flapper type)
suitable for installation on vertical or horizontal pipelines, material Pyrex tempered
glass. Body material shall be carbon steel, rotor & wetted parts shall be bronze. The
material of accessories shall be SS. IP 65 or equivalent degree of protection for
enclosure. Upto 50 Nb size, connection shall be screwed & above 50 mm Nb size it
shall be flanged - ANSI, 150 RF. Accessories like name plate, mating flanges with
gaskets (neoprene), bolts & nuts, etc. shall be supplied.
1.12
Flow Switches
Indicating, Differential pressure, flapper type on line flow switches for line sizes up to
80 mm with an accuracy of +/-0.5% of span and dial size of min. 50 mm having 316
SS flapper/SS 316 bellows housed in die cast aluminium. Micro switch with adjustable
range with 2 SPDT contacts rated for 0.2 A, 220 V DC. IP 65 or equivalent degree
of protection for enclosure. The material of accessories shall be SS. Repeatability
shall be
+/-0.5% of span. Over range protection shall be 50% above maximum flow. Setting
shall be tamper proof external adjustment & scale shall be provided for setting.
Range spring & orifice plate shall be SS 316 for DP type. NPT for sizes below 2 & for
sizes above 2 ANSI 150 RF shall be provided. Accessories like nameplate, mating
flanges with gaskets, bolts & nuts, pipe assembly with orifice plate, etc. 5 way manifold,
pipe, fittings (DP type), etc. shall be supplied.
1.13
Flow Elements
316 SS long radius, welded type flow nozzles as per ASME PTC 19.5 or BS-1042 for
all steam and feed water services with D and D/2 pressure tappings; 316SS
concentric orifice plate assembly as per ASME PTC 19.5 or BS-1042 for all water
services with flange tap connections. Beta ratio of 0.34 to 0.7 for orifice and around 0.7
for flow nozzles.. The material of accessories shall be SS. Refer to Table-5 for provision
of flow elements. All the flow elements shall have 3 pairs of differential pressure
tappings complete with root valves. Orifice plate shall be3 mm thick for nominal pipe
diameter upto 300 mm & 6 mm thick for pipe diameter > 300 mm. The thickness of the
flow nozzle shall be as per the application. The flow elements shall be supplied as
assemblies with High/low pressure tappings, root valves as required. Performance
Guarantee flow elements shall be provided separately. Butt welded edges shall be
prepared as per ANSI 16.25 & flanged connections shall be as per ANSI 16.5
standards. Orifice assembly complete with nipples & valves to be supplied by Bidder
shall be one meter long with ANSI class 150 RF SS flanges at the ends including
gaskets, bolts & nuts. Isolating valves shall have SW end connection. Accessories
like nameplate, gaskets, bolts & nuts, reservoirs (condensing chambers), 6 nos. shut
off valves per assembly, nipple, welding adapters, etc. shall supplied. Bidder shall
submit assembly drawing and flow vs DP curve for each flow element.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 5 OF 42
1.14
Magnetic Flowmeter
Inline type with indicating top mounted transmitter with flange connection. Accuracy:
0.5% of flow rate or volume flow. Repeatability 0.1% of flow rate/volume flow.
Transmitter shall be smart with LCD display and superimposed HART on 4-20mA DC
output. Data storage shall be in EEPROM. Shall have diagnostic capabilities. Touch
control facility on the indicator for checking the rate/volume and diagnostic messages.
Material: Case-Al.alloy with corrosion resistant, flow tube and extension pipe- Stainless
steel (SS 304) and Lining-fluro carbon.
The flow rate shall be available in DCS/PLC and flow integration shall be implemented in
DCS/PLC to indicate volume flow.
1.15
1.16
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 7 OF 42
coloured LCD or fluorescent tube with user selectable span; programmability (selection
of input & scan/storage rate) shall be through Front panel keyboard; the recorder shall
have the capability of being drawn out from the front side of the housing for maintenance
and shall have electrical connection of plug-in type; material of casing shall be die-cast
aluminium with epoxy coating and with a non-glare shatter proof Glass; enclosure shall
be IP32 The quantity of Hybrid recorders shall be 4 nos.
1.21
1.22
1.23
1.24
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 8 OF 42
shall be mounted in IPR cabinet & relay base (silver plated) internally wired to the
external cabling termination block in IPR cabinet. Wiring connection shall be cageclamp & termination shall be suitable for 0.5 sq.mm to 2.5 sq.mm size wiring. Facility to
simulate relay operation manually shall be provided. Relays of different contact
interrogation voltages shall be separated by a barrier in IPR cabinet. Accessories like
name plate (SS) with tag & service inscription, relay base mounting rail/channel, nuts
& bolts, etc. shall be supplied.
In each cabinet, a DC Voltmeter shall be provided to check the Field Interrogation
voltage.
1.25
System Cabinets
These cabinets shall house signal-conditioning cards, input/output cards, processor
cards & associated power supply units. Indoor located, free standing vertical type
system cabinets with IP-32 enclosure and with 2 mm thick sheet metal of cold rolled
steel; double doors with neoprene gaskets; ant vibration pads of 15 mm thick; blower
& louvers in each cabinet with brass mesh; fire proof compound (50 mm thickness) for
sealing cable entry (bottom); fire detector for each cabinet. The racks in system cabinets
shall have provision along with plug in sockets/back plane to house accommodate the
spare slots/modules as specified elsewhere. The colour of the cabinets shall be
indicated at detailed engineering stage. Doors shall have concealed type of hinges and
swing of 100o. to, on the side to help the operator. Power supply distribution shall be
provided on per cabinet basis with all associated MCBs, protections, etc. The system
cabinets, racks in system cabinets, slots in the racks & the terminals shall have
identification numbers. A stainless steel metal tag (plate) shall be fixed to the inside of
the door & the layout of the racks, slots & details of the card type/service shall be
inscribed on this metal tag. Each cabinet shall be provided with one each 3 pin
receptacles for 240 V, 1P, 50 C/S and receptacles for +24V DC. Cabinet shall be
delivered totally wired. All electronics shall be mounted & wiring connections at these
hardware shall be terminated by Bidder. Quantity shall be as required. One of the doors
shall be provided with folder to keep the relevant engineering document of the cabinet.
All cabinets shall have common key for the locks.
In each cabinet, a 24 VDC Voltmeter shall be provided to check the Field Interrogation
voltage.
1.26
Marshalling Cabinets
Indoor located, free standing vertical type marshalling cabinets with IP-32 enclosure and
with 2 mm thick sheet metal of cold rolled steel; single/double door with neoprene
gaskets; anti vibration pads of 15 mm thick; fluorescent lighting; blower & louver in
each cabinet with brass mesh; fire detection for each cabinet; fire proof compound (50
mm thick) for sealing cable entry (bottom, front, rear). The colour of the cabinets shall
be indicated at detailed engineering stage. The type of terminal shall be Phoenix / Weid
ueller / WAGO. The terminal blocks shall be cage clamp type. Fused terminal blocks
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 9 OF 42
hinged at one end to facilitate easy isolation shall be provided wherever necessary. All
cabinets shall be provided with spare terminals for the spare inputs/outputs as specified
else where in the specification.. The type of terminals for terminations from
cabinets/panels shall match with the pre fabricated cables and pins supplied. The
terminals for field cables shall be arranged in a logical order of equipment/system
wise and shall be worked out by Bidder, subject to approval by Owner / Project
Manager/ Consultant. Door shall have concealed type hinges and swing of 180
Degree & lockable. The doors shall be provided both on the front and rear. Channels,
bolts & nuts shall be zinc plated and passivated. Two coats of premier paint and
black colour paint shall be applied. Fluorescent lamp of 40W shall be provided and
shall be operated by the door switches as well as by manual switches. The
marshalling cabinets, the terminal blocks, the terminals and the electronic hardware if
any, shall have identification numbers. Each cabinet shall be provided with one each 3
pin receptacles for 240 V AC, 1Ph, 50 c/s and receptacles for +24V DC. A system
cabinet and associated cabinets shall be supplied on a skid to avoid outside
interconnecting cables. Cabinet
shall
be delivered totally wired. Preparation of
interconnection schedule (ICS) between marshalling cabinets & JBs/FTCs and JBs to
Instruments is in Bidder scope. The format of Interconnection Cable Schedule (ICS) shall
be submitted by the Bidder during detailed engineering stage for approval by Owner /
Project Manager.
All cabinets shall have common key for the locks.
All the terminals shall have no screws and the cables shall be gripped by spring. Each
terminal shall have LED indication with fuses to indicate and isolate earth faults.
1.27
Local Panels
1.27.1
Indoor/Outdoor located, free standing vertical type local panels with 2 mm thick sheet
material of cold rolled steel; ant vibration pads of 15 mm thick; fluorescent lighting;
Double doors with neoprene gaskets at every 1.5 m; blower & louvers in each section
with brass mesh; fire proof compound (50 mm thick) for sealing cable entry (bottom);
fire detector for each section; space heater with thermostatic control for each section
(strip type). IP-52 degree of protection for enclosure for outdoor and IP-32 for indoor.
Removable cover plates with locking facility shall be provided along the bottom of the
front desk continuously to facilitate maintenance work. The length of each cover plate
shall not exceed 1 m. Fluorescent lamp of 40 W shall be provided from one end of the
panel to the other end at continuous length and shall be operated by the door switches
as well as by manual switches. Nameplates shall be provided for all instruments/inserts
with Tag. No. & short description of service engraved. These shall be phenolic
overlays (1.6 mm thick), black background with white lettering & shall be fixed to the
panel by stainless steel screws (counter sunk). Each section of the panels shall be
provided with one each 3 pin receptacles for 240V AC, 1P, 50 c/s &. Panel shall be
delivered totally wired. All instruments, inserts and annunciation windows shall be
mounted & wiring connections at these hardware shall be terminated at site by
Bidder.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 10 OF 42
1.27.2
All the Terminal Blocks shall be rust proof and corrosive resistant for outdoor mounted
panels. Terminal Blocks housing material shall be 6.6 polyamide and metallic portion
shall be coated against rust/corrosion.
1.27.3
1.28
1.29
1.30
Control Valves
1.30.1
1.30.2
Control valves shall be sized to have an opening of 15% at minimum flow condition
and 85% at maximum flow condition. Noise level shall not exceed 85 dB at a
distance of about 1.5 M from the valve. In case of predicted noise level above 85dBA,
suitable low noise trim shall be provided. Noise reduction shall be achieved through an
inherent Trim design and not through external means.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 11 OF 42
1.30.3
All control valves shall have a leakage class of V and tight shut off application class VI
shall be provided.
1.30.4
Either extended type bonnet or cooling fin type bonnet shall be provided for service
above 200 Degree C and for other service the bonnet type shall be standard.
1.30.5
The end connections shall be socket welded for sizes below 50 NB and butt welded
for sizes 50 NB and above. Flanged connection shall be provided for DM water
services, with suitable rubber lined interfaces.
1.30.6
Water seal shall be provided for valves that could be subjected to below atmospheric
conditions.
1.30.7
Generally stem and guide material(trim) shall be SS 316 stellited, and plug and seat
material shall be 17-4 PH SS, except for specific applications like DM water, HP
bypass services. Refer to mechanical section of this specification for selection of
control valve body material and actuator type.. The trims supplied shall be suitable for
quick changing. Actuator housing shall be of pressed steel construction.
1.30.8
Trim shall be designed such that trim exit velocity shall be limited to avoid cavitation.
1.30.9
The action of valves on failure of operating media shall be determined by the process
requirements with regard to safe operation and emergency shut down requirements.
1.30.10
Control valve sizing shall be accompanied with data sheets. Following size calculation
details shall be furnished for Control valves:
1.31
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 12 OF 42
1.32
1.33
1.33.1
1.33.2
The SMART positioner shall be suitable for both single acting and double acting
actuators. The SMART positioner shall be fully modular in construction with
Encapsulated printed wiring board and pressure gauges inside the positioner cover to
protect from transit/site damage.
1.33.3
SMART positioner shall preferably be of the same make as the Control Valve, to ensure
repeatability in Calibration, serviceability and proper maintenance of the Control System.
1.33.4
The SMART positioner shall have pressure sensors to measure the pneumatic outputs
to the actuator.
1.33.5
The control algorithm for the positioner shall use feedback signal from the motion of the
pneumatic relay beam instead of pressure feedback to minimize pneumatic related
effects and for stable and smooth response of the control valve. The SMART positioner
shall have user adjustable tuning sets to identify the optimum tuning for the total valve
assembly. SMART Positioner with HART Communication facility shall communicate all
the valve diagnostics to DCS.
1.33.6
The electrical housing shall be designed to meet NEMA 4X,IEC 60529 IP66.
1.34
Void
1.35
Void
1.36
Void
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 13 OF 42
1.37
1.38
Position Transmitters
24VDC operated Non contact LVDT type with 4-20 mA DC 2 wire system with an
accuracy of 1%; range adjustment and zero adjustment to be provided; IP65 degree of
protection for casing. The output shall be linear. All accessories shall be SS.
1.39
Solenoid Valves
Direct operated solenoid valves, pilot operated for higher sizes with shut off class
(leakage) VI, body material of bronze, plunger material of 316 SS rated for continuous
duty. IP 65 class for enclosure. Insulation class of 'F' for the solenoid. Body ratings shall
suit the pressure and temperature conditions.
1.40
Void
1.41
1.42
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 15 OF 42
1.44
1.44.1
Conductivity Measurement
Solid state/micro-processor based, single stream with an accuracy of +/-1 %FSD, auto
temperature compensation, auto calibration, zero check and integral indicator having
gate valve insertion type (with drawable) cell for hot well conductivity measurements and
flow line (screwed) type cell for other services. Housing for cell and analyser shall be
weather and waterproof. Output shall be isolated 4-20 mA DC linear signal. Dual channel
analyser with independent output signal for each channel of measurement can be used
(if required).
