You are on page 1of 13

INTEGRAFORHOTELSCASESTUDY

AQUALUXHOTELSPA,SUITE&TERME

climaveneta.com

BARDOLINO,GARDALAKE

AQUALUXHOTELSPA,SUITE&TERME

TheBuilding

Luxury 4 stars superior hotel


conceived according to the
ClimateHotel quality seal for
sustainable hotels and tourism
infrastructure, Completed in
autumn 2011

climaveneta.com

Performancedata
TotalCooling Capacity
TotalHeating Capacity
Installed units

Owner:ViolaFamily
Owner:
Viola Family
Architect:RamaArchitettura
HVACDesigner:Ingenieurbro
MicheleCarlini
Built
il volume
l
Built surface
Rooms
SpaWellness
Conference Centre
Taverna
Indoorswimmingpools
Outdoorswimming pools
Restaurants
Bars
Halls

COPYRIGHT 2012 CLIMAVENTA SPA

1470kW
1027kW
2xERACS2WQ
1902,1xTECS2WLC
0511
2xbackupBoilers
2 xAirHandlingUnits
45.000m3
19.000m2
135
1100m2
1300 m2
1300m
350m2
4 900m2
4 900m2
850m2
350m2
400m2

THEClimateHotel
Certification Programme

Anewqualitysealforsustainablehotelsandtourisminfrastructure.

Launched in Bozen in 2009 to answer to the


increasing request for sustainability, health and
well being not only at home but also during
leisure
time
The
h ClimateHotel
l
l quality
l
seall certifies
f
to
investors, tenants, guests and local community
that the building is:

climaveneta.com

Energyconscious
Comfortable
Environmentally friendly
Healthpromoting
Economic
Free of Construction Damage
More valuable and profitable

COPYRIGHT 2012 CLIMAVENTA SPA

FOCUSON

M&E andHVAC
M&E andHVACdesignaimed atcombining EFFICIENCY,SUSTAINABILITY,COMFORT,through a3stepapproach

Energy Reduction
EnergyReduction
Reduced Heating Need

Reduced Cooling Need

Reduced Electrical Consumption

Through extensive insulation of the


building ventilation with advanced
building,ventilation
energy recovery systems,low
consumption systems for swimming
pools nightheating.

Thermal lag (materials with high


thermal mass)andlowthermal
mass) and low thermal
transmittance.Passivesolar design.

Variable flowandinverterdriven
devices for units andpumps.

Extensive Use of Renewables


Groundwateras main source
for the2Integrahighefficiency
watercooled multiuse units for
simultaneous heating and
and
cooling.

140m2 thermal solar to produce40%of totalsanitary hotwatersupply.


Overdimensioned exchangers to optimse efficiency with low
temperatureheating andhightemperaturecooling.

HighEfficiency
g
y HVAC
Heating,cooling andsanitary
hotwaterproduction

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

based onClimaveneta watersourcemultiuse units for simultaneous


heating andcooling with one singleunit.
Thesystemis completeby two backupboilers for heating andone back
upClimaveneta
p
TECSchiller for cooling.
g

FOCUSON

Highefficiency hvac
Distribution andProductionSystems optimised for HighEfficiency

DISTRIBUTION
SYSTEMS
Lowtemperatureheating
&hightemperature
cooling for highest
efficiency comfortbased
comfort based
onadvanced innovative
solutions dedicated to
each area.

climaveneta.com

PRODUCTION
SYSTEMS
Whole
Wh
l structure served
d by
b a
central hydronic system
based on2Integraheat
pumps.
Boilers andTECSunits
and TECS units are
are
conceived only for backup.

COPYRIGHT 2012 CLIMAVENTA SPA

BUILDING
MANAGEMENT
Advanced BMSfor
integration andoptimised
g
all the
managementof
systems installed:
HVAC,lighting,electrical,
fire ineach area(rooms,
restaurant,bar,swimming
pool).

FOCUSON

Highefficiency hvac
Distribution systems
All distributing systems aredesigned to use
lowtemperaturewater(about 45C)and
optimally insulated

Lowtemperatureheating
Low
temperature heating
&hightemperature
cooling for highest
efficiency comfortbased
onfollowing solutions

All fluid distribution systems areinverter


driven, thus modulating flowaccording
driven,thus
flow according to
real requirements andreducing
significantly energy consumption.

Rooms
Restaurant
Bar
Conference
Centre
Kitchen
Swimming pools
Sauna

climaveneta.com

Radiantceilings +1CassetteFancoil
Radiantfloor+Airhandlingsystemwith90%energyrecovery
Radiantfloor+Fancoils +Airhandlingsystem with90%energyrecovery
Radiantfloorwithairhandlingunitsforprimaryair
Advancedairtreatmentwith75%heatrecovery
Radiantfloorandwalls+dedicatedairhandlingunitswithadvanced
heatrecovery
Radiant floor

COPYRIGHT 2012 CLIMAVENTA SPA

FOCUSON

Highefficiency hvac
Production Systems
Productionsystems details:

The whole hotel is served


by a hydronic system based
on 2 Integra water source
heat pumps.

