Environmental Mailing List Commission) will prepare an www.ferc.gov). This fact sheet addresses
If you do not want to send comments environmental assessment (EA) that will a number of typically asked questions,
at this time, but still want to remain on discuss the environmental impacts of including the use of eminent domain
our mailing list, please return the Southern Natural Gas Company’s and how to participate in the
attached Mailing List Retention Form (Southern) application for its 2006 Commission’s proceedings. It is
(Appendix 3). If you do not return the Abandonment and Replacement Project. available for viewing on the FERC
form, you will be taken off the mailing Southern proposes to abandon, replace Internet Web site (http://www.ferc.gov).
list. and modify facilities associated with its
Background
22-inch North Main Loop Line and
Additional Information abandon its Pell City Compressor Pipeline Abandonment, Replacement
Additional information about the Station Unit No. 3 as part of an and Modification
Project is available from the extensive pipeline integrity program. Southern’s 22-inch McConnells North
Commission’s Office of External Affairs, Pipeline changes would occur on Main Loop Line, which is part of its
at 1–866–208–FERC or on the FERC Southern’s existing system in North Main Line System in Tuscaloosa
Internet Web site (http://www.ferc.gov) Tuscaloosa County, Alabama. County, Alabama, was commissioned in
using the eLibrary link. Click on the Abandonment of a compressor station 1946 and is proposed for retirement as
eLibrary link, click on ‘‘General Search’’ would occur in St. Clair County, part of the application. Because of a
and enter the docket number excluding Alabama. reduction in contracted capacity in this
the last three digits in the Docket This notice announces the opening of area due to capacity turnback and
Number field. Be sure you have selected the scoping period that will be used to
capacity shift, this section of the line is
an appropriate date range. For gather environmental input from the
no longer needed. However, to continue
assistance, please contact FERC Online public and interested agencies on the
to provide reliable and safe gas supplies
Support at FercOnlineSupport@ferc.gov project. Scoping comments are
to the western Alabama region,
or toll free at 1–866–208–3676, or for requested by April 10, 2006.
With this notice, the staff of the FERC Southern proposes to replace a section
TTY, contact 1–202–502–8659. The of the abandoned 22-inch McConnells
is asking other Federal, State, local and
eLibrary link also provides access to the North Main loop Line by extending the
tribal agencies with jurisdiction and/or
texts of formal documents issued by the existing 24-inch 2nd North Main Loop
special expertise with respect to
Commission, such as orders, notices, Line.
environmental issues to cooperate with
and rulemakings. us in the preparation of the EA. These
In addition, the Commission now Compressor Station Abandonment
agencies may choose to participate once The Pell City Compressor Station was
offers a free service called eSubscription
they have evaluated Southern’s proposal built in 1989 to deliver firm contract
which allows you to keep track of all
relative to their responsibilities.
formal issuances and submittals in volumes on the Gadsden Lateral Line.
Agencies that would like to request
specific dockets. This can reduce the Since the Gadsden Lateral Line has not
cooperating status should follow the
amount of time you spend researching been operating at full contract capacity,
instructions for filing comments
proceedings by automatically providing the Pell City Unit No. 3 has not been
described in Appendix 1.
you with notification of these filings, This notice is being sent to potentially required to deliver peak day demand on
document summaries and direct links to affected landowners; Federal, state, and the Gadsden Lateral Line. Recent
the documents. Go to http:// local government agencies; elected capacity turnback on the Gadsden
www.ferc.gov/esubscribenow.htm. officials; environmental and public Lateral Line makes it possible to
Finally, public meetings or site visits interest groups; Native American Tribes, abandon the Pell City Unit No. 3 since
will be posted on the Commission’s other interested parties; local libraries it is no longer required to meet firm
calendar located at http://www.ferc.gov/ and newspapers. State and local peak day requirements.
EventCalendar/EventsList.aspx along government representatives are asked to Summary of the Proposed Project
with other related information. notify their constituents of this planned
project and encourage them to comment Tuscaloosa, Alabama
Magalie R. Salas,
Secretary. on their areas of concern. • Abandon in place 4.55 miles of the
[FR Doc. E6–3661 Filed 3–14–06; 8:45 am] If you are a landowner receiving this McConnells 22-inch North Main Loop
notice, you may be contacted by a Segment from Milepost 260.74 to
BILLING CODE 6717–01–P
pipeline company representative about Milepost 265.29. This portion of the
the acquisition of an easement to McConnells North Main Loop Segment
DEPARTMENT OF ENERGY construct, operate, and maintain the would be pigged, filled with nitrogen,
proposed facilities. The pipeline and capped before being abandoned in
Federal Energy Regulatory company would seek to negotiate a place.
Commission mutually acceptable agreement. • Abandon and remove 6.36 miles
However, if the project is approved by from Milepost 265.29 to Milepost
[Docket No. CP06–58–000]
the Commission, that approval conveys 271.65. Southern proposes to remove all
Southern Natural Gas Company; with it the right of eminent domain. pipeline and associated piping
Notice of Intent To Prepare an Therefore, if easement negotiations fail assemblies along this 6.36 mile route,
Environmental Assessment for the to produce an agreement, the pipeline with the exception of the North River
Proposed Southern Natural Gas company could initiate condemnation crossing at Milepost 269.45 and any
Company’s 2006 Abandonment and proceedings in accordance with state uncased road crossings. The uncased
law. road crossing would be cut and capped
sroberts on PROD1PC70 with NOTICES