Movable type for Hot well and flow through, single stream, type for other applications,
with an accuracy less than +/- 1%, response time less than 1 sec for 90% of full scale
change and range of 0-1,0-10,0-100 microsiemens/cm for specific conductivity and 0-1
microsiemens/cm log scale for cation conductivity. Dual cation exchange shall be
provided for cation conductivity. Analyser shall have features like auto zero & span
calibration, ambient temperature compensation, and integral indicator etc. Fault
diagnosis data shall include faults in analog/digital circuits, faults in calibrated valves,
power supply failure and sample failure. Analyser housing shall be weather and
waterproof. Output shall be isolated 4-20 mA DC linear signal. Dual channel analyser
with independent output signal for each channel of measurement can be used (if
required).
1.44.2
pH Measurement
Solid state/micro processor based system with system accuracy of 0.02 pH, auto
temperature compensation, auto zero check, manual zero and span calibration, integral
indicator, automatic ultrasonic cleaner, iso potential adjustment having flow type cells.
Housing for electrode and analyser shall be IP65. Output shall be isolated 4-20 mA DC
linear signal. Accessories shall include preamplifier, screened junction box for electrode.
Dual channel analyser with independent output signal for each channel of measurement
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 16 OF 42
1.44.4
Silica Analyser
Continuous colourimetric with an accuracy of +/-5%, response time better than 10 min
for 90% change including sample switching, six number of sample streams with sample
shut-off solenoid valve having features like auto zero & span calibration, ambient
temperature compensation and integral indicator. Self diagnostic features shall include
alarm for no reagent, calibration fault and silica concentration low/high. Analyser housing
shall be weather and waterproof. Output shall be isolated 4-20 mA DC linear signal.
Range shall be 0-50/0-500 ppb.
1.44.5
Hydrazine Analyser
Continuous electrochemical single stream type with an accuracy of +/-5% FSD,
response time better than 2 min for 90% of full scale having features like auto zero &
span calibration, ambient temperature compensation, and integral indicator etc. Fault
diagnosis data shall include faults in analog/digital circuits, faults in calibrated valves,
power supply failure and sample failure. Analyser housing shall be weather and
waterproof. Output shall be isolated 4-20 mA DC linear signal. The range shall be 050/0-100 ppb.
1.44.6
Sodium Analyser
Continuous flow through sample, multi stream type with accuracy less than +/-10% ,
response time less than 2 min and range of 0-20/0-200 ppb . Analyser shall have
features like auto zero & span calibration, ambient temperature compensation, and
integral indicator etc. Fault diagnosis data shall include faults in analog/digital circuits,
faults in calibrated valves, power supply failure and sample failure. Analyser housing
shall be weather and waterproof. Output shall be isolated 4-20 mA DC linear signal.
1.45
Void
1.46
Void
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 17 OF 42
1.47
Cables
1.47.1
Individual pair shielded & overall shield twisted pair copper cables shall be used for
analog signals & overall shielded cables shall be used for digital signals. All these
cables shall be armoured. All the insulation including overall sheath shall be FRLS
quality. The wire size shall be 0.5 sq.mm. Ferruling indicating terminal numbers on
termination side shall be followed. Colour coding shall be approved by Owner / Project
Manager. Only sleeve type ferruling with printed terminal numbers shall be used. Cross
ferruling shall be adopted.
1.47.2
Instrumentation Cables
Instrumentation cables shall be 600VAC grade, stranded high conductivity annealed,
tinned copper, twisted pair (with min. 20 twists for meter) extruded PVC insulated with
overall and / or individual screening, extruded PVC inner sheathed, galvanized steel wire
armoured, extruded outer sheathed with FRLS PVC compound. The conductor size
shall be minimum 0.8 sq.mm. Triplex cables similar to instrumentation cables can be
used for RTDs. Instrumentation cables carrying digital signals shall have overall
screening along with drain wire and analogue signal carrying cables shall have each pair
screening and overall screening along with each pair drain wire and overall drain wire.
The Fire survival cable shall conform to IEC 331 standard.
1.47.3
Control Cables
Control cables shall be 1100V AC grade, multicore, minimum 1.5 sq.mm cross section,
stranded copper conductor having 7 strands, PVC insulated, inner FRLS PVC sheathed
of type ST-1, galvanized steel wire armoured and outer sheath made of FRLS PVC
compound of type ST-1. In situations where accuracy of measurement or voltage drop in
control circuit, warrant, higher cross sections as required shall be used. For all the CT &
PT cables, minimum 2.5 sq.mm cables shall be used. Solenoid valve Power supply
cables shall be minimum 2.5 sq.mm. The Fire survival cable shall conform to IEC 331
standard.
1.47.4
Compensating Cables
1.47.4.1
All Compensating cables shall be single or multicore cable (ANSI type KK) twisted and
multiple shielded thermocouple extension compensating cable and shall be of Flame
Retardant Low Smoke type (FRLS). All Compensating cable ( Chromel - Alumel) of
FRLS type shall conform to additional test to Prove the FRLS Characteristics as
mentioned in the FRLS Instrument Cable specifications
1.47.4.2
Compensating Cable:
(a)
Reference
ANSI MC (96.1)
ISSUE
R1
TCE FORM 329 R5
TCE.5750A-H-500-001
VOLUME V
SECTION : D5.4
SHEET 18 OF 42
Package: EPC
Conductor
(c)
Insulation
(d)
Lay
(e)
Shielding
1.47.6.1
Mono mode type fibre optic cable shall have following parameters:
(a)
(b)
(c)
(d)
(e)
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 19 OF 42
1.47.6.2
(f)
(g)
Attenuation : less than 0.3-0.4 dB/km at 1300nm, less than 0.15-0.25 dB/km at
1550nm
Cable Type
(b)
62.5 / 125 m
(c)
Jacketing Material
(d)
Attenuation @ 850 nm
(e)
Outside Diameter
(f)
12.5 cm (5 in)
(g)
Minimum
Bend
(Long term)
(h)
(i)
(j)
(k)
(l)
46 kg/1 km ( 31 lb/1000ft)
(m)
1 km
1.48
1.48.1
All the cables are to be treated with anti-rodent treatment properties, voltage grade shall
be 1100V.
1.48.2
Prefabricated Cable :
Used for interconnection between system/marshalling cabinets. Used for panel external
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.4
SHEET 20 OF 42
wiring, tinned copper conductor of 0.5 sq.mm cross section with seven strands
twisted pair with 20 twists/meter. Insulation material shall be PVC, heat resistant
with flame retarding properties with thickness not more than 0.5 sq.mm. Voltage
grade shall be 1100V AC. Each prefabricated cable shall have a minimum of 5 cores
as spares and these shall not be connected to end connectors.
1.48.3
1.49
1.50
2.4.0
PE-DG-392-145-I101
00
326
PE-DG-392-145-I101
PE-SC-367-145-I101
00
327
PE-DG-392-145-I101
PE-SC-367-145-I101
00
328
PE-SC-367-145-I101
PE-DG-392-145-I101
00
PE-DG-392-145-I101
PE-DG-392-145-I101
PE-DG-392-145-I101
PE-SC-367-145-I101
00
PE-DG-392-145-I101
PE-DG-392-145-I101
PE-DG-392-145-I101
PE-SC-367-145-I101
00
331
PE-DG-392-145-I101
PE-SC-367-145-I101
PE-DG-392-145-I101
00
332
333
334
335
336
337
338
339
340
341
2.5.0
MEASUREMENT &&21752/3+,/2623+
'5,(&21752/3+,/2623+
02725,6('$/($&78$7OR'$7$6+((7
1
342
VOLUME V
SECTION : D5.3
SHEET 1 OF 55
Package: EPC
DESIGN REQUIREMENTS
1.1
GENERAL
1.1
The offered I&C system shall be based on State of the art practices prevailing in the
field of Control & Instrumentation for Thermal Power Stations, designed to have a fully
automated plant control using Group level control concept to achieve START to
SYNCHRONIZE in automatic sequence with selective minimum manual interventions.
1.1.1
The Instrumentation and Control equipment system called for in this specification
consists of a functionally distributed microprocessor based system for carrying out the
functions of measurement system, control system, protection and interlock system,
Sequence of events recording and Annunciation system, Condition Monitoring system,
operating system and communication system. The system shall be complete with
hardware and software along with the Man Machine Interface (MMI) capable of
operating together as an integrated system along with panels, cables, unit control desk,
cabinets, field instruments and erection hardware, control elements and devices to
perform the various functions of the above systems as specified. The system shall be up
gradable, evolutionary in both hardware and software. Manufacturers shall provide
evidence on such upgrades in similar plants, along with the bid.
2.0
2.1
2.1.1
2.1.2
(b)
(c)
(d)
(e)
Limit value monitor for generation of contacts for alarm/interlock purpose. E.g.:
ISSUE
R1
TCE FORM 329 R5
VOLUME V
SECTION : D5.3
SHEET 2 OF 55
Package: EPC
2.2
Each of the analog transmitters shall be Smart type with the following
(i)
(ii)
(g)
(h)
No single random fault in the entire automation and control system will cause a
load loss, forced outage or unit trip.
(b)
(c)
Safety related instrumentation and control shall be designed with a fail- safe
mode.
(d)
(e)
The control and automation system and the field instruments and actuators as
well as its support systems, power supplies and data networks shall be immune
to the electromagnetic interference and shall conform to the internationally
accepted standards.
(f)
To meet the operational and safety requirements, the control system hardware
and software shall conform to a modular, hierarchical architecture.
2.3
2.3.1
In order to minimise the burden on the unit operator, all control functions within the
operational load range shall be fully automated. The control system shall be structured
in accordance with a well-defined control hierarchy to permit operator intervention at
appropriate levels during abnormal modes of operation.
2.3.2
VOLUME V
SECTION : D5.3
SHEET 3 OF 55
Package: EPC
(a)
Consistent start-up, shut down and running of the plant under all operational
condition
(b)
(c)
Maximise fuel economy during start-up, shut down and normal on load
operation cycle
(d)
(e)
(f)
To meet the operational and safety requirements, the control system hardware
and software shall conform to a modular, hierarchical architecture. The system
hierarchy shall be at four levels. The closed loop (i.e. modulating) functions and
open loop (i.e. sequence or on/off) functions shall form separate elements at
each of the hierarchical level.
2.4
2.4.1
Drive Level
2.4.1.1
The first and lowest level shall cover all the modulating, sequence and protection control
functions directly associated with all remotely controlled plant items. It shall also
incorporate all necessary interlocks, initiations and trip functions for starting and stopping a
main drive motor.
2.4.1.1
Control at this level shall either be initiated directly from the remote manual control
interface or automatically by the next hierarchical level.
2.4.2
Subgroup Level
2.4.2.1
The second level shall coordinate the control of all first level drives, both closed loop
and open loop, associated with a particular functional subgroup. In the case of a pump
subgroup, for instance, the permissive checks, the coordination of the operation of the
suction and discharge valves, the main drive initiations and the basic modulating control
loops shall be executed at this control level. The major monitoring functions (e.g. turbine
supervisory measurements) shall also be identified with this level.
2.4.2.2
Auto- Start and stop initiation or set point guidance from the next higher control
level.
(ii)
TCE.5750A-H-500-001
VOLUME V
SECTION : D5.3
SHEET 4 OF 55
Package: EPC
(iii)
2.4.2.3
A functional group consists of different units, which individually represent and control a
part of the complete plant and can be divided into two or more groups. Every sub group
is controlled by an independent sub group control, which controls the operation of
various drives. Once a start signal issued by a functional group, the sub group control
brings the sub group from one state into another operating condition by issuing
command signals in a programmed sequence. It brings the sub group from a shut down
state into a working condition and vice-versa. The functional group instrumentation and
control system co-ordinates the entire sub group controls belonging to one functional
group.
2.4.3
Group Level
2.4.3.1
The third and penultimate level shall coordinate the individual subgroup control function
(both modulating and sequence controls) within the main functional groups of the system.
2.4.3.2
The group co-ordinate the sub group of a functional group. Its main function is to deliver
start-up or shutdown command signals to the sub-group and change over from a faulty
subgroup to the reserve sub group, the group co-ordination control supervises the actual
and the required position of the switchgear in the sub group and then decides whether
the sub group shall be switched ON or OFF..
2.4.3.3
2.4.4
2.4.4.1
The fourth level, which stands at the apex of the hierarchical triangle, shall perform the
overall unit coordination. It shall incorporate, for example, the master load control
function which should regulate the load generated by the generator to the demand set
point value. In general for automatic start-up and shutdown control, the sequential
initiations of the functional group sequences should be generated at this level.
2.4.4.2
The typical sequence control functions to be implemented at this level would include:
(a)
(b)
(c)
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 5 OF 55
2.4.4.3
The modulating control functions to be implemented at this level would include the
following:
(a)
Unit load control with frequency regulation incorporating load balancing (remote
set point adjustment from the CCR shall be provided).
(b)
2.4.4.4
In general the operator shall have direct access to all four control levels where these are
identified, through the operator control interface located in the LCR.
2.4.4.5
Communication links shall be provided between the various control systems to allow for
access to the system from any of the operators interface stations.
2.5
2.5.1
The unit control and monitoring shall be performed from unit control room by means of
an CRT operation interface mounted on unit control desk, through a microprocessor
based distributed Digital control monitoring and information system.
2.5.2
The unit shall be remotely controlled, but a fully automatic system of the plant shall be
provided, i.e. all valves, motors, final control elements and other equipment that have to
be operated during start up, operation and shut down, belonging to the Main Systems,
shall be remotely controllable from unit control room by the operator through Distributed
digital control monitoring and Information system.
2.5.3
3.0
3.1
The CLCS shall control the process variables automatically both under steady state and
dynamic conditions with in the limits specified under guarantee clauses over the entire
operational range of the equipment/system.
3.2
(b)
Set point adjustments and indication from operating CRTs for process variables
which need to be changed during load changes, start-up, shutdown, normal or
under any other emergency conditions.
(c)
Fixed set point at the software level/hardware level (only changeable by the
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 6 OF 55
(d)
Bias adjustment with indication where a single controller is controlling more than
one final control element (control valve, control damper, speed drive etc.) to
maintain the same process variable.