Their efficiency allows to reduce


ground water consumption, with
reduced environmental impact and
further energy saving due to
reduced pumping flows.

The advanced concept of Integra


units allows
them to produce
heating
and
cooling,
also
simultaneously, with one single unit.

The system is based on variable


flow pumps,
pumps adapting to the real
thermal load of the building,
further reducing this major energy
consumption factor.

In case of simultaneous request for


heating and cooling, the lower
request is performed for free.

Boilers
B
il
and
d TECS units
it
conceived only for backup.

are

This results in increased energy


EER) with
efficiency (COP and EER),
relevant synergies in case of
simultaneous operation.

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

Totalcooling capacity:
Totalheating capacity:
Installed units:

TER= 6.78

1470kW
1027kW
2xERACS2WQ1902,
1xTECS2WLC0511
2xbackup Boilers

TER= 6.85

TER= 7.10

FOCUSON

Highefficiency hvac
Buildingmanagement
The hotel is equipped with
an
advanced
BMS,
managing
g g all the systems
y
installed: HVAC, lighting,
electrical, fire.
Each area (rooms, restaurant, bar,
swimming pool) is provided with
dedicated circuits for temperature
management, according to the
ambient conditions and outdoor
temperatures.
temperatures

Regulation of systems in each


rooms privileges radian ceiling
more efficient and silent, and uses
f coilil only
fan
l att peakk loads.
l d
Additional energy savings through
several innovative solutions in
many aspects of the systems design
and installation (energy recovery for
swimming pools water etc.)

Independent control for each


area
Room Climate control optimised for
comfort and efficiency:
several
temperature management profiles
(guest in, guest out in the hotel,
guest out not in the hotel,
hotel cleaning,
cleaning
free room)

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

FOCUSONHIGHEFFICIENCYHVAC

Energy
gy Scheme 1

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

FOCUSONHIGHEFFICIENCYHVAC

Energy
gy Scheme 2

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

FOCUSONHIGHEFFICIENCYHVAC

Sustainability
y Analysis
y
Comparativeanalysis of three different solutions

CO2Emissions
TheINTEGRAbaseHVACsystemis
featured by 359ton/aCO2
emissions,thus ensuring:

40%
% CO2EMISSIONS
compared with traditional solution
based onboilers andchillers

23%CO2EMISSIONS
compared with traditional solution
based onboilers
on boilers andheat
and heat pumps.
pumps

Boiler+Chiller

Boiler+Integraunit

Boiler+Heat pump

GroundWater
C
Consumption
ti

Comparativeanalysis of two different solutions

25%

TheINTEGRAbaseHVACsystemis
GROUNDWATER
featured by 187.500m
187 500 m3 yearly water
water
CONSUMPTION
consumption,thus ensuring:
compared with atraditional solution based
onboilers andtraditional heat pumps.
Boiler+Heat pump

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

Boiler+Integraunit

FOCUSONHIGHEFFICIENCYHVAC

Energy
gy Reduction and Payback
y
Analysis
y
EnergyConsumptionofastandardHotel
The AQUALUX systems ensures an
yearly:

13%
17%

47%

56%ENERGY

23%

CONSUMPTION

Swimming Pools

Heating

DHW

Cooling

EnergyConsumptionofClimaHotel
6%

6%

11%
21%

compared with atraditional system


based onboilerandchillers

Onthebasis of aquantitativeanalysis
andinformationabout yearly savings ,
the results show:
theresults

The AQUALUX Hotel is featured by


210.000 yearly average energy costs.

LESSTHAN YEARSPAYBACK
of theadditional initial
investment

This results in:

57%

270.000

SAVINGS PER YEAR

compared with a traditional system based


on boiler and chillers
g
Savings

DHW

Swimming Pools

Heating

climaveneta.com

Coolingg

COPYRIGHT 2012 CLIMAVENTA SPA

Considering only real savings,


before incentives for green
solutions

For moreinformationontheProject:

For further Informationabout theproduct:


www.youtube.com/user/climavenetaweb
www.climaveneta.com/GLOBAL/Products/43/integra/Link
www.climaveneta.com/GLOBAL/download/brochure/index.asp

For further Informationabout theAqualux Hotel:


www.aqualuxhotel.com/ing/
Architect:RamaArchitettura
HVACDesigner:ing.MicheleCarlini Bolzano

Copyright and Confidentiality Notice


COPYRIGHT 2012 CLIMAVENTA SPA. All rights reserved. No part of this document may be reproduced in any form, including video recording, photocopying, downloading, broadcasting or
transmission electronically, without prior written consent of CLIMAVENETA SPA.
Information contained in this material is confidential and proprietary to CLIMAVENETA SPA and its affiliates and may not be modified
modified, copied
copied, published
published, disclosed
disclosed, distributed
distributed, displayed or exhibited
exhibited, in
either electronic or printed formats without written authorization of CLIMAVENETA SPA.

climaveneta.com

COPYRIGHT 2012 CLIMAVENTA SPA

You might also like