Federal Register / Vol. 72, No.

46 / Friday, March 9, 2007 / Notices 10707

occurred and the subsequent assessment Part, 71 FR 51573 (August 30, 2006). FOR FURTHER INFORMATION CONTACT:
of double antidumping duties. The preliminary results for this Helen Kramer or Angelica Mendoza,
This administrative review and notice administrative review are currently due AD/CVD Operations, Office 7, Import
are published in accordance with no later than April 2, 2007. Administration, International Trade
sections 751(a)(1) and 777(i)(1) of the Administration, U.S. Department of
Extension of Time Limits for
Act and 19 CFR 351.221. Commerce, 14th Street and Constitution
Preliminary Results
Dated: February 28, 2007. Avenue, NW, Washington, DC 20230;
The Department requires additional telephone: (202) 482–0405 and (202)
David M. Spooner, time to review, analyze, and verify the 482–3019, respectively.
Assistant Secretary for Import sales and cost information submitted by
Administration. SUPPLEMENTARY INFORMATION:
the parties in this administrative review.
[FR Doc. E7–4295 Filed 3–8–07; 8:45 am] Moreover, the Department requires Background
BILLING CODE 3510–DS–S additional time to issue supplemental On August 1, 2006, the Department
questionnaires and fully analyze the published a notice of opportunity to
responses. Thus, it is not practicable to request an administrative review of the
DEPARTMENT OF COMMERCE complete this review within the original antidumping duty order on seamless
time limit (i.e., April 2, 2007). line and pressure pipe from Argentina
International Trade Administration Therefore, the Department is extending for the period August 1, 2005, through
A–337–806 the time limit for completion of the July 31, 2006. See Antidumping or
preliminary results to not later than July Countervailing Duty Order, Finding or
Certain Individually Quick Frozen Red 31, 2007, in accordance with section Suspended Investigation; Opportunity
Raspberries from Chile: Notice of 751(a)(3)(A) of the Act. to Request Administrative Review, 71
Extension of Time Limit for 2005–2006 We are issuing and publishing this FR 43441 (August 1, 2006). On August
Antidumping Duty Administrative notice in accordance with sections 31, 2006, United States Steel
Review 751(a)(1) and 777(i)(1) of the Act. Corporation (‘‘U.S. Steel’’), a domestic
AGENCY: Import Administration, Dated: March 05, 2007. producer of the subject merchandise,
International Trade Administration, Stephen J. Claeys, made a timely request that the
Department of Commerce. Deputy Assistant Secretary for Import Department conduct an administrative
Administration. review of Siderca. On September 29,
EFFECTIVE DATE: March 9, 2007.
[FR Doc. E7–4318 Filed 3–8–07; 8:45 am] 2006, in accordance with section 751(a)
FOR FURTHER INFORMATION CONTACT: of the Tariff Act of 1930, as amended
BILLING CODE 3510–DS–S
Yasmin Nair or Nancy Decker, AD/CVD (‘‘the Act’’), the Department published
Operations, Office 1, Import in the Federal Register a notice of
Administration, International Trade DEPARTMENT OF COMMERCE initiation of this antidumping duty
Administration, U.S. Department of administrative review. See Notice of
Commerce, 14th Street and Constitution International Trade Administration Initiation of Antidumping Duty and
Avenue, NW, Washington, DC 20230; Countervailing Duty Administrative
telephone (202) 482–3813 or (202) 482– [A–357–809]
Reviews, 71 FR 57465 (September 29,
0196, respectively. Small Diameter Seamless Carbon and 2006). On October 4, 2006, the
Statutory Time Limits Alloy Steel Standard, Line and Department issued its antidumping duty
Pressure Pipe from Argentina: Notice questionnaire to Siderca. On October 18,
Section 751(a)(3)(A) of the Tariff Act 2006, Siderca submitted a letter to the
of Rescission of Antidumping Duty
of 1930, as amended (‘‘the Act’’), Department, certifying that the company
Administrative Review
requires the Department of Commerce made no shipments or entries for
(‘‘Department’’) to issue the preliminary AGENCY: Import Administration, consumption in the United States of the
results of an administrative review International Trade Administration, subject merchandise during the POR.
within 245 days after the last day of the Department of Commerce. Siderca also certified that the company’s
anniversary month of an order for which SUMMARY: On September 29, 2006, the U.S. affiliate, Tenaris Global Services
a review is requested and a final U.S. Department of Commerce (‘‘the U.S.A. Corporation, also did not sell,
determination within 120 days after the Department’’) published a notice of enter, or import subject merchandise for
date on which the preliminary results initiation of an administrative review of consumption into the United States
are published. If it is not practicable to the antidumping duty order on small during the POR.
complete the review within the time diameter seamless carbon and alloy
period, section 751(a)(3)(A) of the Act steel standard, line and pressure pipe Scope of the Order
allows the Department to extend these (‘‘seamless line and pressure pipe’’) The antidumping duty order on
deadlines to a maximum of 365 days from Argentina. The review covers one imports from Argentina covers small
and 180 days, respectively. manufacturer/exporter, Siderca S.A.I.C. diameter seamless carbon and alloy
(‘‘Siderca’’). The period of review standard, line, and pressure pipes
Background (‘‘POR’’) is August 1, 2005, through July (‘‘seamless pipes’’) produced to the
On August 30, 2006, the Department 31, 2006. Following the receipt of a American Standard for Testing and
published in the Federal Register a certification of no shipments by Siderca, Materials (‘‘ASTM’’) standards A–335,
notice of initiation of administrative we notified the domestic interested A–106, A–53, and American Petroleum
review of the antidumping duty order party of the Department’s intent to Institute (‘‘API’’) standard API 5L
on individually quick frozen red rescind this review and provided an specifications and meeting the physical
jlentini on PROD1PC65 with NOTICES

