You are on page 1of 3

12252 Federal Register / Vol. 72, No.

50 / Thursday, March 15, 2007 / Notices

will consider HST service from Los turnback/layover train storage facilities and included in additional public
Angeles to Anaheim. The HST system and a main HST repair and heavy notification.
can provide service to Orange County maintenance facility will be evaluated Issued in Washington, DC, on March 9,
with a terminus in Anaheim. Beyond in the Los Angeles-Orange County HST 2007.
Anaheim right-of-way is constrained EIR/EIS. Mark E. Yachmetz,
and environmental conditions are Probable Effects: The purpose of the Associate Administrator for Railroad
different. HST service beyond Anaheim EIR/EIS process is to explore in a public Development.
to Irvine may be considered separately setting the effects of the proposed [FR Doc. E7–4710 Filed 3–14–07; 8:45 am]
in the future. project on the physical, human, and BILLING CODE 4910–06–P
Further engineering studies to be natural environment. The FRA and the
undertaken as a part of this EIR/EIS Authority will continue the tiered
process will examine and refine evaluation of all significant DEPARTMENT OF TRANSPORTATION
alignments in the selected corridor, environmental, social, and economic
including the alignment option impacts of the construction and Federal Railroad Administration
identified in the statewide program EIR/ operation of the HST system. Impact
EIS that shares tracks with other areas to be addressed include: Environmental Impact Statement for
passenger services separated from Transportation impacts; safety and the California High Speed Train
freight trains with 4 total tracks (2 for security; land use and zoning; System from Palmdale to Los Angeles,
passenger rail service and 2 for freight secondary development; land CA
service) between Los Angeles and acquisition, displacements, and
Fullerton and 2 total tracks with AGENCY: Federal Railroad
relocations; cultural resource impacts, Administration (FRA) U.S. Department
additional passing tracks South of including impacts on historical and
Fullerton. With this alignment option, of Transportation (DOT) .
archaeological resources and parklands/
the electrified HST would share tracks ACTION: Notice of intent to prepare an
recreation areas; neighborhood
(at reduced speeds) with non-electric Environmental Impact Statement.
compatibility and environmental
Metrolink commuter rail, Amtrak justice; natural resource impacts SUMMARY: FRA is issuing this notice to
Surfliner intercity services and including air quality, wetlands, water
occasional freight trains (there are fewer advise the public that FRA and the
resources, noise, vibration, energy, California High Speed Rail Authority
freight operations south of Fullerton). wildlife and ecosystems, including
This alignment option is based on the (Authority) will jointly prepare a project
endangered species. Measures to avoid, level Environmental Impact Statement
premise that the capacity and
minimize, and mitigate all adverse (EIS) and project level Environmental
compatibility issues associated with the
impacts will be identified and Impact Report (EIR) for the section of
shared operations with existing non-
evaluated. the Authority’s proposed California
electric service (Surfliners, Metrolink,
and freight) can be resolved. Additional Scoping and Comments: FRA High-Speed Train (HST) System from
alignment options will be considered encourages broad participation in the the City of Palmdale to the City of Los
that involve dedicated HST tracks that EIS process during scoping and review Angeles in compliance with relevant
may be exclusive to HST service or that of the resulting environmental State and federal laws, in particular the
may also accommodate Metrolink documents. Comments and suggestions California Environmental Quality Act
express services. are invited from all interested agencies (CEQA) and the National Environmental
Station location options were selected and the public at large to insure the full Policy Act (NEPA).
by the Authority and FRA with the range of issues related to the proposed FRA is issuing this notice to solicit
statewide program EIR/EIS considering action and all reasonable alternatives public and agency input into the
travel time, train speed, cost, local are addressed and all significant issues development of the scope of the EIS and
access times, potential connections with are identified. In particular, FRA is to advise the public that outreach
other modes of transportation, ridership interested in determining whether there activities conducted by the Authority
potential, and the distribution of are areas of environmental concern and its representatives will be
population and major destinations along where there might be a potential for considered in the preparation of the
the route, and local planning significant impacts identifiable at a combined EIR/EIS. The Authority and
constraints/conditions. Alternative project level. Public agencies with FRA completed a Program EIR/EIS for
station sites at the selected general jurisdiction are requested to advise FRA the California HST System in 2005 as
station locations will be identified and and the Authority of the applicable the first-phase of a tiered environmental
evaluated in this project level EIR/EIS. permit and environmental review review process for the proposed
Station area development policies to requirements of each agency, and the California HST System. The Authority
encourage transit-friendly development scope and content of the environmental certified the Final Program EIR and
near and around HST stations that information that is germane to the issued a decision, and FRA issued a
would have the potential to promote agency’s statutory responsibilities in Record of Decision in November 2005
higher density, mixed-use, pedestrian- connection with the proposed project. on the Final Program EIS, selecting the
oriented development will be prepared Public agencies are requested to advise HST Alternative for further project level
in coordination with local and regional FRA if they anticipate taking a major environmental review and selecting
planning agencies. Potential station action in connection with the proposed corridor alignments and potential
locations to be evaluated in the Los project and if they wish to cooperate in station locations, including a corridor
Angeles-Orange County HST EIR/EIS the preparation of the project level EIR/ between Palmdale and Los Angeles. The
include: City of Los Angeles-Union EIS. Public scoping meetings have been preparation of this project level
rmajette on PROD1PC67 with NOTICES

