You are on page 1of 2

59770 Federal Register / Vol. 71, No.

196 / Wednesday, October 11, 2006 / Notices

Docket Numbers: ER06–1562–000. eLibrary system by clicking on the program.1 The Omnibus Budget
Applicants: American Electric Power appropriate link in the above list. They Reconciliation Act of 1986 provided
Service Corporation. are also available for review in the FERC with the authority to ‘‘assess and
Description: Indiana Michigan Power Commission’s Public Reference Room in collect fees and annual charges in any
Co submits a third revision to its Washington, DC. There is an fiscal year in amounts equal to all of the
Interconnection and Local Delivery eSubscription link on the Web site that costs incurred by the Commission in
Service Agreement 1262 between enables subscribers to receive e-mail that fiscal year.’’ 2 Each fiscal year the
Wabash Valley Power Association and notification when a document is added Commission estimates the total costs of
AEP. to a subscribed dockets(s). For its operations for the current year. These
Filed Date: 9/29/2006. assistance with any FERC Online estimates are the basis for the current
Accession Number: 20061003–0154. service, please e-mail year’s Administrative Charge which is
Comment Date: 5 p.m. Eastern Time FERCOnlineSupport@ferc.gov or call reflected on the annual billing
on Friday, October 20, 2006. (866) 208–3676 (toll free). For TTY, call statements as such. In addition, the
Docket Numbers: ER06–1563–000. (202) 502–8659. Commission determines the actual
Applicants: American Electric Power operating costs for the prior fiscal year,
Company. Magalie R. Salas, and the prior year’s Administrative
Description: American Electric Power Secretary. Charge is adjusted either upward or
submits a revision to its Repair and [FR Doc. E6–16803 Filed 10–10–06; 8:45 am] downward for the difference between
Maintenance Agreement between BILLING CODE 6717–01–P the prior year’s actual costs and the
Indiana Michigan Power Co and Wabash prior year’s estimates. These
Valley Power Association. adjustments to the prior year’s costs are
Filed Date: 9/29/2006. DEPARTMENT OF ENERGY then reflected as the Adjustment to
Accession Number: 20061003–0155. FERC Administrative Charge on the
Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory annual billing statements.
on Friday, October 20, 2006. Commission
Any person desiring to intervene or to Allocation Methodology for
protest in any of the above proceedings Hydropower Projects
[Docket No. AD07–1–000]
must file in accordance with Rules 211 3. The total costs for the hydropower
and 214 of the Commission’s Rules of Billing Procedures for Annual Charges regulatory program consist of both
Practice and Procedure (18 CFR 385.211 for the Costs for Administering Part I direct and indirect costs. Once the
and 385.214) on or before 5 p.m. Eastern of the Federal Power Act; Notice Commission calculates estimated and
time on the specified comment date. It Reporting Increase in Municipal Costs actual program costs, it allocates these
is not necessary to separately intervene for FY 2005 Actual and FY 2006 costs based on direct time charged by
again in a subdocket related to a Estimated Hydropower Administrative Commission staff to designated time and
compliance filing if you have previously Annual Charges labor codes for municipal and non-
intervened in the same docket. Protests municipal projects.3 Annually the
will be considered by the Commission October 3, 2006. Commission allocates current year
in determining the appropriate action to 1. Municipal licensees have expressed estimated costs and prior year actual
be taken, but will not serve to make concerns regarding the substantial costs based on the direct labor
protestants parties to the proceeding. increases they have observed in their proportions of staff time recorded
Anyone filing a motion to intervene or Statement of Annual Charges issued on against municipal and non-municipal
protest must serve a copy of that August 4, 2006. Specifically, licensees projects in the prior fiscal year.
document on the Applicant. In reference are concerned with the amounts Applying this methodology allows the
to filings initiating a new proceeding, assessed for the current year’s Commission to utilize credible
interventions or protests submitted on Administrative Charge and the prior historical information for the allocation
or before the comment deadline need year’s Adjustment of FERC of current year estimated costs and
not be served on persons other than the Administrative Charge. The increase in provides the relevant data needed to
Applicant. these charges is primarily attributable to appropriately affect the prior year
The Commission encourages a substantial increase in the proportion downward or upward adjustment when
electronic submission of protests and of direct labor hours staff charged to allocating the prior year’s actual costs.
interventions in lieu of paper, using the 4. With regard to the August 4, 2006
municipal projects in FY 2005. The
FERC Online links at http:// statements, the Commission allocated
purpose of this notice is to provide
www.ferc.gov. To facilitate electronic the cost bases for the current year’s
licensees with information regarding the
service, persons with Internet access Administrative Charge and the prior
Commission’s process for assessing
who will eFile a document and/or be year’s Adjustment to FERC
these charges and how this increase in
listed as a contact for an intervenor direct labor applicable to municipal 1 16U.S.C 794–823b.
must create and validate an projects resulted in the increases 2 Pub. L. 99–509 § 3401, 100 Stat. 1874, 1890–91
eRegistration account using the observed on the August 4, 2004 billing (1986) (codified at 42 U.S.C. 7178).
eRegistration link. Select the eFiling statements. 3 The Commission has implemented within its
link to log on and submit the time and attendance system designated codes
intervention or protests. Components of Administrative Annual which segregate staff hours spent on municipal
Persons unable to file electronically Charges projects from staff hours spent on non-municipal
projects. In calculating direct labor proportions, the
should submit an original and 14 copies Commission aggregates the hours recorded against
of the intervention or protest to the 2. The Federal Power Act requires the
municipal and non-municipal time codes. The
pwalker on PRODPC60 with NOTICES

