You are on page 1of 21

FIRE STATION BLDG

Footing
F1

No.

Excavation

conc.work

F2
Excavation
Conc. Work

3
3

F3
Excavation
Conc. Work

2
2

Footing reinforcement
F1
10 tor 150 c/c
Bars parallel to length
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
Bars parallel to breadth
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
F2
10 tor 150 c/c
Bars parallel to length
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2
Bars parallel to breadth
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2
F3
12 tor 150 c/c
Bars parallel to length
1.7/.15= 11+ 1Bar = 12
Length= 1.7-0.15-0.15 =1.4
Bars parallel to breadth
1.7/.15= 11+ 1Bar = 12

No. of column in
footing

Length= 1.7-0.15-0.15 =1.4


3

Surface dressing

Lean Conc
In footing
F1
F2
F3

2
3
2

For plinth beam


H
V

Column above plinth level


C1
of Height 3.5 m

C2
of Height 3.5 m

Reinforcement detail
C1
of Height 3.5 m
Length of Lateral Ties
2*(0.41)+4*(0.26)
Spacing 12 Dia 75c/c
Height of column/75
3.5/0.075 = 47 Bar + 1= 48

HOOKS= 8*Dia
8*0.012
Total rmft in stirup of 12 Dia
Longitudinal bar length
3.5+.045+1.5+48*0.012(DIA)

48

3.5+.045+1.5+48*0.016(DIA)
C2
of Height 3.5 m
Length of Lateral Ties
2*(0.41)+4*(0.26)
Spacing 12 Dia 75c/c
Height of column/75
3.5/0.075 = 47 Bar + 1= 48

HOOKS= 8*Dia
8*0.012

Total rmft in stirup of 12 Dia

48

Longitudinal bar length


3.5+.045+1.5+48*0.02(DIA)

Plinth beams
PB 1
Excavation
H PB 1
V PB 1

3
2

Conc. Work
HPB 1
V PB 1

3
2

Reinf. Of 16 Dia

PB 2
Excavation
VPB 2

Conc Work
VPB 2

Reinf. Of 12 Dia

Roof Beam
RB 1

HRB 1
VRB1

1
3

Reinf. Of 12 Dia

RB 2

HRB 2

Reinf. Of 16 Dia
Reinf. Of 20 Dia

4
4

LB 1
HLB1
VLB1

2
2

Reinf. Of 12 Dia

Shuttering
Ar of roof
Column
C1
of Height 3.5m
C2
of Height 3.5m

2
5

Plinth Beam
PB 1
HPB 1
VPB 2
PB 2
VPB 2

Column in footing
F1
F2
F3

10

Wall
Drawf wall

2
3
2

11

12

13

Plaster
of Height 3.5m

Roof Slab
RS 1

Reinf in roof slab


RS 1
Reinf. Of 8 Dia 150 c/c
Spacing of bars
Length /0.150 = 7.37/0.15
7.37/0.15= 48 Bar + 1 = 49
Breadth /0.15= 8.23/0.15
8.23/0.15= 55 Bar + 1 = 56

14

Flooring
fire station
Platform

15

window
venti
Rolling shutter

16

Ramp conc work

49
56

Quantity

Unit

1.4

1.4

1.6

6.272

cum

1.3

1.3

1.5

5.07

1.6
1.5

1.6
1.5

1.6
1.5

12.288
10.125

1.8
1.7

1.8
1.7

1.6
1.5

10.368
8.67

Total Excavation
Total Conc. Work

28.928
23.865

cum
cum

No. of Bars

10

20

10

20

11

1.2

39.6

11

1.2

39.6

12

1.4

33.6

12

1.4

33.6

8.6
3.65

9.46
3.25
Total

81.356
11.8625
93.2185

sqm

1.3
1.5
1.7

1.3
1.5
1.7

0.15
0.15
0.15

0.507
1.0125
0.867

cum
cum
cum

21.81
24.69

0.23
0.23

0.15
0.15

0.752445
0.851805

cum
cum

0.3

0.45

3.5

0.945

cum

0.3

0.45

3.5

2.3625

cum

Total conc work

3.3075

cum

1.956

187.776

5.621

44.968

1.86

0.096

5.813

46.504

469.44

240.2

1.86

0.096
1.956

6.005

20 Dia

15.81
10.26

0.23
0.23

0.6
0.6
Total
Excavation

2.18178
1.41588

0.6
0.6
Total Conc
work

3.00978
2.27148

21.81
16.46

0.23
0.23

3.59766

cum

5.28126

cum

229.62

7.48

0.23

0.45

0.77418

cum

8.23

0.23

0.45

0.851805

cum

49.38

7.23
24.69

14.46

14.46
16.46

0.23
0.23

0.23

0.23
0.23

0.45
0.45

0.6

0.45
0.45

0.748305
2.555415

cum

191.52

1.99548

cum

57.84
57.84

m
m

1.49661
1.70361

cum
cum

185.52

59.65

sqm

0.3

0.45

3.5

10.5

2*(lh+bh)