Station; City of Norwalk-Norwalk scheduled as an important component Palmdale-Los Angeles HST EIR/EIS will
Transportation Center; and City of of the scoping process for both the State involve development of preliminary
Anaheim-Anaheim Regional and Federal environmental review. The engineering designs and assessment of
Transportation Intermodal Center scoping meetings described in this environmental effects associated with
(ARTIC). In addition, potential sites for Notice will also be advertised locally the construction, operation and

VerDate Aug<31>2005 14:20 Mar 14, 2007 Jkt 211001 PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
Federal Register / Vol. 72, No. 50 / Thursday, March 15, 2007 / Notices 12253

maintenance of the HST system, system capable of speeds in excess of Species Act, and Executive Order 12898
including track, ancillary facilities and 200 miles per hour on a dedicated, fully on Environmental Justice. This EIR/EIS
stations, along the previously selected grade-separated state-of-the-art track. process will also continue the NEPA/
Palmdale-Los Angeles corridor. The FRA has responsibility for Clean Water Act Section 404 merger
DATES: Written comments on the scope oversight of the safety of railroad process established through the
of the Palmdale-Los Angeles HST EIR/ operations, including the safety of any statewide program EIR/EIS process.
EIS should be provided to the Authority proposed high-speed ground This Palmdale-Los Angeles HST EIR/
by April 24, 2007. Public scoping transportation system. For the proposed EIS and other project level EIR/EISs will
meetings are scheduled from April 4– HST, it is anticipated that FRA would examine a range of project alternatives
17, 2007 as noted below. need to take certain regulatory actions for portions of the proposed HST system
ADDRESSES: Written comments on the
prior to operation. within corridors selected in the
In 2005, the Authority and FRA statewide program EIR/EIS, as well as a
scope should be sent to Mr. Dan Leavitt,
completed a Final Program EIR/EIS for no action alternative. This and other
Deputy Director, ATTN. Palmdale-Los
the Proposed California High-Speed project level EIR/EISs will fully describe
Angeles, California High-Speed Rail
Train System (statewide program EIR/ site-specific environmental impacts and
Authority, 925 L Street, Suite 1425, EIS), as the first-phase of a tiered will identify specific mitigation
Sacramento CA 95814, or via e-mail environmental review process. The measures to address those impacts and
with subject line ‘‘Palmdale-Los Authority certified the Final Program will incorporate design practices to
Angeles’’ to: comments@hsr.ca.gov. EIR under CEQA and approved the avoid and minimize potential adverse
Comments may also be provided orally proposed HST System, and FRA issued environmental impacts. The FRA and
or in writing at scoping meetings a Record of Decision under NEPA on the the Authority will assess the site
scheduled at the following locations: Final Program EIS. This statewide characteristics, size, nature, and timing
• Glendale Public Library, 222 E. program EIR/EIS established the of proposed site-specific projects to
Harvard St., Glendale, CA 91205, on purpose and need for the HST system, determine whether the impacts are
April 4, 2007 from 3 to 5 p.m. and from analyzed a HST alternative, and potentially significant and whether
6 to 8 p.m. compared it with a No Project/No
• Los Angeles County Metropolitan impacts can be avoided or mitigated.
Action Alternative and a Modal This and other project EIR/EISs will
Transit Agency Headquarters (Board
Alternative. In approving the statewide identify and evaluate reasonable and
Room), One Gateway Plaza, Los
program EIR/EIS, the Authority and the feasible site-specific alignment