Federal Energy Regulatory Commission, Federal Energy Regulatory Commission number of hours charged to municipal codes is
888 First St. NE., Washington, DC to assess annual charges against divided by this aggregate total to derive the
licensees to reimburse the United States municipal proportion used to allocate hydropower
20426. program costs. The number of hours charged to
The filings in the above proceedings for the costs of administration of the non-municipal projects is treated similarly to derive
are accessible in the Commission’s Commission’s hydropower regulatory the non-municipal proportion.

VerDate Aug<31>2005 16:53 Oct 10, 2006 Jkt 211001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1
Federal Register / Vol. 71, No. 196 / Wednesday, October 11, 2006 / Notices 59771

Administrative Charge using FY 2005 projects under review and the length of gas (LNG) peak-shaving facility in Berks
direct labor proportions. In FY 2005, time it takes to process a hydropower County, Pennsylvania, and certain
Commission staff spent 25% of the total application could impact the workload appurtenant pipeline facilities
hours charged to licensing of proportions. hydropower program interconnecting with the interstate
hydropower projects on municipal workload is cyclical, so in some years facilities of Texas Eastern Transmission
projects. Conversely, 75% of the total there may be more municipal projects L.P. The Temple LNG Plant is presently
hours charged to project licensing were pending versus non-municipal projects. owned by UGI Energy Services, Inc.
attributable to work on non-municipal While this increase does represent a (UGIES). The existing Temple LNG
projects. large swing between municipal and Plant consists of:
non-municipal direct-labor hours, our • 250,000 Mcf (73,000 Bbl) storage
Impact of FY 2005 Direct Labor tank,
review did show a history of cyclical
Allocation • A vaporization system designed to
fluctuations in this split.
5. The significant increase in 8. For questions concerning this deliver up to 50,000 Dth/d and a
municipal project costs for the FY 2006 notice or any other annual charges liquefier designed to deliver 4,000 Dth/
Administrative Charge and the FY 2005 issues, please direct inquiries via e-mail d, and
Adjustment to FERC Administrative to annualcharges@ferc.gov or call Troy • Approximately 5,000 feet of 8-inch-
Charge was the result of more direct Cole at (202) 502–6161. diameter pipeline.
time charged to hydropower municipal No additional land is required since
time and labor codes in FY 2005 then Magalie R. Salas, UGI LNG does not propose any new
in FY 2004. Since the Commission used Secretary. facilities or any modifications to
the FY 2005 municipal allocation of [FR Doc. E6–16785 Filed 10–10–06; 8:45 am] existing facilities. The general location
25% to allocate its FY 2006 BILLING CODE 6717–01–P of the project facilities is shown in
Administrative Annual Charges, Appendix 1.2
licensees will likely notice an increase Land Requirements for Construction
to their current year Administrative DEPARTMENT OF ENERGY
Charge when compared to previous The existing Temple LNG Plant
Federal Energy Regulatory consists of about 71.59 acres of land. No
years. Additionally, since the
Commission used the FY 2004 Commission new facilities would be constructed as
municipal allocation of 11% to allocate [Docket No. CP06–442–000] part of UGI LNG’s application.
its FY 2005 Administrative Charge, the The EA Process
FY 2005 Adjustment to FERC UGI LNG, Inc.; Notice of Intent To
Administrative Charge reflects both a Prepare an Environmental Assessment The National Environmental Policy
significant adjustment resulting from a for the Proposed Temple LNG Plant Act (NEPA) requires the Commission to
14% increase in the proportion of direct and Request for Comments on take into account the environmental
labor allocated and a minor upward Environmental Issues impacts that could result from an action
