You are on page 1of 3

9/8/2015

2012 Construction General Permit

You are here: Permits Landing Page 2012 CGP 2012 CGP Details

2012 Construction General Permit eNOI


Detail

Quick Jump to Other


Permits

Details for PRR12A786

General Information
Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra
Active
PRR12A786
NOI

Project / Site Name:


Current Status:
Tracking Number:
Permit Type:

Interview Page Answers


Is your project/site located in Indian Country Lands?
No
Are you requesting coverage under this NOI as a 'federal operator' as defined
No
in Appendix A?

Operator Information
Operator's Name:
Street:
City:
State:
Zip Code:
Point of Contact Name:
Phone Number:
Operator Email:
Fax:
IRS Employer Identification Number (EIN):

AFI / Ing. Salim Laham


Edificio World Plaza Suite 400
San Juan
Puerto Rico
00940
Salim Laham
(787) 763-5757
slaham@afi.pr.gov
N/A
Feedback
660480699

Project / Facility Information


Project / Site Name:
Street:
City:
State:
Zip Code:
Project / Facility on Indian Land?
Reservation Name:

Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra


Avenida Luis Muoz Rivera
San Juan
Puerto Rico
00926
No
N/A

Additional Project Information


Is your project an 'emergency-related project' as defined in Appendix A?
Have stormwater discharges from your project/site been covered previously
under an NPDES permit?
Estimated Project Start Date:
Estimated Project End Date
Have earth-disturbing activities commenced on your project/site?
County or Similar government subdivision:

No
Yes
12/15/2014
03/30/2016
Yes
San Juan

http://ofmpub.epa.gov/apex/aps/f?p=119:4:14214039305371::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:21765,NOI

1/3

9/8/2015

2012 Construction General Permit

Latitude and Longitude Information


66,06,04
(degrees, minutes, seconds)
18,27,59
(degrees, minutes, seconds)
Google Earth
NAD 83 or WGS 84
8.53

Longitude:
Longitude Unit:
Latitude:
Latitude Unit:
Latitude / Longitude Data Source:
Horizontal Reference Datum
Estimated Area to be Disturbed (to the nearest quarter acre):

Chemical Treatment Information


Will you use polymers, flocculants, or other treatment chemicals at your
construction site?

No

ESA
A. No federally-listed threatened or endangered species or their

Under which criterion listed in Appendix D are you eligible for coverage under
designated critical habitat(s) are likely to occur in your sites action
this permit?

area as defined in Appendix A of this permit

Provide the basis for criterion selection selected:


EIS Prepared by Owner
1) Any federal listed species and/or designated habitat located in your area: N/A
2) The distance between your site and the listed species or designated critical
N/A
habitat (in miles):

SWPPP Point of Contact


Salim Laham
AFI
(787) 763-5757
N/A
slaham@afi.pr.gov

Name:
Organization Name:
Phone:
Fax:
Email:

Discharge Information
Does your project/site discharge stormwater into a Municipal Separate Storm
Yes
Sewer System (MS4)?
Are there any surface waters within 50 feet of your project's earth
Yes
disturbances?
If a TMDL has been approved or established, identify the title or reference of
N/A
the TMDL document:

Impaired Surface Waters to Which you Discharge


Surfacewater(s)towhichyoudischarge

ImpairedWater

Atlantic Ocean

No

ListedWaterPollutant(s)

Tier2,2.5or3

Source

No

N/A

TMDLNameandPollutant

Historic Preservation
Is your project/site located on a property of religious or cultural significance to
an Indian tribe? Are you installing any stormwater controls as described in
No
Appendix E that require? (Appendix E, Step 1):
If yes, have prior surveys or evaluations conducted on the site have already
determined historic properties do not exist, or that prior disturbances have
N/A
precluded the existence of historic properties? (Appendix E, Step 2):
If no, have you determined that your installation of subsurface earth-disturbing
stormwater controls will have no effect on historic properties? (Appendix E,
N/A

http://ofmpub.epa.gov/apex/aps/f?p=119:4:14214039305371::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:21765,NOI

2/3

9/8/2015

2012 Construction General Permit

Step 3):
If no, did the SHPO, THPO, or other tribal representative (whichever applies)
respond to you within the 15 calendar days to indicate whether the subsurface
N/A
earth disturbances caused by the installation of stormwater controls affect
historic properties? (Appendix E, Step 4)
If yes, describe the nature of their response:
N/A

Certifier Information
Name:
Title:
Email:
Certified Date:

Salim Laham
Owner
rlopez@entechdpm.com
04/07/2015

Preparer Information
Name:
Phone:
Fax:
Organization:
Email:

Roberto Lopez-Esquerra
(787) 748-6060
N/A
ENTECH
rlopez@entechdpm.com

Corresponding Documents
No data found.
Back to Search Results

release 1.0

http://ofmpub.epa.gov/apex/aps/f?p=119:4:14214039305371::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:21765,NOI

3/3

You might also like