43144 Federal Register / Vol. 71, No.

146 / Monday, July 31, 2006 / Notices

DEPARTMENT OF ENERGY diameter Mainline D within the same CFR 157.10). A person obtaining party
trench. In addition, 0.25 mile of existing status will be placed on the service list
Federal Energy Regulatory Mainline B will be abandoned in place, maintained by the Secretary of the
Commission principally under existing road Commission and will receive copies of
[Docket No. EL06–81–000] crossings, and replaced in an adjacent all documents filed by the applicant and
trench with the new 42-inch diameter by all other parties. A party must submit
Southern Company Services, Inc.; Mainline D. Transco requests 14 copies of filings made with the
Notice of Institution of Proceeding and authorization under section 7(b) of the Commission and must mail a copy to
Refund Effective NGA to abandon in place the 0.25 mile the applicant and to every other party in
of existing Mainline B in Fairfax the proceeding. Only parties to the
July 21, 2006. County, Virginia. Transco states that the proceeding can ask for court review of
On July 20, 2006, the Commission proposed project will enable it to Commission orders in the proceeding.
issued an order that instituted a provide 165,000 dekatherms per day of Persons who wish to comment only
proceeding in Docket No. EL06–81–000, incremental firm transportation capacity on the environmental review of this
pursuant to section 206 of the Federal to serve increased demand in the Mid- project, should submit an original and
Power Act (FPA), 16 U.S.C. 824e (2005), Atlantic region of the United States. two copies of their comments to the
to provide Southern Company Services, Transco estimates that the proposed Secretary of the Commission.
Inc. a forum in which to address issues project will cost approximately $73.7 Environmental commentors will be
raised in Southern’s request for million, all as more fully set forth in the placed on the Commission’s
rehearing filed August 30, 2004, in application which is on file with the environmental mailing list, will receive
Docket No. ER04–563–002. Southern Commission and open to public copies of the environmental documents,
Company Services, Inc., 116 FERC inspection. and will be notified of meetings
61,050 (2006). This filing is available for review at associated with the Commission’s
The refund effective date in Docket the Commission in the Public Reference environmental review process.
No. EL06–81–000, established pursuant Room or may be viewed on the Environmental commentors will not be
to section 206(b) of the FPA, will be the Commission’s Web site at http:// required to serve copies of filed
date of publication of this notice in the www.ferc.gov using the ‘‘eLibrary’’ link. documents on all other parties. The
Federal Register. Enter the docket number excluding the Commission’s rules require that persons
last three digits in the docket number filing comments in opposition to the
Magalie R. Salas, field to access the document. For project provide copies of their protests
Secretary. assistance, contact FERC Online only to the applicant. However, the non-
[FR Doc. E6–12243 Filed 7–28–06; 8:45 am] Support at party commentors will not receive
BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov or call copies of all documents filed by other
toll-free, (866) 208–3676 or for TTY, parties or issued by the Commission
(202) 502–8659. (except for the mailing of environmental
DEPARTMENT OF ENERGY Any initial questions regarding this documents issued by the Commission)
application should be directed to Marg and will not have the right to seek court
Federal Energy Regulatory Camardello, Manager, Tariffs and
Commission review of the Commission’s final order.
Certificates, Transcontinental Gas Pipe The Commission strongly encourages
[Docket No. CP06–421–000] Line Corporation, P.O. Box 1396, electronic filings of comments, protests,
Houston, Texas 77251 at (713) 215– and interventions via the internet in lieu
Transcontinental Gas Pipe Line 3380. In addition, parties with questions
of paper. See 18 CFR 385.2001(a)(1)(iii)
Corporation; Notice of Application about the Project may call a Transco
and the instructions on the
toll-free telephone number at (866) 455–
July 24, 2006. Commission’s Web site (http://
9103, or access a public Web site at
Take notice that on July 17, 2006, as www.ferc.gov) under the ‘‘e-Filing’’ link.
(http://www.williams.com/potomac) or
supplemented on July 20, 2006, Comment Date: 5 p.m. Eastern Time
an e-mail support address at
Transcontinental Gas Pipe Line on August 14, 2006.
(potomac@williams.com).
Corporation (Transco) filed an In Docket No. PF06–2–000, Transco Magalie R. Salas,
application pursuant to sections 7(c) participated in a pre-filing National Secretary.
and 7(b) of the Natural Gas Act (NGA), Environmental Policy Act review of the [FR Doc. E6–12246 Filed 7–28–06; 8:45 am]
for authorization to construct and proposed project to identify and resolve BILLING CODE 6717–01–P
operate the Potomac Expansion Project, potential landowner and environmental
an incremental expansion of Transco’s problems before the applications were
existing pipeline system in its Mid- filed. DEPARTMENT OF ENERGY
Atlantic market area. Transco states that There are two ways to become
the proposed project will involve the involved in the Commission’s review of Federal Energy Regulatory
construction and operation of this project. First, any person wishing to Commission
approximately 16.39 miles of new obtain legal status by becoming a party
[Docket No. CP06–102–001]
pipeline looping facilities in to the proceedings for this project
Pittsylvania and Campbell Counties, should, on or before the comment date Trunkline LNG Company, LLC; Notice
Virginia, and the replacement of 3.43 stated below, file with the Federal of Filing
miles of existing pipeline in Fairfax Energy Regulatory Commission, 888
County, Virginia. Transco states that the First Street, NE., Washington, DC 20426, July 24, 2006.
sroberts on PROD1PC70 with NOTICES

