DIVISION 16 ELECTRICAL

SECTION 16775: ACCESS CONTROL AND CAR PARK SYSTEM


PART 1 GENERAL
1.1

RELATED DOCUMENTS
A.

Drawings and general provisions of Contract, including General and Supplementary


Conditions and Division 1 Specification Sections, apply to this Section.

B.

Requirements of the following sections apply to this section:

1.2

1. Section

:'' Basic Electrical Materials and Methods''

2. Section

: ''Race Ways and Boxes''

3. Section

: ''Cable Trays''.

RELATED DOCUMENTS
B.

Drawings and general provisions of the Contract, including General and supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
SYSTEM FUNCTIONS AND COMPONENTS GENERAL

1.3
A.

Summary

Comply

1. The car park system shall cover the following:


2. Public Parking areas.

Comply

3. For the tenants of apartments, automatic rising barriers associated with proximity card
readers shall be provided. Barriers manual Control shall also be provided.

Comply

4. For the public parking areas, only parking status display signs indicating the available
free spaces shall be provided at the entrances.
B.

This Section includes the following:

Comply

1. Automatic barrier gates.

Comply

2. Vehicle loop detectors.

C.

Not Comply

3. Differential counters.

Not Comply

4. Provision for implementing Number Plate Recognition System.

Not Comply

5. Parking facility management software.

Not Comply

6. Changeable traffic display panels (Variable Message Signs VMS), indicating status of
the car park (Full/Vacant).

Not Comply

All wiring (network loops), control cabling, conduit, boxes, weather proof enclosures,
contactors and accessories and ancillary work, whether described in the Specification or By Azmeel
not, required for a complete and fully operational system.

JEDDAH GATE LOT E3


Jeddah, KSA

16775 1

ACCESS CONTROL AND


CAR PARK SYSTEM

D.

Related Sections include the following:


1. Division 2 Section "Hot Mix Asphalt Paving" for asphalt driveway and approach paving.

By Azmeel

2. Division 2 Section "Cement Concrete Pavement" for concrete driveway and approach
paving.

By Azmeel

3. Division 3 Section "Cast in Place Concrete" for concrete islands and curbing.

By Azmeel

4. Division 3 Section "Cement Based Screeds" for concrete islands and curbing.

By Azmeel

5. Division 5 Section "Metal Fabrications" for pipe bollards to protect parking control
By Azmeel
equipment.
6. Division 10 Section "Signs, Post and Panel Signs" for exterior parking related signs.

By Azmeel

7. Division 16 Section " Fire Alarm " for integrating parking control equipment with fire
alarm system.

Comply

8. Division 16 Sections for electrical wiring for, connections to, and grounding of parking By Contractor
control equipment.
9. Division 15, Section Building Management System (BMS), Instrumentation And Other supplier
Controls .
1.4

PERFORMANCE REQUIREMENTS
Thermal Movements: Provide parking control equipment that allows for thermal movements
resulting from the following maximum change (range) in ambient and surface temperatures
by preventing buckling, opening of joints, overstressing of components, failure of joint
sealants, failure of connections, and other detrimental effects. Base engineering calculation
on surface temperatures of materials due to both solar heat gain and nighttime sky heat loss.

A.

Temperature Change (Range): 2 deg C, ambient; 70 deg C, material surfaces.

B.

Waterproof Equipment: Listed and labeled for duty outdoors or in damp locations, with a
minimum Ingress Protection rating of IP54.

C.

Software integration with other systems shall be carried out through a standard protocol.

D.

Integrate the system with the Fire Alarm System for the following purpose:

Dry contact

1. Fire Alarm: for opening the barriers and display message at the entry gates in case of fire.

dry contact

2. BMS interface: hard wire interface to provide healthy status and power failure conditions.

dry contact

1.5

50c Comply

SUBMITTALS

A.

Product Data: For each type of product indicated.

B.

Product data submittal shall include the following as minimum:

JEDDAH GATE LOT E3


Jeddah, KSA

16775 2

ACCESS CONTROL AND


CAR PARK SYSTEM

Comply
Comply

1. Schedule of equipment proposed, with catalogue reference number.

Comply

2. Name and address of the manufacturer and country of origin of the product.

Comply

3. Compliance statement to specification, with necessary supporting documents.

Comply
Comply
MCC
Authorized
dealer
Comply

4. Catalogue pages of proposed equipment.


5. Name and address of the authorized local representative/dealer.
6. System architecture and schematic diagram.
C.

D.