Replacement Project Request for


Comments on Environmental Issues A fact sheet prepared by the FERC on each side of the road crossing and
entitled ‘‘An Interstate Natural Gas filled with grout for abandonment in
March 8, 2006. Facility On My Land? What Do I Need place. The cased road crossings that are
The staff of the Federal Energy To Know?’’ is available for viewing on left void would also be filled with grout
Regulatory Commission (FERC or the FERC Web site (http:// and abandoned in place.

VerDate Aug<31>2005 17:27 Mar 14, 2006 Jkt 208001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices 13381

• Install a new anchor block and 10.32 acres) would be required at road reasonable alternatives to the proposed
blowoff/crossover assembly at Milepost and waterbody crossings. project or portions of the project.
271.65, and, if necessary, continue Following construction, permanent We have already identified several
maintenance by installing sleeves on land acquisition of 0.16 acres would be issues that we think deserve attention
coupled joints from Milepost 271.65 to maintained as part of the right-of-way based on a preliminary review of the
Milepost 271.73. for the maintenance of the 24-inch 2nd proposed facilities and the
• Extend its 24-inch 2nd North Main North Main Loop Line Replacement environmental information provided by
Loop Line by constructing, installing section. The remaining acreage required Southern. This preliminary list of issues
and operating 6.1 miles of 24-inch during construction would be restored may be changed based on your
pipeline from Milepost 142.6 to and allowed to revert to its former land comments and our analysis.
Milepost 148.7 (Tuscaloosa County, uses. Project-related impact on:
Alabama). This segment of the 24-inch • 7 residences/structures within 50
2nd North Main Loop Line is parallel to The EA Process feet of the construction workspace.
Milepost 265.3 to Milepost 271.6 of the • 1 active private well within 32 feet
We 2 are preparing this EA to comply
22-inch North Main Loop Line, which is of the construction workspace.
with the National Environmental Policy
proposed to be abandoned above. • 2.6 acres of upland forest.
Act (NEPA) which requires the • Four federally-listed threatened and
Installation of the proposed 2nd North
Commission to take into account the endangered species potentially in the
Main Loop Segment would be within
environmental impacts that could result project area.
the same location and same ditch line
from an action whenever it considers • 9 emergent wetland crossings 3.5
as Southern’s 22-inch North Main Loop
the issuance of a Certificate of Public acres.
Line after the abandonment and removal
Convenience and Necessity. NEPA also • 23 water body crossings.
of the 6.36 miles described above.
• Connect the proposed 2nd North requires us to discover and address • Road crossings.
Main Loop Segment to the existing 24- concerns the public may have about
proposals. This process is referred to as Public Participation
inch 2nd North Main Loop Line by
removing the existing weld cap and ‘‘scoping.’’ The main goal of the scoping You can make a difference by
making a tie-in at Milepost 142.56. It process is to focus the analysis in the providing us with your specific
would also be necessary to install a new EA on the important environmental comments or concerns about the project.
blowoff/crossover assembly at Milepost issues. By this Notice of Intent, the By becoming a commentor, your
148.93, which would be connected to Commission staff requests public concerns will be addressed in the EA
the crossover assembly installed at comments on the scope of the issues to and considered by the Commission. You
Milepost 271.65 on the 22-inch North address in the EA. All comments should focus on the potential
