Federal Register / Vol. 71, No.

232 / Monday, December 4, 2006 / Notices 70371

Access at: http://www.gpoaccess.gov/nara/ DOE’s proposed action is to provide during the public hearing scheduled for
index.html. cost-shared financial assistance to WGC the date and location provided in the
through a cooperative agreement under DATES section of this Notice. Requests to
Program Authority: 20 U.S.C. 1211–2
(1991), 6715, 7117, 7131, 7139, 7140, 7245,
the CCPI for design, construction, and speak at the public hearing can be made
7247, 7261, 7269, and 7269a. operation of the Western Greenbrier Co- by calling or writing the EIS Document
Production Demonstration Project. WGC Manager (see ADDRESSES). Requests to
Dated: November 28, 2006. proposes to design, construct, and speak that have not been submitted
Deborah A. Price, operate a 98 MWe (net) power plant that prior to the hearing will be accepted in
Assistant Deputy Secretary for Safe and Drug- would generate electricity and steam by the order in which they are received at
Free Schools. burning fuel derived from the the hearing. Speakers are encouraged to
[FR Doc. E6–20456 Filed 12–1–06; 8:45 am] beneficiation of approximately 3,000 to provide a written version of their oral
BILLING CODE 4000–01–P 4,000 tons per day of coal refuse. The comments for the record. Each speaker
proposed power plant would be the first will be allowed five minutes to present
commercial application within the comments unless more time is requested
DEPARTMENT OF ENERGY United States of an atmospheric and available. Comments will be
circulating fluidized-bed combustor recorded by a court reporter and will
Notice of Availability; Draft featuring a compact inverted cyclone become part of the public hearing
Environmental Impact Statement for design. The design would require less record.
the Western Greenbrier Co-Production steel and facilitate erection in remote FOR FURTHER INFORMATION CONTACT: For
Demonstration Project areas by reducing the boiler system further information on the proposed
AGENCY: Department of Energy. footprint and height. These innovations project or the draft environmental
could reduce steel costs by impact statement, please contact Mr.
ACTION: Notice of availability and public
approximately 40 percent and shorten Roy G. Spears, as directed above. For
hearings.
construction time by approximately 10 general information regarding the DOE
SUMMARY: The U.S. Department of percent. NEPA process, please contact: Ms. Carol
Energy (DOE) announces the availability DATES: DOE invites the public to M. Borgstrom, Director, Office of NEPA
of the document, Draft Environmental comment on the Draft EIS during the Policy and Compliance (GC–20), U.S.
Impact Statement for the Western public comment period, which ends Department of Energy, 1000
Greenbrier Co-Production January 18, 2007. DOE will consider all Independence Avenue, SW.,
Demonstration Project, (DOE/EIS–0361), comments postmarked or received Washington, DC 20585, Telephone:
for public comment. The draft during the public comment period in (202) 586–4600, or leave a message at:
environmental impact statement (EIS) preparing the Final EIS, and will (800) 472–2756.
analyzes the potential environmental consider late comments to the extent SUPPLEMENTARY INFORMATION:
consequences of providing Federal practicable.
funding for the design, construction, DOE will hold a public hearing on Description of Alternatives
and demonstration of a 98 megawatt Thursday, January 4, 2007, at Western DOE analyzed two alternatives in the
(MWe) net power plant and ash Greenbrier Middle School, Crawley, Draft EIS: The proposed action and the
byproduct manufacturing facility to be West Virginia from 7 p.m. to 9 p.m. An no-action alternative. Under the
located in the municipality of Rainelle, informational session will be held at the proposed action, DOE would provide
Greenbrier County, West Virginia. The same location from 4 p.m. to 6:30 p.m., cost-shared funding to a private-sector
facility would be constructed and preceding the public hearing on the date applicant for the design, construction
demonstrated through a cooperative noted above. and demonstration of a Co-Production
agreement between DOE and Western ADDRESSES: Requests for information Facility based on an innovative
Greenbrier Co-Generation, LLC (WGC) about this Draft EIS or to receive a copy atmospheric-pressure circulating
under the Clean Coal Power Initiative of the Draft EIS should be directed to: fluidized-bed (ACFB) boiler with a
(CCPI). WGC proposes to design, Roy G. Spears, NEPA Document compact inverted-cyclone design. In
construct, and demonstrate an Manager, U.S. Department of Energy, addition to producing electricity and
atmospheric pressure circulating National Energy Technology Laboratory, steam, the Co-Production facility would
fluidized-bed (CFB) power plant that M/S NO–3, P.O. Box 0880, Morgantown, include a kiln that would produce
would generate electricity and steam by West Virginia. Additional information cement for use in the production of
burning approximately 3,000 to 4,000 about the Draft EIS may also be structural brick and other similar
tons per day of coal refuse from several requested by telephone at: (304) 285– products. The Co-Production Facility
local sites as the primary fuel. The 5460, or toll-free at: (800) 432–8330, would utilize coal refuse (also referred
proposed power plant would be the first x5460. to as ‘‘gob’’) from nearby coal refuse
commercial application within the The Draft EIS will be available at sites as the primary fuel source, and
United States of a CFB combustor http://www.eh.doe.gov/nepa/. Copies of portions of the ash generated by the
featuring a compact inverted cyclone the Draft EIS are also available for circulating fluidized-bed (CFB) would
design. review at the locations listed in the be returned to the coal refuse sites for
The Department prepared this draft SUPPLEMENTARY INFORMATION section of use in site reclamation efforts. DOE has
EIS in accordance with the National this Notice. Written comments on the entered into a 5-year cooperative
Environmental Policy Act of 1969 Draft EIS can be mailed to Roy G. agreement with WGC to provide
(NEPA) (42 U.S.C. 4321 et seq.), the Spears, NEPA Document Manager, at financial support through the CCPI
mstockstill on PROD1PC61 with NOTICES

