PACKAGE DETAILS
SL No
Package
Agency
W.O/LOI Ref
Date of
W.O/LOI
Scope of Work
Zero Date/
Contractual
Contractual
Actual
Actual
Start Date Completion Date Contract Period Start Date Finish Date Contract Value
Work order
JITPL/2012-13/Odisha/338
18.06.2012
6 months
09.06.2010
U1- 18 month,
U2 -20 months
52,50,000.00
BSBK Engineers
JITPL/2010-11/Orissa/143
4,35,00,000.00
Approach Road
GC Bhutia
JITPL/2010-11/Odisha/091/001 Amd
1,07,22,694.00
GC Bhutia
JITPL/2010-11/Orissa/091/001 Amd
97,02,569.00
GC Bhutia
JITPL/2010-11/Orissa/091/002 Amd
1,07,22,694.00
Causeway in Chhendipada
GC Bhutia
JITPL/2010-11/Odisha/237
30,50,400.00
31.03.2011
20 days
26.07.2011
5 months
15,09,99,537.00
06.08.2011
4 months
66,71,700.00
01.03.2011
5 months
18,32,35,763.00
GC Bhutia
JITPL/2011-12/Odisha/267
10
11
12
13
14
15
16
17
GC Bhutia
GIL
GIL
GIL
GIL
GIL
Township-II
JITPL/2011-12/Odisha/269
GIL
GIL
GIL
01.03.2011
14.07.2011
79,45,03,851.00
26.07.2011
25,76,910.00
30.11.2011
03.02.2012
13,22,47,969.00
11.02.2012
69,48,900.00
25.10.2010
12.10.2010
12 months
75,00,00,000.00
01.03.2011
01.03.2011
5 months
18,32,35,763.00
25.07.2011
25.07.2011
15 months
50,00,00,000.00
JITPL/2010-11/Odisha/222
JITPL/2010-11/Orissa/176/Amd 01
JITPL/2010-11/Orissa/176/Amd 02
JITPL/2010-11/Orissa/176/Amd 03
JITPL/2010-11/Orissa/176/Amd 04
JITPL/2010-11/Orissa/176/Amd 05
JITPL/2010-11/Odisha/176
JITPL/2010-11/Odisha/222
JITPL/2011-12/Odisha/266/L
Page1of5
PACKAGE DETAILS
SL No
18
19
20
21
22
23
24
25
Package
Township-II
Township -I
BTG Civil
GIL
Pipe Rack
GIL
Pipe Rack
GIL
Transmission Line
Ash Dyke
31
32
33
34
35
36
37
GIL
BTG Civil
27
30
GIL
GIL
Transmission Line
29
GIL
BTG Civil
26
28
Agency
Township-I
Township-I
Township-II
GIL TD
W.O/LOI Ref
GSR Ventures
GSR Ventures
GSR Ventures
GSR Ventures
GSR Ventures
50,00,00,000.00
30.09.2011
29.08.2011
8 months
4,25,00,000.00
21.01.2012
21.01.2012
12 months
50,00,00,000.00
04.04.2012
21.01.2012
21.01.2012
12 months
30,00,00,000.00
14.03.2012
27.02.2012
27.02.2012
2.5 months
24,49,04,990.00
07.08.2010
14 months
16,14,87,770.00
07.08.2010
14 months
23,22,50,950.00
JITPL/2010-11/Odisha/309/LOA
JITPL/2011-12/Odisha/316/LOI/001L
JITPL/2011-12/Odisha/316/LOI
JITPL/2010-11/Orissa/105/Amd 02
GSR Ventures
15 months
JITPL/2010-11/Odisha/309/LOA/Amd 001
GSR Ventures
GSR Ventures
25.07.2011
JITPL/2010-11/Odisha/308/LOA
JITPL/2010-11/Orissa/153/Amd 01
GSR Ventures
18.08.2011
JITPL/2011-12/Odisha/282
GIL TD
GSR Ventures
Scope of Work
Construction of Township(Site Development Works,Housing
Unit Type A,B,C,Community Centre,Water Supply
System,Storm Water Drainage System,Sewerage
System,Misc-Temple,Barrack, Etc.,Fire Protection System)
including Electrical Works for our upcoming 2 x 600 Mw Coal
based Thermal Power Plant at village Derang in District Angul ,Odisha
JITPL/2011-12/Odisha/270
JITPL/2010-11/Orissa/153
JITPL/2010-11/Orissa/Site/17
Zero Date/
Contractual
Contractual
Actual
Actual
Start Date Completion Date Contract Period Start Date Finish Date Contract Value
Date of
W.O/LOI
09.08.2010
24.01.2012
07.03.2011
07.07.2011
11,16,27,490.00
21.05.2010
16,39,976.00
03.02.2012
1,43,49,278.00
22.07.2010
01.03.2011
14.01.2012
05.04.2011
24.03.2011
6 months
3,00,68,976.00
22.04.2011
22.04.2011
15 months
36,50,00,000.00
23.05.2012
23.05.2012
9 months
5,67,53,300.00
29.03.2011
JITPL/2010-11/Orissa/105/Amd 01