(e)
Auto and manual control facility shall be transferable in both directions without
bump of the value of the process variable to control the parameter during manual
operation. Both master Auto Manual station and Auto / Manual station for
individual control element shall be provided in CRTs. Manual control facility will
include operation from Back Up Control Panel also in addition to operation from
operator station.
(f)
(g)
(h)
Soft Auto /Manual station interlocks to drive the final control elements to a
suitable position for safe plant operation in the event of process/equipment
abnormal conditions.
(i)
(j)
(k)
Fail safe operation of final control elements in case of failure of motive power or
signal.
4.0
4.1
Protection, interlock and sequence controls constitute OLCS. This system shall enable
the operator for safe start up and shutdown and carryout normal operation both from
control room and local areas. Protection and Interlock shall be provided for all the
equipment and system to safeguard the equipment against abnormal conditions which
may result in the failure and less utility of the equipment and protect the operating
personnel. Controls shall be provided to start/shutdown various systems and/or any
equipment with associated auxiliaries and to operate the Unit on line with optimum
number of operations and higher safety.
4.2
4.2.1
Features-General Requirements
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 7 OF 55
4.2.2
4.2.3
(a)
The logic and sequence control shall be Digital distributed microprocessor based
and programmable.
(b)
(c)
(d)
Where there is more than one pump or fan for the same service (say 2 pumps),
auto standby features shall be provided to select the standby unit and this
standby unit shall start automatically on failure of running pump or on applicable
process criteria (say low discharge pressure) with an annunciation.
(e)
All the contacts of the sensors used in protection circuit shall be monitored.
(f)
Triple redundant sensors shall be provided when used in protection circuits for
major critical equipment and 2 out of 3 logic shall be derived for further use in
protection circuit
Features-Interlock Requirements
(a)
(b)
(c)
(d)
(e)
Any other conditions for safe starting and shutting down the equipment.
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 8 OF 55
Sequence control shall be provided to start and stop the equipment and the associated
auxiliaries. The sequence control shall have the following features:
4.2.4
(a)
(b)
Criteria check up for each stage of operation with monitoring and displaying.
(c)
Bypass facility for each criteria when only the feedback signal/display is incorrect
but the actual condition is fulfilled. This activity shall be logged and annunciated
in control system (DCS/PLC).
(d)
Adequate time delay between the steps as dictated by the process to establish
an operating parameter or healthiness of an equipment.
(e)
(b)
(c)
The conditions from process such as dry flow conditions, flashing conditions or
any other conditions that may create cavitation.
5.0
5.1
Redundant speed sensor shall be provided with each coal feeder and shall provide an
output to the feeder speed control. All feeder speed sensor tachometer-feedback circuits
shall be suitably shielded from any electrical and mechanical interference.
5.2
A no-coal flow detector complete with amplifier and pick-up located at the outlet of each
coal feeder shall be provided to detect no-coal flow.
5.3
Coal flow measurement with the help of conveyor speed and active load cells shall be
provided for each feeder. The coal flow rate along with the integrator shall be made
available in plant DCS.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 12 OF 55
7.5
The Contractor shall submit a brief write up on CLCS function for all SG, TG and
balance of plant controls along with the bid.
8.0
8.1
8.2
The open loop control system shall be provided as per the guidelines given under
clause 4.0 of this section.
8.3
The Contractor shall submit a brief write up on OLCS function for all SG, TG and
balance of plant controls along with the bid.
9.0
9.1
Measurement system (MS), Closed Loop Control System (CLCS) and Open Loop
Control System (OLCS) shall all be configured with redundancy at processor modules,
communication modules, data bus and power supply modules.
9.2
Both CLCS & OLCS shall be configured with Redundant I/O channels for each
sensor/signals. Where redundant sensors are provided redundant I/O channels shall be
provided for each sensors/signals. (For eg. If two sensors are provided for a particular
service, then totally 4 input channels are required.). All the outputs from the CLCS and
OLCS shall be dual redundant.
.
9.3
Boiler protection system & Turbine Protection system shall be with SIL3 certification for
each unit.
9.4
9.5
For all important and critical controls (CLCS) triple redundant sensors shall be provided.
This will include sensors provided for compensation also. Similarly for critical protection
logic requirements triple redundant sensors for 2 out of 3 logic shall be provided to avoid
spurious tripping. For all other control application dual redundant sensors shall be
provided. Critical closed loop controls are detailed in Clause 12.0 of this section.
10.0
10.1
Two out of three measurements philosophy shall be adopted for the control of all critical
closed and open loop variables for reliability of operation. The control system shall
select the median value for the normal control purpose.
10.2
In case of deviation of one transmitter output from the other two, the same shall be
automatically isolated and average output of the remaining transmitters shall be fed to
the control and measurement system and the control loop in this case shall be
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 13 OF 55
For all other control parameters the number of sensors / transmitters shall be two. One
out of two selection logic and selection of average value of the two signals shall be
followed.
10.4
In the event of excessive deviation between two signals control system shall trip to
manual and it shall be annunciated to bring operators attention and operator has facility
to select any of the transmitters through VDU operation.
10.5
In the event of failure of one of the two transmitters, it shall automatically select a
healthy transmitter but control system shall remain in auto mode.
10.6
Separate transmitters shall be used for measurement avoiding signal tapping from
control loop/ control transmitter.
10.7
For signal compensations, separate signals from separate transmitters shall be used for
measurement and control.
10.8
10.8.1
10.8.2
10.8.3
(a)
Unit trips,
(b)
Boiler trips,
(c)
Turbine trips
(d)
Trip of any auxiliary which will lead to substantial (50%) loss of unit availability.
All sensors for the following causes of trips shall be dual (requirement specified at
Clause 10.8.1 will have priority of application).
(a)
(b)
Alarm
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION : D5.3
SHEET 14 OF 55
(b)
Permissive
(c)
Measurement
10.9
11.0
11.1
Steam Generators (SG) soot blowing controls, Fans, blowers (if applicable) controls for
boiler and auxiliaries. All SG closed loop controls like combustion control (fuel flow / air
flow), temperature & pressure, air flow, SA/PA pressure, SH/ RH steam temperature,
furnace draft, drum level (if applicable) etc..
11.2
All turbine analog controls including EHTC for TD BFP(except turbine integral system
analog controls)
11.3
11.4
Regenerative cycle controls like heater drain, deaerator level, deaerator pressure,
hotwell level, CEP controls, BFP controls, Hotwell makeup, Vacuum Bkr.vlv gland seal
water pressure control.
11.5
Balance of plant controls like auxiliary steam, CW & Circulating cooling water system,
Emergency cooling water system (if applicable), etc.
12.0
Furnace draft
(b)
PA Flow Control,
(c)
SA Pressure control
(d)
SA Flow control
(e)
O2 correction control
(f)
(g)
PLC
PLC
354
PLC
PLC
355
PLC
PLC
356
PLC
PLC
357
PLC
PLC
358
63(&,),&$7,2112PE-SS-999-145-I007
SPECIFICATION
FOR
MOTORISED VALVE ACTUATOR
92/80(,,
%
6(&7,21'
5(912
6+((7
2)
'$7(
Data Sheet A & B
'$7$6+((7$
(TO BE FILLED BY PURCHASER)
'$7$6+((7%
72%(),//('83%<%,''(5
GENERAL*
CONSTRUCTION
AND SIZING
HANDWHEEL
352-(&7
;0:685$7*$5+733
2))(55()(5(1&(
7$*126(59,&(
'87<
212)),1&+,1*
9$/9(7<3(
*/2%(*$7(5(**/2%(
%877(5)/<
23(1,1*&/26,1*7,0(
:25.,1*35(6685(
$0%,(17&21',7,21
6+$//%(68,7$%/()25&217,18286
23(5$7,2181'(5$1$0%,(177(032)
'(*&$1'5(/$7,9(+80,',7<2)
9$/9(6($77(6735(66
%,''(57263(&,)<
5(48,5('9$/9(72548(
%,''(57263(&,)<
$&78$7255$7('72548(
%,''(57263(&,)<
&216758&7,21
727$//<(1&/26(':($7+(53522),3
0(&+$1,&$/326,7,21,1',&$725
72%(3529,'(')2575$9(/
%($5,1*6
'28%/(6+,(/'('*5($6(/8%5,&$7('$17,
)5,&7,21
*($575$,1)25
/,0,76:,7&+72548(6:,7&+
23(5$7,21
6,=,1*
23(1&/26($75$7('63(('$*$,167
'(6,*1('',))(5(17,$/35(6685($72)
5$7('92/7$*()25,62/$7,1*6(59,&(
7+5((68&&(66,9(23(1&/26(23(5$7,216
250,16:+,&+(9(5,6+,*+(5 FOR
INCHING(REGULATING) SERVICE 150 STARTS/HR
MINIMUM
5(48,5('
<(6
25,(17$7,21
72302817('
12
6,'(02817('
$&78$7250$.(02'(/
%,''(57263(&,)<
027250$.(02'(/7<3(5$7,1*
.:
%,''(57263(&,)<
648,55(/&$*(,1'8&7,210272567$57,1*
&855(17/,0,7('726,;7,0(67+(5$7('
&855(17
(1&/26('%,''(572&21),50
$'5*1290,6&5
%'5*1290,6&5
&'5*1290,6&5
''5*1290,6&5
7KHDFDKDEHDHGKFHD
HHD3D
KDGHKDEH*H6KDGHDH,6
6+$)7530
%,''(57263(&,)<
2/56(79$/8(
%,''(57263(&,)<
&2/2856+$'(
%,''(57263(&,)<
122)5(9)25)8//75$9(/
%,''(57263(&,)<
#3:568337207567$57(5
93+$&
#&21752/92/7$*(5(48,5(0(17
72%('(5,9(')5207+(32:(56833/<72
7+(67$57(599
#(1&/2685(&/$662)02725
,3 ,3)/$0(3522)
,3727$//<(1&/6(/)9(17,/$7('
#,168/$7,21&/$66
&/$66%
#:,1',1*7(033527(&7,21
7+(50267$71,1($&+3+$6(
359
67$57,1*)8///2$'&855(17
&/$66)
$&78$725$33/,&$%/(:,5,1*
',$*5$0
72',6(1*$*($8720$7,&$//<'85,1*0272523(5$7,21.
027257<3(
ELECTRIC
ACTUATOR
63(&,),&$7,2112PE-SS-999-145-I007
SPECIFICATION
FOR
MOTORISED VALVE ACTUATOR
92/80(,,
%
6(&7,21'
5(912
6+((7
2)
'$7(
Data Sheet A & B
'$7$6+((7$
(TO BE FILLED BY PURCHASER)
'$7$6+((7%
72%(),//('83%<%,''(5
INTEGRAL
STARTER
INTERPOSING
RELAY
$FDEHI
HJD6DH
6,1*/(3+$6(:521*3+$6(
6(48(1&(3527(&7,21
5(48,5('
,17(*5$/67$57(5
5(48,5('
1275(48,5('
7<3(2)6:,7&+,1*'(9,&(
&217$&7256
7+<5,67256
7<3(
IF SMART
D 6(5,$//,1.,17(5)$&(
,17(*5$/),(/'02817('
E 6(5,$//,1.35272&2/
)281'$7,21),(/'%86352),%86
7&3,3
F6(5,$//,1.0(',$
7:,67('3$,5&&%/ &2$;,$/&&%/
2)&
G+$1'+(/'352*5$00(5
5(48,5('
1275(48,5('
H0$67(567$7,21
5(48,5('
1275(48,5('
I0$67(5671,175)$&(:,7+'&6
02'%86
7&3,3
J'(7$,/62)63(&,$/&$%/(
(1&/26('
1275(48,5('
67(3'2:1&21775$16)250(5
5(48,5('
23(1&/26(3%
5(48,5('
1275(48,5('
67233%
5(48,5('
1275(48,5('
,1',&$7,1*/$036
5(48,5('
1275(48,5('
/2&$/5(027(66
5(48,5('
1275(48,5('
67$786&217$&76)25021,725,1*
5(48,5('
1275(48,5('
,17(*5$/67$57(5',6785%('
6,*1$/
5(48,5('2/5(/$<23(5$7('
&21732:(56833/<)$,/('66,1/2&$/
72548(6:,7&+237'0,':$<
,17(5326,1*5(/$<6
5(48,5('
,17(5326,1*5(/$<48$17,7<
12 12
'5,9,1*92/7$*(
9'&
BBBBBBBBBBBBB9'&
'5,9,1*&855(17
$0$;
BBBBBBBBBBBBB$0$;
/2$'5(6,67$1&(
!KK
!BBBBBBBKBBBBBBBBBBK
0)5 02'(/12
%,''(57263(&,)<
TORQUE
SWITCH
23(1&/26(
1111
(Not Applicable
for Smart
Actuator)
&217$&77<3(
121&
5$7,1*
$9$&$1'$9'&
5(48,5(')256(77,1*'(6,5('72548(
$&&85$&<
2)6(79$/8(
0)5 02'(/12
%,''(57263(&,)<
23(1,17&/26(
1
1
&217$&77<3(
121&
5$7,1*$&'&
$9$&$1'$9'&
LIMIT
SWITCH
(Not Applicable
for Smart
Actuator)
360
1$'-
1
1
121&
121&
63(&,),&$7,2112PE-SS-999-145-I007
SPECIFICATION
FOR
MOTORISED VALVE ACTUATOR
92/80(,,
%
6(&7,21'
5(912
6+((7
2)
'$7(
Data Sheet A & B
'$7$6+((7$
(TO BE FILLED BY PURCHASER)
'$7$6+((7%
72%(),//('83%<%,''(5
POSITION
TRANSMITTER
326,7,2175$160,77(5)FKJ
G
5(48,5('
0)5 02'(/12
%,''(57263(&,)<
7<3(
6833/<
9'&
287387
$
$&&85$&<
TERMINAL
BOX
CABLE GLANDS
WEIGHT
NOTES
)6
#63$&(+($7(5
SPACE
HEATER
1275(48,5('
5(48,5('
#32:(56833/<
#5$7,1*
027257(50,1$/%2;
5(48,5('
$&78$7257(50,1$/%2;
5(48,5('
(1&/&/$660757%$&78$7257%
#,3#
#($57+,1*7(50,1$/
5(48,5('
5(48,5('
1275(48,5('
126
#32:(5&$%/(*/$1'
6,=(
#63$&(+($7(5&$%/(*/$1'
6,=(
27+(5&21752/&$%/(*/$1'6
1I%)9I&:3803&DEHH3
27+(5&21752/&$%/(*/$1'6
12&$%/(*/$1'6+28/'%(68,7$%/()25
&DEHH3 12)25&$%/(6,=(3
;)25,1&+,1*'87<21/<
727$/:(,*+7$&78$725
$&&(6625,(6
%,''(57263(&,)<
BBBBBBBBBBBBBBBBB.J
,3,3
SCOPE'(6,*10$18)$&785(,163(&7,217(67,1*$1''(/,9(5<726,7(2)(/(&75,&$&78$725)25,1&+,1*2523(1&/26('87<
CODES & STANDARDS'(6,*1$1'0$7(5,$/686('6+$//&203/<:,7+7+(5(/(9$17/$7(671$7,21$/$1',17(51$7,2167$1'$5'$6$0,1,080
7+()2//2:,1*67$1'$5'66+$//%(&203/,(':,7+
,6,6,6,6,6,6$1',6
7(03(5$785(5,6(6+$//%(5(675,&7('72'(*&)25$0%,(177(03(5$785(2)'(*&
&$%/(*/$1'62)'28%/(&2035(66,217<3(%5$660$7(5,$/6+$//%(3529,'('
7+(72548(6:,7&+(66+$//%(3529,'(':,7+0(&+$1,&$//$7&+,1*'(9,&(7235(9(1723(5$7,21:+(1816($7,1*)5207+((1'326,7,216
7+(/$7&+,1*'(9,&(6+$//81/$7&+$66221$67+(9$/9(/($9(67+((1'326,7,21,)68&+3529,6,21,61273266,%/(7+(72548(6:,7&+(6
6+$//%(%<3$66('%<(1'326,7,21/,0,76:,7&+(6:+,&+23(16219$/9(/($9,1*(1'326,7,217+(6(/,0,76:,7&+(6$5($'',7,21$/727+(
180%(52)/,0,76:,7&+(663(&,),('(/6(:+(5(
7+(027256+$//23(5$7(6$7,6)$&725,/<81'(57+(6833/<92/7$*(9$5,$7,21$75$7(')5(48(1&<729$5,$7,21,1
)5(48(1&<$75$7('6833/<92/7$*(6,08/7$1(2869$5,$7,21,192/7$*( )5(48(1&<7+(6802)$%62/87(3(5&(17$*(127(;&((',1*
7+(027256+$//%(68,7$%/()25',5(&721/,1(67$57,1*
PREPARED BY
CHECKED BY
APPROVED BY
1$0(
0$0D
3DD-D
6.'DD
1$0(
6,*1$785(
6,*1$785(
'$7(
'$7(
361
362
NOTE: THE WIRING DIAGRAM SHALL BE MODIFIED FOR LIMIT SWITCHES & TORQUE SWITCHES FOR 4 NO + 4 NC CONTACTS
4 NO + 4 NC
4 NO + 4 NC
4 NO + 4 NC
4 NO + 4 NC
2.6.0
363
VOLUME V
SECTION :TABLE 5
SHEET 1 OF 1
Measurement & Control, Electrical sensors, Elec. Position sensors & Sig.
