DESIGN OF AN EXTENDED AERATION TREATMENT PLANT

2300 P.E.
CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS TANAH KERAJAAN
SELUAS 30.0EKAR, MUKIM PEDAH, DAERAH JERANTUT, PAHANG DARUL MAKMUR
UNTUK TETUAN DOYENVEST (M) SDN BHD
BASIC DATA:
This is an outline design to produce 10:20 BOD5:SS effluent.

Population,
Dry Weather Flow,

PE
DWF

=
=

2300 P.E
0.225 m3/c/d

Suspended Solid,
BOD5,
Influent Ammonia

SS
BOD
NH3-N

=
=
=

300 mg/l
250 mg/l
30 mg/l

Effluent BOD5,
Effluent SS
Effluent Ammonia

EBOD
ESS
ENH3-N

=
=
=

10 mg/l
20 mg/l
10 mg/l

LOADING
a.

Hydraulic flow,

Qavg

=
=

PE * DWF
517.50 m3/d

b.

Peak Flow,

Qpeak

Peak Factor * Qavg

Pff

=
=

4.7(P)
4.29

Qpeak

=
=
=

Pff x Qavg
2219.31 m3/d
1.54 m3/min

c.

Suspended Solids Loading Rate

=
=

Qavg * SS
155.25 kg/d

d.

BOD5 Loading Rate

=
=

Qavg * BOD
129.38 kg/d

e.

NH3-N Loading Rate

Qavg * NH3-N
15.53 kg/d

-0.11

Peak Flow Factor

Therefore,

PRIMARY BAR SCREEN DESIGN


Design Population,

PE

Design Flow,
Peaking Factor,
Peak Flow,

Qavg
PF
Qpeak

2300
517.50 m3/day
4.29
2219.31 m3/day

0.0060 l/s
25.81 l/s

Guidelines : Quantity of screenings = 30 m3 screening / 10^6 m3 wastewater


Number of Channels
Number of Back-up Channel

=
=

1
1

Qavg

517.50 m3/day

Quantity of Screenings

=
=

Qavg x 30 / 1000000
0.0155 m3/day

Quantity of Screenings

=
=

7 x Quantity of Screenings per day


0.109 m3

Number of Storage Units


Quantity per Unit

=
=

1
0.109 m3

Dimension of screenings trough


L
W
D

=
=
=

0.50 m
0.30 m
0.30 m

0.045 m3

Provide storage for 7 days

Volume

>

0.109 m3

Screen Design
Guidelines: Max flow through velocity at Qpeak
Guidelines: Min approach velocity at Qpeak

Vmax
Vmin

Bar Size
Clear Opening

Bs
Co

=
=

Efficiency Coefficient

Eff

10 mm
25 mm
Clear Opening
Clear Opening + Bar size

Clear area through each screen at Qpe AQpeak

Total cross sectional area of channel

AC

0.71

Qpeak
Vmax x 24 x 60 x 60

0.026 m2

AQpeak
Eff

Assume, Depth of Flow at Qpeak

=
=

0.036 m2

0.050 m
.

Required Width of Clear Opening @ Q

Wclr

=
=

Number of Openings

No

AC / D
0.72 m

Wclr x 1000
Co

29

1.0 m/ses
0.3 m/sec

error

Number of Bars

Nbars

Gross Width of Screen

Wch

Set

=
=

No - 1

Wclr + (Nbars x Bs / 1000)

28

1.00 m

Wch

0.50 m

Qpeak

2219.31 m3/day

Vapp

=
=

Qpeak / (Wch x D)
1.03 m/sec

>=

0.30 m/sec

ok

=
=

Qpeak / (Wclr x D)
0.71 m/sec

<=

1.00 m/sec

ok

Check velocities

Velocity of approach

Velocity through screen

Vscr

0.02569 m3/sec

Hydraulic Profile Through Screen


Headloss Through Clean Screen
Formula:

HLc = .0729 (V^2 - v^2)


where

HLc
V
v

=
=
=

Clean screen max headloss (m)


0.71 Velocity through screen (m/s)
1.03 Approach velocity (m/s)

Therefore

HLc

-0.04 m

Elevation of Channel Invert

76.75 m

Upstream Water Elevation

76.76 m

Downstream Water Elevation

76.80 m

?
Clogged screen max headloss (m)
1.429 Velocity through screen (m/s)
1.03 Approach velocity (m/s)

Headloss Through Half Clogged Screen


Assume velocity through screen is doubled
Formula:

HLc = .0729 (V^2 - v^2)


where

HLc
V
v

=
=
=

Therefore

HLc

0.07 m

Elevation of Channel Invert

76.75 m

Upstream Water Elevation

76.87 m

Downstream Water Elevation

76.80 m

PUMP SUMP DESIGN


Influent at Qpeak

Influent

2219.31 m3/day

or

25.69 l/s

Influent at Qavg

Influent

517.50 m3/day

or

5.99 l/s

L
W
D
v

=
=
=
=

Dimension of pump station


Depth between start and stop
Chamfer volume

1.80 m
1.50 m
0.65 m
1/2 x ( 2.05 x 0.2 x 0.4 )

0.072 m3

Therefore effective volume to fill /drain


V

Pumping rate @ Qpeak

LxW xD-v

1.68 m3

26.00 l/s

T x q
4

15

V
T
q

=
=
=
=

?
4.0
26.00
1.56

>=

25.69 l/s

ok

Pump cycle time at Qavg


Guideline: 6 min, 15 max @ Qavg
Volume required for pump sump,

Assume number of start / stop


where

Therefore,

times per hr (required 6 - 15 start/hour)


Required Volume (m3)
Cycle Time (minute)
Pumping Rate (L/sec)
Pumping Rate (m3/min)
1.56 m3

<

Pump Headloss Calculations

VALVES & FITTINGS

K
VALUE

EXIT
CHECK VALVE
GATE VALVE
TEE THRU SIDE
ELBOW - 90 DEG

1.00
2.50
0.20
1.80
0.30

QUANTITY

DISCHARGE
TOTAL

1
1
1
1
6

1.00
2.50
0.20
1.80
1.80

SUM OF K's FOR FITTINGS

7.30

PIPE DIAMETER

0.20

PUMPING RATE

26.00

L/sec

V = VELOCITY

0.83

m/sec

F = TOTAL FITTING HEAD LOSS


= (K x V2 / 2g)

0.25

L = LINEAR METER OF STRAIGHT PIPE

8.00

C = HAZEN-WILLIAMS ROUGHNESS COEFFICIENT

100.00

P = HEAD LOSS USING HAZEN-WILLIAMS EQATION

0.05

TOTAL LOSS = F + P

0.30

79.60 - 76.00
3.45

3.75

S = STATIC HEAD LOSS (Worst Case Scenerio)

TOTAL DYNAMIC HEAD

1.68 m3

ok

Size pump for

26.00 L/sec

3.75 m

TDH

The submersible pump selected is as follows:Make


=
TSURUMI
Model
=
100B42.2
Capacity
=
18.20 L/sec
Total Head
=
6.20 m
Power
=
2.20 kW
Discharge Size
=
100 mm
No. of Units
=
2 (1 duty; 1 standby)