Shop Drawings: Include plans, elevations, details, and interface to other work. Detail
equipment assemblies and indicate dimensions, required clearances, method of field
assembly, components, and location and size of each field connection.
1. Wiring Diagrams: Power, signal, and control wiring.

Comply

2. Samples: Provide samples of parking control equipment subject to the Engineer's


approval for colour/finish.

Noted

Qualification Data: For firms and persons specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include lists of completed projects with
project names and addresses, names and addresses of architects/engineers and owners, and
other information specified or required by the Engineer.

E.

Field quality control test reports.

F.

Operation and Maintenance Data: For parking control to include in emergency, operation,
and maintenance manuals. Include the following:

G.

1.6

Submittal
Comply

1. As Built layouts and schematics.

Comply

2. System operation.

Comply

3. Maintenance schedule.

Comply

4. System software documentation

Comply

5. Power supply schedule.

Comply

6. Integration and interfaces with other systems documentations.

Comply

Record (As Built) Drawings: At Project close out, submit Record (As Built) Drawings of all
system components and peripherals in accordance with the requirements of the Specification,
Division 1.

Comply

QUALITY ASSURANCE

JEDDAH GATE LOT E3


Jeddah, KSA

16775 3

ACCESS CONTROL AND


CAR PARK SYSTEM

A.

B.

Installer Qualifications: Engage an experienced installer who is an authorized representative


of the parking control equipment manufacturer for both installation and maintenance of the
type of units required for Project, and whose installations have resulted in construction with a
record of successful in service performance of projects of similar complexity.
Local Representative: Provide evidence that proposed equipment manufacturer has a locally
established and authorized organization which can be called upon for professional advice and
maintenance as may be required, and which can immediately supply spare parts to support
day to day and emergency maintenance requirements. Failure to satisfy the Engineer may
disqualify a manufacturer.

Comply

Comply

1. Maintenance Proximity: Not more than one hour normal travel time from Installer's place
of business to Project site.

Comply

C.

Source Limitations: Obtain parking main control equipment through one source from a single
manufacturer.

Comply

D.

Pre installation Conference: Conduct conference at Project site to comply with requirements
in Division 1 Section "Project Management and Coordination."

By Contractor

1.7
A.

COORDINATION
Coordinate installation of anchorages for parking control equipment. Furnish setting
drawings, templates, and directions for installing anchorages, including sleeves, concrete
inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or
masonry. Deliver such items to Project site in time for installation.

B.

The contractor shall be responsible for coordination with the Access Control Specialist in
order to integrate the proximity card reader to the rising barrier .

C.

Electrical System Roughing in: Coordinate layout and installation of parking control
equipment with connections to power supplies.

D.

The Contractor shall be responsible for coordination with various systems under this Contract

1.8
A.

1.9

By Contractor
Comply
Supervision by Mcc
Noted

EXTRA MATERIALS
Furnish extra materials described below that match products installed and that are packaged
with protective covering for storage and identified with labels describing contents.

Noted

1. Gate Arms: 20% breakaway gate arms, but not less than 1, for the total number of gates
installed, complete with accessory components.

Noted

2. Manufacturers recommended spare parts for a minimum of 2 years operation.

Noted

POWER SUPPLY

JEDDAH GATE LOT E3


Jeddah, KSA

16775 4

ACCESS CONTROL AND


CAR PARK SYSTEM

A.

1.10
B.

1.11

Provide an Uninterruptible Power Supply (UPS) at 230 V, 60 Hz for 30 minutes in the control
room to serve all the access control and car park management system equipment including
motors of arm barriers. All required power supply equipment and cabling from this source is
to be provided under this section of work.

Other
Supplier

AVAILABILITY OF SPARE PARTS AND FORWARD COMPATIBILITY.


The Contractor has to obtain and submit a written undertaking from the manufacturer that
the spare parts of the system to be installed shall be made available upon request for at least
10 years from the date of substantial completion.

Comply

PROJECT CONDITIONS

A. Environmental Conditions: System shall be capable of withstanding the project environmental


conditions specified under Division 16 Section 16050 without mechanical or electrical damage
or degradation of operating capability.

Comply

PART 2 PRODUCTS
2.1
APPROVED MANUFACTURERS
A.

