Federal Register / Vol. 71, No.

202 / Thursday, October 19, 2006 / Notices 61759

Request for expedited consideration and Filed Date: 10/06/2006. DEPARTMENT OF ENERGY
for waivers and pre-approvals. Accession Number: 20061006–5064.
Filed Date: 10/11/2006. Federal Energy Regulatory
Comment Date: 5 p.m. Eastern Time
Accession Number: 20061013–0076. Commission
Comment Date: 5 p.m. Eastern Time on Friday, October 27, 2006.
[Docket Nos. CP98–150–006, Ø007, and
on Wednesday, November 1, 2006. Any person desiring to intervene or to Ø008; Docket Nos. CP98–151–003, Ø004
Docket Numbers: ER07–33–000. protest in any of the above proceedings and CP05–19–000; Docket Nos. CP06–5–
Applicants: New York Independent must file in accordance with Rules 211 000, CP06–6–000, and CP06–7–000; Docket
System Operator, Inc. and 214 of the Commission’s Rules of No. CP06–76–000; Docket No. CP02–31–
Description: NYISO submits a request Practice and Procedure (18 CFR 385.211 002]
for temporary tariff waiver. and 385.214) on or before 5 p.m. Eastern
Filed Date: 10/06/2006. time on the specified comment date. It Millennium Pipeline L.L.C.; Columbia
Accession Number: 20061013–0082. is not necessary to separately intervene Gas Transmission Corporation; Empire
Comment Date: 5 p.m. Eastern Time again in a subdocket related to a State Pipeline and Empire Pipeline,
on Friday, October 27, 2006. compliance filing if you have previously Inc.; Algonquin Gas Transmission
Docket Numbers: ER07–34–000. intervened in the same docket. Protests System; Iroquois Gas Transmission
Applicants: Plains End II, LLC. will be considered by the Commission System; Notice of Availability of the
Description: Petition of Plains End II, in determining the appropriate action to Final Supplemental Environmental
LLC for order accepting market-based be taken, but will not serve to make Impact Statement for the Proposed
rate tariff for filing and granting waivers protestants parties to the proceeding. Northeast–07 Project
and blanket approvals and request for Anyone filing a motion to intervene or October 13, 2006.
expedited action. protest must serve a copy of that The staff of the Federal Energy
Filed Date: 10/12/2006. document on the Applicant. In reference
Accession Number: 20061013–0081. Regulatory Commission (FERC or
to filings initiating a new proceeding, Commission) has prepared a Final
Comment Date: 5 p.m. Eastern Time interventions or protests submitted on
on Thursday, November 2, 2006. Supplemental Environmental Impact
or before the comment deadline need Statement (FSEIS) on the natural gas
Docket Numbers: ER96–1551–018. not be served on persons other than the pipeline facilities proposed for the
Applicants: Public Service Company Applicant. Northeast (NE)-07 Project in Genesee,
of New Mexico.
The Commission encourages Ontario, Yates, Schuyler, Steuben,
Description: Public Service Company
electronic submission of protests and Chemung, Tioga, Broome, Delaware,
of New Mexico submits a compliance
interventions in lieu of paper, using the Orange, Rockland, Putnam, and
Electric Refund Report of Public Service
FERC Online links at http:// Dutchess Counties, New York; Morris
Company of New Mexico.
Filed Date: 10/06/2006. www.ferc.gov. To facilitate electronic County, New Jersey; and Fairfield and
Accession Number: 20061006–5052. service, persons with Internet access New Haven Counties, Connecticut,
Comment Date: 5 p.m. Eastern Time who will eFile a document and/or be proposed by Millennium Pipeline L.L.C.
on Friday, October 27, 2006. listed as a contact for an intervenor (Millennium), Columbia Gas
must create and validate an Transmission Corporation (Columbia),
Take notice that the Commission
eRegistration account using the Empire State Pipeline and Empire
received the following electric securities
eRegistration link. Select the eFiling Pipeline, Inc. (collectively referred to as
filings:
link to log on and submit the Empire), Algonquin Gas Transmission
Docket Numbers: ES07–1–000. System (Algonquin), and Iroquois Gas
Applicants: Edison Sault Electric intervention or protests.
Persons unable to file electronically Transmission System (Iroquois) in the
Company. above-referenced dockets.
Description: Edison Sault Electric Co should submit an original and 14 copies
The FSEIS was prepared to satisfy the
submits an application for authorization of the intervention or protest to the
requirements of the National
to borrow under Section 204 of the Federal Energy Regulatory Commission,
Environmental Policy Act (NEPA). The
Federal Power Act. 888 First St., NE., Washington, DC
staff concludes that approval of the
Filed Date: 10/10/2006. 20426.
proposed project with appropriate
Accession Number: 20061012–0099. The filings in the above proceedings mitigating measures as recommended,
Comment Date: 5 p.m. Eastern Time are accessible in the Commission’s would have limited adverse
on Tuesday, October 24, 2006. eLibrary system by clicking on the environmental impact. The FSEIS also
Take notice that the Commission appropriate link in the above list. They evaluates alternatives to the proposal,
received the following foreign utility are also available for review in the including system alternatives,
company status filings: Commission’s Public Reference Room in alternative sites for compressor stations,
Docket Numbers: FC07–1–000. Washington, DC. There is an and pipeline alternatives.
Applicants: Uskmouth Power eSubscription link on the Web site that The FSEIS addresses the potential
Limited. enables subscribers to receive e-mail environmental effects of the
Description: Uskmouth Power notification when a document is added construction and operation of the
Limited submits a Notice of Self to a subscribed dockets(s). For following natural gas pipeline facilities:
Certification. assistance with any FERC Online
Filed Date: 10/03/2006. service, please e-mail Millennium Pipeline Project—Phase I
Accession Number: 20061003–5016. FERCOnlineSupport@ferc.gov, or call • Construction of about 181.7 miles of
Comment Date: 5 p.m. Eastern Time
cprice-sewell on PROD1PC66 with NOTICES