CHANNEL INVERT

EL

76.75

HIGH LEVEL ALARM

EL

76.75

STANDBY PUMP CUT IN

EL

76.60

DUTY PUMP CUT IN

EL

76.45

ALL PUMPS CUT OFF

EL

75.80

INVERT ELEVATION

EL

75.40

Time to fill sump

0.0

0.15

0.15

0.65

0.4

Pump cycle time at Qpeak


Guideline: 6 min, 15 max @ Qavg

=
Time to empty sump

=
=

Cycle time base on actual operating point

V
Qpeak
1.09

min

V
Qpump - Qpeak
-3.75

min

60
Time fill + Time empty
-22.6

min per hour


min per cycle
cycle per hour

[ 4 x Qraw / (2.5 m/s x 3.14] 1/2

[ 4 x 0.0182 / (2.5 m/s x 3.14] 1/2

6 - 15 cycle / hr error

Determine Size of Force Main


Guideline: 1 - 2.5m/s velocity in pipe
Required size of raw sewage pipe

=
=
Actual velocity in selected pipe

0.115 m
100 mm
Qpump / cross section area of pipe
2.32 m/s <

>

115 mm

error

2.5 m/s

ok

Determine Total Dynamic Head ( TDH )


TDH

hst + hf + hm

=
=
=

Static head (m)


Losses through the pipe ( Hazen - William Formula )
Losses through fittings

Where ;

hst
hf
hm

Thus, static head of pump, hst

Hazen - William Formula


hf

Where ;

79.60 - 76.00 m
3.45
m

6.82

V
C

Velocity m/sec

V = Q/A

11.50 L/sec
1000 x 3.142 x 0.10 2 / 4

=
=

1.85

0.83 m/sec

Coefficient of roughnes

100.00

Length of pipe, m

8.00 m

Diameter of pipe, m

0.20 m

Thus, losses through the pipe, h f

0.050 m

Losses through fittings


hm

Where ;

Head loss coefficeint

7.30

Velocity m/sec

0.83

Gravity, m/s

9.81

hm

0.25 m

KV
2g

Therefore ,
Total Dynamic Head ( TDH )

=
=

hst + hf + hm
3.76 m

To plot chart for the System Curve & Pump Curve from the above equitition:Q (L/s)

V (m/s)

hst (m)

hf (m)

0
3.33
6.67
10.00
13.33
16.67
20.00
23.00

0.00
0.11
0.21
0.32
0.42
0.53
0.64
0.73

3.45
3.45
3.45
3.45
3.45
3.45
3.45
3.45

0.000
0.001
0.004
0.009
0.015
0.022
0.031
0.040

* refer to Chart attached

hm (m) TDH (m)


0.000
0.004
0.017
0.038
0.067
0.105
0.151
0.199

3.45
3.46
3.47
3.50
3.53
3.58
3.63
3.69

Pump head
(m)
16.0
14.0
12.6
10.8
9.0
7.0
5.2
3

A
B
C

L
D1.167

INFLUENT RAW SEWAGE PUMP


(TSURUMI MODEL 100 B42.2)
20.00

System Curve

Head (m)

15.00

Pump Operating Point


18.2L/sec @ 5.5 m TDH

10.00

5.00
Pump Curve

0.00
0

10

12

14

16

Flowrate, Q (L/sec)

18

20

22

24

26

28

30

FINE SCREEN DESIGN


Parameters
Population

PE

Peak Flow

Qpeak

2219.31 m3/day

0.03 m3/sec

Qavg

=
=

517.50 m3/day
0.01 m3/sec

Guidelines: Max flow through velocity at Qpeak

Vmax

1.00 m/sec

Guidelines: Min approach velocity at Qpeak

Vmin

1.00 m/sec

Hd

0.00 m

Bar Size
Clear Opening

Bs
Co

=
=

10.00 mm
12.00 mm

Efficiency Coefficient

Eff

Design Flow

Set Elevation of Datum

2,300

Design

Clear Opening
Clear Opening + Bar size

=
Clear area through each screen at Qpeak,

AQpeak

=
Total cross sectional area of channel required

0.55
Qpeak
Vmax
0.0257 m2
AQpeak
Eff

=
Assume Depth of Flow
Width of Clear Openings

Number of Openings

Wclr

No

0.05 m2
0.055 m

Width of Frame

Nbars

0.47 m

Wclr x 1000
Co

=
=

AQpeak / D

=
Number of Bars

-----

39
No - 1
38

Wfr

0.10 m

Gross Width of Screen

=
=

Set width of screen

0.50 m

Qpeak

1.71 B (H^1.5)

Qpeak

0.026 m3/s

Set depth of flow

0.055 m from - -

Determine width of throat

Therefore

=
=

Qpeak / 1.71 / (H^1.5)


1.16 m

Throat width of grit chamber

Wclr + Wfr + (Nbars x Bs / 1000)


0.95 m

Determine Width of Downstream Throat


Total Peak Flow,

OK

Energy equation between upstream and downstream of clean screen


Velocity at Qpeak through clear openings of screen, Vs
Vs

Headloss through clean screen

Qpeak
Wclr x d1

0.65 m/sec

hLs

=
=

(Vs^2 - v1^2) / 2g
0.0039 m

X2
X3

E2
= + d2 + (v2^2 /2g)
=
E3 + d3 + (v3^2 /2g) + hLs

X2

E2
d1
v1
E3
d2
v2

=
=
=
=
=
=

0.000
0.09
0.60
0.000
0.055
0.93

X2
X3

=
=

0.10
0.10

x 1/0.7

X3

Where,
Trial and Error

Therefore,

m
m
m/sec
m
m
m/sec

Height above datum


Upstream Depth
Upstream Velocity
Height above datum
Downstream Depth @ Qpeak
Channel Velocity

ok

0.000
Elevation of Channel Invert

79.00 m

Upstream Water Elevation

79.09 m

Downstream Water Elevation

79.06 m

Energy equation between upstream and downstream of 50% clogged screen


Headloss through clogged screen

hLcs

Velocity through clogged screen


(Assume 50% clogging)

Vcs

hLcs

(Vcs^2 - v2^2) / 2g x 1/0.7


Qpeak
Wclr x 0.5 x Upstream Depth d"

0.92 m/sec

0.05

Therefore,
X2
X3

= 2 + d" + (v"^2 /2g)


E
=
E3 + d3 + (v3^2 /2g) + hLcs

X2

E2
d"
v"
E3
d3
v3

=
=
=
=
=
=

0.00
0.120
0.43
0.00
0.055
0.93

X2
X3

=
=

0.13
0.15

X3

Where,
Trial and Error

m
m
m/sec
m
m
m/sec

Check:

-0.018
Elevation of Channel Invert

79.00 m

Upstream Water Elevation

79.12 m

Downstream Water Elevation

79.06 m

ok

Height above datum


Upstream Depth
Upstream Velocity
Height above datum
Downstream Depth @ Qpeak
Channel Velocity

