12348 Federal Register / Vol. 71, No.

47 / Friday, March 10, 2006 / Notices

Notice is hereby given that the LLC (PJM) alleging that, in DEPARTMENT OF ENERGY
deadline for filing motions to intervene contravention of PJM’s Operating
or protest is April 3, 2006. Agreement and Commission orders and Federal Energy Regulatory
Absent a request to be heard in policy, PJM has failed to implement the Commission
opposition by the deadline above, marginal losses component of locational [Docket No. EL06–56–000]
Global Energy is authorized to issue marginal pricing, thereby foregoing
securities and assume obligations or significant overall market efficiencies in MMC Energy North America LLC,
liabilities as a guarantor, indorser, the PJM energy market as a whole, and Complainant v. California Independent
surety, or otherwise in respect of any causing unjust, unreasonable and System Operator Corporation,
security of another person; provided unduly discriminatory market prices Respondent; Notice of Complaint
that such issuance or assumption is for
which substantially harm the PHI March 3, 2006.
some lawful object within the corporate
Companies. Take notice that on March 3, 2006,
purposes of Global Energy, compatible
with the public interest, and is The PHI Companies certify that a MMC Energy North America LLC
reasonably necessary or appropriate for copy of the complaint has been served (MMC) filed a complaint under section
such purposes. on PJM. 206 of the Federal Power Act and Rule
The Commission reserves the right to 206 of the Commission Rules of Practice
Any person desiring to intervene or to and Procedure, alleging that the
require a further showing that neither protest this filing must file in
public nor private interests will be California Independent System Operator
accordance with Rules 211 and 214 of Corporation acted imprudently and in a
adversely affected by continued the Commission’s Rules of Practice and
approval of Global Energy’s issuances of preferential manner in its selection of
Procedure (18 CFR 385.211 and generation units to meet Reliability
securities or assumptions of liability.
385.214). Protests will be considered by Must Run requirements for 2006. MMC
Copies of the full text of the Director’s
the Commission in determining the asks that a refund effective date be
Order are available from the
Commission’s Public Reference Room, appropriate action to be taken, but will established within 60 days of the filing
888 First Street, NE., Washington, DC not serve to make protestants parties to herein, and that further proceedings on
20426. The Order may also be viewed the proceeding. Any person wishing to the complaint be held in abeyance,
on the Commission’s Web site at become a party must file a notice of pending resolution of arbitration.
http://www.ferc.gov, using the eLibrary intervention or motion to intervene, as MMC certifies that copies of the
link. Enter the docket number excluding appropriate. The Respondent’s answer complaint were served on the contacts
the last three digits in the docket and all interventions, or protests must for CAISo as listed on the Commission’s
number filed to access the document. be filed on or before the comment date. list of Corporate Officials.
The Respondent’s answer, motions to Any person desiring to intervene or to
Comments, protests, and interventions
intervene, and protests must be served protest this filing must file in
may be filed electronically via the
accordance with Rules 211 and 214 of
Internet in lieu of paper. See, 18 CFR on the Complainants.
the Commission’s Rules of Practice and
385.2001(a)(1)(iii) and the instructions The Commission encourages Procedure (18 CFR 385.211 and
on the Commission’s Web site under the electronic submission of protests and 385.214). Protests will be considered by
‘‘e-Filing’’ link. The Commission interventions in lieu of paper using the the Commission in determining the
strongly encourages electronic filings. ‘‘eFiling’’ link at http://www.ferc.gov. appropriate action to be taken, but will
Magalie R. Salas, Persons unable to file electronically not serve to make protestants parties to
Secretary. should submit an original and 14 copies the proceeding. Any person wishing to
[FR Doc. E6–3452 Filed 3–9–06; 8:45 am] of the protest or intervention to the become a party must file a notice of
BILLING CODE 6717–01–P Federal Energy Regulatory Commission, intervention or motion to intervene, as
888 First Street, NE., Washington, DC appropriate. The Respondent’s answer
20426. and all interventions, or protests must
DEPARTMENT OF ENERGY be filed on or before the comment date.
This filing is accessible on-line at
The Respondent’s answer, motions to
Federal Energy Regulatory http://www.ferc.gov, using the
intervene, and protests must be served
Commission ‘‘eLibrary’’ link and is available for on the Complainants.
review in the Commission’s Public The Commission encourages
[Docket No. EL06–55–000] Reference Room in Washington, DC. electronic submission of protests and
There is an ‘‘eSubscription’’ link on the interventions in lieu of paper using the
Atlantic City Electric Company,
Web site that enables subscribers to ‘‘eFiling’’ link at http://www.ferc.gov.
Delmarva Power & Light Company,
Potomac Electric Power Company, receive e-mail notification when a Persons unable to file electronically
Complainant v. PJM Interconnection, document is added to a subscribed should submit an original and 14 copies
LLC, Respondent; Notice of Complaint docket(s). For assistance with any FERC of the protest or intervention to the
Online service, please e-mail Federal Energy Regulatory Commission,
March 3, 2006. FERCOnlineSupport@ferc.gov, or call 888 First Street, NE., Washington, DC
Take notice that on March 2, 2006, (866) 208–3676 (toll free). For TTY, call 20426.
Atlantic City Electric Company, (202) 502–8659. This filing is accessible on-line at
Delmarva Power & Light Company, and http://www.ferc.gov, using the
Comment Date: 5 p.m. Eastern Time,
dsatterwhite on PROD1PC65 with PROPOSAL

Potomac Electric Power Company (the ‘‘eLibrary’’ link and is available for
March 22, 2006.
PHI Companies), pursuant to section review in the Commission’s Public
206 of the Federal Power Act, 16 U.S.C. Magalie R. Salas, Reference Room in Washington, DC.
824e and section 206 of the Secretary. There is an ‘‘eSubscription’’ link on the
Commission’s Rules of Practice and [FR Doc. E6–3447 Filed 3–9–06; 8:45 am] Web site that enables subscribers to
Procedures, 18 CFR 385.206, filed a receive e-mail notification when a
BILLING CODE 6717–01–P
complaint against PJM Interconnection, document is added to a subscribed

VerDate Aug<31>2005 20:31 Mar 09, 2006 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1