Angeles, CA 90012, on April 5, 2007
FRA selected the HST Alternative and alternatives, evaluate the impacts from
from 3 to 5 p.m. and from 6 to 8 p.m. selected certain corridors/general
• Sylmar Park Recreation Center, construction, operation, and
alignments and general station maintenance of the HST system, and
13109 Borden Avenue Sylmar, CA
locations, incorporated mitigation identify mitigation measures.
91342 on April 10, 2007, from 3 to 5:00
strategies and design practices, and Information and documents regarding
p.m. and from 6 p.m. to 8 p.m.
specified further measures to guide the the HST environmental review process
• Palmdale City Hall, Council
development of the HST system at the will be made available through the
Chambers, 38300 North Sierra Highway,
site-specific project level of Authority’s Internet site: http://
Palmdale, CA 93550, on April 12, 2007
environmental review to avoid and www.cahighspeedrail.gov/.
from 3 to 5 p.m. and from 6 to 8 p.m.
• Los Angeles River Center & Gardens minimize potential adverse Purpose and Need: The need for a
(Atrium), 570 W. Avenue 26, Los environmental impacts. HST system is directly related to the
The Palmdale-Los Angeles HST EIR/ expected growth in population and
Angeles, CA 90065, on April 17, 2007
EIS will be developed as a second-tier, increase in intercity travel demand in
from 3 to 5 p.m. and from 6 to 8 p.m.
site-specific environmental document. It California over the next twenty years
FOR FURTHER INFORMATION CONTACT: Mr. is one of a number of second-tier and beyond. With growth in travel
David Valenstein, Environmental environmental reviews for sections of demand, there will be an increase in
Program Manager, Office of Railroad the HST system that FRA and the travel delays arising from the growing
Development, Federal Railroad Authority intend to undertake. It will be congestion on California’s highways and
Administration, 1120 Vermont Avenue tiered from and incorporate by reference at airports. In addition, there will be
(Mail Stop 20), Washington, DC 20590; the certified statewide program EIR/EIS negative effects on the economy, quality
Telephone (202)–493–6368, or Mr. in accordance with Council on of life, and air quality in and around
Leavitt at the above noted address. Environmental Quality (CEQ) California’s metropolitan areas from a
SUPPLEMENTARY INFORMATION: The regulations (40 CFR 1508.28) and State transportation system that will become
California High-Speed Rail Authority CEQA Guidelines (14 C.C.R. 15168[b]). less reliable as travel demand increases.
(Authority) was established in 1996 and Tiering will ensure that the Palmdale- The intercity highway system,
is authorized and directed by statute to Los Angeles HST EIR/EIS builds upon commercial airports, and conventional
undertake the planning for the all previous work prepared for and passenger rail serving the intercity
development of a proposed statewide incorporated in the statewide program travel market are currently operating at
HST network that is fully coordinated EIR/EIS. The EIR/EIS will be carried out or near capacity, and will require large
with other public transportation in accordance with FRA’s Procedures public investments for maintenance and
services. The Legislature has granted the for Considering Environmental Impacts expansion to meet existing demand and
Authority the powers necessary to (64 FR 28545 [May 26, 1999]) and will future growth. The purpose of the
oversee the construction and operation address not only NEPA and CEQA but proposed HST system is to provide a
of a statewide HST network once other applicable statutes, regulations new mode of high-speed intercity travel
financing is secured. As part of the and executive orders, including the that would link the major metropolitan
rmajette on PROD1PC67 with NOTICES