DESIGN OF A CONSTANT VELOCITY GRIT CHANNEL


Guidelines = 0.2 m/s flow through velocity
Number of Channels Provided
Number of Back-up Channels Provided

=
=

1
1

Constant Velocity Channel Formula


Q

1.71 B (H1.5)

Q
B
H

=
=
=

Flow
Width of Throat
Depth of Flow

( Q / 1.71 / B )^0.67

A
W
H

=
=
=

2/3 W H
Width of Parabola
Depth of Flow

0.2 m/s

=
=

A x V
2/3 W H x V

Therefore,
Area of Parabola,

m3/s
m
m

m
m

Assume:

Therefore

Assume:

B
Qavg per Channel

=
=

(Per guidelines)

1.5 Q
H x V

0.33 m
517.50 m3/day

FLOW FACTOR
( x QAVG)

Q AT DIFFERENT
FACTOR
m3/sec

Depth
H(m)

Width
W(m)

0.10
0.25
0.50
1.00
2.00
3.00
4.00
4.29
5.00
6.00
7.00

0.001
0.001
0.003
0.006
0.012
0.018
0.024
0.026
0.030
0.036
0.042

0.01
0.02
0.03
0.05
0.08
0.10
0.12
0.13
0.14
0.16
0.18

0.43
0.58
0.73
0.92
1.16
1.33
1.46
1.50
1.57
1.67
1.76

0.0060 m3/s

@ Qavg

@ Qpeak

Determine Length of Channel


Say settlement vel of particle

Vs

0.02 m/s
0.2 m/s

Say velocity of flow

Depth of channel at peak flow,


Width of channel,

H
W

=
=

Length of Channel

1.29 m

3.00 m

Surface Area of Channel

SA

4.49 m2

Surface Overflow Rate

SR

Provided Length

0.13 m
1.50 m
V x H
Vs

Qpeak / SA
494.50 m3/m2/day

< 1500

m3/m2/day

Quantity of grit
Guidelines = 0.03 m3 / 1000 m3 of wastewater
Grit Quantity per Channel

Provide area for 30 days storage


Grit quantity

Qavg x 0.03/1000

0.016 m3/day

0.47 m3

=
=
=
=

3.00 m
0.50 m
0.15 m
0.225

Dimension of hopper at bottom of grit channel


L : W ration 2:1 as per guidelines
L
W
D
Volume

1500

>=

0.466

ok

mm

700 mm
50 mm

450 mm

1000

mm

Check ratio of grit tank dimension


Ratio W: D = 1 : 2

W
2.00

D
1

Ratio W: L = 1 : 2

W
1

L
2

Hydraulic Retension Time, Tr


Guidelines = 3 min @ Qpeak < 5,000 pe
Area of retangular
Area of trapezium
Area of grit storage

=
=
=

1.05 m2
0.06 m2
0.45 m2

Total Area
L

=
=

1.56 m2
3.00 m

Volume, V

4.69 m3

Qpeak

=
=

2219.31 m3/day
1.54 m3/min

Tr

=
=

V / Qpeak
3.04 min

>= 3 min

ok

X-Axis
-0.837
-0.787
-0.748
-0.731
-0.664
-0.580
-0.460
-0.365
-0.290
-0.214
0
0.214
0.290
0.365
0.460
0.580
0.664
0.731
0.748
0.787
0.837

Y-Axis
0.161
0.143
0.129
0.123
0.101
0.077
0.049
0.031
0.019
0.011
0
0.011
0.019
0.031
0.049
0.077
0.101
0.123
0.129
0.143
0.161

CONSTANT VELOCITY FLOW


X - SECTION
0.700

0.600

0.700

Depth (m)

0.600
0.500
0.400
0.300
0.200
0.100

GRIT STORAG

0.000
-0.100
-0.500

-0.400

-0.300

-0.200

-0.100

0.000

Width (m)

0.10

ITY FLOW CHANNEL


ECTION

Width
Depth
X - Axis
Y - Axis
0.427
0.011
0.580
0.019
0.731
0.031
0.921
0.049
1.160
0.077
1.328
0.101
1.462
0.123
1.496
0.129
1.575
0.143
1.673
0.161

GRIT STORAGE

0.000

Width (m)

0.100

0.200

0.300

0.400

0.500

CONSTANT VELOCITY FLOW CHANNEL


X - SECTION
1.250
1.150
1.050

Depth (m)

0.950
0.850
0.750
0.650
0.550
0.450
0.350
0.250
0.150
0.050

-0.650

-0.450

-0.250

-0.050
GRIT
STORAGE
-0.150
-0.050 Width (m)
Channel

0.150

0.350

0.550

DESIGN OF A GRIT / GREASE CHAMBER


Guidelines : Detension time T = 360 sec @ Qpeak
Number of Channels Provided
Number of Back-up Channels Provided

=
=

1
1

Qpeak

=
=

2219.31 m3/day
0.026 m3/sec

Detension Time

=
=

6 min
360 sec

Volume Required

=
=

Qpeak x T
9.25 m3

L
W
D

=
=
=

2.90 m
1.60 m
0.85 m

3.94 m3

>

L:W
W:D

=
=

1.81
1.88

:
:

Provided Length
Width of channel,
Surface Area of Channel

L
W
SA

=
=
=

2.90 m
1.60 m
4.64 m2

Surface Overflow Rate

SR

=
=
<

Qpeak / SA
478.30 m3/m2/day
1500 m3/m2/day

Grit Quantity

=
=

Qavg x 0.03/1000
0.016 m3/day

Allow for storage of 30 days

0.47 m3

8 kg / 1000 m3
0.95

Peak Flow

Provide:
Length
Width
Depth
Volume Provided
Ratio

9.25 m3
1.0
1.0

ok

Determine Length of Channel

ok

Quantity of grit
Guidelines = 0.03 m3 / 1000 m3 of wastewater

Quantity of grease
Average quantity of grease
Specific gravity of grease

S
sg

=
=

Therefore quantity of grease

Qs

=
=

Qavg x S
4.14 kg/day

Flowrate of Grease

Fs

=
=

Qs / 1000 / sg
0.0044 m3/day

Allow for storage of 30 days

Vs

=
=

30 x Fs
0.131 m3

Accumulated grease for 30 days


Accumulated grit for 30 days

Vs

=
=

0.131 m3
0.466 m3

Depth of Feed

0.25 m

Therefore,

A1

2.39 m2

=
=

1.50 m
0.75 m

Grit/Grease Drying Bed Sizing

Area required

Dimension of Grit/Grease Drying Bed


Length
Width

Grease

error

Area

1.13 m2

>

2.39 m2

error

DESIGN OF A GREASE CHAMBER


Guidelines : Detension time T = 180 sec @ Qpeak
Number of Chamber Provided
Number of Back-up Chamber Provided