(866) 208–3676 (toll free). For TTY, call 30-inch-diameter pipeline from Corning,
on Tuesday, October 24, 2006. (202) 502–8659. New York, to Ramapo, New York, (from
Docket Numbers: FC07–2–000. milepost [MP] 190.6 to MP 376.6), with
Applicants: Enel Latin America, LLC. Magalie R. Salas, four proposed route modifications
Description: Enel Latin America, LLC Secretary. within this area;
submits a Self-Certification of Foreign [FR Doc. E6–17467 Filed 10–18–06; 8:45 am] • Acquisition from Columbia and
Utility Company Status. BILLING CODE 6717–01–P continued use of about 7.1 miles of 24-

VerDate Aug<31>2005 14:50 Oct 18, 2006 Jkt 211001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1
61760 Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices

inch-diameter Line A–5 pipeline from —Spencer, MP 217.3, Tioga County; • Construction of miscellaneous
MP 340.5 to MP 347.7; —Catatonk, MP 228.2, Tioga County; pipeline modifications and meter
• Construction of the new Corning —Owego, MP 231.5, Tioga County; station modifications at several
Compressor Station and measuring and —Union Center, MP 240.2, Broome locations in Rockland County, New
regulating (M&R) facilities at MP 190.6; County; York, and Fairfield County,
• Installation of upgrades to the —Endicott, MP 241.7, Broome County, Connecticut;
Ramapo M&R station in Ramapo, —Westover, MP 245.7, Broome County; • Modifications to three existing
Rockland County, New York; and —Willis Road, MP 248.1, Broome compressor stations in Rockland and
• Construction of the Wagoner M&R County; Putnam Counties, New York, and Morris
station in Deer Park, Orange County, —Port Dickinson, MP 250.8, Broome County, New Jersey; and
New York, at MP 337.9. County; • Construction of one new natural gas
Columbia would abandon certain —Kirkwood, MP 253.8, Broome County; compressor station in New Haven
facilities related to the Millennium —Hancock, MP 285.6, Delaware County; County, Connecticut.
Pipeline Project—Phase I. Columbia —Hartwood Club, MP 332.1, Sullivan
County; Iroquois MarketAccess Project
proposes the following:
• Abandonment in place of about 4.5 —Middletown, MP 347.7, Orange • Reduction of the proposed size of
miles of 10-inch-, 82.2 miles of County; the compressor to be constructed in the
12-inch-, 0.2 mile of 16-inch-, and 2.5 —Huguenot, MP 3440.5, Orange County; Town of Brookfield, Connecticut, from
miles of 20-inch-diameter pipeline in —Warwick, MP 359.3, Orange County; 10,000 hp to 7,700 hp;
Steuben, Chemung, Tioga, Broome, —Greenwood Lake, MP 364.2, Orange • Installation of natural gas cooling
Orange, and Delaware Counties, New County; and related facilities at the Brookfield
—Central Hudson/Tuxedo, MP367.9, Compressor Station; and
York, designated as Line A–5;
Orange County; • Installation of gas cooling and
• Abandonment by removal
—Sloatsburg, MP 373.3, Rockland related facilities at Iroquois’ existing
(Millennium would remove Columbia’s
County; compressor station in Town of Dover,
pipeline when it installs its pipeline via
—Ramapo, MP 376.4, Rockland County; Dutchess County, New York.
same ditch replacement) of about 55.5 The FSEIS has been placed in the
and
miles of 12-inch-, 16.6 miles of public files of the FERC and is available
—Buena Vista, MP 383.3, Rockland
10-inch-, and 8.8 miles of 8-inch- for distribution and public inspection