adjustment related to the difference in whenever it considers the issuance of a
October 4, 2006. Certificate of Public Convenience and
actual and estimated costs previously
The staff of the Federal Energy Necessity. NEPA also requires us to
assessed in FY 2005.
Regulatory Commission (FERC or discover and address concerns the
Review of Hydropower Program Costs Commission) will prepare an public may have about proposals. This
6. After calculating the annual environmental assessment (EA) that will process is referred to as ‘‘scoping’’. The
charges, the Commission reviewed the discuss the environmental impacts of main goal of the scoping process is to
total FY 2005 and FY 2006 hydropower the operation of facilities for the Temple focus the analysis in the EA on the
costs and the applicable time and labor LNG Plant involving operation of important environmental issues. By this
categories for the hydropower program facilities by UGI LNG, Inc (UGI LNG) in Notice of Intent, the Commission staff
which clearly differentiates between Berks County, Pennsylvania.1 This EA requests public comments on the scope
municipal and non-municipal activities. will be used by the Commission in its of the issues to address in the EA. All
Overall, total costs for the hydropower decision-making process to determine comments received are considered
program were found to have only small whether the project is in the public during the preparation of the EA. State
increases between the fiscal years. There convenience and necessity. and local government representatives
were no new programs added in the A fact sheet prepared by the FERC are encouraged to notify their
hydropower area in FY 2005 or FY 2006 entitled ‘‘An Interstate Natural Gas constituents of this proposed action and
that would have contributed to this Facility On My Land? What Do I Need encourage them to comment on their
increase, thus the small increase in total To Know?’’ was attached to the project areas of concern.
hydropower program costs. However, notice UGI LNG provided to Because the Temple LNG Plant is an
since there was more direct time landowners. This fact sheet addresses a existing facility and no new additions or
charged to municipal time and labor number of typically asked questions, modifications are proposed, the EA will
codes in FY 2005 than in FY 2004, including how to participate in the focus on the operation of the proposed
municipal licensees received a larger Commission’s proceedings. It is project, the cryogenic design aspects of
proportion of the total hydropower available for viewing on the FERC the plant, and public safety.
program costs. Internet Web site (http://www.ferc.gov).
2 The appendices referenced in this notice are not
7. The Commission’s hydropower Summary of the Proposed Project
being printed in the Federal Register. Copies of all
program workload depends on how
UGI LNG seeks authorization to appendices, other than Appendix 1 (maps), are
many hydropower applications or available on the Commission’s Web site at the
acquire and operate in interstate
pwalker on PRODPC60 with NOTICES

inspections are pending before the ‘‘eLibrary’’ link or from the Commission’s Public
commerce an existing liquefied natural Reference Room, 888 First Street, NE., Washington,
Commission in any given year. The
DC 20426, or call (202) 502–8371. For instructions
Commission can not predict with exact 1 UGI LNG’s application was filed with the on connecting to eLibrary refer to the last page of
certainty which licensees will file each Commission under section 7 of the Natural Gas Act this notice. Copies of the appendices were sent to
year. In addition, the complexity of the and Part 157 of the Commission’s regulations. all those receiving this notice in the mail.

VerDate Aug<31>2005 16:53 Oct 10, 2006 Jkt 211001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1