=
=

1
1

Peak Flow

=
=

2219.31 m3/day
0.026 m3/sec
180 sec

Qpeak

Detension Time

Volume Required

Qpeak x T

4.62 m3

L
W
D

=
=
=

3.80 m
1.20 m
1.10 m

5.02 m3

Average quantity of grease


Specific gravity of grease

S
sg

=
=

8 kg / 1000 m3
0.95

Therefore quantity of grease

Qs

=
=

Qavg x S
4.14 kg/day

Flowrate of Grease

Fs

=
=

Qs / 1000 / sg
0.0044 m3/day

Allow for storage of 30 days

Vs

=
=

30 x Fs
0.13 m3

Provide:
Length
Width
Depth
Volume Provided

>

4.62 m3

ok

0.13 m3

ok

Grease Quantities

Depth of grease baffle required to contain scum for 30 days


Length
L
=
3.80 m
Width
W
=
1.20 m
Depth of water below baffle
D
=
0.02 m
Volume of grease storage provided

0.09 m3

>

WEIR BEFORE AERATION BASINS


Design Population,
Design Flow,
Peaking Factor,
Peak Flow,

Number of Aeration Basins,

not use

PE
Qavg
PF
Qpeak

Peak Flow to Each Aeration Basin

2300
517.50 m3/day
4.29
2219.31 m3/day

Qpeak / N
0.026 m3/sec

Q(m3/sec)

Cw x Le x H^1.5

Cw
Le
H

=
=
=

1.84
0.3704 m
0.148 m

Le

where

L
n
H

=
=
=

0.40 m
2
0.148 m

Therefore

Le

0.3704 m

Therefore

where

0.03 m3/sec

=
=

Formula

0.01 m3/sec

Weir Coefficient
Length
Height

With end contraction


L - (0.1)nH

0.039 m3/sec

Length
Number of side contractions
Height of Flow

>=

0.026 m3/sec

Height of water above weir

102 mm

Qpeak if both tanks open

Height of weir

170 mm

Qpeak if one tank open

Therefore, size opening for 400mm x 250 mm H

272 mm

ok

RECTANGULAR WEIR AT OUTLET BOX


Design Population,
Design Flow,
Peaking Factor,
Peak Flow,

Formula

PE
Qavg
PF
Qpeak

2300
517.50 m3/day
4.29
2219.31 m3/day

Q(m3/sec)

Cw x Le x H^1.5

Cw
Le
H

=
=
=

1.84
0.578 m
0.11 m

Le

where

L
n
H

=
=
=

0.60 m
2
0.110 m

Therefore

Le

0.578 m

Therefore

0.039 m3/sec

where

0.01 m3/sec
0.03 m3/sec

Weir Coefficient
Length
Height

With end contraction

Height of water above weir

L - (0.1)nH

110 mm

Length
Number of side contractions
Height of Flow

>=

@ Qpeak

0.026 m3/sec

ok

90 DEG V-NOTCH WEIR AT OUTLET BOX


Design Population,
Design Flow,

PE
Qavg

2000
450.00 m3/day

Peaking Factor,

PF

Peak Flow,

Qpeak

4.35
1959.73 m3/day

0.023 m3/sec

90 deg V-Notch Weir Formula


5/2

q (m3/sec)

H (m)

Therefore,

Set depth of weir @ 250mm

1.417 H
192 mm
0.023 m3/sec

ok

or

0.192 m

at Qpeak

>=

0.023 m3/sec

ok

DESIGN OF ANOXIC CHAMBER


Population

PE

Peak Flow

Qpeak

=
=
=

2,219.31 m3/day
92.47 m3/hr
1.54 m3/min

=
=

0.026 m3/s
25.69 l/s

=
=

517.50 m3/day
21.56 m3/hr

=
=
=

0.36 m3/min
0.01 m3/s
5.99 l/s

4.29

=
=
=
=
=
=
=
=
=

30
10
3600
2880
28
0.1
0.11

Qavg

Design Flow

Peaking Factor

PF

2300

Using the Lodification Ludzack-Ettinger Process


Assume
Influent Ammonia-N
Ni
Effluent Ammonia-N
Ne
Mixed liquor Suspended Solids
MLSS
Mixed Liquor Volatile Suspended Solids MLVSS
Temperature
Temp
Dissolved Oxigen
Do
Specific Denitrification Rate
U
Overall Denitrification rate
Ua
Residence Time
Temp

?
?

mg/l
mg/l
mg/l
mg/l
(MVLSS
deg C
mg/l
per day
per day
hrs

0.8

x MLSS

Calculation Overall Denitrification Rate


Formula :

Ua

U x 1.09(Temp-20)X(1-DO)
0.20 per day

Ni - Ne
Ua x MLVSS

Calculation Residence Time


Formula :

Size anoxic zone for a residence time of Anox

24 hrs/day

0.81 hrs required

hrs

Anox
24

43.13

m3

nos

Vreq

21.56

m3

Length
Width
Depth

=
=
=
=

2.30
1.50
4.50

m
m
m

Anoxic tank volume

31.05

m3

Actual hydraulic retention time provided

Determine size of anoxic tank


Anoxic zone volume required,

Number of Anoxic Tank,


Volume required per Tank,

Vol

Qavg

Tank Dimension

Anoxic tank volume


Qavg
2.88 hrs

>

21.56 m3

ok

EXTENDED AERATION TANK DESIGN


Sizing
Number of Aeration Tank,

No.

Minimum Hydraulic Retention Time,

HRT

418.31 m3

Vol

209.16 m3

Area
Length
Width
Depth
Freeboard
Volume

A
L
W
D
FB
Vol

=
=
=
=
=
=

46.48
10.60
4.40
4.50
0.65
209.88

Total Volume Provided

Vp

419.76 m3 >

HRT Provided

19.47 hrs >

3600 mg/l

Volume Required,
Volume Required Per Tank,

2
19.4 hours

Dimension of each tank:

Ratio

Therefore,

m2
m
m
m
m
m3

L
10.60
2.41

:
:
:

W
4.40
1

418.31 m3
19.4 hrs

ok

Sludge Age (MCRT)


Guidelines > 20 days
Assume,

MLSS
SA

Total solids in aeration tank


Excess sludge wasting / day + Solids in effluent

Total solids in aeration tank

=
=

MLSS x Vp / 1000
1511.14 kg

Solids in effluent

=
=

10 mg/l
5.18 kg/day

Sludge Yield,

=
=

0.40 @ 24 hours HRT


0.60 @ 18 hours HRT

Therefore actua

Sy

Sd

=
=

QAVG x Sy (BOD5-EBOD5)
68.45 kg/day

SA

20.53 days

WAS

68.45 kg/day

Determine Sy @ Actual HRT


Via Interpolation

Excess sludge wasting / day


(Sludge accumulation per day)

(24 -21.9)
(24 - 18)

Assume underflow concentration = 1% or 10,000 mg/l or 10 kg/m3


Volume of WAS

=
=

0.4

0.55 kg / kg BOD removed based on HRT interpolation

Waste Activated Sludge (WAS)


Excess Sludge Wasting / day

(0.6 - 0.4)

6.84 m3/day
6844.61 l/day

ok

Return Activated Sludge Flow (RAS)


