Professional Documents
Culture Documents
For too long D&A has been viewed as an isolated activity, entirely
separate from production. But with a Post-Wood Review drive
to maximize resources and minimize cost, operators are starting
to align their strategy to transition from late life operations to
decommissioning.
To find out how Shell, BP, CNR International, Hess Corporation, Maersk,
Kvaerner, Acteon and many more are tackling this shift, simply visit
www.decomworld.com/asset-retirement/
decomworld.com/asset-retirement
Business Intelligence for the Offshore Oil & Gas Industry
WATER DEPTHS
SOUTHERN
NORTH SEA
Average
forecast for Forecast
Well P&A expenditure Expenditure
(including Irish Sea) from
2013 to 2022: Big Dotty Dawn Field Hewett
£3.5 million Field Field
per platform well 24% = £2.5bn*
£6.6 million *Incl. Irish Sea
per subsea well
C C
C C C
SOURCE:
Oil Field Type Gas Field Type C Condensate C Oil Condensate C Gas Condensate www.decc.gov.uk
www.oilandgasuk.co.uk
Business Intelligence for the Offshore Oil & Gas Industry
FIELD
DEPTH
- 20-30m
C
Inde Field
- 30-40m
C C C C
Miller Field
- 110-150m
Leadon Brent
Don Field Field
Business Intelligence for the Offshore Oil & Gas Industry
n
hl
ru
sys
c tu
lla ti o n s wi t
te m s
re s
ta
ns
8 21
I
th la rg e ste el o t h e r st e el ti o n s ys te m s
wi j ac th
wi ja
d uc
s
ck
s
ke
ion
p ro
ion
e ts
ts *
I n s t a lla t
I n s t a lla t
S u bs e a
*
31 214 278
s n d 2 5 ,0 0 0 k m
ell r ou s
ile
s
W
a
p
s-
ng
Pi p e l i n e
C u t ti
7%
ONLY
478
platforms may
OF INSTALLANTIONS
DECOMMISSIONED need to be
TO DATE removed before
2045
Norway holds
35% of the
15 to 25
installations will be decommissioned
estimated worldwide
decommissioning
expenditure, with only
annually in Europe during the next 15 years. 7% of the global
For the UKCS alone, this amounts to offshore infrastructure
the dismantlement and removal of the
approximate equivalent of 254 Eiffel Towers
- 31 of them weighing in fact a lot more
(i.e. more than 10,000 tonnes), eight Over
installations with large concrete substructures
(in the region of 20,000 tonnes), 280 subsea
800
wells are scheduled for
and 21 floating production systems and plugging and abandonment
last but not least, 3000 pipelines between 2013 and 2022.
and 5000 wells Nearly 480 of these wells
are in the central and
(SOURCE: Oilprice.com)
northern North Sea
of which nearly
60% are platform wells
The cumulative
expenditure for per well, each taking
FORM
S UB
next 30 years
EA S
PIPE
LIN ES
Business Intelligence for the Offshore Oil & Gas Industry
• Post-Wood Review drive to maximise North Sea resources means there is a need to approach D&A in
the wider context as part of end of field life management
• Critical need to reduce escalating D&A costs as the North Sea industry approaches the £35bn
decommissioning and abandonment challenge
• The only way to achieve economies of scale, and with up to 478 platforms reported to need removing
before 2045, it's never been a more important time
• Allocating resources upfront to eradicate bottlenecks which are currently putting extraordinary
pressure on the decommissioning supply chain
• Encouraging integration & collaboration at every level with thorough up-front planning to identify
synergies and cost efficiencies
To ensure you reap the long term benefits associated with a robust asset retirement strategy, DecomWorld have developed
the Offshore Asset Retirement Conference, North Sea (17-18 Nov, Aberdeen) which is driving this critical shift in the
decommissioning & abandonment market, whilst aligning to the latest Wood Review developments.
With +1000 attendees gathering over the last ten years and drawing from our renowned Gulf of Mexico track-record, we’ve
bought together the globally recognized experts and technical leaders from Shell, BP, Hess Corporation, CNR International,
Maersk and many more to share in-depth case studies which will equip you with the tools and strategies required to
effectively engage your asset retirement campaign.
Attend this ground breaking meeting point with a track record of success and you will:
• Get exclusive insight into how the Wood Review will impact decommissioning regulation
and your end of life strategy
• Hear from leading global decommissioning managers to understand how you can streamline your
approach for cost effective asset retirement
• Understand how you can work with your design, operations and COP teams to seamlessly transition
to decommissioning
• Apply innovative rig-less well P&A technology to your abandonment projects in order to reduce cost
and time
• Address the major HSE issues in your decommissioning program to minimize risk to people and the
environment
Just some of the top companies that you will hear from at this year’s Offshore Asset Retirement Conference, North Sea:
Save an extra $100 on your ticket to OARC 2014 using the exclusive whitepaper discount ARDA100 when you register
online here before Friday 22nd August: https://secure.decomworld.com/asset-retirement/register.php