Federal Register / Vol. 71, No.

84 / Tuesday, May 2, 2006 / Notices 25835

DEPARTMENT OF ENERGY be effective August 7, 2005, to Persons unable to file electronically


correspond with the effective date that should submit an original and 14 copies
Federal Energy Regulatory the Commission required for the Sales of the protest or intervention to the
Commission Tariff in its March 17, 2006 order. Federal Energy Regulatory Commission,
Comment Date: 5 p.m. Eastern Time 888 First Street, NE., Washington, DC
[Docket Nos. EC06–111–000, et al.]
on May 8, 2006. 20426.
ESI Energy, LLC, et al.; Electric Rate 5. Cabrillo Power I LLC; Cabrillo Power This filing is accessible on-line at
and Corporate Filings II LLC; El Segundo Power, LLC; Long http://www.ferc.gov, using the
Beach Generation, LLC ‘‘eLibrary’’ link and is available for
April 26, 2005. review in the Commission’s Public
The following filings have been made [Docket Nos. ER99–1115–009; ER99–1116– Reference Room in Washington, DC.
with the Commission. The filings are 009; ER06–820–001; ER98–1127–009; ER98– There is an ‘‘eSubscription’’ link on the
listed in ascending order within each 1796–008] Web site that enables subscribers to
docket classification. Take notice that on April 17, 2006 receive e-mail notification when a
Cabrillo Power I LLC, Cabrillo Power II document is added to a subscribed
1. ESI Energy, LLC; Bison Wind GP, LLC, El Segundo, LLC and Long Beach
LLC; Heartland LP, LLC; Bison Wind docket(s). For assistance with any FERC
Generation, LLC filed amendments to Online service, please e-mail
Holdings, LLC; Bison Wind, LLC; FPL their market-based rate tariffs to
Energy Burleigh County Wind, LLC; FERCOnlineSupport@ferc.gov, or call
conform with the other market-based (866) 208–3676 (toll free). For TTY, call
FPL Wind Cowboy Wind, LLC rate tariffs held by subsidiaries of NRG (202) 502–8659.
[Docket No. EC06–111–000] Energy, Inc that have been approved by
the Commission in recent proceedings. Magalie R. Salas,
Take notice that on April 14, 2006 ESI
Energy, LLC; Bison Wind GP, LLC; Comment Date: 5 p.m. eastern time on Secretary.
Heartland LP, LLC; Bison Wind May 8, 2006. [FR Doc. E6–6582 Filed 5–1–06; 8:45 am]
Holdings, LLC; Bison Wind, LLC; FPL 6. Governors of the States of Arizona, BILLING CODE 6717–01–P
Energy Burleigh County Wind, LLC; and California; Colorado, Montana, Nevada,
FPL Wind Cowboy Wind, LLC filed an New Mexico; Oregon, Utah, Washington
application for approval of a corporate DEPARTMENT OF ENERGY
and Wyoming
organization and request for expedited
[Docket No. RR06–2–000] Federal Energy Regulatory
approval pursuant to section 203 of the
On April 20, 2006, the Governors of Commission
Federal Power Act.
Comment Date: 5 p.m. eastern time on the States of Arizona, California,
Colorado, Montana, Nevada, New Notice of Application Accepted for
May 5, 2006. Filing and Soliciting Motions To