raspberries from Chile, covering the opportunity to comment on the parameters described below, regardless
period July 1, 2005, through June 30, rescission. We received no comments. of application. The scope of this order
2006. See Initiation of Antidumping and Therefore, we are rescinding this also includes all products used in
Countervailing Duty Administrative administrative review. standard, line, or pressure pipe
Reviews and Requests for Revocation in EFFECTIVE DATE: March 9, 2007. applications and meeting the physical

VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\09MRN1.SGM 09MRN1
10708 Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices

parameters described below, regardless elevated temperatures but must not products are covered by the scope of
of specification. For purposes of this exceed relevant ASME code this order.
order, seamless pipes are seamless requirements. Seamless line pipes are Specifically excluded from the scope
carbon and alloy (other than stainless) intended for the conveyance of oil and of this order are boiler tubing and
steel pipes, of circular cross-section, not natural gas or other fluids in pipelines. mechanical tubing, if such products are
more than 114.3 mm (4.5 inches) in Seamless line pipes are produced to the not produced to A–335, A–106, A–53 or
outside diameter, regardless of wall API 5L specification. Seamless pipes are API 5L specifications and are not used
thickness, manufacturing process (hot– commonly produced and certified to in standard, line or pressure
finished or cold–drawn), end finish meet ASTM A–106, ASTM A–53 and applications. In addition, finished and
(plain end, beveled end, upset end, API 5L specifications. Such triple unfinished OCTG are excluded from
threaded, or threaded and coupled), or certification of pipes is common this order, if covered by the scope of
surface finish. These pipes are because all pipes meeting the stringent another antidumping duty order from
commonly known as standard pipe, line A–106 specification necessarily meet the same country. If not covered by such
pipe, or pressure pipe, depending upon an OCTG order, finished and unfinished
the API 5L and ASTM A–53
the application. They may also be used OCTG are included in this order when
specifications. Pipes meeting the API 5L
in structural applications. Pipes used in standard, line or pressure
specification necessarily meet the
produced in non–standard wall applications. Finally, also excluded
ASTM A–53 specification. However, from this order are redraw hollows for
thicknesses are commonly referred to as
pipes meeting the A–53 or API 5L cold–drawing when used in the
tubes. The seamless pipes subject to this
specifications do not necessarily meet production of cold–drawn pipe or tube.
order are currently classifiable under
subheadings 7304.10.10.20, the A–106 specification. To avoid Although the HTSUS subheadings are
7304.10.50.20, 7304.31.60.50, maintaining separate production runs provided for convenience and customs
7304.39.00.16, 7304.39.00.20, and separate inventories, manufacturers purposes, our written description of the
7304.39.00.24, 7304.39.00.28, triple- certify the pipes. Since scope of this order is dispositive.
7304.39.00.32, 7304.51.50.05, distributors sell the vast majority of this
product, they can thereby maintain a Rescission of the Administrative
7304.51.50.60, 7304.59.60.00, Review
7304.59.80.10, 7304.59.80.15, single inventory to service all
7304.59.80.20, and 7304.59.80.25 of the customers. The primary application of As noted above, on October 18, 2006,
Harmonized Tariff Schedule of the ASTM A–106 pressure pipes and triple Siderca submitted a letter to the
United States (‘‘HTSUS’’). certified pipes is in pressure piping Department indicating that it did not
systems by refineries, petrochemical make any shipments or entries of
Specifications, Characteristics and Uses plants and chemical plants. Other subject merchandise to the United
The following information further applications are in power generation States during the POR. In response to
defines the scope of this order, which plants (electrical–fossil fuel or nuclear), the Department’s query to U.S. Customs
covers pipes meeting the physical and in some oil field uses (on shore and and Border Protection (CBP), CBP
parameters described above. offshore), such as for separator lines, confirmed that a small quantity of
Seamless pressure pipes are intended gathering lines and metering runs. A subject merchandise was entered for
for the conveyance of water, steam, minor application of this product is for consumption into the United States
petrochemicals, chemicals, oil products, use as oil and gas distribution lines for during the POR from a third country. On
natural gas and other liquids and gasses commercial applications. These February 8, 2007, the Department
in industrial piping systems. They may applications constitute the majority of placed on the record of this review
carry these substances at elevated the market for the subject seamless copies of the entry documents in
pressures and temperatures and may be pipes. However, A–106 pipes may be question. On the basis of these
subject to the application of external used in some boiler applications. documents, the Department concluded
heat. Seamless carbon steel pressure that Siderca could not have known that
pipe meeting the ASTM standard A–106 The scope of this order includes all the merchandise exported to a third
may be used in temperatures of up to seamless pipe meeting the physical country would be re–exported to the
1000 degrees Fahrenheit, at various parameters described above and United States. On February 20, 2007, the
American Society of Mechanical produced to one of the specifications Department notified counsel for U.S.
Engineers (‘‘ASME’’) code stress levels. listed above, regardless of application, Steel of its intent to rescind this
Alloy pipes made to ASTM standard A– and whether or not also certified to a administrative review and requested
335 must be used if temperatures and non–covered specification. Standard, comments on the intended rescission.
stress levels exceed those allowed for line and pressure applications and the Counsel notified the Department on the
A–106 and the ASME codes. Seamless above–listed specifications are defining following day that they would not
pressure pipes sold in the United States characteristics of the scope of this order. comment and had no objection to
are commonly produced to the ASTM Therefore, seamless pipes meeting the rescission. See Memorandum to the File
A–106 standard. physical description above, but not from Helen M. Kramer, Case Analyst,
Seamless standard pipes are most produced to the A–335, A–106, A–53, or dated February 22, 2007.
commonly produced to the ASTM A–53 API 5L standards shall be covered if Based upon Siderca’s certification and
specification and generally are not used in a standard, line or pressure the evidence on the record, we are
intended for high temperature service. application. For example, there are satisfied that Siderca had no shipments
They are intended for the low certain other ASTM specifications of of subject merchandise to the United
temperature and pressure conveyance of pipe that, because of overlapping States during the POR. Pursuant to 19
water, steam, natural gas, air and other characteristics, could potentially be CFR 351.213(d)(3), the Department may
jlentini on PROD1PC65 with NOTICES