Available Manufacturers: subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include, but are not limited to
1. Amano (Belgium)

B.

2. Honeywell (China) Or approved equal

The suppliers in Saudi Arabia can be :

1. Mounir Fennira, Hostra, Jeddah 21431, Telephone: +966 2 6655608

MCC is
Authorized
Dealer of
Honeywell

2. Raed Moghrabi , Electronic special Equipment ,Jeddah ,+966 2 6606456


3. Mohammed Kazli SP , Trust middle east Co. , Jeddah ,+966 2 6396753
2.2

MATERIALS

A. Aluminum: Alloy and temper recommended by aluminum producer and manufacturer for type
of use and finish indicated, and as follows:

Other Supplier

1. Sheet: ASTM B 209M.


2. Extruded Shapes: ASTM B 221M.
B. Cold Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B.
C. Zinc Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, commercial quality, with Z180
coating designation; mill phosphatized.

Other Supplier

D. Stainless Steel Sheet: ASTM A 666, Type 304.


E. Anchorages: Anchor bolts, hot dip galvanized according to ASTM A 153/A 153M.
2.3

Other Supplier

Other Supplier

AUTOMATIC BARRIER GATES

A. General: Provide a parking control device consisting of operator and controller housed in
cabinet enclosure with gate arm. Fabricate unit with gate arm height in down position of not
more than 889 mm to prevent even small vehicles from passing under gate arm.
JEDDAH GATE LOT E3
Jeddah, KSA

16775 5

ACCESS CONTROL AND


CAR PARK SYSTEM

Comply

1. Controller: Factory sealed, solid state, plug in type, with galvanized steel box for wiring
connections. Equip unit with the following features:

Comply

a. Capable of storing successive inputs and sequentially processing each one.

Comply

b. Automatic instant reversing mechanism that stops downward motion of gate arm if
arm strikes an object and that immediately returns arm to upward position. Include a
0 to 60 second variable time reset device.

Comply

c. On off power supply switch.

Comply

d. Automatic manual switch.

Comply
Comply

e. Directional arming logic.


f.

Noted

RS 485 communication port.

Noted

g. Broken gate arm monitoring.

Noted

h. Programmable automatic timer.

Noted

i.

Internal re settable counters.

j.

Thermal overload protection with manual reset.

Noted
Noted

k. Thermostatically controlled heater with on off auto switch.


l.

Noted

Diagnostic mode for on site testing, with LEDs for inputs and outputs.

m. Automatic and continuous testing of inputs and outputs.

Comply

n. Switch to test motor and limit switches or raise gate arm manually.

Comply

o. Single, 230 V ac grounded power receptacle.

Comply

B. Cabinets: Fabricated from metal sheet with seams welded and ground smooth; approximately
400 mm square by 1100 mm tall. Provide single, gasketed access door for each cabinet with
flush mounted locks. Furnish two keys for each lock, all locks keyed alike. Fabricate cabinet
with internal reinforcing and four mounting holes accessible only from inside cabinet.
1. Material: 2.8 mm thick, stainless steel sheet.

Comply
Comply

a. Finish cabinet exterior with No. 4 finish.

Comply

b. Finish cabinet, interior and exterior, with manufacturer's standard yellow baked
enamel finish over primer.

Comply

C. Straight Gate Arm: Aluminum, with enamel coated or paint finish and red stripes on traffic
side face. Provide mounting flange with breakaway feature to ensure clean break if arm is
struck by vehicle.

Comply

1. Length: to cover the entire (endurances/exits) lane width. Attention and consideration
shall also be given to the clear height inside the car park, and accordingly proper type of
arm selected, whether straight gate arm or folding type, as suitable and fit for proper
operation and function.

Comply

2. Tip supports shall be specified for arm lengths more than 4000mm.

Comply

JEDDAH GATE LOT E3


Jeddah, KSA

16775 6

ACCESS CONTROL AND


CAR PARK SYSTEM

D. Operator: 1/2 hp (as recommended by manufacturer) ,230V AC, 60 Hz, single phase, instant
reversing, continuous duty motor for operating gate arm. Transmit power to gate arm drive
shaft through speed reducer to harmonic acting crank and connecting rod. Fabricate crank,
rod, and drive shaft of galvanized solid bar steel. Provide an operable cam for adjusting arm
travel.