County.
diameter pipeline in Delaware, Sullivan, at: Federal Energy Regulatory
Orange, and Rockland Counties, New Millennium would replace the
facilities Columbia would abandon in Commission, Public Reference Room,
York, designated as Line A–5, and of the 888 First Street, NE., Room 2A,
Walton Deposit M&R station at MP place or by removal with its proposed
project facilities, or it would continue to Washington, DC 20426. (202) 502–8371.
276.1 in Delaware County (Millennium A limited number of copies are
would relocate this facility at the use those it would acquire by
conveyance. available from the Public Reference
landowner’s request and to move it Room identified above. In addition,
closer to Line A–5); Millennium proposes to construct
Columbia’s Line A–5 Replacement copies of the FSEIS have been mailed to
• Abandonment by conveyance to federal, state, and local agencies; public
Millennium of: Project as part of the Phase I Project.
interest groups; individuals and affected
Æ About 3.1 miles of 10- and 12-inch- Columbia Line A–5 Replacement landowners who requested a copy of the
diameter pipeline in Steuben County, Project FSEIS; libraries; newspapers; and
New York, designated as Line 10325;
• Replacement of 8.8 miles of 8- and parties to this proceeding.
Æ About 0.4 mile of 10-inch-diameter Additional information about the
16-inch-diameter segments of
pipeline in Broome County, New York, project is available from the
Columbia’s existing Line A–5 pipeline
designated as Line 10356; Commission’s Office of External Affairs,
with larger 30-inch-diameter pipeline in
Æ About 52.5 miles of 10-, 12-, and at 1–866–208–FERC or on the FERC
Orange and Rockland Counties, New
24-inch-diameter pipeline in Steuben, Internet Web site (http://www.ferc.gov)
York;
Chemung, Broome, and Orange using the eLibrary link. Click on the
• Modification of three existing M&R
Counties, New York, designated as Line eLibrary link, click on ‘‘General Search’’
stations (the Tuxedo, Sloatsburg, and
A–5; and enter the docket number excluding
Ramapo M&R stations) on this segment
Æ About 2.6 miles of 6-inch-diameter the last three digits in the Docket
of Line A–5 to accommodate the larger
pipeline in Tioga County, New York, Number field. Be sure you have selected
diameter pipeline; and
designated as Line AD–31; an appropriate date range. For
• Abandonment in place of about 1.0
Æ About 0.1 mile of 12-inch-diameter assistance with eLibrary, the eLibrary
mile of the existing Line A–5 pipeline.
pipeline in Broome County, New, York, helpline can be reached toll free at 1–
designated as Line N; Empire Connector Project 866–208–3676, for TTY at (202) 502–
Æ About 6.7 miles of 24-inch- • Construction of about 78 miles of 8659, or at
diameter pipeline in Rockland County, new 24-inch-diameter pipeline and FERCOnlineSupport@ferc.gov. The
New York, designated as Line 10338; associated facilities in Ontario, Yates, eLibrary link on the FERC Internet Web
Æ The following M&R stations in New Schuyler, Chemung, and Steuben site also provides access to the texts of
York: Counties, New York; and formal documents issued by the
—Corning Natural Gas, MP 180.4, • Construction of a new compressor Commission, such as orders, notices,
Steuben County; and rulemakings.
cprice-sewell on PROD1PC66 with NOTICES