Converters for IS two wire DC systems.
Industrial Platinum. RTD
Air Purge System
Measurement of Fluid Flow by Meter Run
Temperature Measurement
Degree of Protection by Enclosure
Electrical Apparatus for Explosive Gas
Standards for Cables
Process control security requirements
ISA S 5.1
ISA S 5.2
ISA S 5.3
ISA S 18.1
ISA S 71.04
ISA S 75.01
ISA S 75.02
ISA S 75.03
IEC 113
IEC 534
IEC 617-12
IEC 654
IEC 801
IEC 848
IEC 902
API 670
ISO 4200
ISO 5167
ANSI B 2.1
ANSI FCI 70.02
ANSI B 16.104
ISA MC 96.1 /
ASTM E 23003/DIN 43710/IEC
60584
DIN 19243
DIN 43760/ IEC
751
ISA S 12.4 / NFPA
496
ISO 5167
ANSI MC 96.1 /
IEC 751
IEC 529
IEC
IEC
IEC 62443
ISSUE
R1
TCE FORM 329 R5
3.0.0
365
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
1.
Pressure indicators
2.
Pressure switches
3.
Pressure
Transmitters
4.
Differential Pressure
Indicators
5.
Differential Pressure
Switches
6.
Differential Pressure
Transmitters
7.
Thermometers
8.
Temperature switch
9.
Resistance
temperature detector
assembly
10.
Thermocouple
assembly
11.
Temperature
transmitters
12.
Thermowells
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
13.
INSTRUMENT /
EQUIPMENT
Interposing relay
TESTS TO BE CONDUCTED
14.
Level gauges
15.
Level switches
(magnetic)
16.
17.
Flow switch
Material test / Hydro test/ (1.5 time max. pr) / function test
18.
Flow glasses
Material test /Hydro test/ (1.5 time max. pr) / function test
19.
20.
Flow element
21.
Control valves
(a)
(b)
(c)
(d)
(e)
(f)
(g)
Pneumatic Block
Valves:
(a)
(b)
(c)
(d)
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
(e)
(f)
(g)
(h)
(i)
Pressure Regulating
Valves
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
Position Transmitters
25.
I/P Converters
26.
Solenoid Valves
27.
28.
Junction Boxes
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
29.
INSTRUMENT /
EQUIPMENT
Transmitter Racks
TESTS TO BE CONDUCTED
30.
Transmitter Racks
31.
Compensating cable
32.
Local Panels
33.
Marshalling Cabinets
34.
System cabinets
35.
Wiring Termination
and Accessories
35.1
Routine test
35.2
Type test
35.3
Hydro test, Air leak test for tubing/Piping & fittings, IBR
certificate required for impulse pipes, tubes and fittings of all
steam & water services
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
36
36.1
Measurement &
Control System
TESTS TO BE CONDUCTED
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(a)
(b)
(c)
Central Processing
Unit for Man Machine
Interface
(a)
(b)
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(a)
(b)
(c)
(d)
(e)
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
(f)
Keyboard
(a)
(b)
(c)
Printers
(a)
(b)
(c)
(d)
40
Floppy/Tape Drive
Unit / Bulk Memory
Unit / CD drive Unit /
DAT Drive
(a)
Noise test
(b)
(c)
(d)
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
(e)
41
Vibration Monitoring
& Analysis System
(a)
(b)
(a)
(b)
PADO System
(a)
(b)
CMMS System
(a)
(b)
MIS System
(a)
(b)
(a)
(b)
ISSUE
R1
VOLUME V
SECTION : TABLE14
SL. NO
INSTRUMENT /
EQUIPMENT
TESTS TO BE CONDUCTED
Smart Transmitter
Maintenance Station
(a)
(b)
(a)
(b)
ISSUE
R1
VOLUME V
SECTION : TABLE14
PART-B: GUIDELINES FOR FACTORY ACCEPTANCE TEST (FAT) FOR DCS/ PLC
1
GENERAL REQUIREMENTS
Factory acceptance test (Fat) procedure : Ref. Note -1 & 2
TEST REQUIREMENTS
(a)
Test shall be performed with the completely assembled system and also
with complete i&c software and performing all functions expected out while
in actual service and with system configuration as finalised.
(b)
(c)
(c)
PRELIMINARY CHECKS
(a)
(b)
(c)
(d)
(e)
(f)
(g)
ISSUE
R1
VOLUME V
SECTION : TABLE14
PART-B: GUIDELINES FOR FACTORY ACCEPTANCE TEST (FAT) FOR DCS/ PLC
(a)
(b)
(c)
(d)
(e)
(f)
6
ISSUE
R1
VOLUME V
SECTION : TABLE14
PART-B: GUIDELINES FOR FACTORY ACCEPTANCE TEST (FAT) FOR DCS/ PLC
(g)
(h)
(i)
(j)
8
(k)
(l)
NOTES:
1
The intent of the fat is to demonstrate and ensure that the I&C system meets all
the functional requirements as intended in the specification / contract. A
completed integrated test of the system shall be carried out at vendor's works
in the presence of owner / project manager / consultant, on completion of
integration/manufacturing of the system. The shipment of i&c equipment to site
ISSUE
R1
VOLUME V
SECTION : TABLE14
PART-B: GUIDELINES FOR FACTORY ACCEPTANCE TEST (FAT) FOR DCS/ PLC
will be effected only after the fat has been accepted by the owner / project
manager / consultant.
2
Fat shall be conducted with the distance between the processor and other
supporting peripherals as per the final layout in the control room.
Duration of fat shall be minimum three (3) weeks. the fat procedure shall be
subject to owner / project managers approval.
For closed loop controls vendor shall also demonstrate the performance using
simulation software to cover the relative performance of the boiler parameters
and turbine parameters.
During the course of fabrication the owner / project manager shall have access
to the plant for inspection. at all times, the owner / project manager / consultant
shall have the right to inspect for quality control.
Preshipment inspection
The complete system shall be examined at the factory for workmanship,
assembly and fat, mechanical safety, materials, wiring, connections, parts, finish,
operation and strict conformance to this specification and approved design
layouts and detail drawings . All tests including functional tests shall be
conducted as per is and this specification.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.5
SHEET 1 OF 5
1.0
1.1
2.0
2.1
(b)
2.2
2.2.1
FAT shall be a complete integrated test of the DCS/PLC system and carried out at
CONTRACTORs / Sub-Vendors works on completion of manufacturing of the
system. The test shall be performed with the completely assembled system and
performing all the functions, it is expected to perform while in actual service. The
various tests to be performed for DCS/PLC system equipment / total system
together with the guideline for Factory acceptance test (FAT) procedure are detailed
in TABLE-14. The CONTRACTOR shall submit a detailed "Factory Acceptance Test
Procedure" in line with the above specified guidelines for Owner / Consultant
approval.
2.2.2
ISSUE
R1
TCE.5750A-H-500-001
VOLUME V
SECTION : D5.5
SHEET 2 OF 5
2.3
2.3.1
(ii)
(b)
(c)
(d)
3.0
3.1
3.2
3.3
Test shall be a Total Integration Test of the whole DCS/PLC System including the
testing of communication links.
3.4
3.5
The trial operation shall be considered successful provided that each item of
equipment can operate continuously at the specified characteristics for the period of
trial operations. During this period, any modifications / repairs as required shall be
carried out. If the total interruption period (outage time) is more than 4 hours, the trial
operation duration shall be extended by the period of interruption.
3.6
Total interruption period (system outage time) shall be calculated as detailed in 5.4
below.
4.0
4.1
After successful trial operation, the OWNER shall conduct performance guarantee
test for a period of 14 days in the presence of CONTRACTORs commissioning
engineer. During the test, the system shall run with 100% availability. Contractor
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.5
SHEET 3 OF 5
shall also furnish the guaranteed process parameters and the acceptable deviations
before conducting the performance test.
4.2
4.2.1
Redundancy checks for processor, communication, power supply and 1/O modules.
This check shall be conducted in a sequence as mutually decided between the
Client and the contractor. During each redundancy check, the plant operation shall
not be disturbed and the control loops shall continue in auto mode. The trending of
control parameters shall be in service during these checks and the over shoot /
under shoot of the controlled parameters shall be less than 1%. These checks shall
be logged (removal and relocation of modules/cables) in the system in addition to
being made available to the operator in operator station.
4.2.2
Response time for each type of update as per the specification shall be checked on
line by suitably recording each activity.
4.2.3
4.2.4
4.2.5
4.2.5
4.2.6
4.2.7
The calculations / documents earlier furnished for establishing the specified system
availability, shall be demonstrated with due consideration for the running plant.
4.2.8
4.3
PG Test Methodology
4.3.1
If the performance of the system deviates from the specification requirements, the
contractor shall be given a maximum period of 3 days depending on the gravity of
the defect as mutually agreed, to carryout the modification without disturbing the
plant operation.
4.3.2
Contractor shall declare the system fit for checking after completing the modification
/ rectification. The specific test shall be repeated for proper functioning.
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.5
SHEET 4 OF 5
4.3.3
Contractor shall be given maximum of three attempts each not exceeding 3 days for
any subsequent defects found. After 3 tests for each activity, if the system still
deviates from the specified requirements, the warranty period may be extended
depending on the gravity of the defect, during which period, the contractor shall
rectify / modify the system to meet the specified requirements.
4.3.4
During the test, any modules / equipment fails, the contractor immediately within four
hours shall replace the faulty module / equipment and the test shall be repeated
after extended continuous running of 96 hrs.
4.3.5
The total duration for the site acceptance tests i.e site pre-commissioning tests and
Trial operation test together shall not exceed 30 days including the repetition of tests
and duration for replacement / rectification.
4.3.6
During all the above tests, Contractor shall ensure that the disturbance to the
process is minimum.
4.4
4.4.1
The failure of any one of the hard or soft copy device shall not be taken as nonavailability of the system. However, the mean time to repair shall not exceed that
specified by the CONTRACTOR. Any other failure shall be considered as system
reliability / availability failure as defined in Section D5.3.
4.4.2
The PG test shall be repeated if the test results deviate from the guaranteed values.
All the special equipment, tools and tackles required for the successful completion of
the PG test shall be provided by CONTRACTOR as part of the total scope of
services. Ready stock of all types of modules / PC boards shall be available as part
of the total scope of services for immediate replacement during the period.
4.5
The DCS/PLC System PG test shall be carried out to Owners satisfaction. The last
5% of the total supply payment will be released only after successful completion of
DCS/PLC system PG test.