Main Loop Line as detailed above. received are considered during the environmental effects of the proposal,
preparation of the EA. By this notice, we alternatives to the proposal (including
St. Clair County, Alabama are also asking Federal, state, and local alternative locations and routes), and
• Abandon in place its Pell City agencies with jurisdiction and/or measures to avoid or lessen
Compressor Station Unit No. 3 (St. Clair special expertise with respect to environmental impact. The more
County, Alabama) at Milepost 352.8 on environmental issues to formally specific your comments, the more useful
Southern’s North Main and North Main cooperate with us in the preparation of they will be. Please carefully follow
Loop Lines. All existing gas piping the EA. Agencies that would like to these instructions to ensure that your
systems would be disconnected request cooperating status should follow comments are received in time and
including fuel gas and blind flanges the instructions for filing comments properly recorded:
would be installed at these points. below. • Send an original and two copies of
Additionally, electric power would be Our independent analysis of the your letter to: Magalie R. Salas,
disconnected from the unit such that all issues will be in the EA. Depending on Secretary, Federal Energy Regulatory
control systems would be inoperable. the comments received during the Commission, 888 First St., NE., Room
The unit would then be purged with scoping process, the EA may be 1A, Washington, DC 20426.
nitrogen and prepared for long term published and mailed to Federal, state, • Label one copy of the comments for
storage in place. and local agencies, public interest the attention of Gas Branch 3.
The location of the project facilities is groups, interested individuals, affected • Reference Docket Number CP06–
shown in Appendix 2.1 landowners, newspapers, libraries, and 58–000.
the Commissions official service list for • Mail your comments so that they
Land Requirements
this proceeding. A comment period will will be received in Washington, DC on
Abandonment, replacement and be allotted for review if the EA is or before April 10, 2006.
modification of the proposed facilities published. We will consider all Please note that the Commission
would require the temporary comments on the EA before we make encourages electronic filing of
disturbance of about 105.24 acres of our recommendations to the comments. See 18 Code of Federal
land, the majority of which is within Commission. Regulations (CFR) 385.2001(a)(1)(iii)
Southern’s existing 100-foot right-of- and the instructions on the
way. Additional extra work spaces of Currently Identified Environmental Commission’s Web site at http://
Issues www.ferc.gov under the ‘‘e-Filing’’ link
1 The appendices referenced in this notice are not
In the EA, we will discuss impacts and the link to the User’s Guide. Prepare
being printed in the Federal Register. Copies of all
appendices, other than appendix 1 (maps), are that could occur as a result of the your submission in the same manner as
you would if filing on paper and save
sroberts on PROD1PC70 with NOTICES

available on the Commission’s Web site at the construction and operation of the
‘‘eLibrary’’ link or from the Commissions Public project. We will also evaluate it to a file on your hard drive. Before
Reference Room, 888 First Street, NE., Washington, you can file comments you will need to
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the create an account by clicking on ‘‘Login
this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects to File’’ and then ‘‘New User Account.’’
all those receiving this notice in the mail. (OEP). You will be asked to select the type of

VerDate Aug<31>2005 17:27 Mar 14, 2006 Jkt 208001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
13382 Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices

filing you are making. This filing is included in Appendix 3. If you do not Transmission Company’s prior-period
considered a ‘‘Comment on Filing.’’ return this form, you will be removed adjustments to its gas compressor fuel
The determination of whether to from our mailing list. and lost and unaccounted for balances,
distribute the EA for public comment as discussed in the February 15, 2006
will be based on the response to this Additional Information
order.1
notice. If you are interested in receiving Additional information about the FERC conferences are accessible
it, please return the Information project is available from the under section 508 of the Rehabilitation
Requested (Appendix 3). An effort is Commission’s Office of External Affairs, Act of 1973. For accessibility
being made to send this notice to all at 1–866–208–FERC or on the FERC accommodations please send an e-mail
individuals affected by the proposed Internet Web site (http://www.ferc.gov) to accessibility@ferc.gov or call toll free
project. This includes all landowners using the eLibrary link. Click on the (866) 208–3372 (voice) or 202–502–8659
who are potential right-of-way grantors, eLibrary link, click on ‘‘General Search’’ (TTY), or send a fax to 202–208–2106
whose property may be used and enter the docket number excluding with the required accommodations.
temporarily for project purposes, or who the last three digits in the Docket
own homes within distances defined in Number field. Be sure you have selected All interested persons are permitted
the Commission’s regulations of certain an appropriate date range. For to attend. For further information please
aboveground facilities. assistance, please contact FERC Online contact Abraham Silverman at (202)
Support at 502–6444 or e-mail
Becoming an Intervenor abraham.silverman@ferc.gov.
FERCOnlineSupport@ferc.gov or toll
In addition to involvement in the EA free at 1–866–208–3676, or for TYY, Magalie R. Salas,
scoping process, you may want to contact (202) 502–8659. The eLibrary Secretary.
become an official party to the link also provides access to the texts of [FR Doc. E6–3664 Filed 3–14–06; 8:45 am]
proceeding known as an ‘‘intervenor’’. formal documents issued by the BILLING CODE 6717–01–P
To become an intervenor you must file Commission, such as orders, notices,
a motion to intervene according to Rule and rulemakings.
214 of the Commission’s Rules of In addition, the Commission now DEPARTMENT OF ENERGY
Practice and Procedure (18 CFR offers a free service called eSubscription
385.214). Intervenors have the right to which allows you to keep track of all Federal Energy Regulatory
seek rehearing of the Commission’s formal issuances and submittals in Commission
decision. Motions to Intervene should specific dockets. This can reduce the
be electtronically submitted using the amount of time you spend researching Meetings; Sunshine Act
Commission’s eFiling system at http:// proceedings by automatically providing
www.ferc.gov. Persons without Internet March 9, 2006.
you with notification of these filings,
access should send an original and 14 document summaries and direct links to The following notice of meeting is
copies of their motion to the Secretary the documents. Go to http:// published pursuant to section 3(a) of the
of the Commission at the address www.ferc.gov/esubscribenow.htm. government in the Sunshine Act (Pub.
indicated previously. Persons filing L. No. 94–409), 5 U.S.C 552b:
Motions to Intervene on or before the Magalie R. Salas,
AGENCY HOLDING MEETING:Federal
comment deadline indicated above must Secretary.
Energy Regulatory Commission.
send a copy of the motion to the [FR Doc. E6–3669 Filed 3–14–06; 8:45 am]
Applicant. All filings, including late BILLING CODE 6717–01–P
DATE AND TIME: March 16, 2006, 10 a.m.
interventions, submitted after the PLACE:Room 2C, 888 First Street NE.,
comment deadline must be served on Washington DC 20426.
the Applicant and all other intervenors DEPARTMENT OF ENERGY
identified on the Commission’s service STATUS: Open.
list for this proceeding. Persons on the Federal Energy Regulatory MATTERS TO BE CONSIDERED: Agenda.
service list with email addresses may be Commission *Note—Items listed on the agenda
served electronically; others must be [Docket No. RP06–151–000] may be deleted without further notice.
served a hard copy of the filing.
Affected landowners and parties with CONTACT PERSON FOR MORE INFORMATION:
Kern River Gas Transmission
environmental concerns may be granted Magalie R. Salas, Secretary, Telephone
Company; Notice of Technical
intervenor status upon showing good (202) 502–8400. For a recorded listing
Conference
cause by stating that they have a clear item stricken from or added to the
and direct interest in this proceeding March 8, 2006. meeting, call (202) 502–8627.
which would not be adequately Take notice that the Commission will This is a list of matters to be
represented by any other parties. You do convene a technical conference on considered by the Commission. It does
not need intervenor status to have your Tuesday, March 21, 2006, at 9:30 a.m. not include a listing of all papers
environmental comments considered. (EST), in a room to be designated at the relevant to the items on the agenda;
offices of the Federal Energy Regulatory however, all public documents may be
Environmental Mailing List Commission, 888 First Street, NE., examined in the Public Reference Room.
If you wish to remain on our Washington DC 20426.
environmental mailing list, please The technical conference will deal 1 Kern River Gas Transmission Co., 114 FERC

return the Information Request Form with issues related to Kern River Gas ¶61,162 (2006).