Mexico, Oregon, Utah, Washington and
2. DeSoto County Generating Company, Wyoming filed a petition, pursuant to Intervene, Protests, and Comments
LLC; Progress Genco Ventures, LLC; section 215 of the Federal Power Act, to April 26, 2006.
Southern Power Company create a Regulatory Advisory Body for Take notice that the following
[Docket No. EC06–112–000] the Western Interconnection. The hydroelectric application has been filed
Take notice that on April 14, 2006 petitioners propose to organize the with the Commission and is available
DeSoto County Generating Company, Western Interconnection Regional for public inspection:
LLC, Progress Genco Ventures, LLC, and Advisory Body pursuant to a Policy a. Type of Application: Preliminary
Southern Power Company filed an Resolution of the Western Governors’ Permit.
application for approval of a disposition Association. b. Project No.: 12652–000.
Comment Date: 5 p.m. eastern time on c. Date filed: February 28, 2006.
of jurisdictional facilities pursuant to
May 26, 2006. d. Applicant: Gerald M. Lutticken.
section 203 of the Federal Power Act.
e. Name of Project: Helltown Ravine
Comment Date: 5 p.m. eastern time on Standard Paragraph
Hydroelectric Project.
May 5, 2006. Any person desiring to intervene or to f. Location: On Helltown Ravine, a
3. Entergy Services, Inc. protest this filing must file in tributary to Butte Creek, Butte County,
accordance with Rules 211 and 214 of California.
[Docket No. EL01–88–004] the Commission’s Rules of Practice and g. Filed Pursuant to: Federal Power
Take notice that on April 10, 2006 Procedure (18 CFR 385.211, 385.214). Act, 16 U.S.C. 791(a)–825(r).
Entergy Services, Inc. as agent and on Protests will be considered by the h. Applicant Contact: Mr. Gerald M.
behalf of the Entergy Operating Commission in determining the Lutticken, P.E., 730 Bluegrass Drive,
Companies filed amendments to its appropriate action to be taken, but will Petaluma, California, (707) 206–2099.
Entergy System Agreement in not serve to make protestants parties to The proposed Helltown Ravine
compliance with the Commission’s June the proceeding. Any person wishing to Hydroelectric Project would occupy
1, 2005 and December 19, 2005 orders. become a party must file a notice of lands within the Bureau of Land
Comment Date: 5 p.m. eastern time on intervention or motion to intervene, as Management and private lands.
May 31, 2006. appropriate. Such notices, motions, or i. FERC Contact: Patricia W. Gillis at
4. MidAmerican Energy Company protests must be filed on or before the (202) 502–8735.
comment date. On or before the j. Deadline for filing comments,
[Docket No. ER96–719–012] comment date, it is not necessary to protests, and motions to intervene: 60
Take notice that on April 3, 2006 serve motions to intervene or protests days from the issuance date of this
rmajette on PROD1PC67 with NOTICES