QRAS

MLSS
Cu - MLSS

Cu

Underflow concentration assume at 0.8 % solid or 8,000 mg/l

QRAS

423.41 m3/day

4.92 l/s

Set QRAS

465.75 m3/day

5.42 l/s

Qavg

517.50 m3/day

Ratio of QRAS : QAVG

QAVG

0.90

ok

OR

2.00 kg O2 / kg BOD5

AOR

=
=

QAVG
Total

=
=

517.50 m3/day
517.50 m3/day

=
=

Total x 2 / 1000
1.04 kg/day

249.44 kg/day

Oxygen Requirements

Oxygen required per kg of BOD5 re


Actual Oxygen Required

OR x BOD5 removed
248.40 kg/day

Maintain DO of 2 mg/l in aeration tank

Oxygen required in tank

Total AOR

Oxygen correction factor

AOR/SOR

AOR/SOR =
Where

(((BETA * ACF * Csf @ 28 deg) - C ) / Css ) * ALPHA * 1.024^T-20


BETA
ACF
Csf
C
Css
Alpha
T

=
=
=
=
=
=
=

0.98
0.989
7.83
1.5
9.08
0.75
30

AOR/SOR

0.64

Standard Oxygen Required

SOR

391.23 kg/day

O2 transfer efficiency

O2eff

20 %

Actual O2 transfer efficiency

O2act

Therefore

m3/hr (See catalog)

SOR kg/day
O2eff/100 x 1.201 kg/m3 x 0.232 kg O2/kg air x 1440 min/day

Total amount of air required


=

4.88 m3/min

Flowrate per diffuser

=
=

0.10 m3/min
100.00 L/min

Quantity

Number of diffusers required

=
Number of diffusers per tank

or

Total air required / Flowrate


48.75

Use

52

26 Nos in each Aeration tank

ok

m3/hr

Check F/M Ratio


Guidelines for F/M ratio is between 0.05 to 0.10 kg BOD / kg MLSS
Influent BOD5,

=
=

250 mg/l
129.38 kg/day

MLSS

3600 mg/l

Volume provided, Vp
F/M Ratio

=
=
=

419.76 m3
INBOD / (MLSS x Vp)
0.086

ok

Check Aeration Loading


Guidelines :

0.1 - 0.4 kg/m3/day


AL

INBOD / Vp

0.31 kg/m3/day

ok

Check Mixing Rate


Per EPA guidelines,

0.010 to 0.025 m3/min. m3

Volume of air from Blower

Va

Volume of tank provided

Vp

Mixing Rate

Therefore,

#NAME? m3/min

(See Blower calculations)

419.76 m3

Va / Vp
#NAME? m3/min. m3

#NAME?

CLARIFIER DESIGN
Guidelines : Hydraulic retension time (HRT) = 2 hours @ Qpeak
Guidelines : Surface overflow rate = 30 m3/m2/day
Guidelines : Side water depth (SWD) = 3 m
Surface Area

=
=

Qpeak / 30 m3/m2/day
73.98 m2

Number of clarifiers

Surface area required per clarifier

36.99 m2

L
W

=
=

6.20 m
6.20 m

Therefore, actual area provided

38.44 m2

Provided Length, L
Provided Width, W

=
=

6.20 m
6.20 m

Effective Volume
SWD in cone

=
=

Cone volume
Vertical SWD

=
=

65.73 m3
1.04 m

Vertical SWD volume

39.98 m3

Total Volume
Total SWD

=
=

105.70 m3
4.50 m

Dimension of each clarifier

>

36.99 m2

ok

Volume of cone with slope of 60 deg.


3.46 m
(See attach volume cals)
ok

HRT
Per guidelines: < 2 hours
=
=

Total Volume m3 / Qpeak m3/day x 24 hours


2.29
>=
2 hours

ok

Overflow Weir
Per guidelines: 150 - 180 m3/day/m
Max weir loading rate, Wr
Peak Flow, Qpeak

=
=

Min Weir Length Required per Clarifier

=
=

Total length of weir provided per Clarifier, Tw

Actual weir loading rate

Solids Loading Rate (SLR)


Guideliness :

MLSS

180 m3/day/m
2219.31 m3/day
Qpeak / Wr / No. of Clarifiers
6.16 m
3.00 m
369.89 m3/day/m

< 150 kg/m2/day at Qpeak


< 50 kg/m2/day at Qavg
=

3600 mg/l

Total Q
=
Qpeak
+
(For QRAS look under Extended Aeration Tank Sizing)
=
#NAME? m3/day
SLR (Qpeak)

=
=

SLR (Qavg)

error

=
=

or

3.6 kg/m3

QRAS

(Total Q / Actual Surface Area) x MLSS kg/day


#NAME? kg/m2/day

#NAME?

(Qavg + Qras) / Actual Surface Area x MLSS kg/day


#NAME? kg/m2/day

#NAME?

Launder Calculation
Overflow from weir to lauder

Launder size
Length
Width
Flow velocity
Depth of flow in launder

=
=

=
=
=
=

Qpeak
1109.66

3.00
0.25
0.80
21.41

/ number of tank
m3 / launder

m
m
m /s
mm

< 1.0 m/s


ok
< 0.3m as provided

Determine Volume of Cone


L

h
60

Therefore, Volume of Cone

BW 1

L
W
BW 1
BW 2

=
=
=
=

6.20
6.20
2.20
2.20

=
=

(L - BW1) / 2
2.00

=
=

(W - BW2) / 2
2.00

=
=

height of cone
A x Tan 60
3.46 m

Tan y
y

=
=
=

h /B
Tan -1 (h/B)
60.00 degrees

[ (1/3 x 2A x 2B x h) +(1/2 x 2A x BW2 x h)


+ ( 1/2 x (W + BW2) x h) ]

L (m)
W (m)

h (m)

A (m)

BW1 (m)

BW2

m
m
m
m

65.73 m3

Scum Withdrawal Airlift Pipe Design


Percent submergence
Hs
Hl

Scum Airlift
Hs
Hl
Percent Submergence

Hs / (Hs + Hl)

=
=

Depth (m) of air pipe below water surface


Height (m) of lift

=
=
=

x 100

3.8 m
0.7 m
84.44 %

With reference to the attached chart, Discharge


Velocity
Air Requirement

=
=
=

45 gpm
2 ft/sec
7 cfm

2.84 l/s
0.61 m/s
0.20 m3/min

AEROBIC SLUDGE HOLDING TANK DESIGN


Guidelines: Sludge yield = 0.6 kg/kg BOD5 (Standard "A")

Design Population,

PE

Design Flow,

QAVG

Sludge Yield

Ys

0.55 kg/kgBOD5/day

Sludge accumulation per day

Sd

=
=

QAVG x Ys (BOD5-EBOD5)
68.31 kg

28 Deg C

Percent Volatile Suspended Solid (VSS)

VSS

75 %

Percent VSS Destruction

VSSd

55 %

Influent to Digester

WAS

68.31 kg/day

Influent Solid Content

Conc

1%

Total Volatile Solid

TVS

=
=

VSS/100 x WAS
51.23 kg/day

Total Volatile Solid Destruction

TVSd

=
=

VSSd/100 x TVS
28.18 kg/day

TSd

Nonvolatile Solid + VS Remaining

(WAS - TVS) + { (1 - VSSd/100) x

(26.73 - 20.05) + { (1 - 55/100) x 20.05)

Temperature of Wastewater

Therefore, Total Solids Remaining After Digestion

TSd

Density of water

Specific gravity of sludge

sg

2300
517.5 m3/day

1000.00 kg/m3
1.015
3.95 m3/day

30 days

Volume of Tank Required

Vtank

Number of Tank Provided

No.