5.0
5.1
The test shall demonstrate the specified guaranteed availability of 99.7% for
DCS/PLC system & 99.9% for SIL3 certified BMS & Boiler Protection system,
Turbine protection system for a continuous period of 6 months as specified in
Section D5.3 or as agreed for the project.
5.2
5.3
5.4
During the test period, the Owners engineer shall keep the log of total outage period
ISSUE
R1
Package: EPC
VOLUME V
SECTION : D5.5
SHEET 5 OF 5
The Contractor shall depute their representative/ engineer for the total duration of
Availability Guarantee Test covering 24 hrs. of the day.
5.6
5.7
The DCS/PLC System Availability Guarantee Test shall be carried out to Owners
satisfaction. The last 5% of the total supply payment will be released only after
successful completion of DCS/PLC system Availability Guarantee Test.
6.0
6.1
Special I&C systems refers to any I&C system other than DCS/PLC system and
detailed in TABLE-13. Tests and inspection requirement for the same shall be as
detailed in TABLE-14.
ISSUE
R1
384
3DH &
'H
0$9D
3KFD,HF
x ,GHIFD/DEH
x 3KFD'DDJH
x 4D
x 6DH&DDF
0$9D
0$9D
0$9D
*
Cate
gory
3KFD9HIFD
3KFD'DDJH
'H
$FFHH
3KFD,HF
3KFD'DDJH
'H
0J$FFHH
3KFD,HFI
'H3DJ&
/IJ/FJ$DJHH
&H'DJ3FH
0JDFFHH3K
$93DG&DEH*DG3DH
+DGDH+JH/H
)H)D 3DH/D
Characteristics Checked
Extent
of
Check
%+(/
4D
,HF
5H
$HHI
GFH
1KFD
GDDJH7H
&DED
H
%+(/
9HG
6EHG
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
$H
HIHHFH
GFH
7H5H
$HHI
GFH
1KFD
GDDJH
Acceptance
Norms
Format
of
Records
6+((7
5(912
6(&7,21'
92/80(,,%
2)
Agency
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I036___
3GF
&DDJH'DD
$HHI
KHH
GFH
$HG
7H&HIFDH
&IJD
GDJD%24
&DF
HFIFD
%24
&DF
HFIFD
%24
&DF
HFIFD
$HG*$
'DJ%24
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
352*5$00$%/(/2*,&&21752//(5
3H63DF
%DH %DH
FKDJH7DIH
836
,GFDJ/D
$FD0HH
7DGFH6JD
&HH
,H6JH
/&H
3/&FH
,2GH3H
6GH
&FD
GH0J
5DF(KHH
Materials
/Components
Component /
operation
1.0
Sl.
No.
3(0& ,
385
Sl.
No.
3KFD,HF
,GHIFD/DEH7HFK
6HFIFD
3KFD'DDJH
$FFHH
,DDDDJHHI
&H 3H
Characteristics Checked
0$
Cate
gory
9D
Extent
of
Check
&DF
HFIFD
3GF
&DDJH
$HG*$
&IJD
GDJ%24
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
352*5$00$%/(/2*,&&21752//(5
&380
.HEDG0H
&''H3H
266H
6IDH
(JHHJIDH
KHII
/FHHG&'
Component /
operation
3(0& ,
$H
HIHHFH
GFH
%+(/
4D
,HF
5H
%+(/
9HG
6EHG
Acceptance
Norms
Format
of
Records
6+((7
5(912
6(&7,21'
92/80(,,%
2)
Agency
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I036___
386
0$
+HDKHI3/&GH
&(HJD
7HHDHDHDFH
%HI3/&
GH
0$
0$
0$
HJ8
3KFDDDJHH:J
FKHF DEHJ&
&KHFJ,5 +9H
+DGDH)FD
9HIFD
3
2HD
*
Cate
gory
+HDKHIDKH
GHHHDFDHG
K3HJI3/&H
Assembly
Characteristics Checked
)FD7HI
+0,2:6GHFH
FKD0
.HEDG0H
3HHF
Component /
operation
9D
(HFFD
9D
(HFFD
9D
(HFFD
)FD
)
Extent
of
Check
%+(/
4D
,HF
5H
$73FHGH
%+(/
9HG
6EHG
%+(/
7HFHIFD 4D
DH)$7
,HF
5H
$HH
$HGH
EHKHDK
FKHH
H21
%+(/
4D
,HF
5H
7H
&HIFD
$HG*$
'DJ3DH
:J'DJD
,5 +9DH
HHD
,HDD
DGDG
%+(/
4D
,HF
5H
Acceptance
Norms
Format
of
Records
6+((7
5(912
6(&7,21'
92/80(,,%
Agency
2)
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I036___
&HF
$HG
2HDI
&IJD
HFHFHG
'DJD %24
'HFHI+0,
DG)$7
H
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
352*5$00$%/(/2*,&&21752//(5
2.0
Sl.
No.
3(0& ,
387
5HGGDFHDI
&FD6H
0HDHHI5HH
7H&FDKKG
DH
6HI'DJFIHDHI3/&
H
&FD
6H
9HIFD
'DJF
9HIFD
&3DH'H
9HIFD
6IDH
9HIFD
0$
5HGGDF2HD
3H60GH
9HIFD
2HDI3/&GH
DFDH0DF
3KE HHF
FKH,GFDJD
&/JF
(JHHJ)HDH+0,
)HDH
0$
3FHFIJD
3HJDGEHD
DDFDEHDG/DGJ
3FH
9HIFD
0$
0$
0$
0$
,2FIJD,2HD
0$
Cate
gory
,2
)FD
9HIFD
Characteristics Checked
3.0
Component /
operation
9D
9D
9D
(HFFD
(HFFD
9D
9D
(HFD
Extent
of
Check
)$73FHGH
)$73FHGH
)$73FHGH
)$73FHGH
)$73FHGH
)$73FHGH
)$73FHGH
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
352*5$00$%/(/2*,&&21752//(5
Factory
Acceptance Test
(FAT)
Sl.
No.
3(0& ,
$6H)$7
$6H)$7
$6H)$7
$6H)$7
$6H)$7
$6H)$7
$6H)$7
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
4D
,HF
5H
%+(/
9HG
6EHG
Acceptance
Norms
Format
of
Records
6+((7
5(912
6(&7,21'
92/80(,,%
Agency
2)
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I036___
48$/,7<3/$112PE-QP-999-145-I036___
92/80(,,%
6(&7,21'
5(912
6+((7
'$7(
2)
1.
Input/Output Functional Verification.
2.
&KHFIFHFHIDGGHJIDFDG,2GHD
HDFDEH3/&F IJDGDJD$DH JDJHHD
KDEHHGDH, DG FKHFHDDG
6&$1H &KHFHHDFHHI FDG FHH
HF
Processor Verification
3/&&IJDGDJEHHIHHGIDFHDJ
5HGGDF
48$/,7<3/$112PE-QP-999-145-I036___
92/80(,,%
6(&7,21'
5(912
6+((7
3.
4.
5.
'$7(
2)
7H+&GIHGGDF
%KKHFHDHEHF
KHFHGIKHD KHFDHI
HGGDFIJDDHHGDGDGDFFH,FDHIK
HGGDFFKHIFI DFHDGE
FHKDEHGHDHGI HHGFDGGD D
FHJDHHG
DGDG DFFH6FKHKDEH
HHGEDDHII
HHJKH3D&38
DJIDHIDFH&KHFJKGEHEHJ
KHJKJI3F
H/('DHDIDFHGF
DGDG
9HGKDGH DHDH 9HGDGDGDFFHDGHDH
/DGJ6DH&DDFI3FHDHHGFDFHF
7KKDEHGHEDJ DGHDIIHJDHG
3/&H
Power Supply Module Verification
&KHFI360 HGGDGHD HHFIF D&KHFKH
KHDKHIH
I EKKHGH
D
GFDHDHH6DHID HIH360DGHIKD
DGE360KDDHHKDH
Communication System Verification
&FDHKDEHH
KDHG3/&
&IJD'DJD9HIKD EKKHFFDEHDH
DFDGFHFHG&FDEHHH3/&FH,2DF
2:6HFEHFKHFHGKJKDIGDD6DHKH
EID HEG FHFIJE
&KHFKDKH
FFDFHKHIGDD
)JHH HDHEH
GHDHGDH HG
DGDGDFFHIFIDFHFDFHFIFD
6FHHGDHH
,2FDH
62(HH
'DDDIHHKKG DHJ&FD
3FDH&DFHFI FDDGDHDIGDD
DHDHGJDHFKDJH
Diagnostic Verification
HIHHGIFKHFJID
3GF&DDJH/HDHKDEH
GDJFIHDH+DGDHIDHEHDHGEHJD,2
48$/,7<3/$112PE-QP-999-145-I036___
0GH3FH&FD
0GH3H6GHHF
92/80(,,%
STANDARD QUALITY
PLAN
IKH
JHDGHIKHF
HGJHGDJF
6(&7,21'
FOR
HDJH
5(912
'$7(
PROGRAMMABLE LOGIC CONTROLLER
6+((7
2)
6.
Control Panel /Desk Verification
7.
Software Verification
&/JF6IDHFKHDDG$DJFHKD
EHHGIDIIHGFG&JFKDEH
FKHFHGIFHFIFDDHDHGJFFKHH
(JHHJIHDH
D2HFKDJJIDDHHH
E2HGIFD&/JF'DJD
F2HFIJDI*DKF7HG/J+65
+0,IHDH
&KHFIFIJD H DI*DKF7HG/J
+65DG$DKHI
I 'DDG3E
DI,DHDHGGFH
8.
Burn in Elevated Temperature test
(HFFHH KDEH EHFHG% HHDHG HHDH
HDHKHFHGHGHDHGEH
D 3/&GHDHHD
'HJFGHFHHJHG
FGIK
390
48$/,7<3/$112PE-QP-999-145I036___
92/80(,,%
6(&7,21'
5(912
6+((7
'$7(
2)
391
392
63(&,),&$7,2112
92/80(
6(&7,21
5(912
'$7(
22)
2
'DD6KHH1PE-CL-999-145-I031-0
6+((7
6/
12
7(676&+(&.6
&+(&.)25
.0
48$1780
2)&+(&.
02'(/127$*12
5$1*(6&$/(
(1'&211(&7,21
6:,7&+&217$&7
5$7,1* 126
&$/,%5$7,21
0
5(3($7$%,/,7<
',))(5(17,$/
5()(5(1&('2&
$&&(37$1&(12506
$33529('
7(&+,1&$/
5(48,5(0(17'$7$
6+((75(/(9$17
67$1'$5'
0$18)$&785(5
&$7$/2*8(
6(732,17
0
$'-8670(17
29(535(6685( /($.
0
7(67
5(9,(:2)7&)250$7(5,$/2)
6(1625
029(0(17
)25/27
+286,1*
$*(1&<
3:
5(0$5.6
9
0
&
&
0
&
&
0
&
&
&
&
0
0
&
&
%
%
&
%
&
&
%
%
%
0)572
&$55<287
5287,1(7(67
21
:+(17&)25
0$7(5,$/)25
7+(352-(&7
127
$9$,/$%/(
&203/,$1&(
&(57,),&$7(
72%(
3529,'('%<
7+(
0$18)$&785
(5
5(9,(:2)7&)25
7<3(7(67
%
'(*5((2)3527(&7,21
5(9,(:2)7&)250,&52
)25/27
%
6:,7&+
$&&(6625,(
6$6
0
& &
$33/,&$%/(
/(*(1'
00$18)$&785(568%&2175$&725&&2175$&725120,1$7(',163$*(1&<%%+(/33(5)250:
:,71(6699(5,),&$7,21
127(
&2175$&725723529,'(&203/,$1&(&(57,),&$7()257(676&+(&.69(5,),('%<&2175$&725$1'
68%0,77+(6$0($/21*:,7+7(67&(57,),&$7(672%(9(5,),('%<%+(/
393
63(&,),&$7,2112
92/80(
6(&7,21
5(912
'$7(
2)
2
'DD6KHH1PE-CL-999-145-I026-0
6+((7
6/
12
7(676&+(&.6
&+(&.)25
48$170
2)&+(&.
5()(5(1&('2&
$*(1
&<
$&&(37$1&(12506
3:
.0
',$/6,=(
02'(/127$*12
5$1*(6&$/(
(1'&211(&7,21
6:,7&+&217$&7
5$7,1* 126
&$/,%5$7,21
0
$&&85$&<
5(3($7$%,/,7<
)256:,7&+
6(732,17$'-8670(17
)256:,7&+
29(535(6685( /($.
7(67
23(5$7,212)355(/(,)
'(9,&(
0
0
0
21(
3(5
7<3(
$33529('
7(&+,1&$/
5(48,5(0(17'$7$
6+((7
9
0
&
&
0
&
&
0
&
&
0
&
&
&
&
0
&
&
%
%
&
&
&
&
0&
5(9,(:2)7&)250$7(5,$/2)
6(1625
029(0(17
)25/27
352&(66&211(&7,21
+286,1*
&
5(0$5.6
%
%
%
%
0)572
&$55<287
5287,1(
7(6721
:+(1
0$7/
&25(/$7,21
$5(127
$9$,/$%/(
0)56
&203/,$1&(
72%(
3529,'('
5(9,(:2)7&)25
7<3(7(67
%
'(*5((2)3527(&7,21
5(9,(:2)7&)25
21(3(5
%
&217$&75$7,1*2)
7<3(
6:,7&+
$&&(6625,(
6$6
0
& &
$33/,&$%/(
/(*(1'
00$18)$&785(568%&2175$&725&&2175$&725120,1$7(',163$*(1&<%%+(/33(5)250:
:,71(6699(5,),&$7,21
127(
&2175$&725723529,'(&203/,$1&(&(57,),&$7()257(676&+(&.69(5,),('%<&2175$&725$1'
68%0,77+(6$0($/21*:,7+7(67&(57,),&$7(672%(9(5,),('%<%+(/
394
395
Routine Test
3.0
+G7H
2HD&DED
'HDGHG
FHF
'HFIIDJ
0DJ7DJ10GH
5DJH
:DK
6HJK7DDHF
GH
:DKIKDG
GH
3K FD&KHFD
3HH
9D
9D
9D
&5
&5
H
DH
I
HDFK
0D
2H
6DH
I
HDFK
Extent
of
Check
G
G
G
G
G
G
$HGGJ
GDDKHH
%+(/6HF
1/HDDJH
G
G
G
G
G
G
G
G
G
,HF
5H
G
2)
Agency
7H
&HIFDH
,HF
5H
,HF
5H
/J%
7H
&HIFDH
%+(/
9HG
6EHG
$HGGJ
GDDKHH
%+(/6HF
0DIDFJ
DGDG
GJ
$HGGJ
GDDKHH
%+(/6HF
$HGGJ
GDDKHH
%+(/6HF
IDFJ
DGDG
GJ
Acceptance
Norms
Format
of
Records
5(912
6(&7,21'
6+((7
,%
92/80(,
DK
I
HFHH
H
)IDH
H
&DFH
FHIFDH
EHHIHG
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I029
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
0HDHH
0HDHH
HH
JKH
7KHD
KF9D
0HDHH
D
0HDHH
FD
&KHFD7H
0$0HD
0$
0$
0$
0$7
0$9
0$3K
Cate
gory
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
6,*+7)/2:,1',&$725
Characteristics Checked
Assembly
2.0
G*D
%G&H,H
)DJH*DH
:
Material /
Components
Component /
operation
1.0
Sl.