Comply

E. Accessories:

Comply

1. Low voltage red warning lights that illuminate when gate is in down position.
2. Gate arm tip support.
2.4

Comply

Comply
Comply

VEHICLE LOOP DETECTORS and DIFFERENTIAL COUNTERS

A. Vehicle Loop Detector System: Provide self tuning electronic detector with adjustable
detection patterns, adjustable sensitivity and frequency settings, and panel indicator light
designed to detect presence or transit of a vehicle over an embedded loop of wire. Provide
number of loops consisting of multiple strands of wire, number of turns, loop size, and method
of placement at location shown on Drawings, as recommended in writing by detection system
manufacturer for function indicated.
1. Field Assembled Loop: Wire, in size indicated for field assembly, and sealant; style for
pave over installation.
2. System Performance: Capable of the following:
a. Recognize vehicle direction by detecting vehicle.
b. Differentiate vehicle direction by detecting vehicle moving from one loop to another,
reporting to server, which display on the VMS the parking spaces status per zone.
c. Generate reverse count if vehicle backs up after generating directional count in
forward direction.

Comply

Supply &
Supervision
only
Single loop
for exit side
to open the
barrier ,

d. Continuous diagnostic monitoring for intermittently operating and failed loops.


e. Crosstalk test between adjacent loops.
2.5

ACCESS CONTROL UNITS

A. Card Reader Access Unit: Access control system that activates barrier gates ,Elevators,entrance
doors and functions only when authorized card is presented. Fabricate housing from welded
cold rolled steel sheet with weatherproof front access panel equipped with flush mounted
lock and two keys. Finish units with manufacturer's standard baked enamel coating system.
Provide face lighted unit fully visible at night.

Comply

1. System: System shall be coordinated with main contractor .


2. Operation: On line communication to remote parking control system computer.
3. Features: Capable of monitoring and auditing barrier gate activity.
4. Mounting: As indicated on Drawings.

JEDDAH GATE LOT E3


Jeddah, KSA

Comply

Control/Monitor door
Elevator and barrier only
via acccess control pc
Comply
Comply

16775 7

ACCESS CONTROL AND


CAR PARK SYSTEM

5. Cards: access control system cards carried by tenants to access their dedicated zones are
to be used to access the dedicated parking areas inside the parking as well, and at main
entrances. (1000 CARDS).
6. For elevators the card reader shall be interfaced with lift control panel. Coordination with
lift supplier is to be carried by contractor.
2.6

Comply

Comply

CARD READER CONTROL SYSTEM

A. Description
1. The Card Reader Control System Architecture will comprise of the following components:
a. Master Access Controller for independent building blocks

Comply

b. Barrier Controller

Comply

2. The system shall function on the commands of the access control management software
and the building management system. Each building block shall have a master access
controller (MAC) which will locally control barrier controllers and provide access
scheduling, transaction logging and alarms. These MACs shall be linked to the access
control system server in the central security room of the building blocks via an Ethernet
LAN connection.
3. The system shall be modular in architecture and completely compliant with LON and
BACNET protocols

Comply

Moduler

B. Building Door locking device


1. The door locking device installation shall be coordinated by the Contractor with the
Architecture.
2. The Contractor shall ensure that in case of fire, the doors in the exit path will be
automatically opened.
3. The lock shall be an Electromagnetic Shear Lock and shall be produced by an ISO 9001
certified manufacturer. The lock shall be of the self aligning magnetic shear type suitable
for mortise mounting and shall not exceed 15 cubic inches (9x1 l/2x1 l/10). The lock shall
be dual voltage accepting 12 or 24 VDC without the alteration of any settings at the
time of the installation.
4. The power requirements of the lock shall not exceed four Watts (l60mA @ 24VDC or
320mA @12VDC).The lock shall be self contained with no external circuit board and will
self align into the locked position when the door closes without the need for door
position sensing or timers. The lock shall not be position sensitive; it may be mounted at
the top or side of the door and will operate on single or double acting doors. The LOCK
shall be fully sealed in resin to make it tamper proof.

by Contractor
Comply

Comply

Comply

C. Building Door Control Device


1. Exit Push Button: The Push Button shall be produced by an ISO 9001 certified
manufacturer. The Push Button shall be an industrial grade 1.5 diameter mushroom
button.
JEDDAH GATE LOT E3
Jeddah, KSA

16775 8

ACCESS CONTROL AND


CAR PARK SYSTEM

Comply

2. The Button shall be labeled EXIT and shall be green back lit using a multi chip LED. A
separate red LED shall be provided as an additional indicator.
3. The LEDs shall operate on 12 or 24 VDC (field selectable). The switch shall be DP/ST and
rated at 7 Amps at 12 or 24 VDC. The push button shall be mounted on a stainless steel
single gang face plate. The switch shall be available in either momentary or alternate
action versions.
2.7

Comply

Comply

Operation:
The operation of the system shall be as follows:

2.8

A.

