You are on page 1of 1

Federal Register / Vol. 71, No.

74 / Tuesday, April 18, 2006 / Notices 19883

Southern proposes to abandon in copies of the environmental documents, appropriate. The Respondent’s answer
place a small segment of its 20-inch and will be notified of meetings and all interventions, or protests must
North Main Loop Line commencing at associated with the Commission’s be filed on or before the comment date.
milepost 435.8 to milepost 454.8 located environmental review process. The Respondent’s answer, motions to
in Douglas and Fulton Counties, Environmental commentors will not be intervene, and protests must be served
Georgia. Southern states that required to serve copies of filed on the Complainants.
abandonment of the 20 inch North Main documents on all other parties. The Commission encourages
Loop segment described in its However, the non-party commentors electronic submission of protests and
application will not affect its ability to will not receive copies of all documents interventions in lieu of paper using the
meet the firm requirements of its firm filed by other parties or issued by the ‘‘eFiling’’ link at http://www.ferc.gov.
transportation customers. Commission (except for the mailing of Persons unable to file electronically
Any questions regarding this environmental documents issued by the should submit an original and 14 copies
application should be directed to Commission) and will not have the right of the protest or intervention to the
Patricia S. Francis, Senior Counsel, to seek court review of the Federal Energy Regulatory Commission,
Southern Natural Gas Company, P.O. Commission’s final order. 888 First Street, NE., Washington, DC
Box 2563, Birmingham, Alabama The Commission strongly encourages 20426.
35202–2563 at (205) 325–7696. electronic filings of comments protests This filing is accessible online at
There are two ways to become and interventions via the Internet in lieu http://www.ferc.gov, using the
involved in the Commission’s review of of paper. See 18 CFR 385.2001(a)(1)(iii) ‘‘eLibrary’’ link and is available for
this project. First, any person wishing to and the instructions on the review in the Commission’s Public
obtain legal status by becoming a party Commission’s Web site (http:// Reference Room in Washington, DC.
to the proceedings for this project www.ferc.gov) under the ‘‘e-Filing’’ link. There is an ‘‘eSubscription’’ link on the
should, on or before the comment date Comment Date: May 2, 2006. Web site that enables subscribers to
stated below, file with the Federal receive e-mail notification when a
Energy Regulatory Commission, 888 Magalie R. Salas,
document is added to a subscribed
First Street, NE., Washington, DC 20426, Secretary. docket(s). For assistance with any FERC
a motion to intervene in accordance [FR Doc. E6–5734 Filed 4–17–06; 8:45 am] Online service, please e-mail
with the requirements of the BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov, or call
Commission’s Rules of Practice and (866) 208–3676 (toll free). For TTY, call
Procedure (18 CFR 385.214 or 385.211) (202) 502–8659.
and the Regulations under the NGA (18 DEPARTMENT OF ENERGY Comment Date: 5 p.m. Eastern Time
CFR 157.10). A person obtaining party on May 1, 2006.
status will be placed on the service list Federal Energy Regulatory
maintained by the Secretary of the Commission Magalie R. Salas,
Commission and will receive copies of [Docket No. OR06–7–000] Secretary.
all documents filed by the applicant and [FR Doc. E6–5728 Filed 4–17–06; 8:45 am]
by all other parties. A party must submit Eighty-Eight Oil LLC, Complainant, v. BILLING CODE 6717–01–P
14 copies of filings made with the Tesoro High Plains Pipeline Company,
Commission and must mail a copy to Respondent; Notice of Complaint
the applicant and to every other party in DEPARTMENT OF ENERGY
the proceeding. Only parties to the April 11, 2006.
proceeding can ask for court review of Take notice that on April 10, 2006, Federal Energy Regulatory
Commission orders in the proceeding. pursuant to Rule 206 of the Commission
However, a person does not have to Commission’s Rules of Practice and
[Project No. 2503–085—South Carolina]
intervene in order to have comments Procedures, 18 CFR 385.206 (2005), and
considered. The second way to the Commission’s Rules of Practice Duke Power, a Division of Duke Energy
participate is by filing with the Procedure Applicable to Oil Pipelines, Corporation; Notice of Availability of
Secretary of the Commission, as soon as 18 CFR 343.1(a), Eighty-Eight Oil LLC Environmental Assessment
possible, an original and two copies of (Eighty-Eight) filed a complaint in
comments in support of or in opposition reference to Tesoro High Plains Pipeline April 11, 2006.
to this project. The Commission will Company’s (THPPC) denial of service to In accordance with the National
consider these comments in Eighty-Eight for the interstate Environmental Policy Act of 1969 and
determining the appropriate action to be transportation of crude oil under the Federal Energy Regulatory
taken, but the filing of a comment alone THPPC’s FERC Tariff No. 3. Commission’s (Commission)
will not serve to make the filer a party Eighty-Eight certifies that copies of regulations, 18 CFR part 380 (Order No.
to the proceeding. The Commission’s the complaint were served on THPPC’s 486, 52 FR 47897), the Office of Energy
rules require that persons filing counsel. Projects has reviewed an application for
comments in opposition to the project Any person desiring to intervene or to non-project use of project lands and
provide copies of their protests only to protest this filing must file in waters at the Keowee-Toxaway
the party or parties directly involved in accordance with Rules 211 and 214 of Hydroelectric Project (FERC No. 2503),
the protest. the Commission’s Rules of Practice and and has prepared an environmental
Persons who wish to comment only Procedure (18 CFR 385.211 and assessment (EA) for the proposed non-
on the environmental review of this 385.214). Protests will be considered by project use. Duke Power is the licensee
hsrobinson on PROD1PC68 with NOTICES

project should submit an original and the Commission in determining the for the project. The project is located on
two copies of their comments to the appropriate action to be taken, but will the Little and Keowee Rivers in Oconee
Secretary of the Commission. not serve to make protestants parties to County, South Carolina.
Environmental commentors will be the proceeding. Any person wishing to In the application, Duke Power
placed on the Commission’s become a party must file a notice of requests Commission authorization to
environmental mailing list, will receive intervention or motion to intervene, as lease to the Waterford Communities

VerDate Aug<31>2005 15:03 Apr 17, 2006 Jkt 208001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1

You might also like