Council on Environmental Quality the address noted above. Written program.


(CEQ) regulations that implement the comments may also be submitted by fax WGC was a successful applicant in
procedural provisions of NEPA (40 CFR to: (412) 285–4403, or submitted Round 1 of the CCPI program and will
parts 1500–1508), and the DOE electronically to: be ultimately responsible for the siting,
procedures implementing NEPA (10 roy.spears@netl.doe.gov. Oral comments design, construction, and operation of
CFR part 1021). on the Draft EIS will be accepted only the facility and related components.

VerDate Aug<31>2005 11:51 Dec 01, 2006 Jkt 211001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
70372 Federal Register / Vol. 71, No. 232 / Monday, December 4, 2006 / Notices

WGC is collectively owned by the towns Availability of the Draft EIS of the protest or intervention to the
of Rainelle, Rupert, and Quinwood, and Copies of this Draft EIS have been Federal Energy Regulatory Commission,
its mission is to provide economic distributed to Members of Congress, 888 First Street, NE., Washington, DC
development for the area through the Federal, State, and local officials, and 20426.
construction and operation of the agencies, organizations and individuals This filing is accessible online at
proposed facility. who may be interested or affected. This http://www.ferc.gov, using the
The main focus of the WGC Co- ‘‘eLibrary’’ link and is available for
Draft EIS will be available on the
Production Facility Project is the review in the Commission’s Public
Internet at: http://www.eh.doe.gov/
construction and operation of the 98 Reference Room in Washington, DC.
nepa/. Additional copies can also be
MWe generating plant that utilizes the There is an ‘‘eSubscription’’ link on the
requested by telephone at: 304–285–
technologies described in Section 2.3 of Web site that enables subscribers to
5460, or (800) 432–8330, x5460. Copies
the Draft Environmental Impact receive e-mail notification when a
of the Draft EIS are also available for
Statement. However, there are several document is added to a subscribed
public review at the Greenbrier County
unique and important aspects of the docket(s). For assistance with any FERC
Public Library, 301 Courtney Drive,
project that extend beyond the Online service, please e-mail
Lewisburg, West Virginia, and at the
construction and operation of the power FERCOnlineSupport@ferc.gov, or call
plant. In addition to generating power Rainelle Municipal Public Library, 312
7th Street, Rainelle, West Virginia. (866) 208–3676 (toll free). For TTY, call
for the national grid and demonstrating (202) 502–8659.
the inverted cyclone technology, the Issued in Washington, DC, on November Comment Date: 5 p.m. Eastern Time
proposed plant is intended to use coal 28, 2006.
on December 11, 2006.
refuse as its primary fuel source, to Mark J. Matarrese,
apply potential waste streams to Director, Office of Environment, Security, Magalie R. Salas,
beneficial uses, and to serve as an Safety and Health, Office of Fossil Energy. Secretary.
economic catalyst for the region by [FR Doc. E6–20435 Filed 12–1–06; 8:45 am] [FR Doc. E6–20469 Filed 12–1–06; 8:45 am]
providing an anchor tenant for a BILLING CODE 6450–01–P BILLING CODE 6717–01–P
planned industrial park (the ‘‘EcoPark’’)
to be located in Rainelle. As a result,
there are connected actions associated DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY
with the excavation and reclamation of
the proposed coal refuse piles (e.g., Federal Energy Regulatory Federal Energy Regulatory
beneficiation of the coal refuse by a Commission Commission
third party), the additional industrial [Docket No. TX07–1–000] [Docket No. RP07–74–000]
activities that may occur with the
