Professional Documents
Culture Documents
-When receiving spare parts for sewage, put them in the store on upper deck
across refrigeration compressor room, same locker electrician is using for storage
-When installing new toilet bowl membrane grease it up with Vaseline to prevent
drying up rubber which would happen if toilet is not in use for long time
-Add coolant if necessary to lifeboat engines, rescue boat is 2AE responsibility
-After installing new spare parts for MGPS, be sure to take out inlet SW strainer
and clean it if necessary, location above fwd bilge well stbd
-Once per month do start/stop sequence for st/by purifier as well as for DO
purifier in order to prevent seizing up, also sludge discharge line of purifiers
which are not in use keep closed to prevent fumes to come up and cause
corrosion and seize
-LO chart for the machinery use is laminated and posted in ECR behind computer
on the bulkhead for quick reference
-Weekly check LO store in steer. gear room to ensure that there is no opened
pails in the new/sealed pales section
-Instruct oilers to regularly clean the bilge pump strainer and bilge wells
strainers as well as to thoroughly prime the pump before starting, one pump
stator was destroyed in dry dock, leaving the pump with poor suction inside
rubber coating of stator was burned and deformed
-Once per month instruct oiler to take out DO strainer on Incinerator and to clean
-Check regularly and clean if necessary ignitor, flame eye, main burner and
thermo couple, take care of thermo couple when cleaning it is ceramic coated
(easily damageable)
-Check regularly and clean if necessary 15ppm cell and filter
-When incinerating report to the bridge starting and stoping time of incineration
as well as amount of garbage incinerated, example garbage started incineration
15/05/2015 @ 09:00, garbage incineration stopped 15/05/2015 @ 16:00, total
amount incinerated 1.5m3 of which domestic 1.2m3 and plastic 0.3m3
-Every day after finish filling log book and water record book, oiler is to take log
to chief engineer cabin drawer, water record book is filled up by 2AE only
-OWS printing paper is in white carton box on the shelf near smartsafe box in
ECR
-MOL seals are located near log printer ECR stbd
-Upper deck store is of 1AE (expendables, silicon, Vaseline, isolation tape, some
tools etc)
-C deck store is of C/O (boiler suits, shoes, goggles)
-D deck store is of 1/0 (office supplies, pencils, copy paper etc)
-D deck store another one is of C/E (log books, ORB.s etc)
Wish you pleasant stay on board, calm sea and trouble free contract!
3AE