Federal Register / Vol. 71, No.

57 / Friday, March 24, 2006 / Notices 14873

[FR Doc. 06–2842 Filed 3–23–06; 8:45 am] except pile driving and associated above p. Agency Comments—Federal, state,
BILLING CODE 6450–01–C water dock construction activities, is and local agencies are invited to file
prohibited from February 15 through comments on the described
June 15. Pile driving and associated in- applications. Copies of the applications
DEPARTMENT OF ENERGY water dock construction activities are may be obtained by agencies directly
prohibited from April 15 to June 15. from the Applicant. If an agency does
Federal Energy Regulatory Installation or maintenance of not file comments within the time
Commission navigational markers is exempt from specified for filing comments, it will be
these time-of-year restrictions.’’ To ‘‘All presumed to have no comments. One
Notice of Application for Amendment in-water construction, except pile copy of an agency’s comments must also
of Shoreline Management Plan and driving and associated above water dock be sent to the Applicant’s
Soliciting Comments, Motions To construction activities, is prohibited representatives.
Intervene, and Protests from February 15 through June 15. Pile
driving shall include the removal of Magalie R. Salas,
March 16, 2006.
existing piles necessary for construction Secretary.
Take notice that the following
of the associated facility and be limited [FR Doc. E6–4253 Filed 3–23–06; 8:45 am]
application has been filed with the
Commission and is available for public to only piling installed utilizing impact BILLING CODE 6717–01–P

inspection: equipment.’’
l. Location of the Application: This
a. Application Type: Amendment of DEPARTMENT OF ENERGY
filing is available for review at the
Shoreline Management Plan.
Commission in the Public Reference
b. Project No: 2210–131. Federal Energy Regulatory
Room 888 First Street, NE., Room 2A,
c. Dates Filed: March 16, 2006. Commission
Washington, DC 20426 or may be
d. Applicant: Appalachian Power
viewed on the Commission’s Web site at
Company (APC).
http://www.ferc.gov using the ‘‘e- [Docket No. CP06–85–000]
e. Name of Project: Smith Mountain
library’’ link. Enter the docket number
Pumped Storage Project. CenterPoint Energy Gas Transmission
excluding the last three digits in the
f. Location: The project is located on Company; Notice of Application
docket number field to access the
the Roanoke River, in Bedford, document. For assistance, call toll-free
Pittsylvania,Franklin, and Roanoke March 17, 2006.
1–866–208–3676 or e-mail
Counties, Virginia. FERCOnlineSupport@ferc.gov. For TTY, On March 10, 2006, in Docket No.
g. Filed Pursuant to: Federal Power call (202) 502–8659. A copy is also CP06–85–000, CenterPoint Energy Gas
Act, 16 U.S.C. 791(a)–825(r) and 799 available for inspection and Transmission Company (CEGT),
and 801. reproduction at the address in item h. pursuant to section 7(c) of the Natural
h. Applicant Contact: Frank M. above. Gas Act, as amended, and section 157
Simms, Hydro Generation Department, m. Individuals desiring to be included subpart A of the Federal Energy
American Electric Power, P.O. Box on the Commission’s mailing list should Regulatory Commission’s (Commission)
2021, Roanoke, VA 24022–2121, (540) so indicate by writing to the Secretary regulations requests authorization to
985–2875. of the Commission. construct, own, and operate the
i. FERC Contact: Any questions on n. Comments, Protests, or Motions to Carthage to Perryville Project designed
this notice should be addressed to Mrs. Intervene—Anyone may submit to receive and transport 1.237 billion
Heather Campbell at (202) 502–6182, or comments, a protest, or a motion to cubic feet per day of natural gas. The
e-mail address: intervene in accordance with the project would consist of: 171.9 miles of
heather.campbell@ferc.gov or Mr. Bob requirements of Rules of Practice and 42-inch diameter pipeline; compression
Fletcher at (202) 502–8901, or e-mail Procedure, 18 CFR 385.210, .211, .214. totaling 41,240 hp at two compressor
address: robert.fletcher@ferc.gov. In determining the appropriate action to stations; meter and regulator stations at
j. Deadline for filing comments and or take, the Commission will consider all receipt points with 3 Texas intrastate
motions: April 14, 2006. protests or other comments filed, but pipelines; interconnections with 4
All documents (original and eight only those who file a motion to interstate pipelines; and, appurtenant
copies) should be filed with: Ms. intervene in accordance with the facilities. The facilities will operate
Magalie R. Salas, Secretary, Federal Commission’s Rules may become a separately from CEGT’s existing
Energy Regulatory Commission, 888 party to the proceeding. Any comments, pipeline system, and CEGT is seeking
First Street, NE., Washington DC 20426. protests, or motions to intervene must implementation of a fixed charge for
Please include the project number (P– be received on or before the specified Fuel Use and Lost and Unaccounted For
2210–131) on any comments or motions comment date for the particular Gas (LUFG) applicable to transportation
filed. Comments, protests, and application. on the new facilities, all as more fully
interventions may be filed electronically o. Filing and Service of Responsive described in the application. CEGT
via the internet in lieu of paper. See, 18 Documents—Any filings must bear in seeks waiver of the Commission’s
CFR 385.2001(a)(1)(iii) and the all capital letters the title regulations such that the 30-day
instructions on the Commission’s Web ‘‘COMMENTS’’, comment period for the Final
site at http://www.ferc.gov under the ‘‘RECOMMENDATIONS FOR TERMS Environmental Impact Statement may
e-Filing’’ link. The Commission strongly AND CONDITIONS’’, ‘‘PROTEST’’, or coincide with the 30-day requested
encourages e-filings. ‘‘MOTION TO INTERVENE’’, as certificate order’s rehearing period and
k. Description of Request: The applicable, and the Project Number of that notational voting be used to extent
wwhite on PROD1PC61 with NOTICES

licensee requests to amend the July 5, the particular application to which the this approach would expedite the
2005 Order Modifying and Approving filing refers. A copy of any motion to order’s issuance. CEGT requests that the
Shoreline Management Plan (112 FERC intervene must also be served upon each Commission issue requested
¶ 61,026) to revise ordering paragraph representative of the Applicant authorizations by October 30, 2006 so
(D) from: ‘‘All in-water construction, specified in the particular application. that facilities may be operable in time

VerDate Aug<31>2005 18:26 Mar 23, 2006 Jkt 208001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1