3.43-mile replacement of the existing a motion to intervene in accordance Take notice that on July 18, 2006,
pipeline in Fairfax County, Virginia, with the requirements of the Trunkline LNG Company, LLC
will consist of the removal and Commission’s Rules of Practice and (Trunkline LNG), P.O. Box 4967,
replacement of 3.18 miles of 30-inch Procedure (18 CFR 385.214 or 385.211) Houston, Texas 77210–4967, filed an
diameter Mainline B with 42-inch and the Regulations under the NGA (18 application, pursuant to section 3(a) of

VerDate Aug<31>2005 17:34 Jul 28, 2006 Jkt 208001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\31JYN1.SGM 31JYN1
Federal Register / Vol. 71, No. 146 / Monday, July 31, 2006 / Notices 43145

the Natural Gas Act (NGA) and part 157 and to every other party in the Filed Date: July 14, 2006.
of the Commission’s Rules and proceeding. Only parties to the Accession Number: 20060720–0015.
Regulations, to amend its pending proceeding can ask for court review of Comment Date: 5 p.m. Eastern Time
application filed on March 31, 2006. Commission orders in the proceeding. on Friday, August 4, 2006.
Trunkline LNG seeks to revise: Motions to intervene, protests and Docket Numbers: EC06–142–000.
(1) The depreciation rate reflected on comments may be filed electronically Applicants: Atlantic Power Holdings
Exhibit O and the corresponding annual via the Internet in lieu of paper, see, 18 LLC; Trans-Elect NTD Path 15, LLC; AP
depreciation expense, (2) the estimated CFR 385.2001(a)(1)(iii) and the Sub.
incremental revenues, expenses and instructions on the Commission’s Web Description: Trans-Elect NTD Path 15,
income reflected on Exhibit N, and (3) site under the ‘‘e-Filing’’ link. The LLC et al submits an application
the cost of service, rate derivation and Commission strongly encourages requesting that the Commission grant
Pro Forma Sheet No. 5 contained in electronic filings. authorization for the indirect
Exhibit P. The application is on file Comment Date: 5 p.m. Eastern Time disposition of jurisdictional facilities.
with the Commission and open for on August 14, 2006. Filed Date: July 18, 2006.
public inspection. This filing is Accession Number: 20060720–0063.
available for review at the Commission Magalie R. Salas,
Comment Date: 5 p.m. Eastern Time
in the Public Reference Room or may be Secretary. on Tuesday, August 8, 2006.
viewed on the Commission’s Web site at [FR Doc. E6–12247 Filed 7–28–06; 8:45 am] Take notice that the Commission
http://www.ferc.gov using the BILLING CODE 6717–01–P received the following electric rate
‘‘eLibrary’’ link. Enter the docket filings:
number excluding the last three digits in Docket Numbers: ER99–2416–006.
the docket number field to access the DEPARTMENT OF ENERGY
Applicants: EL Paso Electric
document. For assistance, please contact Company.
FERC Online Support at Federal Energy Regulatory
Commission Description: El Paso Electric Co.
FERCOnlineSupport@ferc.gov or toll submits a notice of change in status to
free at (866) 208–3676, or for TTY, inform FERC of four changes with
Combined Notice of Filings #1
contact (202) 502–8659. regards to the characteristics relied
Trunkline LNG states that the July 21, 2006. upon in granting their market-based rate
negotiated rate with its customer, BG Take notice that the Commission authority.
LNG Services, LLC (BG LNG), is based received the following electric corporate Filed Date: July 17, 2006.
on a 40 year depreciable life for the filings: Accession Number: 20060719–0150.
Infrastructure Enhancement Project. The Comment Date: 5 p.m. Eastern Time
Docket Numbers: EC06–139–000.
facilities will be new construction and on Monday, August 7, 2006.