station in Genesee County, New York.


—Cooper Planes, MP 182.1, Steuben In addition, the Commission now
County; Algonquin Ramapo Expansion Project offers a free service called eSubscription
—M Account, MP 187.5, Steuben • Replacement about 4.9 miles of which allows you to keep track of all
County; existing 26-inch-diameter pipeline with formal issuances and submittals in
—Corning Glass, MP 188.4, Steuben 42-inch-diameter pipeline in Rockland specific dockets. This can reduce the
County; County, New York; amount of time you spend researching

VerDate Aug<31>2005 14:50 Oct 18, 2006 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1
Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices 61761

proceedings by automatically providing instructions for filing comments Northern Border Pipeline (NBPL)
you with notification of these filings, described in Appendix 1. system to the KMIP system.
document summaries and direct links to If you are a landowner receiving this The general location of the project
the documents. Go to the eSubscription notice, you may be contacted by a facilities is shown in Appendix 2.2
link on the FERC Internet Web site. pipeline company representative about
the acquisition of an easement to Land Requirements
Magalie R. Salas,
construct, operate, and maintain the Construction of the proposed pipeline
Secretary. proposed facilities. The pipeline and aboveground facilities would affect
[FR Doc. E6–17473 Filed 10–18–06; 8:45 am] company would seek to negotiate a about 54.1 acres of land and includes
BILLING CODE 6717–01–P mutually acceptable agreement. access roads, pipe/contractor yards, and
However, if the project is approved by extra work areas. Following
the Commission, that approval conveys construction, roughly 4.63 acres would
DEPARTMENT OF ENERGY with it the right of eminent domain. be permanently maintained. The
Therefore, if easement negotiations fail remaining 49.5 acres of land would be
Federal Energy Regulatory
to produce an agreement, the pipeline restored and allowed to revert to its
Commission
company could initiate condemnation former use.
[Docket No. CP06–455–000] proceedings in accordance with state
law. The EA Process
Kinder Morgan Illinois Pipeline LLC; A brochure prepared by the FERC The National Environmental Policy
Notice of Intent To Prepare an entitled ‘‘An Interstate Natural Gas Act (NEPA) requires the Commission to
Environmental Assessment for the Facility On My Land? What Do I Need take into account the environmental
Proposed Kinder Morgan Illinois To Know?’’ is available for viewing on impacts that could result from an action
Pipeline Project and Request for the FERC Web site at http:// whenever it considers the issuance of a
Comments on Environmental Issues www.ferc.gov. This fact sheet addresses Certificate of Public Convenience and
a number of typically asked questions, Necessity. NEPA also requires us to
October 13, 2006.
including the use of eminent domain discover and address concerns the
The staff of the Federal Energy and how to participate in the
Regulatory Commission (FERC or public may have about proposals. This
Commission’s proceedings. process is referred to as ‘‘scoping’’. The
Commission) will prepare an
environmental assessment (EA) that will Summary of the Proposed Project main goal of the scoping process is to
discuss the environmental impacts of focus the analysis in the EA on the
KMIP seeks authority to construct and
the Kinder Morgan Illinois Pipeline important environmental issues. By this
operate the following pipeline facilities:
Project involving construction and Notice of Intent, the Commission staff
operation of facilities by Kinder Morgan Cook County, IL requests public comments on the scope
Illinois Pipeline LLC (KMIP) in Cook, • About 2.6 miles of new 24-inch- of the issues to address in the EA. All