When the system is interfaced with main entrance door, it shall have the provision for
Interfacing with Fire Alarm system to release the lock in the event of a fire.

Comply

B.

The main Unit shall operate on 230V, 60Hz supply and shall provide power to all system
components.

Comply

1. The main unit will have an interface relay which will send a 24VDC signal to the
system for releasing the Door lock. The relay will have at least one N/O and one N/C
changeover contact.

12VDC
N/O & N/C

2. An exit switch with LED indication shall be provided next to the main unit in the Guard
Room for operation by the watch man. The push button on the switch panel shall be
stainless steel designed for heavy use.

Comply

MISCELLANEOUS PARKING CONTROL EQUIPMENT

Other Supplier

A. Parking zone "Variable Message Signs (VMS)": Single faced signs consisting of (high bright
LEDs) illumination source contained in welded steel bodies with extended hood and baked
enamel finish.
1. Type: Flashing.
2. Operation: Automatic by barrier gate controller.
3. Illumination: Traffic signal lamps and colored fiberglass sign face.
4. Mounting: as advised by Architect.
5. Location and Number: on each entrance for parking.
2.9

PARKING FACILITY MANAGEMENT SOFTWARE

Other Supplier

A. General: Manufacturer's standard software that provides automatic facility monitoring,


supervision, and remote control of parking control equipment from one or more locations.
1. System Performance: Capable of the following:
a.
b.
c.
d.
e.

Collect data for access and space control.


Calculate occupancy and display status (full/vacant) for each zone on VSM signs.
Communication between car park management system equipments and work stations.
Program parking control equipment.
Accuracy: System accuracy of 95 percent with tolerance +/ 2 percent.

JEDDAH GATE LOT E3


Jeddah, KSA

16775 9

ACCESS CONTROL AND


CAR PARK SYSTEM

B. System software shall use industry standard protocols such as LON, LAN, Ethernet, TCP/IP
protocols, subject to system supplier.
C. System server client Architecture is to support multiple users.
2.10 CABLING
A.

RS 485 Cables
1.
RS 485 communications require 2 twisted pairs, with a distance limitation of 1220 m.
2.
PVC Jacketed, RS 485 Cable: Paired, 2 pairs, twisted, No. 22 AWG, stranded (7x30)
tinned copper conductors, PVC insulation, unshielded, PVC jacket, and NFPA 70,
Type CMG.
3.
Plenum Type, RS 485 Cable: Paired, 2 pairs, No. 22 AWG, stranded (7x30) tinned
copper conductors, fluorinated ethylene propylene insulation, unshielded, and
fluorinated ethylene propylene jacket.
a.
NFPA 70, Type CMP or equivalent.
b.
Flame Resistance: NFPA 262 Flame Test.

2.11 FINISHES

by Azmeel
Contractor.
Supervision by mcc

Access Control
Communication high
Speed 100 Mbps Lan
tcp/ip

by Azmeel
Contractor.
Supervision by mcc

A.

Comply with internationally recognized standards.

B.

Stainless Steel Finishes: Remove tool and die marks and stretch lines or blend into finish.
Grind and polish surfaces to produce uniform, directionally textured, polished finish
indicated, free of cross scratches. Run grain with long dimension of each piece.

C.

Bright, Directional Polish: No. 4 finish.

D.

When polishing is completed, passivate and rinse surfaces. Remove embedded foreign
matter and leave surfaces chemically clean.

by Azmeel
Contractor.
Supervision by mcc

EXAMINATION

by Azmeel
Contractor.
Supervision by mcc

B.

Examine substrates, areas, and conditions, with Installer present, for compliance with
requirements for installation tolerances, critical dimensions, and other conditions affecting
performance.

by Azmeel
Contractor.
Supervision by mcc

C.