project (e.g., potential production of Brazos Electric Power Cooperative, Dauphin Island Gathering Partners;
building products from the cement), and Inc.; Notice of Filing Notice of Proposed Changes in FERC
potential future commercial and Gas Tariff
industrial development that are November 27, 2006.
intended to occur as a result of the Take notice that on October 13, 2006 November 24, 2006.
plant. These additional project aspects and amended on November 21, 2006, Take notice that on November 20,
are not integral to the DOE decision on Brazos Electric Power Cooperative, Inc. 2006, Dauphin Island Gathering
whether to provide cost-shared funding filed an application for an order Partners (Dauphin Island) tendered for
to demonstrate the clean coal directing a physical interconnection of filing as part of its FERC Gas Tariff, First
technologies of interest. facilities and transmission services Revised Volume No. 1, the revised tariff
Under the No Action Alternative, under sections 210, 211 and 212 of the sheets listed below to become effective
DOE would not provide cost-shared Federal Power Act. December 21, 2006:
funding to demonstrate the Co- Any person desiring to intervene or to
First Revised Sheet No. 5
Production Facility Project. Although protest this filing must file in First Revised Sheet No. 33
WGC could proceed to implement the accordance with Rules 211 and 214 of Third Revised Sheet No. 50
proposed project in spite of DOE’s No the Commission’s Rules of Practice and First Revised Sheet No. 89
Action Alternative, it is unlikely that Procedure (18 CFR 385.211, 385.214). Third Revised Sheet No. 115
this project would be completed Protests will be considered by the First Revised Sheet No. 284
successfully without DOE funding Commission in determining the Second Revised Sheet No. 286
support. The No Action alternative appropriate action to be taken, but will Second Revised Sheet No. 315
would not involve new construction, not serve to make protestants parties to First Revised Sheet No. 342
the proceeding. Any person wishing to First Revised Sheet No. 344
new discharges, or changes in land or
First Revised Sheet No. 358
water uses in the planning area. Because become a party must file a notice of
this alternative would not involve intervention or motion to intervene, as Dauphin Island states that these tariff
introducing new emission sources, no appropriate. Such notices, motions, or sheets reflect numerous housekeeping
impact on the air quality, either locally protests must be filed on or before the changes to Dauphin Island’s tariff.
or regionally, is expected. Aesthetic and comment date. On or before the Dauphin Island states that copies of
scenic conditions, as well as surface and comment date, it is not necessary to the filing are being served
ground water, would remain serve motions to intervene or protests contemporaneously on its customers
unchanged. The No Action alternative on persons other than the Applicant. and other interested parties.
mstockstill on PROD1PC61 with NOTICES

would not contribute to the goal of the The Commission encourages Any person desiring to intervene or to
CCPI program, which is to accelerate electronic submission of protests and protest this filing must file in
commercial deployment of advanced interventions in lieu of paper using the accordance with Rules 211 and 214 of
technologies that provide the United ‘‘eFiling’’ link at http://www.ferc.gov. the Commission’s Rules of Practice and
States with clean, reliable, and Persons unable to file electronically Procedure (18 CFR 385.211 and
affordable energy. should submit an original and 14 copies 385.214). Protests will be considered by

VerDate Aug<31>2005 11:51 Dec 01, 2006 Jkt 211001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1