No.
3(0& ,
396
6GH0$
6KDGH )K
Cate
gory
0$
9D
9D
Extent
of
Check
G
$HGGJ
GDDKHH
%+(/6HF
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
6,*+7)/2:,1',&$725
Characteristics Checked
Packing
5.0
Painting
Component /
operation
4.0
Sl.
No.
3(0& ,
5(912
G
G
,HF
5H
%+(/
9HG
6EHG
$HGGJ
GDDKHH
%+(/6HF
Acceptance
Norms
Format
of
Records
6(&7,21'
6+((7
,%
92/80(,
Agency
2)
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I029
397
*D7EH
Routine Test
3.0
+G7H
9D
9D
9D
9D
&5
&5
H
DH
I
HDFK
0D
2H
6DH
I
HDFK
Extent
of
Check
G
G
G
G
G
G
G
$HGGJ
GDDKHH
%+(/6HF
1/HDDJH
G
G
G
G
G
G
G
G
G
G
G
,HF
5H
G
2)
Agency
7H
&HIFDH
,HF
5H
,HF
5H
/J%
7H
&HIFDH
%+(/
9HG
6EHG
$HGGJ
GDDKHH
%+(/6HF
0DIDFJ
DGDG
GJ
$HGGJ
GDDKHH
%+(/6HF
$HGGJ
GDDKHH
%+(/6HF
IDFJ
DGDG
GJ
Acceptance
Norms
Format
of
Records
5(912
6(&7,21'
6+((7
,%
92/80(,
DK
I
HFHH
H
)5HIH
H
&DFH
FHIFDH
EHHIHG
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I028
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
0HDHH
0HDHH
HH
JKH
7KHD
KF9D
0HDHH
D
0HDHH
FD
&KHFD7H
0$0HD
0$
*D 2DHDJ
'HDGHG
FHF
&DED
0$
0$
0$
0$7
0$9
0$3K
6FDHJDGD
0DJ7DJ10GH
5DJH
:DK
6HJK7DDHF
GH
:DKIKDG
GH
3K FD&KHFD
3HH
*
Cate
gory
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
/(9(/*$8*(6
Characteristics Checked
Assembly
%G&H,H
)DJH*DH
2.0
Material /
Components
Component /
operation
1.0
Sl.
No.
3(0& ,
398
6GH0$
6KDGH )K
Cate
gory
0$9
9D
D
Extent
of
Check
G
$HGGJ
GDDKHH
%+(/6HF
Reference
documents
3 $JHF3HIJKH7H
: $JHF:HJKH7H
9 $JHF9HIJKH7H
Type/Method
of
Check
67$1'$5'48$/,7<3/$1
)25
/(9(/*$8*(6
Characteristics Checked
Packing
5.0
Painting
Component /
operation
4.0
Sl.
No.
3(0& ,
5(912
G
G
,HF
5H
%+(/
9HG
6EHG
$HGGJ
GDDKHH
%+(/6HF
Acceptance
Norms
Format
of
Records
6(&7,21'
6+((7
,%
92/80(,
Agency
2)
$
Remarks
'$7(
48$/,7<3/$112PE-QP-999-145-I028
399
1.1
1.0
Sl.
No.
LEGEND:
CR
MA
MI
MATERIAL
Component /
operation
PEM :: C&I
- Critical characteristics
- Major characteristics
- Minor characteristics
MA
MA
MA
MA
MA
Cate
gory
*
Type/Method
of
Check
MT/PT
2.
100%
100%
100%
100%
Each H.T.
One/
Heat(HT
Batch)
Extent of
Check
Hyd. Test
Visual
1.
Review of H.T.
Chart
Physical,
Chemical tests
5.
3.
Surface Quality
Heat Treatment
2.
4.
Physical, Chemical
properties
1.
Characteristics Checked
ISA-S-75.19/
ASME B 16.34
ASME B 16.34
MSS-SP-55
ASME B 16.34
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
3/2
3/2
3/2
---
---
2,1
2,1
After
Machining on
machined
surface only
Applicable for
Body
and
Bonnet only.
For
Lower
rating only if
called for in
specification.
Only for
rating ANSI
900 and
above.
IBR
Certification
(if applicable)
to be verified
by BHEL
Remarks
DATE: 24.07.2010
6
Agency
OF
1 - BHEL
2 - Vendor
3 - Sub-vendor
Test
Certificate
Test
Certificate
Test
Certificate
Test Report
/ FILM
Test
Certificate
Test
Certificate
Format
of
Records
REV. NO.
SHEET
Acceptance
Norms
D
05
1
SECTION
ISA-S-75.19/
ASME B 16.34
ASME B 16.34
MSS-SP-55
ASME B 16.34
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
Reference
documents
IIB
VOLUME
400
LEGEND:
CR
MA
MI
Routine Test
Degree of protection
1.
2.
MA
MA
MA
MA
MA
MA
MA
MA
Cate
gory
*
Type/Method
of
Check
One / type
One
sample/
Lot
3. Cyclic test
(Endurance)
4. Dimension
(Measurement)
One
sample /
type
IP/NEMA
Tests
100%
100%
2. Scragging
HV, IR,
Continuity
function
100%
One
sample/
Heat
One
sample/
Heat
One /
Type
100%
100%
Extent of
Check
1. Stiffness
ratio
Mech. Test
ChemicalAnalysis
Cyclic test
10,000 cycles
Measurement
Visual
Performance
3.
Mech. Properties
2.
3.
Composition
Hardness
2.
1.
Surface Quality
1.
Characteristics Checked
- Critical characteristics
- Major characteristics
- Minor characteristics
Spring
1.3
1.4
Diaphragm
Component /
operation
1.2
Sl.
No.
PEM :: C&I
Approved Data
sheet
Approved Data
sheet
Rele. Standards
Appd Drg
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
Rele. Standards
Mfr. standard
10,000 cycles
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
Material spec. /
Mfr. standard
No damage
Mfr. standard
Mfr. standard
3/2
3/2
3/2
---
---
---
---
---
---
---
---
---
---
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
In case TC is
not available,
Actual test
shall be
conducted
Remarks
DATE: 24.07.2010
6
Agency
OF
1 - BHEL
2 - Vendor
3 - Sub-vendor
Test
Certificate
Test
Certificate
Record
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Format
of
Records
REV. NO.
SHEET
Acceptance
Norms
D
05
2
SECTION
Material spec. /
Mfr. standard
10,000 cycles/
Mfr. standard.
Mfr. standard
Mfr. standard
Reference
documents
IIB
VOLUME
401
IN PROCESS INSPECTION
2.1
OPERATION TEST
ON COMPLETED
VALVE (Final
inspection)
4.0
CR
MA
MI
3.3
Body
3.2
LEGEND:
Actuator Chamber
3.1
Opening/Closing time
2.
- Critical characteristics
- Major characteristics
- Minor characteristics
MA
Valve Travel
1.
Type/Method
of
Check
100%
100%
100%
100%
100%
REV. NO.
SHEET
Approved drg. /
data sheet
Approved drg. /
data sheet
FCI-70.2
No Leakage
No Leakage
Proper Physical
Contact
Mfr. Standard
Mfr. Standard
ASME B 16.34
Mfr. standard
Mfr. Standard
---
---
---
---
---
2,1
2,1
Refer Note-4
Refer Note-4
Refer Note-4
Refer Note-4
Refer Note-4
Butt weld
ends shall be
included.
Remarks
DATE: 24.07.2010
6
Agency
OF
1 - BHEL
2 - Vendor
3 - Sub-vendor
Test Report
Test Report
Test
Certificate
Test
Certificate
Test
Certificate
Test
Records
Records
Records
Test
Records
Records
Test
Certificate
Format
of
Records
D
05
3
SECTION
Acceptance
Norms
IIB
VOLUME
Approved drg. /
data sheet
Approved drg. /
data sheet
FCI-70.2
ISA - S-75.19
Mfr. Standard
------
Mfr. Standard
One
sample/lot
Mfr. Standard
100%
ASME B 16.34
Mfr. standard
Mfr. Standard
Reference
documents
One
sample/Lot
100% (on
accessible
surfaces)
100%
100%
Extent of
Check
Measurement
Measurement
Pneumatic Test
Hydro test
Pneumatic test
Blue Matching
Hardness
Measurement
Measurement
Visual &
MT/PT
Visual
Review of
calibration
certificates
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
Cate
gory
Seat Leakage
3.0
3.
Lapping
Dimensional checks
2.
2.2
Surface flaws
1.
Marking
2.
2.0
Performance
1.
Pressure Gauges
1.5
Characteristics Checked
Component /
operation
Sl.
No.
PEM :: C&I
402
Sl.
No.
LEGEND:
CR
MA
MI
Component /
operation
PEM :: C&I
MA
MA
MI
MA
MA
MA
MA
MA
MA
MA
Cate
gory
*
Type/Method
of
Check
100%
100%
100%
Visual and
dimensional
Visual
Visual and
dimensional
100%
One per
type
iMeasurement
(Press. vs.
discharge and
discharge vs.
opening 0100% in steps
of 10%)
Function
100%
100%
100%
100%
100%
Extent of
Check
Measurement
Measurement
Measurement
Measurement
Measurement
Cleanliness, painting,
stamping (for direction of
flow), Tag No.
12.
- Critical characteristics
- Major characteristics
- Minor characteristics
Control Valve
characteristics / CV Test
8.
11.
Accuracy (Overall)
7.
Overall dimensions
Sensitivity
6.
10.
Hysteresis
5.
Repeatability
4.
9.
Linearity/cam
characteristic
3.
Characteristics Checked
As per specs/
Approved drg. /
data sheet
As per specs/
Approved drg. /
data sheet
As per specs/
Approved drg. /
data sheet
As per specs/
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
--
Refer Note-4
On
assembled
valve
Refer Note-4
iSize = Body
& port size Or
Body size &
CV for non
std port.
Refer Note 1.
Refer Note-4
Refer Note-4
Refer Note-4
Refer Note-4
Refer Note-4
Remarks
DATE: 24.07.2010
6
Agency
OF
1 - BHEL
2 - Vendor
3 - Sub-vendor
Test
Certificate
Test
Certificate
Records
Test Report
Test
Certificate
Test Report
Test Report
Test Report
Test Report
Test Report
Format
of
Records
REV. NO.
SHEET
Acceptance
Norms
D
05
4
SECTION
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
As per specs/
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Reference
documents
IIB
VOLUME
403
Electronic position
transmitter(not
applicable if provided
integral to smart
positioner)
Current to Pneumatic
converter(not
applicable for smart
positioner)
5.4
5.5
Physical Verification
Make/Model
Degree of Protection
Linearity
Hysterisis
1.
2.
3.
4.
Type/Method
of
Check
100%
100%
Each
type
100%
100%
100%
100 %
Each
type
100 %
Extent of
Check
Measurement
Measurement
IP/NEMA test
Visual
Operation
Leakage test
Visual (soap
solution)
Measurement
CR
CR
MA
MA
MA
Accuracy
1.
MA
MA
Overall leakage
2.
MA
MA
Cate
gory
Performance Test
1.
Characteristics Checked
- Critical characteristics
- Major characteristics
- Minor characteristics
5.3
CR
MA
MI
5.2
Positioner
5.1
LEGEND:
AUXILIARY ITEMS
Component /
operation
5.0
Sl.
No.
PEM :: C&I
Inspection
Report
Inspection
Report
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
---
---
---
---
---
---
---
---
2,1
2,1
On completed
valve
Overall
leakage
including
tubing
Remarks
DATE: 24.07.2010
6
Agency
OF
1 - BHEL
2 - Vendor
3 - Sub-vendor
3/2
3/2
3/2
3/2
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Relevant
Standard
Approved drg. /
data sheet
Approved data
sheet /
No leakage
No leakage
No leakage
No leakage
Format
of
Records
REV. NO.
SHEET
Acceptance
Norms
D
05
5
SECTION
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
Relevant
Standard
Approved drg. /
data sheet
Approved data
sheet /
Mfr. Standard
Mfr. Standard
Mfr. Standard
Mfr. Standard
Reference
documents
IIB
VOLUME
404
LEGEND:
2.
3.
4.
5.
6.
1.
PACKING
7.0
NOTES:
PAINTING
5.
MA
CR
MA
Hysterisis
4.
CR
Linearity
3.
MA
MA
Degree of Protection
2.
MA
Cate
gory
Soundness of Painting
Physical Verification
Make/Model
1.
Characteristics Checked
Visual
Visual and
Measurement
Measurement
Measurement
Measurement
IP/NEMA test
Visual
Type/Method
of
Check
100%
100%
Each
type
100%
100%
Each
type
100%
Extent of
Check
Mfr. Standard
BHEL specn. /
Mfr. Standard
Approved data
sheet / Mfr.