For the record, prepare written report, endorsed by Installer, listing conditions detrimental
to performance.

D.

Examine roughing in for electrical systems to verify actual locations of connections before
parking control equipment installation.

by Azmeel
Contractor.
Supervision by mcc

PART 3 EXECUTION
3.1

E.
3.2
B.

Noted

Proceed with installation only after unsatisfactory conditions have been corrected.

Noted

PREPARATION

by Azmeel
Contractor.
Supervision by mcc

Provide templates for anchor bolts and other items encased in concrete or below finished
surfaces so as not to delay the Work.

JEDDAH GATE LOT E3


Jeddah, KSA

16775 10

ACCESS CONTROL AND


CAR PARK SYSTEM

3.3

INSTALLATION

Installation by
Azmeel Contractor.
Supervision by mcc

B.

Automatic Barrier Gates: Anchor cabinets to concrete bases with anchor bolts or
expansion anchors and mount barrier gate arms.

C.

Vehicle Loop Detectors: Bury and seal wire loop at locations indicated on Drawings
according to manufacturer's written instructions. Connect to parking control equipment
operated by detector.

Installation by
Azmeel Contractor.
Supervision by mcc

D.

Ground equipment according to Division 16 Section "Grounding and Bonding."

E.

Connect wiring according to Division 16 Section " Conductors and Cables."

Installation by
Azmeel Contractor.
Supervision by mcc

FIELD QUALITY CONTROL

Comply

B.

Manufacturer's Field Service: Engage a factory authorized and trained service


representative to inspect, test, and adjust field assembled components and equipment
installation, including connections, and to assist in field testing. Report results in writing.

Comply

C.

Perform the following field tests and inspections and prepare test reports:

Comply

3.4

1.
2.
3.

Comply
Comply
Comply

D.

Remove and replace parking control equipment where test results indicate that it does
not comply with specified requirements.

Other Supplier

E.

Additional testing and inspecting, at Contractor's expense, will be performed to


determine compliance of replaced or additional work with specified requirements.

Other Supplier

F.

Experimental period for all systems shall be three months, before provisional taking
over.

Other Supplier

3.5

3.6

Each electrical test and visual and mechanical inspection shall be stated in NETA ATS,
Section 7.15 and compliance with test parameters shall be certified.
Operational Test: After electrical circuitry has been energized, units shall be started
to confirm proper motor rotation and unit operation.
Controls and safeties shall be tested and adjusted. Report any damaged and
malfunctioning controls and equipment.

Other Supplier

ADJUSTING AND CLEANING


B.

Adjust parking control equipment to operate smoothly, easily, and properly. Confirm
that locks engage accurately and securely without forcing or bending.

C.

Lubricate hardware, gate operators, and other moving parts.

D.

After completing installation of exposed, factory finished parking control equipment,


inspect exposed finishes and repair damaged finishes.

E.

Remove barrier gate arms during the construction period to prevent damage, and
install them immediately before Substantial Completion.
Comply

DEMONSTRATION

JEDDAH GATE LOT E3


Jeddah, KSA

16775 11

ACCESS CONTROL AND


CAR PARK SYSTEM

B.

Engage a factory authorized and trained service representative to train Owners


maintenance personnel to adjust, operate, and maintain parking control equipment.
Refer to Division 1 Section "Closeout Procedures, Demonstration and Training."

Comply

C.

Train personnel on procedures to follow if operation fails or malfunctions.

Comply

3.7

Comply

TESTS ON SITE
B.

Equipment and Labor:


system.

Provide all testing equipment and specialists for testing

Comply

C.

Tests are to include insulation resistance, continuity, loop characteristics, signal


measurements and analysis, logic routines etc. in accordance with manufacturer's test
plan, to be submitted two months before testing, and fully cover performance of
components.

Comply

D.

Operational tests are to be carried out on system for one week, to test performance of
system as if fully operational at peak periods, with all normal and abnormal functions
checked and analyzed. Trained staff is to be stationed at various positions to carry out
operations and report results. Operations are to include, without limitation, actual
vehicular movement over detector loops, performance of counters, central control
unit and the like, card reader operation and consequent operations etc. as well as
auditing and management functions.

3.8

PARKING CONTROL EQUIPMENT SCHEDULE


B.

Comply

Other Supplier

Provide parking control equipment for each zone as shown on the Drawings.

END OF SECTION