Kankakee and Will Counties, Illinois.1 diameter pipeline, installed along comments received are considered
KMIP proposes to install approximately existing utility corridors. The new during the preparation of the EA. State
3.1 miles of new 24-inch-diameter pipeline would connect a new KMIP- and local government representatives
pipeline and three new meter stations. Natural meter station to Natural’s are encouraged to notify their
In addition, KMIP plans to lease 360,000 existing Calumet #3 pipeline; constituents of this proposed action and
decatherms/day (Dth/day) in about 26 • A new meter station with a capacity encourage them to comment on their
miles of existing pipeline facilities of up to 360,000 Dth/day, installed areas of concern.
owned by Natural Gas Pipeline adjacent to an existing Natural meter Our 3 independent analysis of the
Company of America (Natural). This EA station and would measure gas flow issues will be in the EA. Depending on
will be used by the Commission in its from the Natural system to the KMIP the comments received during the
decision-making process to determine pipeline; scoping process, the EA may be
whether the project is in the public published and mailed to federal, state
Will County, IL and local agencies, public interest
convenience and necessity.
This notice announces the opening of • Approximately 0.47 mile of new 24- groups, interested individuals, affected
the public comment period that will be inch-diameter pipeline, installed along landowners, newspapers, libraries and
used to gather environmental input from existing utility corridors. The new the Commission’s official service list for
the public and interested agencies on pipeline would connect a new KMIP– this proceeding. A comment period will
the project. Comments are requested by ANR meter station with Natural’s be allotted for review if the EA is
November 13, 2006. existing Herscher-Dyer pipeline; published. We will consider all
With this notice, the FERC staff is • A new meter station with a capacity comments on the EA before we make
asking other Federal, state, local and of up to 360,000 Dth/day, installed our recommendations to the
tribal agencies with jurisdiction and/or adjacent to ANR Pipeline Company’s Commission.
special expertise with respect to (ANR’s) existing meter station and
environmental issues to cooperate with would measure gas flow from the ANR 2 The appendices referenced in this notice are not

us in the preparation of the EA. These system to the new KMIP–ANR pipeline being printed in the Federal Register. Copies of all
connector; and appendices, other than Appendix 2 (map), are
agencies may choose to participate once available on the Commission’s Web site at the
they have evaluated KMIP’s proposal Kankakee County, IL ‘‘eLibrary’’ link or from the Commission’s Public
cprice-sewell on PROD1PC66 with NOTICES

relative to their responsibilities. Reference Room, 888 First Street, NE., Washington,
Agencies that would like to request • A new meter station with a capacity DC 20426, or call (202) 502–8371. For instructions
cooperating status should follow the of up to 360,000 Dth/day, installed on connecting to eLibrary refer to the last page of
adjacent to Natural’s existing meter this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
1 KMIP’s application was filed with the station located along the border of 3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the

Commission under section 7 of the Natural Gas Act Illinois and Indiana. The new meter environmental staff of the Office of Energy Projects
and Part 157 of the Commission’s regulations. station would measure gas flow from the (OEP).

VerDate Aug<31>2005 14:50 Oct 18, 2006 Jkt 211001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1

You might also like