JITPL/2010-11/Orissa/112
JITPL/2010-11/Orissa/139/001Amd
JITPL/2010-11/Orissa/139
JITPL/2010-11/Odisha/223
JITPL/2011-12/Odisha/238/001Amd
JITPL/2011-12/Odisha/238
JITPL/2011-12/Odisha/247/L
JITPL/2012-13/Odisha/337
Page2of5
6,38,91,465.00
3,53,491.00
07.03.2011
01.03.2011
4.5 months
4,13,03,790.00
5 months
14,70,66,090.00
2,71,577.00
PACKAGE DETAILS
SL No
Package
Agency
W.O/LOI Ref
Date of
W.O/LOI
Scope of Work
Zero Date/
Contractual
Contractual
Actual
Actual
Start Date Completion Date Contract Period Start Date Finish Date Contract Value
38
MBPL
JITPL/2010-11/Orissa/141
39
Security Tower
Mehul Constructions
JITPL/2010-11/Orissa/SEW/125
40
Security Tower
Mehul Constructions
JITPL/2010-11/Orissa/SEW/125
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Boundary Wall
Temporary Cladding
Cooling Tower
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
Monalisha Constructions
05.06.2010
23.02.2012
18.04.2012
19.04.2012
18.04.2012
19.04.2012
29.11.2011
JITPL/2012-13/Orissa/005
JITPL/2012-13/Orissa/006
JTP/D/W078
JITPL/2010-11/Orissa/161
07.09.2010
23.09.2010
07.10.2010
20.06.2011
06.12.2011
27.06.2012
Area Grading work at Weigh Bridge near Fly Ash Silo for our
upcoming 2 x 600 Mw Coal based Thermal Power Plant at
village Derang in District -Angul ,Odisha
Design,Engineering,Manufacturing,Supply,Erection,Testing
and Commissioning of Fire Protection System including
spares,tools & tackles for our upcoming 2 x 600 Mw Coal
based Thermal Power Plant at village Derang in District Angul ,Odisha
17.12.2010
17.12.2010
06.06.2012
JITPL/2011-12/Odisha/259
JITPL/2011-12/Odisha/297
JITPL/2012-13/Odisha/341
JITPL/2010-11/Odisha/185/L
02.11.2010
JITPL/2010-11/Odisha/197
JITPL/2010-11/Odisha/198
58
59
Petron
Niko Portacabin Systems
Quartz Infra
05.06.2010
30 days
4,50,000.00
74,14,575.00
83,179.78
5,99,555.00
05.05.2012
7 days
5,99,544.70
30.08.2010 to JITPL,Angul,Orissa
JITPL/2010-11/Odisha/165
JITPL/2010-11/Orissa/173
17,05,00,000.00
-
JITPL/2010-11/Odisha/165/002Amd
JITPL/2010-11/Orissa/156
09.06.2010
05.09.2010
30.11.2010
36,07,500.00
30.10.2010
27,75,850.00
23.09.2010
4 months
3,44,08,325.00
95,00,000.00
31.01.2011
6 months
12,85,00,000.00
2 months
60,47,460.00
27.06.2012
60 days
24,06,000.00
02.11.2010
12 months
11,25,00,000.00
02.11.2010
12 months
9,84,91,283.00
02.11.2010
12 months
1,40,08,717.00
20.06.2011
1,28,090.40
Erection,Testing,Start Up,Commissioning,Performance
Testing at site of 2 Nos Induced Draft Cooling Towers
complete in all respects including civil works for our 2 x 600
Mw Coal based Thermal Power Plant at village Derang in
District -Angul ,Odisha
05.03.2010
CT-1 : 17 months
CT-2 : 20 months
20.10.2011
20.10.2011
12 months
1,00,00,00,000.00
14.01.2012
14.01.2012
10 weeks
27,94,118.00
11.04.2011
11.04.2011
2 months
7,95,63,825.00
JITPL/2010-11/Odisha/169
11.10.2010
57
Unit-1:18 months
Unit-2 : 20
months
JITPL/2011-12/Odisha/284/LOI
JITPL/2011-12/Odisha/305
JITPL/2011-12/Odisha/246
Page3of5
35,40,08,000.00
PACKAGE DETAILS
SL No
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
Package
Agency
Quartz Infra
Boundary Wall
Quartz Infra
Ash Dyke
Area Grading/Levelling Work for CHP
Boundary Wall
400 Kv Switchyard
Quartz Infra
R K Associates
R K Associates
R K Associates
R K Associates
R K Associates
Raunaq
Raunaq
W.O/LOI Ref
Zero Date/
Contractual
Contractual
Actual
Actual
