Professional Documents
Culture Documents
PLASTIC PRODUCTS
Si.
NO.
Si.
NO.
MACHINE NAME
SINGNATURE
OPERATOR
SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX
DMCS / 001
Issue No :- 01
ME
MONTH
Feb-15
Department :- Maint
HOW?
10
11
12
13
14
15
16
17
18
19
HOW?
10
11
12
13
14
15
16
17
18
19
- M/C CONDITION OK
- MACHINE PROBLEM
DMCS / 001
Issue No :- 01
Rev No:- 00/05.10.2013
Department :- Maintenance
20
21
22
23
24
25
26
27
28
29
30
31
20
21
22
23
24
25
26
27
28
29
30
31
- NO PRODUCTION
PREPARED BY
REVIEWED BY
APPROVED BY
STANSON
PLASTIC PRODUCTS
Si.
NO.
Si.
NO.
MACHINE NAME
SINGNATURE
OPERATOR
SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX
MA
1
COOLING TOWER
MONTH
HOW?
10
11
12
13
14
15
16
17
HOW?
10
11
12
13
14
15
16
17
- M/C CONDITION OK
- MACHINE PROBLEM
- NO PR
MACHINE PICTURE
5
DMCS / 001
Issue No :- 01
Rev No:- 00/05.10.2013
Feb-15
Department :- Maintanance
18
19
20
21
22
23
24
25
26
27
28
29
30
31
18
19
20
21
22
23
24
25
26
27
28
29
30
31
- NO PRODUCTION
- NOT CHECKED
PREPARED BY
7
REVIEWED BY
APPROVED BY
Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER
APPROVED BY
STANSON
PLASTIC PRODUCTS
Si.
NO.
MACHINE NAME
Check control Panel indication lamps and fan working in good contidion
10
11
Si.
NO.
12
Clean heat exchanger inlet water strainer and check the strainer condition
13
14
SINGNATURE
OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)
ENTER THE STATUS IN THE APPROPRIATE BOX
MACHINE PICTU
1
(vg;go)
MONTH
10
11
12
13
14
15
16
17
HOW?
(vg;go)
10
11
12
13
14
15
16
17
- M/C CONDITION OK
- MACHINE PROBLEM
- NO PR
(cw;gj
10
11
DMCS / 002
Issue No :- 01
Rev No:- 00/05.10.2013
Apr-14
18
19
Department :- production
20
21
22
23
24
25
26
27
28
29
30
31
18
19
20
21
22
23
24
25
26
27
28
29
30
31
- NO PRODUCTION
- NOT CHECKED
(cw;gj;jp bra;atpy;iy)
(brf; bra;atpy;iy)
PREPARED BY
12
13
REVIEWED BY
APPROVED BY
STANSON
PLASTIC PRODUCTS
Si.
NO.
MACHINE NAME
Check control Panel indication lamps and fan working in good contidion
10
11
Si.
NO.
12
Clean heat exchanger inlet water strainer and check the strainer condition
13
14
SINGNATURE
OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)
ENTER THE STATUS IN THE APPROPRIATE BOX
MACHINE PICTU
1
(vg;go)
MONTH
10
11
12
13
14
15
16
17
HOW?
(vg;go)
10
11
12
13
14
15
16
17
- M/C CONDITION OK
- MACHINE PROBLEM
- NO PR
(cw;gj
10
11
DMCS / 003
Issue No :- 01
Rev No:- 00/05.10.2013
Apr-14
18
19
Department :- production
20
21
22
23
24
25
26
27
28
29
30
31
18
19
20
21
22
23
24
25
26
27
28
29
30
31
- NO PRODUCTION
- NOT CHECKED
(cw;gj;jp bra;atpy;iy)
(brf; bra;atpy;iy)
PREPARED BY
12
13
REVIEWED BY
APPROVED BY
STANSON
PLASTIC PRODUCTS
Si.
NO.
MACHINE NAME
Check control Panel indication lamps and fan working in good contidion
10
11
Si.
NO.
SINGNATURE
12
Clean heat exchanger inlet water strainer and check the strainer condition
OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)
MACHINE PICTU
1
(vg;go)
MONTH
10
11
12
13
14
15
16
17
HOW?
(vg;go)
10
11
12
13
14
15
16
17
- M/C CONDITION OK
- MACHINE PROBLEM
- NO PR
(cw;gj
10
DMCS / 004
Issue No :- 01
Rev No:- 00/05.10.2013
Apr-14
18
19
Department :- Mixing
20
21
22
23
24
25
26
27
28
29
30
31
18
19
20
21
22
23
24
25
26
27
28
29
30
31
- NO PRODUCTION
- NOT CHECKED
(cw;gj;jp bra;atpy;iy)
(brf; bra;atpy;iy)
PREPARED BY
11
APPROVED BY
12
REVIEWED BY
Si.
NO.
ON
PLAST
IC
MACHINE NAME
PROD
HOW?
UCTS
Daily Check points
Si.
NO.
SINGNATURE
HOW?
MONTH
10 11 12
10 11 12
OPERATOR
SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX
- M/C CONDITION OK
- MACHINE PROB
DMCS / 001
EET
Issue No :- 01
Rev No:- 00/05.10.2013
MONTH
Feb-15
Department :- Maintanance
13 14 15 16 17 18 19 20 21 22 18 19 20 24 25 26 27 28 29 21 22 23 24
13 14 15 16 17 18 19 20 21 22 18 19 20 24 25 26 27 28 29 21 22 23 24
E PROBLEM
- NO PRODUCTION
PREP
REVI
APPR
25 26 27 28 29 30 31
25 26 27 28 29 30 31
- NO PRODUCTION
PREPARED BY
REVIEWED BY
APPROVED BY