0.3

0.45

3.5
NET total

26.25
36.75

sqm

21.81
16.46

0.23
0.23

0.6
0.6

26.448
20.028

sqm
sqm

8.23

0.23

0.45
Total

7.614
54.09

sqm
sqm

1.3
1.5
1.7

1.3
1.5
1.7

1.5
1.5
1.5
Total

15.6
27
20.4
63

sqm

3.5
0.6

24.8906
1.91406

cum
cum

30.92
13.87

0.23
0.23

30.92

7.37

8.23

3.5

216.44

sqm

0.13

7.885163

cum

8.23

403.27

7.37

412.72
1631.98

56
3.65

sqm
sqm

7
3.65

8
1

4.8
4
2.4

1.2
0.6
2.1

5.76
2.4
5.04

sqm
sqm
sqm

3.65

2.25

0.6

2.46375

cum

.1m added
extra

10
119.2
12
67.2

12
1128.604
20
298.04
16
333.964

2(lh+bh)

2 SIDES

8
1631.98

2* becoz of
bottom and top

PRICING OF FIRE STATION BLDG AT TUGHALAKABAD


S. No. Description of item
1
Surface dressing not exceeding 15 cm deep in soft/loose soil
2

Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for
foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in
soft/loose soil.

Returning, filling, in including spreading, levelling, watering and well ramming in


layers not exc. 25 cm in soft/loose soil.

M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of
surface area

Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion
per sqm of vertical surface

Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of
surface.

7
8

Treating the soil along with external perimeter of building at the rate of 2.25 litre
of emulsion per meter of perimeter of wall.
Cement concrete in foundation filling and mass concrete type D2 1:4:8

TMT bars 10 mm dia and over cut to length bent to shape required including
cranking bending spirally for hooping for cloumns hooking ends and binding with
mild steel wire not less than 0.9-0 mm dia

10

Formwork to sides of concrete in foundation footings bases of columns and plinth


beams

11

Reinforced cement concrete (design mix) in foundation including footings


foundation beams plinth beams bases of columns etc in M25

12

Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and
similar works

13

Reinforced cement concrete (design mix) in slabs simply supported on walls


beams and columns in floor roof landings and balconies etc in M25

14

Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan
not exc 6 m mean radius

15

Rendering 10mm thick in CM 1:4 second layer of 5 mm in CM 1:4 with water


proofing compund sand finished external plaster

16

Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster

17

Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas
slabs etc

18

20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over
100 mm thick PCC Type D2 over 150 mm thick hard core

19
20
21
22

7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM
1:4 over 100 mm thick PCC 1:2:4
Roof treatment
Dry distemper
Three coats of white wash on ceiling

23

Three coats of lime wash on internal walls

24

Supply and fix steel windows with side hung shutters including projecting type
hinges with steel handle and steel peg stays with glazing bars

25

Supply and fix steel ventilators with top hung shutter including hinges steel pegs
and stay complete

26
27
28

shutter ?
Qty
93.2185

Unit
Sqm

Rate
7.9

Amount
736.42615

SSR
3011

33.29984

Cum

115.2

3836.1416

3006

3.301775

Cum

41.7

137.68402

3009

209.25

Sqm

80.6

16865.55

3047

69.75

Sqm

126.8

8844.3

3048

59.65

Sqm

80.6

4807.79

3049

93.2185

Sqm

38.6

3598.2341

3051

3.99075

Cum

2303.3

9191.8945

4025

3032.968

kg

48.6

147402.24

10034

153.84

Sqm

134.2

20645.328

7004

41.804985

Cum

3482.2

145573.32

4053

59.65

Sqm

211.5

12615.975

7006

7.885163

Cum

3770

29727.065

4055

26.80466

Cum

255.3

6843.2297

5019

108.22

Sqm

134.8

14588.056
14001 & 14004

98.22

Sqm

77.3

7592.406

59.65

Sqm

76.3

4551.29514001 & 14004

Sqm

805.69

13013 & others

Sqm

520.4

13074

Sqm
Sqm
Sqm

300
31.1
11.8

0
0
0

Assessed
15010
15006

14001

Sqm

11.8

15006

5.76

Sqm

1689.4

9730.944

10071

2.4

Sqm

1484.6

3563.04

10075

Sqm
Rm
Sqm
Total

629.8
326.7
700

0
10089
0
10082
0
Assessed
450850.92

Add 3% for
unforeseen
items

13525.528

Grand total

464376.45

Plinth area of
building
Plinth area
rate per Sqm

Sqm
#DIV/0!

10

12

16

20

25

0.39

0.61

0.89

1.57

2.46

3.85

1616.98

119.2

67.2
1128.6

333.244

298.04

1195.8

333.244

298.04

1616.98

119.2

630.6222

72.712

1064.262 523.19308 733.1784

3023.9677

You might also like