Start Date Completion Date Contract Period Start Date Finish Date Contract Value
Date of
W.O/LOI
Scope of Work
14.12.2011
30.01.2012
02.02.2012
23.09.2010
05.04.2011
30.04.2012
21.07.2012
22.11.2011
07.10.2010
14.09.2010
12 months
4,75,00,000.00
07.10.2010
Civil Works for River Water System and Plant Raw Water
System complete in all respect for our upcoming 2 x 600 Mw
Coal based Thermal Power Plant at village Derang in District
-Angul ,Odisha
14.09.2010
12 months
8,75,00,000.00
11.07.2012
2 months
1,28,88,000.00
02.02.2011
02.02.2011
2 months
93,43,000.00
17.01.2011
17.01.2011
6 months
1,00,32,500.00
05.04.2011
05.04.2011
30 days
11.04.2011
11.04.2011
2 months
1,21,31,353.00
14.06.2011
14.06.2011
3 months
24,36,850.00
15.10.2011
15.10.2011
3 months
1,37,27,800.00
06.12.2011
06.12.2011
2 months
36,86,730.00
06.12.2011
06.12.2011
2 months
52,64,460.00
09.06.2010
12 months
JITPL/2011-12/Odisha/300
JITPL/2011-12/Odisha/310
JITPL/2011-12/Odisha/311
JITPL/2010-11/Odisha/164
JITPL/2011-12/Odisha/240
JITPL/2012-13/Odisha/326
JITPL/2012-13/Odisha/350
JITPL/2011-12/Odisha/
JITPL/2010-11/Odisha/171
JITPL/2010-11/Odisha/172
10,49,72,288.00
28.02.2012
As per site
requirement
1,59,69,075.00
02.02.2012
8 months
21,49,92,524.00
23.09.2010
3 months
3,42,98,750.00
05.04.2011
30 days
30.04.2012
7 months
21.07.2012
7 days
31,91,250.00
As per Site
Requirement
3,90,000.00
50,65,205.00
7,60,17,000.00
Samarpita
Samarpita
Shradha
Shradha
Shradha
Shradha
Shradha
Siddharth
Siddharth
Siemens
JITPL/2011-12/Odisha/312/001Amd
11.07.2012 Raw water pipe line in low lying area at Samal Barrage
JITPL/2011-12/Odisha/312
JITPL/2010-11/Odisha/207
JITPL/2011-12/Odisha/241
JITPL/2011-12/Odisha/245
JITPL/2011-12/Odisha/256
JITPL/2011-12/Odisha/283
JITPL/2011-12/Odisha/296
JITPL/2011-12/Odisha/298
JITPL/2010-11/Orissa/128
09.06.2010
Page4of5
28,52,456.00
3,01,25,100.00
PACKAGE DETAILS
SL No
80
81
82
83
84
85
86
Package
400 Kv Switchyard
400 Kv Switchyard
400 Kv Switchyard
BTG Civil Works
BTG Civil Works
BTG Civil Works
BTG Civil Works
Agency
Siemens
Siemens
Siemens
SPCL
SPCL
SPCL
SPCL
W.O/LOI Ref
Date of
W.O/LOI
08.06.2010
Design,Engineering,Manufacturing,Inspection,Supply of
Electrical Balance of Plant for our 2 x 600 Mw Coal based
thermal power plant at village Derang in District -Angul
,Odisha
2 weeks from
Receipt of LOA
12 months
75,98,37,457.00
09.06.2010
12 months
1,00,37,443.00
09.06.2010
2 weeks from
Receipt of LOA
12 months
3,01,25,100.00
05.05.2010
05.05.2010
22 months
1,59,00,00,000.00
12.06.2012
05.05.2010
22 months
2,46,32,500.00
14.07.2011
05.05.2010
22 months
2,58,81,32,828.00
JITPL/2010-11/Orissa/102/LOI/002L
05.05.2010
22 months
05.05.2010
22 months
05.04.2011
30 days
15.06.2010
20 months
JITPL/2010-11/Orissa/126
JITPL/2010-11/Orissa/127
JITPL/2010-11/Orissa/128
JITPL/2010-11/Orissa/92/LOI
JITPL/2010-11/Orissa/102/LOI/Amd 02
JITPL/2010-11/Orissa/102/LOI/Amd 01
87
SPCL
JITPL/2010-11/Orissa/102/LOI
88
SPCL
JITPL/2011-12/Odisha/242
11.05.2010
89
Tecpro
Scope of Work
Zero Date/
Contractual
Contractual
Actual
Actual
Start Date Completion Date Contract Period Start Date Finish Date Contract Value
JITPL/2010-11/Orissa/131
05.04.2011
15.06.2010
Page5of5
Civil Works for Coal handling Plant for our 2 x 600 Mw Coal
based thermal power plant at village Derang in District Angul ,Odisha
2,55,42,00,000.00
21,74,020.00
61,81,95,000.00