Volume of Tank Required

Storage days provided

TVS }

40.13 kg/day

Therefore, TSd in term of volume

(Calculated earlier)

118.62 m3
1
118.62 m3

SIZE OF EACH TANK


Depth
Width
Length

=
=
=

Volume

4.5 m
3.3 m
8.0 m
118.80 m3

>

118.62 m3

ok

OXYGEN REQUIREMENT FOR DIGESTION


Guidelines: 1.5kgO2/kgBOD
Wt of sludge digested

Ws

Amount of oxygen required, (AOR) Ws x 1.5

Oxygen correction factor


AOR/SOR
Where

=
=

Sd - TSd
28.18 kg

42.27 kg

AOR/SOR
=

(((BETA * ACF * Csf @ 28 deg) - C ) / Css ) * ALPHA * 1.024^T-20

BETA
ACF
Csf
C
Css
Alpha
T

=
=
=
=
=
=
=

0.98
0.989
7.83
1.5
9.08
0.75
30

AOR/SOR

0.64

Standard Oxygen Required

SOR

Assume O2 transfer efficiency

O2eff

Therefore

Total amount of air required

66.29 kg/day
10 %
SOR kg/day
O2eff/100 x 1.201 kg/m3 x 0.232 kg O2/kg air x 1440 min/day

1.65 m3/min

Flowrate per diffuser

200.00 L/min
0.200 m3/min

Quantity

Number of diffusers required

Total air required / Flowrate


=
8.26

Use

10

ok

DRYING BED DESIGN


Digested Sludge From Aerobic Digester
Concentration of Sludge

DS

#NAME? kg/day
1%
10 kg/m3

=
Specific gravity of sludge
Volume of Digested Sludge

sg

Vds

(See Aerobic Digester cals)

1.015
#NAME? m3/day

Per guidelines: Provide 4 week cycle for 450mm thick feed depth
Volume of Vds required
(Based on 21 days drying; 7 days feeding)

Vds(m3/day) x 28days

#NAME? m3

Depth of Feed

Therefore,

#NAME? m2

#NAME? m2 ( 1/3 reduction in area)

Area required

0.45 m

Provide fully covered drying beds


Therefore actual area required
Number of Drying Beds provided

=
=
=

16.50 m
2.50 m
41.25 m2

Dimension of Drying Beds


Dimension of Bed
Length
Width
Area
Total area of drying bed provided

nos of bed x bed area


165.0 m2

>

#NAME? m2

###

Determine Volume of Dewatered Sludge (DS)


Assume final sludge concentration is 25%
DS

Vs x Si x SGi x n
SGo x So

DS
Vs
Si
So
SGi
SGo
n

=
=
=
=
=
=
=

Therefore
DS

### m3/day

DS x 30 days

#NAME? m3

=
=
=
=

0.50
1.00
4.60
2.30

?
###
0.01
0.25
1.015
1.03
0.95

Volume of Dewatered Sludge, (m3/day)


Volume of Influent Sludge (m3/day)
Fractional Percent Solid Content of Influent Sludge
Fractional Percent Solid Content of Dewatered Sludge
Specific Gravity of Sludge Before Thickening
Specific Gravity of Sludge After Thickening
Fractional Percent Capture

@ 25% solid

Provide covered storage for 30 days


Volume required

Dimension provided

Depth
Width
Length
Volume

m
m
m
m3

>

#NAME? m3

ok

Drying Bed Feed Pump Design


Pump Sizing
Pumping rate per pump

=
=

9.10 L/sec
546.00 L/min

Pump Headloss Calculations

VALVES & FITTINGS

ENTRY
EXIT
CHECK VALVE
SLUICE VALVE
REDUCER
TEE THRU SIDE
TEE THRU RUN
ELBOW - 45 DEG
ELBOW - 90 DEG

K
VALUE

QUANTITY

SUCTION
TOTAL

QUANTITY

DISCHARGE
TOTAL

0.50
1.00
2.50
0.20
0.30
1.80
0.60
0.23
0.30

1
0
0
0
0
0
0
0
0

0.50
-

0
1
0
1
1
0
1
0
5

0.00
1.00
0.00
0.20
0.30
0.00
0.60
0.00
1.50

SUM OF K's FOR FITTINGS

0.50

3.60

PIPE DIAMETER

0.10 m

0.10

PUMPING RATE

9.10 L/sec

9.10

V = VELOCITY

1.16 m/sec

1.16

F = TOTAL FITTING HEAD LOSS


= (K x V2 / 2g)

0.03 m

0.25

L = LINEAR METER OF STRAIGHT PIPE

0.00 m

15.00

M = MULTIPLYING FACTOR

1.10

1.10

100.00

100.00

C = HAZEN-WILLIAMS ROUGHNESS COEFFICIENT


P = HEAD LOSS USING HAZEN-WILLIAMS EQATION

0.00 m

0.39

TOTAL LOSS = F + P

0.03 m

0.64

TOTAL SUCTION + DISCHARGE LOSS

0.73 m

S = STATIC HEAD LOSS (Worst Case Scenerio)

4.00 m

TOTAL DYNAMIC HEAD

4.73 m

Size pump for

9.10 L/sec @

4.73 m

The submersible pump selected is as follows:Make


=
Ebara
Model
=
65DVS51.5
Capacity
=
9.10 L/sec
Total Head
=
4.73 m
Power
=
1.50 kW
Discharge Size
=
65 mm
No. of Units
=
1 (1 duty)

TDH

connect to

100

mm

Determine Size of Force Main


Guideline: 1 - 2.5m/s velocity in pipe
Required size of sludge pump

[ 4 x Qsludge / (2.5 m/s x 3.14] 1/2

[ 4 x 0.0091 / (2.5 m/s x 3.14] 1/2

Actual velocity in selected pipe

0.068 m

80 mm

1.81 m/s

>

>

68 mm

ok

2.5 m/s

ok

Determine Total Dynamic Head ( TDH )


TDH

hst + hf + hm

=
=
=

Static head (m)


Losses through the pipe ( Hazen - William Formula )
Losses through fittings

Where ;

hst
hf
hm

Thus, static head of pump, h st

Hazen - William Formula


hf
=
6.82

Where ;