Applicants: Duquesne Light Holdings,
of a durable long-lived nature.
Inc.; DUET Investment Holdings Docket Numbers: ER05–1102–001.
Therefore, Trunkline LNG proposes to
Limited; Industry Funds Management Applicants: Goldendale Energy
depreciate the life of the assets over a
Limited. Center, LLC.
term of 40 years instead of 20 years as
Description: Duquesne Light Description: Goldendale Energy
indicated in the March 31, 2006
Holdings, Inc., et al., submits an Center, LLC submits a revised Reactive
application. The revision results in the
application for approval under section Supply and Voltage Control from
recourse rate decreasing from $1.2616
203 of the Federal Power Act and Generation Sources Service Rate
per Dt to $1.1378 per Dt and the
composite depreciation rate of 5.0% request for expedited consideration. Schedule pursuant to the Commission
Filed Date: July 17, 2006. May 19, 2006 Order.
will be 2.5%.
Any questions regarding the Accession Number: 20060718–0158. Filed Date: July 17, 2006.
application are to be directed to William Comment Date: 5 p.m. Eastern Time Accession Number: 20060718–0157.
W. Grygar, Vice President of Rates and on Monday, August 7, 2006. Comment Date: 5 p.m. Eastern Time
Regulatory Affairs, 5444 Westheimer Docket Numbers: EC06–140–000; on Monday, August 7, 2006.
Road, Houston, Texas 77056–5306; EL06–86–000. Docket Numbers: ER06–506–004.
phone number (713) 989–7000. Applicants: Edison Electric Institute; Applicants: New York Independent
Any person wishing to obtain legal Jurisdictional Signatories to the Spare System Operator, Inc.; New York
status by becoming a party to the Transformer Sharing Agreement. Transmission Owners.
proceedings for this project should, on Description: Jurisdictional Signatories Description: New York Independent
or before the below listed comment submits a joint application for System Operator, Inc. and the New York
date, file with the Federal Energy authorization for transfers of Transmission Owners submits Second
Regulatory Commission, 888 First jurisdictional facilities and a petition for Revised Sheet 944C et al. to FERC
Street, NE., Washington, DC 20426, a declaratory order, pursuant to section Electric Tariff, Original Volume 1 in
motion to intervene in accordance with 203 of FPA and 207 of the Commission’s compliance with FERC’s June 15, 2006
the requirements of the Commission’s rules of practice and procedure. Order.
Rules of Practice and Procedure (18 CFR Filed Date: July 18, 2006. Filed Date: July 17, 2006.
385.214 or 385.211) and the Regulations Accession Number: 20060720–0114. Accession Number: 20060718–0159.
under the NGA (18 CFR 157.10). A Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time
person obtaining party status will be on Tuesday, August 8, 2006. on Monday, August 7, 2006.
placed on the service list maintained by Docket Numbers: EC06–141–000. Docket Numbers: ER06–744–002.
the Secretary of the Commission and Applicants: Cadillac Renewable Applicants: Sabine Cogen, LP.
sroberts on PROD1PC70 with NOTICES

will receive copies of all documents Energy LLC; Deville Energy, LLC. Description: Sabine Cogen, LP
filed by the applicant and by all other Description: Application for submits a notice of non-material change
parties. A party must submit 14 copies authorization for disposition of in status in compliance with the
of filings made with the Commission jurisdictional facilities under section reporting requirements adopted by
and must mail a copy to the applicant 203 of the Federal Power Act. FERC in Order 652.

VerDate Aug<31>2005 17:34 Jul 28, 2006 Jkt 208001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\31JYN1.SGM 31JYN1