You are on page 1of 48

STANSON

PLASTIC PRODUCTS
Si.
NO.

Daily Check points

clean machine throughly

Ensure motor and blade rotate normally

Check any abnormal noise in motor and blade assembly

Check control Panel switches for burning and rust free

Si.
NO.

Weekly Check points

Check all mountings bolts are in correct position

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

MACHINE NAME

SINGNATURE

Check all fasteners tightness in blade assembly

OPERATOR

SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

DMCS / 001

DAILY MACHINE CHECK SHEET

Issue No :- 01

Rev No:- 00/05.10.2

ME

PLASTIC GRINDING MACHINE

MONTH

Feb-15

Department :- Maint

HOW?

10

11

12

13

14

15

16

17

18

19

HOW?

10

11

12

13

14

15

16

17

18

19

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

- M/C CONDITION OK

- MACHINE PROBLEM

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

DMCS / 001
Issue No :- 01
Rev No:- 00/05.10.2013
Department :- Maintenance

20

21

22

23

24

25

26

27

28

29

30

31

20

21

22

23

24

25

26

27

28

29

30

31

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

- NO PRODUCTION
PREPARED BY

REVIEWED BY

APPROVED BY

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxPlastic Grinder

STANSON
PLASTIC PRODUCTS
Si.
NO.

Daily Check points

Check the pump outlet pressure

Ensure fan and springlar rotate normally

check pumps valve in opening condition

Check any abnormal noise in pump and fan

Check control Panel switches for burning and rust free

Si.
NO.

Weekly Check points

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

MACHINE NAME

Check all mountings bolts are in correct position

Clean and check the pump inlet strainer

SINGNATURE

OPERATOR

SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX

MA
1

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

DAILY MACHINE CHECK SHEET

COOLING TOWER

MONTH

HOW?

10

11

12

13

14

15

16

17

HOW?

10

11

12

13

14

15

16

17

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

- M/C CONDITION OK

- MACHINE PROBLEM

- NO PR

MACHINE PICTURE
5

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

DMCS / 001
Issue No :- 01
Rev No:- 00/05.10.2013

Feb-15

Department :- Maintanance

18

19

20

21

22

23

24

25

26

27

28

29

30

31

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

- NO PRODUCTION

- NOT CHECKED

PREPARED BY

7
REVIEWED BY

APPROVED BY
Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

APPROVED BY

Stanson 02\file:///var/www/apps/conversion/tmp/scratch_1/285526655.xlsx285526655.xlsxCOOLING TOWER

STANSON
PLASTIC PRODUCTS
Si.
NO.

Daily Check points

Clean the control cabinet air filer.

Clean machine thoroughly.

Check nozzle area for melt accumulation and clea if necessary.

Check the Hydralic oil level in the tank.

Check any oil leakage in the machine.

Check any abnormal noise in Machine.

Check any Water lekage in the machine

MACHINE NAME

Check any Water lekage in the machine

Check control Panel indication lamps and fan working in good contidion

Check the heat exchanger inlet and outlet valve contidion

10

Check and clean the blower air filter(daily twice)

11

Check and clean screen filter

Si.
NO.

Weekly Check points

12

Clean heat exchanger inlet water strainer and check the strainer condition

13

Check and fill the grease pump grease

14

Check and clean the de-humitifier filter

SINGNATURE

OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)
ENTER THE STATUS IN THE APPROPRIATE BOX

MACHINE PICTU
1

DAILY MACHINE CHECK SHEET

100 Ton Injection Moulding Machine


HOW?

(vg;go)

MONTH

10

11

12

13

14

15

16

17

HOW?

(vg;go)

10

11

12

13

14

15

16

17

- M/C CONDITION OK

- MACHINE PROBLEM

- NO PR

(kp#pd; fd;O!d; rhpahf cs;sJ)

(kp#pd; fd;O!d; rhpahf ,y;iy)

(cw;gj

CTURE ( ,ae;jpuj;jpd; g[ifg;glk; )


9

10

11

DMCS / 002
Issue No :- 01
Rev No:- 00/05.10.2013

Apr-14

18

19

Department :- production

20

21

22

23

24

25

26

27

28

29

30

31

18

19

20

21

22

23

24

25

26

27

28

29

30

31

- NO PRODUCTION

- NOT CHECKED

(cw;gj;jp bra;atpy;iy)

(brf; bra;atpy;iy)
PREPARED BY

12

13
REVIEWED BY

APPROVED BY

STANSON
PLASTIC PRODUCTS
Si.
NO.

Daily Check points

Clean the control cabinet air filer.

Clean machine thoroughly.

Check nozzle area for melt accumulation and clea if necessary.

Check the Hydralic oil level in the tank.

Check any oil leakage in the machine.

Check any abnormal noise in Machine.