Standard
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
Relevant
Standard
Approved drg. /
data sheet
Reference
documents
REV. NO.
SHEET
Mfr. Standard
BHEL specn. /
Mfr. Standard
Approved data
sheet / Mfr.
Standard
Approved drg. /
data sheet /
BHEL specn.
Approved drg. /
data sheet /
BHEL specn.
Relevant
Standard
Approved drg. /
data sheet
Inspection
Report
Inspection
Report
Inspection
Report
Test
Certificate
Inspection
Report
Test
Certificate
Test
Certificate
Format
of
Records
D
05
6
SECTION
Acceptance
Norms
IIB
VOLUME
---
---
---
---
---
---
---
2,1
2,1
Refer Note-3
Refer Note-2
CR
MA
MI
- Critical characteristics
- Major characteristics
- Minor characteristics
1 - BHEL
2 - Vendor
3 - Sub-vendor
Remarks
DATE: 24.07.2010
6
Agency
OF
Cv test will be conducted if Test Certificate for a similar Model / Size / Cv is not available. Validity of the certificate considered as last 3 years. Cv test conducted
at IIT/FCRI/any govt. approved laboratory shall not be witnessed by BHEL.
In the absence of BHEL spec. for painting, vendor to obtain BHELs approval on their painting specification / procedure.
Sea worthy packing, if applicable.
The quantum of check shall be 100% for manufacturer and 10% for BHEL/BHEL nominated inspection agency.
IBR certificates in Form III-C shall be submitted if called for in the specification/datasheet.
Copies of all TCs(Test Certificates) for materials duly correlated with Heat Nos., TCs for electrical items and mechanical tests(Leak/Operation) shall be
submitted to BHEL for verification and acceptance.
Smart Positioner
(As Applicable)
Component /
operation
6.0
5.6
Sl.
No.
PEM :: C&I
405
1.2
MA
MI
* CR
Dimensions
2.
Calibration
Painting
3.
MA
Visual
Performance
Test
Visual
MA
MA
Measurement
Penetrant test
Visual
Measurement
Measurement
Measurement
Physical,
Chemical
Tests
MA
MA
MA
MA
MA
MA
MA
MA
Cate
gory
Type/Method
of
Check
100%
One per
type
100%
100%
100%
100%
100%
100 %
Sample
100%
One /
Plate
OR
One/
Heat
Extent
of
Check
IR - Inspection Reports
DS Data Sheet
TC - Test Certificates
SP Tech. Spec.
AP Approved Drawings/doc
2.
Surface flaw on
machined surface
3.
Overall dimensions
Surface finish
2.
1.
Dimension
1.
Dimensions
Chemical,Mech Properties,
UT & Heat Treatment
Physical, Chemical
properties
1.
Characteristics Checked
- Critical characteristics
- Major characteristics
- Minor characteristics
ASSEMBLY and
FINAL INSPECTION
3.0
LEGEND:
IN PROCESS
Machine
2.0
Machining
Flanges
A. Forgings
B.
MATERIAL
Orifice Plate
Component /
operation
1.0
1.1
Sl.
No.
PEM :: C&I
Reference
documents
AP / DS / SP
IR / MR
TC
IR
IR
IR / TC
-------
IR
IR
MTC,UT
cert,HT cert
IR
Lab Report
3/2
3/2
3/2
3/2
3/2
3/2
3/2
3/2
3/2
3/2
3/2
-----
1
2
3
IBR
certification
(if
applicable)
to be
verified by
BHEL
Remarks
- BHEL
- Vendor
- Sub-vendor
---
2,1
----
DATE: 30.05.13
2,1
----
---
---
Agency
OF
SP / MS
SP
AP / DS
AP
No surface flaw
Mirror Finish
AP
AP / DS
ANSI B 16.34
AP
Format
of
Records
05
REV. NO.
1
SECTION
SHEET
IIB
D
VOLUME
Acceptance
Norms
SP / MS
------------
AP / DS
AP
ASTM 165 /
IS:3658
------------
AP
AP / DS
Material Spec
as per ASTM
A 388 for UT
AP
AP / DS / SP
406
4.0
Sl.
No.
MA
MI
* CR
- Critical characteristics
- Major characteristics
- Minor characteristics
IR - Inspection Reports
DS Data Sheet
TC - Test Certificates
SP Tech. Spec.
AP Approved Drawings/doc
----
3/2
----
Refer Note
4
Remarks
- BHEL
- Vendor
- Sub-vendor
----
DATE: 30.05.13
1
2
3
Agency
OF
LEGEND:
SP / MS
4.
SP / MS
3.
100%
Acceptance
Norms
Visual
Reference
documents
Format
of
Records
2.
MA
Cate
gory
Extent
of
Check
All test reports & dimension reports shall be verified by BHEL wherever verification is by BHEL at the time of Final Inspection.
Soundness of Packing
against transit damage
Characteristics Checked
Type/Method
of
Check
05
REV. NO.
2
SECTION
SHEET
IIB
D
VOLUME
1.
NOTE:
PACKING
Component /
operation
PEM :: C&I
407
Terminal Head
Thermowell
1.3
1.4
MA
MI
* CR
Protective Sheath
1.2
LEGEND:
Raw Material /
Component
Resistance sheath
1.0
1.1
Component /
operation
Sl.
No.
PEM :: C&I
Leak Test
4.
Visual
CR
Thread
matching
P
W
V
Measurement
Chemical
composition
Chemical
testing
Chemical
testing
Chemical
testing
MA
MA
CR
MA
MA
CR
Cate
gory
- Critical characteristics
- Major characteristics
- Minor characteristics; Mfd std - Manufacturers standard
3.
Chemical properties
2.
1.
Material composition
Material composition
Material composition
Characteristics Checked
Type/Method
of
Check
Approved drg.,
BHEL Spec.
Approved drg.,
BHEL Spec.
1
2
3
Approved drg.,
BHEL Spec.
Approved drg.,
BHEL Spec.
Approved drg.,
BHEL Spec.
Relevant
material std.
Approved drg. /
data sheet
Approved drg.,
BHEL Spec.
Relevant
material std.
Relevant
material std.
Relevant
material std.
Acceptance
Norms
- BHEL
- Vendor
- Sub-vendor
Inspection
Report
Inspection
Report
Inspection
report
Test
Certificate
Test
Certificate
Test
Certificate
Test
Certificate
Format
of
Records
P
3,2
3,2
3,2
3,2
3,2
01
REV. NO.
1
SECTION
SHEET
IIB
VOLUME
Approved drg. /
data sheet
Approved drg. /
data sheet
Approved drg. /
data sheet
Reference
documents
100%
100%
100%
One
Sample
from
each lot
One
Sample
from
each lot
Extent
of
Check
1**
2,1i
1i
---
---
---
---
Agency
OF
$
2/1
2,1
2,1
2,1
2,1
**10% of
total quantity
with minimum
of 2 random
piece/type &
size
IBR
certificate
wherever
specified to
be verified.
iBHEL to
witness 25%
Samples
compliance
certificate to
be verified.
kRelevant
Remarks
DATE: 21.03.2012
408
LEGEND:
Packing
3.0
MA
MI
* CR
Routine Tests
2.2
Type Test
Final Inspection
RTD Assembly
2.0
2.1
2.3
Component /
operation
Sl.
No.
PEM :: C&I
3.
MA
CR
CR
MA
CR
MA
MA
MA
Cate
gory
Visual
Verification
P
W
V
Measurement
Electrical
Measurement
Measurement
Visual
Visual
- Critical characteristics
- Major characteristics
- Minor characteristics; Mfd std - Manufacturers standard
Soundness of packing
Insulation Resistance
2.
Dimensions
3.
Marking
2.
1.
Workmanship
1.
Characteristics Checked
Type/Method
of
Check
Mfd std.
Mfd std.
1
2
3
Approved drg. /
data sheet
IS:2848
IS:2848
Approved drg. /
data sheet
IS:2848
IS:2848
Approved drg. /
data sheet
- BHEL
- Vendor
- Sub-vendor
Inspection
Report
Test
Certificate
Test
Certificate
Test Report
Test Report
Inspection
Report
Format
of
Records
P
----
3/2
----
----
----
Agency
OF
3/2
01
REV. NO.
2
SECTION
SHEET
IIB
VOLUME
Acceptance
Norms
IS:2848
IS:2848
Approved drg. /
data sheet
Reference
documents
100%
Each
type
One
Sample
from
each
type
100%
100%
100%
100%
100%
Extent
of
Check
---
1*
---
---
1k
1k
1k
*Type Test
Certificate
(not more
than 5 year
old) to be
verified
Visual
Remarks
DATE: 21.03.2012
4.0.0
ThefollowingdocumentsshallbesubmittedbyBidderat
Biddingstage:
1.Signed&StampedPLCsystemconfigurationdrawingwith
writeup
2.Signed&StampedpowersupplyschemesforPLCsystem,
peripherals,andRemoteI/Opanels.
3.Signed&StampedcopyofQAPs&FATforPLC
4.FilledDatasheetBforPLC
5.Earthingrequirement
410
5.0.0
AWARD OF CONTRACT
411
LIST OF DELIVERABLES OF PEM - C&I DEPARTMENT FOR DM PLANT (2 X 660 MW SURATGARH PROJECT)
DOCUMENT NUMBER
Sl.No. DRAWING NO.
PE-GL-163A-145-I100
DRAWING/DOCUMENT TITLE
SHEET
1 of 1
USER REMARKS
INSTRUMENTATION
11
PE-V9-392-163A-I910
PE-V9-392-163A-I911
1
2
3
PE-V9-392-163A-I912
PE-V9-392-163A-I913
PE-V9-392-163A-I914
PLC PANEL
PLC CONFIGURATION DRAWING
PLC PANEL GA (INTERNAL & EXTERNAL)
CONTROL SCHEMES (BLOCK LOGIC)
PE-V9-392-163A-I915
VENDOR
C&I
PE-V9-392-163A-I916
$$
VENDOR
C&I
6
7
8
9
10
PE-V9-392-163A-I917
PE-V9-392-163A-I918
PE-V9-392-163A-I919
PE-V9-392-163A-I920
PE-V9-392-163A-I921
I
I
A
A
A
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
C&I
C&I
C&I
C&I
C&I
IF APPLICABLE
11
PE-V9-392-163A-I922
VENDOR
C&I
12
PE-V9-392-163A-I923
VENDOR
C&I
13
PE-V9-392-163A-I924
VENDOR
C&I
14
PE-V9-392-163A-I925
VENDOR
C&I
15
PE-V9-392-163A-I926
VENDOR
C&I
16
PE-V9-392-163A-I927
VENDOR
C&I
17
PE-V9-392-163A-I928
VENDOR
C&I
18
19
20
21
22
23
24
25
PE-V9-392-163A-I929
PE-V9-392-163A-I930
PE-V9-392-163A-I931
PE-V9-392-163A-I932
PE-V9-392-163A-I933
PE-V9-392-163A-I934
PE-V9-392-163A-I935
PE-V9-392-163A-I936
I
A
I
A
A
I
I
A
A
-
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
1
2
3
4
5
6
7
8
9
10
PE-V9-392-163A-I901
PE-V9-392-163A-I902
PE-V9-392-163A-I903
PE-V9-392-163A-I904
PE-V9-392-163A-I905
PE-V9-392-163A-I906
PE-V9-392-163A-I907
PE-V9-392-163A-I908
PE-V9-392-163A-I909
26
PE-V9-392-163A-I937
27
PE-V9-392-163A-I938
28
PE-V9-392-163A-I939
29
PE-V9-392-163A-I940
30
31
PE-V9-392-163A-I941
PE-V9-392-163A-I942
32
PE-V9-392-163A-I943
33
34
A
I
A
I
A
I
A
A
I
A
I
A
A
A
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
VENDOR
C&I
C&I
C&I
C&I
C&I
C&I
VENDOR
C&I
VENDOR
C&I
VENDOR
C&I
VENDOR
VENDOR
C&I
C&I
A
-
VENDOR
VENDOR
VENDOR
C&I
C&I
C&I
VENDOR
C&I
VENDOR
C&I
VENDOR
C&I
VENDOR
C&I
A
I
VENDOR
VENDOR
C&I
C&I
VENDOR
C&I
PE-V9-392-163A-I944
VENDOR
C&I
PE-V9-392-163A-I945
VENDOR
C&I
35
PE-V9-392-163A-I946
36
37
38
PE-V9-392-163A-I947
PE-V9-392-163A-I948
PE-V9-392-163A-I949
39
PE-V9-392-163A-I950
VENDOR
C&I
I
I
A
VENDOR
VENDOR
VENDOR
C&I
C&I
C&I
VENDOR
C&I
OTHER DOCUMENTS
1
PE-V9-392-163A-I951
VENDOR
C&I
PE-V9-392-163A-I952
VENDOR
C&I
PE-V9-392-163A-I953
VENDOR
C&I
PE-V9-392-163A-I954
VENDOR
C&I
PE-V9-392-163A-I955
VENDOR
C&I
Notes:
$$
412
413
Group No
1
2
3
4
1
2
3
Tag No
Description
R/W
Range
OPC DATA INPUT FORMAT ( FORMAT FOR SOFT SIGNAL EXCHANGE BETWEEN PLC & DDCMIS)
6.0.0
414
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 1 OF 7
1.0
GENERAL
1.1
2.0
2.1
The Bidder shall be required to erect all cabinets, consoles, desks, all cables,
conduits, instruments etc. required for complete I&C system covered in this
specification.
2.2
The Bidder shall provide all supervisory, skilled, semiskilled and unskilled labours
including instrument tube fitters, licensed cable jointing mechanics etc., tools and
tackles, consumable, erection materials required for the complete installation,
transport vehicles, hydraulic jacks, welding sets, mobile cranes, blowers and other
necessary equipment for timely efficient erection and testing.