MidAmerican Energy Company filed on persons other than the Applicant. notice.
proposed changes to its FERC Electric The Commission encourages The Commission’s Rules of Practice
Tariff, Original Volume No. 11 (Sales electronic submission of protests and and Procedure require all intervenors
Tariff) for sales of capacity and energy interventions in lieu of paper using the filing documents with the Commission
within the MidAmerican control area, to ‘‘eFiling’’ link at http://www.ferc.gov. to serve a copy of that document on

VerDate Aug<31>2005 15:18 May 01, 2006 Jkt 208001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\02MYN1.SGM 02MYN1
25836 Federal Register / Vol. 71, No. 84 / Tuesday, May 2, 2006 / Notices

each person in the official service list specified comment date for the applicable, and the Project Number of
for the project. Further, if an intervenor particular application, either a the particular application to which the
files comments or documents with the competing development application or a filing refers. Any of the above-named
Commission relating to the merits of an notice of intent to file such an documents must be filed by providing
issue that may affect the responsibilities application. Submission of a timely the original and the number of copies
of a particular resource agency, they notice of intent to file a development provided by the Commission’s
must also serve a copy of the document application allows an interested person regulations to: Magalie Salas, Secretary,
on that resource agency. to file the competing application no Federal Energy Regulatory Commission,
k. Description of Project: The later than 120 days after the specified 888 First Street, NE., Washington, DC
proposed project would use flows comment date for the particular 20426. A copy of any motion to
discharged from Pacific Gas & Electric’s application. A competing license intervene must also be served upon each
(PG&E) Upper Centerville Canal, application must conform with 18 CFR representative of the Applicant
licensed as Project No. 803 and consist 4.30(b) and 4.36. specified in the particular application.
of: (1) An intake located at the end of p. Notice of Intent: A notice of intent t. Agency Comments: Federal, state,
PG&E’s Upper Centerville Canal, (2) a must specify the exact name, business and local agencies are invited to file
proposed 3,800 foot penstock, (3) a address, and telephone number of the comments on the described application.
proposed powerhouse having a total prospective applicant, and must include A copy of the application may be
installed capacity of 515-kilowatts, (4) a an unequivocal statement of intent to obtained by agencies directly from the
proposed 13.8-kilovolt 1.5 mile submit, if such an application may be Applicant. If an agency does not file
transmission line, and (5) appurtenant filed, either a preliminary permit comments within the time specified for
facilities. The proposed project would application or a development filing comments, it will be presumed to
have an average annual generation of application (specify which type of have no comments. One copy of an
1,430,000 kilowatt-hours, which would application). A notice of intent must be agency’s comments must also be sent to
be sold to a local utility. served on the applicant(s) named in this the Applicant’s representatives.
l. Locations of Applications: A copy of public notice.
the application is available for q. Proposed Scope of Studies under Magalie R. Salas,
inspection and reproduction at the Permit: A preliminary permit, if issued, Secretary.
Commission in the Public Reference does not authorize construction. The [FR Doc. E6–6574 Filed 5–1–06; 8:45 am]
Room, located at 888 First Street, NE., term of the proposed preliminary permit BILLING CODE 6717–01–P
Room 2A, Washington DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis, DEPARTMENT OF ENERGY
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Federal Energy Regulatory
number excluding the last three digits in impacts. Based on the results of these Commission
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation Notice of Application Accepted for
1–866–208–3676 or e-mail of a development application to Filing and Soliciting Motions To
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Intervene, Protests and Comments
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Take notice that the following
available for inspection and Intervene: Anyone may submit hydroelectric application has been filed
reproduction at the address in item h. comments, a protest, or a motion to with the Commission and is available
above. intervene in accordance with the for public inspection:
m. Individuals desiring to be included requirements of Rules of Practice and a. Type of Application: Preliminary
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Permit.
so indicate by writing to the Secretary In determining the appropriate action to b. Project No.: 12659–000.
of the Commission. take, the Commission will consider all c. Date filed: March 6, 2006.
n. Competing Preliminary Permit: protests or other comments filed, but d. Applicant: Richard V. Williamson.
Anyone desiring to file a competing only those who file a motion to e. Name of Project: Stony Creek Water
application for preliminary permit for a intervene in accordance with the Power Project.
proposed project must submit the Commission’s Rules may become a f. Location: On Stony Creek, near
competing application itself, or a notice party to the proceeding. Any comments, Stonyford, Colusa County, California.
of intent to file such an application, to protests, or motions to intervene must The proposed project will be located
the Commission on or before the be received on or before the specified within the Mendocino National Forest.
specified comment date for the comment date for the particular g. Filed Pursuant to: Federal Power
particular application (see 18 CFR 4.36). application. Act, 16 U.S.C. 791(a)–825(r).
Submission of a timely notice of intent Comments, protests and interventions h. Applicant Contact: Mr. Richard V.
allows an interested person to file the may be filed electronically via the Williamson, 1842–M Camino Verde,
competing preliminary permit Internet in lieu of paper; See 18 CFR Walnut Creek, CA 94597, (925) 457–
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions 2971.
the specified comment date for the on the Commission’s Web site under ‘‘e- i. FERC Contact: Etta Foster, (202)
particular application. A competing filing’’ link. The Commission strongly 502–8769.
preliminary permit application must encourages electronic filing. j. Deadline for filing comments,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive protests, and motions to intervene: 60
rmajette on PROD1PC67 with NOTICES

o. Competing Development Documents: Any filings must bear in all days from the issuance date of this
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, notice.
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS All documents (original and eight
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, or copies) should be filed with Magalie R.
the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as Salas, Secretary, Federal Energy

VerDate Aug<31>2005 15:18 May 01, 2006 Jkt 208001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\02MYN1.SGM 02MYN1