Check any Water lekage in the machine

MACHINE NAME

Check any Water lekage in the machine

Check control Panel indication lamps and fan working in good contidion

Check the heat exchanger inlet and outlet valve contidion

10

Check and clean the blower air filter(daily twice)

11

Check and clean screen filter

Si.
NO.

Weekly Check points

12

Clean heat exchanger inlet water strainer and check the strainer condition

13

Check and fill the grease pump grease

14

Check and clean the de-humitifier filter

SINGNATURE

OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)
ENTER THE STATUS IN THE APPROPRIATE BOX

MACHINE PICTU
1

DAILY MACHINE CHECK SHEET

250 Ton Injection Moulding Machine


HOW?

(vg;go)

MONTH

10

11

12

13

14

15

16

17

HOW?

(vg;go)

10

11

12

13

14

15

16

17

- M/C CONDITION OK

- MACHINE PROBLEM

- NO PR

(kp#pd; fd;O!d; rhpahf cs;sJ)

(kp#pd; fd;O!d; rhpahf ,y;iy)

(cw;gj

CTURE ( ,ae;jpuj;jpd; g[ifg;glk; )


9

10

11

DMCS / 003
Issue No :- 01
Rev No:- 00/05.10.2013

Apr-14

18

19

Department :- production

20

21

22

23

24

25

26

27

28

29

30

31

18

19

20

21

22

23

24

25

26

27

28

29

30

31

- NO PRODUCTION

- NOT CHECKED

(cw;gj;jp bra;atpy;iy)

(brf; bra;atpy;iy)
PREPARED BY

12

13
REVIEWED BY

APPROVED BY

STANSON
PLASTIC PRODUCTS
Si.
NO.

Daily Check points

Clean the control cabinet air filer.

Clean machine thoroughly.

Check nozzle area for melt accumulation and clea if necessary.

Check the Hydralic oil level in the tank.

Check any oil leakage in the machine.

Check any abnormal noise in Machine.

Check any Water lekage in the machine

MACHINE NAME

Check any Water lekage in the machine

Check control Panel indication lamps and fan working in good contidion

Check the heat exchanger inlet and outlet valve contidion

10

check the blower mesh in open condition

11

clean the blower mesh throughly

Si.
NO.

SINGNATURE

12

Weekly Check points

Clean heat exchanger inlet water strainer and check the strainer condition

OPERATOR (Mg;nul;lh;)
SUPERVISOR(Ng;gh;it!h;)

ENTER THE STATUS IN THE APPROPRIATE BOX

MACHINE PICTU
1

DAILY MACHINE CHECK SHEET

45 Ton vertical Injection Moulding Machine


HOW?

(vg;go)

MONTH

10

11

12

13

14

15

16

17

HOW?

(vg;go)

10

11

12

13

14

15

16

17

- M/C CONDITION OK

- MACHINE PROBLEM

- NO PR

(kp#pd; fd;O!d; rhpahf cs;sJ)

(kp#pd; fd;O!d; rhpahf ,y;iy)

(cw;gj

CTURE ( ,ae;jpuj;jpd; g[ifg;glk; )


8

10

DMCS / 004
Issue No :- 01
Rev No:- 00/05.10.2013

Apr-14

18

19

Department :- Mixing

20

21

22

23

24

25

26

27

28

29

30

31

18

19

20

21

22

23

24

25

26

27

28

29

30

31

- NO PRODUCTION

- NOT CHECKED

(cw;gj;jp bra;atpy;iy)

(brf; bra;atpy;iy)
PREPARED BY

11

APPROVED BY

12
REVIEWED BY

Si.
NO.

ON
PLAST
IC
MACHINE NAME
PROD
HOW?
UCTS
Daily Check points

clean machine throughly

Ensure the sieve sitting normally

Check any abnormal noise in blower

Check control Panel switches for


burning and rust free

Si.
NO.

SINGNATURE

Weekly Check points

HOW?

DAILY MACHINE CHECK SHEET


DRYER

MONTH

10 11 12

10 11 12

Check all mountings bolts are in


correct position
Check all the values are in close
positions

OPERATOR
SUPERVISOR
ENTER THE STATUS IN THE APPROPRIATE BOX

- M/C CONDITION OK

- MACHINE PROB

DMCS / 001

EET

Issue No :- 01
Rev No:- 00/05.10.2013

MONTH

Feb-15

Department :- Maintanance

13 14 15 16 17 18 19 20 21 22 18 19 20 24 25 26 27 28 29 21 22 23 24

13 14 15 16 17 18 19 20 21 22 18 19 20 24 25 26 27 28 29 21 22 23 24

E PROBLEM

- NO PRODUCTION

PREP

REVI

APPR

25 26 27 28 29 30 31

25 26 27 28 29 30 31

- NO PRODUCTION
PREPARED BY

REVIEWED BY

APPROVED BY

You might also like