V
C

1.85

Velocity m/sec

V = Q/A

8 L/sec
1000 x 3.142 x 0.10

1.16 m/s

/ 4

1.16 m/sec

Coefficient of roughness

Length of pipe, m

Diameter of pipe, m

Thus, losses through the pipe, hf

L
D1.167

4.00 m

0.00
15.00
0.10

#DIV/0! m

Losses through fittings


hm

KV
2g

Where ;

Head loss coefficeint

4.10

Velocity m/sec

1.16

Gravity, m/s

9.81

hm

0.29 m

Therefore ,
Total Dynamic Head ( TDH )

=
=

hst + hf + hm
### m

To plot chart for the System Curve & Pump Curve from the above equitition:Q (L/s)

V (m/s)

TDH (m)

0
2
4
8
9.5

0.00
0.25
0.51
1.02
1.21

4
4.04
4.15
4.57
4.80

* refer to Chart attached

Pump head (m)


18.6
16.4
14.2
8.3
4.2

18.6
16.4
14.2
13
8.33
4.2

4
4.04
4.15
4.23
4.57
4.8

A
B
C

DRYING BED FEED PUMP


Submersible Pump
EBARA Model 65DVS51.5
20
Pump Curve

18

Head (m)

16
Pump Operating Point
9.2 L/sec @ 4.7 m

14
12
10
System Curve
8
6
4
2
0
0

6
Flowrate, Q (L/sec)

10

X-Axis
0
3.3
6.67
10
13.33
16.67
19.98
65DVS

X-Axis
0
2
4
8
9.5

Pump
System
16.2
4
14.2
4.25
12.4
4.92
11
5.97
9
7.39
7.4
9.17
5.6
11.27
Pump
System
18.6
4
16.4
4.04
14.2
4.15
8.33
4.57
4.2
4.8

3.580986

Pump
0
198
400.2
600
799.8
1000.2
1198.8

System

Blower- 1 Sizing
Air Requirement for Aeration

#NAME? m3/min

Air Requirement for Aerobic Sludge Digestion

#NAME? m3/min

#NAME? m3/min

Qd

TOTAL AIR REQUIREMENT

Determine air flow under standard condition, Qs


Qs

Qd x (1.0332 + Pd)

273 + St

273 + Sd

1.0332

Qs

Air flow under standard condition

(m3/min)

Qd

#NAME?

Air flow under discharge condition

(m3/min)

Pd

=
=

0.41
-0.05

Discharge static pressure


Suction static pressure

(kgf/cm2)
(kgf/cm2)

30

Suction temperature

38

Discharge temperature

#NAME? m3/min

PS
St
Sd

C
C

Therefore,
Qs

Determine discharge pressure under standard condition, Ps


Ps

1.0332 + Pd
1.0332 + PS

0.48 kgf/cm2

Size blower for 9.09 m3/min @ 0.48 kgf/cm2


Provide 2 blowers : 1 duty, 1 standby
Model:

Fu Tsu Model TSC 125, 920rpm, 15.0kW

1.0332

Blower-3 Sizing
Air Requirement for Scum Airlift

0.20 m3/min

Air Requirement for RAS

#NAME? m3/min

Air Requirement for WAS

Air Requirement for MLSS

#NAME? m3/min
#NAME? m3/min

#NAME? m3/min

Qd

TOTAL AIR REQUIREMENT

Determine air flow under standard condition, Qs


Qs

Qd x (1.0332 + Pd)

273 + St

273 + Sd

1.0332

Qs

Air flow under standard condition

(m3/min)

Qd

#NAME?

Air flow under discharge condition

(m3/min)

Pd

0.45

Discharge static pressure

(kgf/cm2)

PS
St

-0.05

Suction static pressure

(kgf/cm2)

30

Suction temperature

Sd

38

Discharge temperature

#NAME? m3/min

C
C

Therefore,
Qs

Determine discharge pressure under standard condition, P s


Ps

1.0332 + Pd
1.0332 + PS

0.53 kgf/cm2

Size blower for 1.76 m3/min @ 0.53 kgf/cm2


Provide 1 blowers : 1 duty
Model:

Fu-Tsu Model TSC 80, 760 rpm @ 5.5 Kw

1.0332

Sludge Withdrawal Airlift Pipe Design


Calculate the submerged distance of the air inlet (S) by the following formula:
S

Basin SWD - ( 1 + (3 x Pump Dia) / 12 )

where
SWD (ft)
Pump Dia (in) for RAS
Pump Dia (in) for MLSS & scum

=
=
=

14.76 ft
3.00 in
2.00 in

4.50 m
0.075 m
0.050 m

13.01 ft

3.97 m

Calculate the Air Supply Volume (Vair) required:


Vair

h / { C x LOG [ (H + 10.4) / 10.4 ] }

where
h
H
C

=
=
=

Vair

A eff

0.75 total lift required (m)


4.50 submergence (m)
10.20 constant for less than 15m lift
0.47 m3/min of air per m3 of water
25.00 air-lift efficiency (%)

Determine Volume of Air Requirement for SCUM, VSCUM


SCUM

=
=

Vair-SCUM

=
=

75.0 m3/day
0.0521 m3/min
Vair x RAS x Aeff
0.0981 m3/min

Determine Volume of Air Requirement for RAS, VRAS


RAS

=
=

Vair-RAS

=
=

#NAME? m3/day
#NAME? m3/min

See Aeration Tank cals

Vair x RAS x Aeff


#NAME? m3/min

Determine Volume of Air Requirement for WAS, VWAS


WAS

=
=

Vair-WAS

=
=

#NAME? m3/day
#NAME? m3/min

See Aeration Tank cals

Vair x WAS x Aeff


#NAME? m3/min

Determine Volume of Air Requirement for MLSS Return, VMR


MLSS

=
=
=

MLSS Return

=
=

Vair-MLSS

=
=

4 Qave - QRAS
2070.00 - 182.3 m3/day
#NAME? m3/day
#NAME? m3/day
#NAME? m3/min
Vair x MLSS x Aeff
#NAME? m3/min

Aeration Piping Headloss To Aeration Tanks


Criteria
Ambient air temperature

To

Ambient barometric pressure

Po

1.00 atm

Air supply pressure

1.450 atm

Blower capacity

Qb

#NAME? m3/min

Blower efficiency

75 %

Friction factor

0.029 x D^0.027
Q^0.148

Temperature in pipe (deg K)

To x (P/Po)^0.283

Velocity head

Hv

9.82E-8

Headloss (mm)

hL

f x (L/D) x Hv

Size (mm)
80
80
80
80
80
80
80
50
25
25
25
25
25
25
25

Quantity
1
1

K Value
2.50
0.80
0.20
1.80
0.60
0.30
0.30
0.60
0.20
0.60
0.60
0.30
0.30
0.20
0.80

30 deg C

303.2 deg K

Equations

TQ^2
PD^4
or

K x Hv

A. Pipe Fittings Losses


No.
1
2
9
3
4
5
6
4
9
7
4
5
8
9
10

Valves & Fittings


Check valve
Gate valve
Reducer
Tee thru side
Tee thru run
Elbow 90 deg
Elbow 90 deg
Tee thru run
Reducer
Tee thru run
Tee thru run
Elbow 90 deg
Elbow 90 deg
Reducer
Gate valve

1
1
2
2
2

Q (m3/min)
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

T (deg K)
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
336.77
Subtotal

hL, headloss (mm)


#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

B. Straight Pipe Losses


No.
1
2
3
4

Length (m)
8.00
4.00
7.00
4.00

DIA (mm)
100
50
50
25

Velocity (m/min)
#NAME?
#NAME?
#NAME?
#NAME?