Authority’s efforts to implement a high- 1990 Clean Air Act Amendments, areas of the state; interface with
speed train system, the Authority Section 404 of the Clean Water Act, the international airports, mass transit, and
adopted a Final Business Plan in June National Historic Preservation Act of highways; and provide added capacity
2000, which reviewed the economic 1966, Section 4(f) of the Department of to meet increases in intercity travel
feasibility of a 700-mile-long HST Transportation Act, the Endangered demand in California in a manner

VerDate Aug<31>2005 14:20 Mar 14, 2007 Jkt 211001 PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
12254 Federal Register / Vol. 72, No. 50 / Thursday, March 15, 2007 / Notices

sensitive to and protective of Station location options were selected EIS process during scoping and review
California’s unique natural resources. by the Authority and FRA with the of the resulting environmental
Alternatives: The Palmdale-Los statewide program EIR/EIS considering documents. Comments and suggestions
Angeles HST EIR/EIS will consider a No travel time, train speed, cost, local are invited from all interested agencies
Action or No Project Alternative and access times, potential connections with and the public at large to insure the full
HST Alternatives for the Palmdale to other modes of transportation, ridership range of issues related to the proposed
Los Angeles corridor. potential and the distribution of action and all reasonable alternatives
No Action Alternative: The take no population and major destinations along are addressed and all significant issues
action (No Project or No Build) the route, and local planning are identified. In particular, FRA is
alternative is defined to serve as the constraints/conditions. Alternative interested in determining whether there
baseline for assessment of the HST station sites at the selected general are areas of environmental concern
Alternative. The No Build Alternative station locations will be identified and where there might be a potential for
represents the region’s transportation evaluated in this project level EIR/EIS. significant impacts identifiable at a
system (highway, air, and conventional Station area development policies to project level. Public agencies with
rail) as it existed in 2006, and as it encourage transit-friendly development jurisdiction are requested to advise FRA
would exist after completion of near and around HST stations that and the Authority of the applicable
programs or projects currently planned would have the potential to promote permit and environmental review
for funding and implementation by higher density, mixed-use, pedestrian- requirements of each agency, and the
2030. The No Build Alternative defines oriented development around the scope and content of the environmental
the existing and future intercity stations will be prepared in information that is germane to the
transportation system for the Palmdale coordination with local and regional agency’s statutory responsibilities in
to Los Angeles corridor based on planning agencies. Potential station connection with the proposed project.
programmed and funded improvements locations to be evaluated in the Public agencies are requested to advise
to the intercity transportation system Palmdale-Los Angeles HST EIR/EIS FRA if they anticipate taking a major
through 2030, according to the include: City of Palmdale, Palmdale action in connection with the proposed
following sources of information: State Transportation Center; City of Sylmar, project and if they wish to cooperate in
Transportation Improvement Program Sylmar Metrolink station; and City of the preparation of the project level EIR/
(STIP), Regional Transportation Plans Burbank, Burbank Metrolink station. EIS. Public scoping meetings have been
(RTPs) for all modes of travel, airport The HST station at Los Angeles Union scheduled as an important component
plans, and intercity passenger rail plans. Station is being evaluated in the project of the scoping process for both the State
level Los Angeles-Orange HST EIR/EIS and Federal environmental review. The
HST Alternative: The Authority
and will not be considered in the scoping meetings described in this
proposes to construct, operate and
Palmdale-Los Angeles HST EIR/EIS Notice will also be advertised locally
maintain an electric-powered steel-
process. In addition, potential sites for and included in additional public
wheel-on-steel-rail HST system, over
turnback/layover train storage facilities notification.
700-mile long (1,126-kilometer long), and a main HST repair and heavy
capable of speeds in excess of 200 miles maintenance facility will be evaluated Issued in Washington, DC, on March 9,
per hour (mph) (320 kilometers per hour in the Palmdale-Los Angeles HST EIR/ 2007.
[km/h]) on dedicated, fully grade- EIS. Mark E. Yachmetz,
separated tracks, with state-of-the-art Probable Effects: The purpose of the Associate Administrator for Railroad
safety, signaling, and automated train EIR/EIS process is to explore in a public Development.
control systems. The Palmdale to Los setting the effects of the proposed [FR Doc. E7–4711 Filed 3–14–07; 8:45 am]
Angeles HST corridor that was selected project on the physical, human, and BILLING CODE 4910–06–P
by the Authority and FRA with the natural environment. The FRA and the
statewide program EIR/EIS follows SR– Authority will continue the tiered
58/Soledad Canyon from the City of evaluation of all significant DEPARTMENT OF TRANSPORTATION
Palmdale to Sylmar and then along the environmental, social, and economic
Metrolink Railroad line to Los Angeles impacts of the construction and Federal Transit Administration
Union Station. The corridor is relatively operation of the HST system. Impact
wide in the area that includes both the Intent To Prepare an Environmental
areas to be addressed include:
SR–14 and Union Pacific Railroad Impact Statement for High-Capacity
transportation impacts; safety and
alignments between the Antelope Valley Transit Improvements in the Leeward
security; land use, and zoning;
and Santa Clarita. Further engineering Corridor of Honolulu, HI
secondary development; land
studies to be undertaken as a part of this acquisition, displacements, and AGENCY: Federal Transit Administration,
EIR/EIS process will examine and refine relocations; cultural resource impacts, DOT.
alignments in the selected corridor, including impacts on historical and ACTION:Notice of Intent to prepare an
including sections from the Palmdale to archaeological resources and parklands/ Environmental Impact Statement (EIS).
Santa Clarita and from the Burbank recreation areas; neighborhood
Metrolink Station to Los Angeles Union compatibility and environmental SUMMARY: The Federal Transit
Station. An alignment option that justice; natural resource impacts Administration (FTA) and the City and
closely follows the SR–14 through including air quality, wetlands, water County of Honolulu, Department of
Soledad Canyon will be considered as resources, noise, vibration, energy, Transportation Services (DTS) intend to
well as an alignment option through wildlife and ecosystems, including prepare an EIS on a proposal by the City
Soledad Canyon along the Santa Clara endangered species. Measures to avoid, and County of Honolulu to implement
rmajette on PROD1PC67 with NOTICES

River. Alignments along San Fernando minimize, and mitigate all adverse a fixed-guideway transit system in the
Road adjacent to Taylor Yard and along impacts will be identified and corridor between Kapolei and the
the existing Metrolink right-of-way evaluated. University of Hawai1i at Mānoa with a
around the Taylor Yard area will be Scoping and Comments: FRA branch to Waikı̄kı̄. Alternatives
considered. encourages broad participation in the proposed to be considered in the draft

VerDate Aug<31>2005 14:20 Mar 14, 2007 Jkt 211001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1

You might also like