liquids and gasses in plumbing and used in A–106 applications. These rescind an administrative review, in
heating systems, air conditioning units, specifications generally include A–162, whole or with respect to a particular
automatic sprinkler systems, and other A–192, A–210, A–333, and A–524. exporter or producer, if the Secretary
related uses. Standard pipes (depending When such pipes are used in a standard, concludes that, during the period
on type and code) may carry liquids at line or pressure pipe application, such covered by the review, there were no

VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\09MRN1.SGM 09MRN1
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices 10709

entries, exports, or sales of the subject Review’’ of this countervailing duty DEPARTMENT OF COMMERCE
merchandise. Therefore, the Department order for calendar year 2005, the period
is rescinding this review in accordance of review (‘‘POR’’). See Antidumping or International Trade Administration
with 19 CFR 351.213(d)(3). Countervailing Duty Order, Finding, or
Although Siderca did not have any Exporters’ Textile Advisory Committee
Suspended Investigation; Opportunity
sales or exports of subject merchandise (ETAC); Notice of Open Meeting
to Request Administrative Review, 71
to the United States during the POR, its FR 37890 (July 3, 2006). In accordance A meeting of the Exporters’ Textile
subject merchandise entered the United with 19 CFR 351.221(c)(1)(i), we Advisory Committee will be held on
States during the POR under its published a notice of initiation of the Thursday, April 12, 2007 from 1:00-4:00
antidumping case number, without its review on August 30, 2006 for the 2005 at the Ronald Reagan Building, Trade
knowledge, by way of intermediaries. POR. See Initiation of Antidumping and Information Center, 1300 Pennsylvania
The Department will instruct CBP 15 Avenue, NW., Washington, DC 20004,
Countervailing Duty Administrative
days after the publication of this notice Training Room A.
Reviews and Requests for Revocation in
to liquidate such entries at the ‘‘All
Part, 70 FR 51573 (August 30, 2006). The ETAC is a national advisory
Others’’ rate in effect on the date of the
The preliminary results for this review committee that advises Department of
entry. See Antidumping and
are currently due no later than April 2, Commerce officials on the identification
Countervailing Duty Proceedings:
2007. of export barriers, and on market
Assessment of Antidumping Duties, 68
expansion activities. With the
FR 23954 (May 6, 2003). Extension of Time Limits for elimination of textile quotas under the
We are issuing and publishing this Preliminary Results WTO agreement on textiles and
notice in accordance with section
clothing, the Administration is
751(a)(1) of the Act and 19 CFR Section 751(a)(3)(A) of the Tariff Act
committed to encouraging U.S. textile
351.213(d)(4). of 1930, as amended (‘‘the Act’’), and apparel firms to export and remain
Dated: March 5, 2007. requires the Department to issue the competitive in the global market.
Stephen J. Claeys, preliminary results of an administrative The meeting will be open to the
Deputy Assistant Secretary for Import review within 245 days after the last day public with a limited number of seats
Administration. of the anniversary month of an order for available. For further information or