Q (m3/min)
#NAME?
#NAME?
#NAME?
#NAME?

f, fric. factor
#NAME?
#NAME?
#NAME?
#NAME?

T (deg K)
336.77
336.77
336.77
336.77
Subtotal

hL, headloss (mm)


#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

C. Supply Pressure At The Blower


1
2
3
3
4
5
6

Losses in piping
Losses in pipe fittings
Losses in air filter
Losses in silencer
Losses in blower
Losses in diffusers
Static head

=
=
=
=
=
=
=

Total

#NAME?
#NAME?
50.00
50.00
150.00
160.00
4100.00

mm
mm
mm
mm
mm
mm
mm

#NAME? mm

Therefore, the absolute supply


pressure

#NAME? m

#NAME? atm

D. Power Requirement of Blower, P (kw)

where

Therefore,

8.314 kJ/k mole deg K

air mass flow, kg/s

#NAME? Kw

5.5 Kw
ok

Select next bigger size motor

Size blower for 9.09 m3/min @ 0.48 kgf/cm2


Fu Tsu Model TSC 125, 920rpm, 15.0kW
Provide 2 blowers; 1 running, 1 standby

w RTo
8.41 e

x [ (P/Po)^0.283 - 1 ]

or

#NAME? HP
7 HP

CHLORINATION TANK DESIGN


Qpeak

2219.31 m3/day

1.54 m3/min

Detension Time at Qpeak

Volume of Tank

15.00 min
Qpeak x t

23.12 m3

Number of Tanks

Number of Bays per Tank

Dimension of Tank Provided


Depth
Wetted depth
Width
Length
Number of pass

H
h
W
L
n

=
=
=
=
=

1.80 m
1.50
0.75 m
4.50 m
4

Vp

Volume Provided

24.30 m3 >=

ok

max 3m

23.12 m3

Check:
Ratio

Ratio
Wetted depth
1.50
2
Length
4.50
6

Detension Time at Qpeak

=
=

ok
:
:
:
:
:
:

Width
0.75
1
Width
0.75
1

Vp / Qpeak
15.77 min >

15 min ok

PARSHALL FLUME FOR DISCHARGE


Design Flow,
Peaking Factor
Peak Flow

Qavg
PF
Qpeak

=
=
=

517.5 m3/day
4.29
2219.31 m3/day

Formula for flow calculation with diffrent throat width of Parshall Flume by Harlan Bengtson

Flow thru 1" PF,

0.338 x H1.55

Flow tru PF

=
=

flow in PF in cfs
0.9071091 cfs = Qpeak

Head over flume

in ft

1.8263509 ft
556.7 mm

where

For Q > Qpeak, water level in PF

90 DEGREE V-NOTCH WEIR AT OUTLET BOX


Design Population ,
Design Flow,
Peaking Factor
Peak Flow

PE
Qavg
PF
Qpeak

=
=
=
=

2300
517.5
4.29
2219.31

m3/day
m3/day

90 Deg V-Notch Weir Formula

1.417H 5/2

q(m3/sec)

H (m)

150

Therefore, q

0.012348

Set depth of weir @

200

mm

ok

mm or
m3/sec > =

0.15

m at Qpeak

0.02569

m3/sec ok

INFLUENT
Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

INFLUENT

517.50
129.38
155.25

Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

INFLUENT
FLOW

INFLUENT

#NAME?
129.38
#NAME?

Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

SECONDARY EFFLUENT

#NAME?
109.97
#NAME?

SCREEN
CHAMBER *

MLSS
Flow (m3/d)

Flow (m3/d)

#NAME?

BOD(kg/d)
TSS(kg/d)

PUMP
STATION

ANOXIC TANK

AERATION
BASINS

#NAME?
#NAME?
#NAME?

SECONDARY
CLARIFIERS

FINAL
EFFLUENT
10 mg/L BOD
20 mg/L TSS

LAST
MANHOLE
RAS
RAS = 1%
Flow (m3/d)
TSS(kg/d)

423.41
4234.09

LIQUID FLOW
SOLID FLOW
WAS
* Assume 15% of BOD/TSS is removed from screenings and grit
* Assume 2% of flow is removed from screenings

WAS = 1%
Flow (m3/d)
TSS(kg/d)

#NAME?
#NAME?
DIGESTED SLUDGE
Flow (m3/d)
TSS(kg/d)

DEWATERED SLUDGE

3.95
#NAME?

Flow (m3/d)
TSS(kg/d)

AEROBIC
SLUDGE HOLDING
TANK
(75% VSS)
(55% VSS Destruction)

SLUDGE
DRYING BEDS
(25-40% SOLIDS)
(95% CAPTURE)

SUPERNATANT
Flow (m3/d)
TSS(kg/d)

SOLIDS BALANCE @ Qavg

#NAME?
#NAME?

#NAME?
#NAME?

INFLUENT
Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

INFLUENT
FLOW

INFLUENT

689.63
172.41
206.89

Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

INFLUENT

697.82
172.41
236.97

Flow (m3/d)
BOD (kg/day)
TSS(kg/d)

SECONDARY EFFLUENT

683.87
146.55
201.43

Flow (m3/d)
BOD(kg/d)
TSS(kg/d)

SCREEN
CHAMBER *

AERATION
BASINS

683.82
6.84
13.68

SECONDARY
CLARIFIERS

FINAL
EFFLUENT
10 mg/L BOD
20 mg/L TSS

RAS
LIQUID FLOW
SOLID FLOW
* Assume 15% of BOD/TSS is removed from screenings and grit
* Assume 2% of flow is removed from screenings
WAS
WAS = 1%
Flow (m3/d)
TSS(kg/d)

9.10
91.03
THICKENED SLUDGE
Flow (m3/d)
TSS(kg/d)

GRAVITY
SLUDGE THICKENER
TANK
(3% Solid)

SUPERNATANT
Flow (m3/d)
TSS(kg/d)

DIGESTED SLUDGE

2.09
62.79

Flow (m3/d)
TSS(kg/d)

AEROBIC
SLUDGE HOLDING
TANK
(80% VSS)
(55% VSS Destruction)

SOLIDS BALANCE @ Qavg

Flow (m3/d)
TSS(kg/d)

SLUDGE
DRYING BEDS
(25-40% SOLIDS)
(95% CAPTURE)

SUPERNATANT

7.01
28.24

DEWATERED SLUDGE

1.23
36.89

Flow (m3/d)
TSS(kg/d)

1.18
1.84

0.05
35.05

SLUDGE
HOLDING
AREA
(30 DAYS)