2.3
The Bidder shall maintain proper record of the materials at the place of storage for
quick identification as and when required.
2.4
The Bidder shall carry out all repairs to damages that might have suffered during
transit or in subsequent storage and replacement of all lost parts.
2.5
The Bidder shall furnish a detail erection schedule, which shall be finalised along with
the offer keeping in view the overall erection and commissioning schedule. The
erection schedule as agreed with the PURCHASER shall be strictly adhered to by the
Bidder.
2.6
The erection work shall include but not limited to the following:
(a)
(a)
(b)
(c)
(d)
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 2 OF 7
(e)
(f)
(g)
2.7
Supply of structural steel like clamps, bolts, nuts, etc. to fabricate hangers and
supports and other accessories required to install all the equipment supplied under this
contract.
2.8
Supply of all consumables like welding rods, drill bits, tapes, grease, lubricants etc. as
required.
3.0
ERECTION
3.1
3.1.1
The Bidder shall arrange for the transportation and handling of cabinets and desks
from stores to work site suitably without any damage. If any damage is observed
before handling, this shall be brought to the notice of the PURCHASER.
3.1.2
Before installation of cabinets and desks, the necessary openings and inserts required
to be made on the floor by the Bidder shall be checked and then after proper
alignment, the cabinets and desks shall be installed on the floor by the Bidder. All
necessary civil work to be carried out for this shall be in Bidders scope of supply.
3.1.3
The cabinets and desks shall be cleaned by blowing air to remove dust or foreign
particles.
3.1.4
The Bidder's scope of work and supply shall also include tightening of wires,
replacement of broken items and retouching of damaged painted surface of cabinets
those has taken place during transport from store to work site and during installation.
3.1.5
The Bidder's scope of work and supply shall also include tightening of wires,
replacement of broken items and retouching of damaged painted surface of cabinets
those has taken place during transport from store to work site and during installation.
3.2
3.2.1
All electrical work shall conform to the rules and regulations of Indian Electricity Act.
3.2.2
All cables shall be tested for insulation level. Cable ends shall be properly cleaned.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 3 OF 7
3.2.3
The entry to and exit from pipes shall be smooth and free from burr where cables are
run through pipes. Cable shall be pulled into the pipes in such a way that there shall
be no damage to the cables.
3.2.4
3.2.5
3.2.6
A minimum distance of 400 mm shall be kept between instrument / signal cables and
power cables.
3.2.7
Each tray shall be filled with a maximum of two layers for instrument and control
cables and one layer for power cables providing 20% spare space in the number of
layers specified.
3.2.8
Instrument Cable Trays, shall be erected vertically as far as possible to avoid dust
accumulation.
3.2.9
3.2.10
Thermocouple cables shall be run completely independent of all other cables with
minimum separation as per relevant standard and with cross over at right angles.
3.2.11
The cabling accessories shall include cage-clamp type terminal blocks, splicing
materials, crimping tools, cable support grips, insulating tapes, GI flexible conduits,
conduit fittings, GI perforated covered trays, supports, accessories, and cadmium
plated trays & cable glands.
4.0
4.1
ERECTION REQUIREMENTS
4.1.1
The installation details given in the specification are the guide lines and the installation
shall be done as per the standards. The exact routing of impulse pipes/ tubes will be
decided at site during erection by the Bidder depending upon the location of tap points.
PURCHASER/ ENGINEER reserve the right to approve the suitable location of field
mounted junction boxes.
4.1.2
The Bidder shall prepare isometric drawing for installation and routing of impulse pipes
from the tapping point location to each instrument and device supplied by him. The
BIdder shall furnish as installed drawing to the PURCHASER/ENGINEER.
4.1.3
The actual location of transmitter racks, junction boxes and other instruments shall be
decided by the Bidder depending on the site conditions considering the layout and
maintenance aspects.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 4 OF 7
4.1.4
The Bidder shall get prior approval as per approved quality assurance plan of the
Purchaser / Purchasers Representative before any installation work starts. If any
work is carried out by the Bidder before prior approval from Purchaser / Purchasers
Representative and modification is sought by Purchaser / Purchasers Representative
later, then the work shall be redone by Bidder without any cost / material implications
to the Purchaser / Purchasers Representative.
4.1.5
Impulse / sample piping, air supply and pneumatic tubing, cable trays and equipment
shall be supported rigid enough to prevent vibration and anchored sufficiently to
prevent strains on equipment installed. Supporting clamps shall be provided atleast at
every one metre distance for better rigidity. Impulse / sampling piping shall be
provided with adequate slope, (preferably 1:10). Hanger and supports shall be so
installed as not to interfere with free expansion and contraction of the piping and
tubing between anchors. Suitable vibration dampners, etc., shall be provided
wherever necessary. In addition, care shall be taken that the arrangement of impulse
/ sampling piping, air supply and pneumatic tubing from detrimental sagging,
mechanical injury, abuse due to unusual service conditions from sources other than
those due to pressure, temperature and vibrations. All impulse lines of joints shall be
welded type unless otherwise specified. Argon arc welding shall be employed.
4.1.6
All the panels, desk, cabinets supplied by the Bidder shall be welded or bolted to the
floor channel.
4.2
TESTING REQUIREMENTS
4.2.1
The Bidder shall set up his own instrument laboratory. The calibration equipment shall
cover complete range and shall have the desired accuracy of not less than 0.1%. All
the calibration equipment shall have the certification from National Physical Laboratory
(NPL) or IDEMI for the duration of Contract Period.
4.2.2
The Bidder shall follow the standard procedures for calibration of various instruments
and as set by the manufacturer of instruments and as instructed by the Purchaser
including any requirements of field calibration. First, the calibrations shall be carried
out independently by the Bidder and later in the presence of Purchaser who shall
certify the same. Proper documentation in this regard shall be maintained and handed
over to the Purchaser.
4.2.3
All the instruments shall be calibrated for the entire range of the instrument for which it
is designed. Calibration shall include test for repeatability. After first commissioning,
the instruments shall be tested for calibration again to check whether the instrument
maintains its zero and maximum of the range.
4.2.4
All instruments and control equipment shall be calibrated to read correctly to the
satisfaction of equipment supplier / Purchaser.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 5 OF 7
4.2.5
All switches shall be tested for the actuation of both normally open and normally
closed contacts at the desired set points and also for the fixed / differential settings.
4.2.6
All the float operated level switches shall be tested for the movement of the float and
linkages to make to break the switch contacts by filling up with water before
installation. For such tests, necessary testing set up required shall be arranged by the
Bidder. All the conductivity type probes and switches shall be tested for performance
before installation.
4.2.7
Air leak tests shall be performed on all flue gas impulse / sample lines, air supply and
pneumatic lines. Necessary equipment such as portable compressor, connecting
pipes, materials, cables and test gauges shall be provided by the Bidder.
4.2.8
Hydro test shall be performed for all other impulse lines / sampling lines. Necessary
equipment such as hydro test pumps and temporary piping to the required point, fill
pump etc., materials such as temporary gaskets, miscellaneous fasteners, etc. tools
and tackles including test pressure gauges, etc. are to be provided by the Bidder.
4.2.9
For all electrical actuators of the valves, functioning, setting and performance of limit
switches / torque switches of various positions shall be checked before and after
installation of the actuators. The position transmitters for inching applications shall
also be calibrated.
4.2.10
4.3
COMMISSIONING REQUIREMENTS
4.3.1
Prior to taking the instruments in service, all impulse lines, sampling lines and air
supply lines shall be blown as required with the establishment of adequate line
pressure and temperature conditions to keep the lines thoroughly clean.
4.3.2
On-line i.e., without removing control valves from the pipe, calibration of the
positioners and stroking of control valves / control dampers shall be carried out as
required during control system tuning.
4.3.3
4.3.4
4.3.5
After delivery of the equipment, the Bidder shall locate all the equipment including
electronic cards in its final position, check all the power wiring, grounding and
interconnection cables, all in accordance with manufacturers recommendations. The
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 6 OF 7
LOOP TESTING
4.4.1
The action of the controller is set as prescribed. Controller settings for various modes
of operation (Proportional band, reset and rate action) are at nominal value.
4.4.2
For current signals, 4 20 mA shall be injected and checked the loop for 0%, 25%,
50%, 75% and 100% of full scale inputs.
4.4.3
For temperature loops with thermocouples, a known milli volt signal shall be injected
and the output display shall be checked for input signals of 0%, 25%, 50%, 75% and
100%.
4.4.4
For temperature loops with RTDs, a known resistance shall be injected in the control
cable through decade resistance box and output display shall be checked for 0%,
25%, 50%, 75% and 100%.
4.4.5
For field mounted switches for alarms / interlocks, the action shall be simulated by
disconnecting the wires / shorting the terminals and the function of the associated
system shall be checked.
4.4.6
Any equipment required by the Bidder for testing, calibration and commissioning shall
be brought by the Bidder at site. The list of such equipment shall be furnished along
with the offer.
5.0
COMMISSIONING
5.1
The Bidder shall take care to complete all pre-commissioning activities and simulation
tests after erection to suit the over all start up of respective plant equipment.
5.2
The pre-commissioning activities of the system shall be completed at least two (2)
days in advance as per the schedule of plant start-up.
5.3
The controllers shall be tuned as per the process requirement. The list of set points,
alarms / interlocks, settings for the controllers shall be furnished in the standard format
and handed over to the PURCHASER.
5.4
Control loops shall be put in auto mode as per the operational requirement of different
phases.
ISSUE
R1
TCE FORM 329 R5
Package: EPC
VOLUME V
SECTION :TABLE 6
SHEET 7 OF 7
5.5
Bus Worst loading conditions calculation shall be proved at the time of commissioning.
5.6
Before taking over of the plant by the PURCHASER, all the system and auto control
loops shall run satisfactorily for at least one month at varying loads without disturbing
any adjustment. During this period, supervision and maintenance of the system shall
be the scope and responsibility of the Bidder.
5.7
The performance test shall be carried out for the system offered and certificates to
these effects shall be approved by the PURCHASER.
6.0
Safety
6.1
The entire works will be carried out with necessary precautions to meet the rules of
local statutory authorities to have the utmost protection to men and material. The use
of safety equipment like safety belts, helmets, safety shoes, safety glasses etc. will be
enforced. All the rigging and lifting equipment will be tested for reliability and for safe
operation. A full fledged safety engineer will be provided by the VENDOR to be in
charge of the supervision of safety requirements at site. It is the VENDORS
responsibility to provide safety to his personnel and equipment.
6.2
6.3
ISSUE
R1
TCE FORM 329 R5
VOLUME
III
REV. NO. 00
VOLUME-III
422
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: III
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
REV
V NO: 00
SCHED
DULE OF CL
LARIFICATIO
ON
All clarification from the Technica
al Specificatiion shall be filled
f
in by the
t
BIDDER
R clause by
y clause
in this fformat only.
VOLUME
SECTION
CLAU
SE
NO.
PAGE
NO.
SP
PECIFICATIO
ON
RE
EQUIREMEN
NT
CLARIFICATION
423
REASONS
R
FOR
CATION
CLARIFIC
SPE
EC NO: PE-TS-3392-163A-A001
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
VOL
LUME: III
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
REV
V NO: 00
SCHEDU
ULEOFD
DEVIATIO
ONS
S. No.
V
Volume /
S
Section
Page
P
No.
Clau
use
No
o.
T
Technical
Sp
pecification
De
eviation
Bid
dder shall indicate quoted in cost of wi thdrawal column of schedu
ule of technicaal deviation along with theirr
tecchnical offer.
n along with price
Bid
dder shall furn
nish priced sch
hedule of tech
hnical deviatio
p
bid in seaaled envelope
e.
Co
ost of withdraw
wal prices shall be submittted without ta
axes, duties, freight
f
and othher taxes as applicable forr
pro
oject.
PA
ARICULARS OF
O BIDDER / AUTHORISE
ED REPRESENTATIVE
NAME
DESIGNA
ATION
SIGN
DATE
424
CO
OMPANY SEAL
TITLE: TECHN
NICAL SPECIF
FICATION FOR
DM PLANT
SPE
EC NO: PE-TS-3392-163A-A001
VOL
LUME: III
2X660 MW Suratgarh
h Super Critica
al TPS, Stage-V
V Unit 7
& 8 at Suratgarh, Rajjasthan
REV
V NO: 00
ANN
NEXUREI
SCHEDULE
E OF GUARA
ANTEED CH
HEMICAL CO
ONSUMPTIO
ON 33% HC
Cl per annum
m AND
48
8% NaOH pe
er annum
GAURANTEED 33%
% HCl CONSU
UMPTION PER
R
NNE)
ANNUM FOR DM PLANT (IN TON
GAURANTEED 48%
% NaOH CON SUMPTION
PER ANNUM
A
FOR DM
D PLANT (IN
N TONNE)
___TONNE
___TONNE
uaranteed chemical
c
con
nsumption (33% HCl pe
er annum an
nd 48% NaO
OH per
Bidder tto submit gu
annum)) in a sealed
d envelope.
PART
TICULARS OF BIDDER
B
/ AUTH
HORISED REPR
RESENTATIVE
NAME
D
DESIGNATION
SIG
GNATURE
425
DATE
E
COMPA
ANY SEAL
VOL III
* SCHEDULE OF DECLARATIONS
DECLARATIONS
Authorized representatives
Signature
..
Name
Bidders Name
with
DESIGNATION
SIGNATURE
DATE
426
COMPANY SEAL
Bidder shall furnish this price schedule in his price offer only
Particulars of bidder / authorised representative
Name
Designation
Signature
427
Date
Company
seal
a)
b)
2.1
2.2
Total lump sum firm price for all services including unloading,
handling & transportation at site , Erection & Commissioning, trial
run, preparation & submission of As Built drawings, etc, required
for completion of DM PLANT as per tender technical specification
(PE-TS-392-163A-A001).
2.3
2.4
Price for PG test and handing over the plant to the customer.
Bidder shall furnish this price schedule in his price offer only
Particulars of bidder / authorised representative
Name
Designation
Signature
428
Date
Company
seal