[FR Doc. E7–4289 Filed 3–8–07; 8:45 am] which a review is requested and the copies of the minutes, contact Rachel
BILLING CODE 3510–DS–S final results of review within 120 days Alarid at (202) 482-5154.
after the date on which the preliminary Date: March 5, 2007.
results are published. If it is not
DEPARTMENT OF COMMERCE practicable to complete the review R. Matthew Priest,
within the time period, section Deputy Assistant Secretary for Textiles and
International Trade Administration 751(a)(3)(A) of the Act allows the Apparel.
C–475–819 Department to extend these deadlines to [FR Doc.E7–4282 Filed 3–8–07; 8:45 am]
a maximum of 365 days and 180 days, BILLING CODE 3510–DS–S
Certain Pasta from Italy: Extension of respectively.
Time Limit for Preliminary Results of
We are currently analyzing DEPARTMENT OF COMMERCE
the Countervailing Duty Administrative
supplemental information provided by
Review
the respondents and the Government of International Trade Administration
AGENCY: Import Administration, Italy in this review. Because the
International Trade Administration, Department requires additional time to Mission Statement
Department of Commerce. review, analyze, and issue additional AGENCY: International Trade
EFFECTIVE DATE: March 9, 2007. supplemental questionnaires, it is not Administration, Department of
FOR FURTHER INFORMATION CONTACT: practicable to complete this review Commerce.
Brandon Farlander or Audrey Twyman, within the originally anticipated time
ACTION: Notice.
AD/CVD Operations, Office 1, Import limit (i.e., by April 2, 2007). Therefore,
Administration, International Trade the Department is extending the time Healthcare Technologies Trade Mission
Administration, U.S. Department of limit for completion of the preliminary to Turkey, Jordan, and Egypt
Commerce, 14th Street and Constitution results to not later than July 31, 2007,
Avenue, NW, Washington, DC 20230; in accordance with section 751(a)(3)(A) October 24 to November 1, 2007
telephone: (202) 482–0182 and (202) of the Act. I. Mission Description
482–3534, respectively.
We are issuing and publishing this The United States Department of
Background notice in accordance with sections Commerce, International Trade
On July 24, 1996, the Department of 751(a)(1) and 777(i)(1) of the Act. Administration, U.S. Commercial
Commerce (‘‘the Department’’) Dated: March 05, 2007. Service, Office of Global Trade
published a countervailing duty order Stephen J. Claeys, Programs, in conjunction with the
on certain pasta (‘‘pasta’’ or ‘‘subject Deputy Assistant Secretary for Import
Global Healthcare Team, will lead a
merchandise’’) from Italy. See Notice of Administration. healthcare technologies trade mission to
Countervailing Duty Order and [FR Doc. E7–4315 Filed 3–8–07; 8:45 am]
Istanbul, Turkey; Amman, Jordan; and
Amended Final Affirmative Cairo, Egypt from October 24 to
jlentini on PROD1PC65 with NOTICES

BILLING CODE 3510–DS–S


Countervailing Duty Determination: November 1, 2007. This mission will
Certain Pasta From Italy, 61 FR 38544 allow representatives of U.S. medical
(July 24, 1996). On July 3, 2006, the equipment and healthcare technology
Department published a notice of firms interested in entering or
‘‘Opportunity to Request Administrative expanding existing business in these

VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\09MRN1.SGM 09MRN1