You are on page 1of 2

34672 Federal Register / Vol. 72, No.

121 / Monday, June 25, 2007 / Notices

Comment Date: 5 p.m. Eastern Time review in the Commission’s Public The Commission encourages
on June 22, 2007. Reference Room in Washington, DC. electronic submission of protests and
There is an ‘‘eSubscription’’ link on the interventions in lieu of paper using the
Kimberly D. Bose,
Web site that enables subscribers to ‘‘eFiling’’ link at http://www.ferc.gov.
Secretary. receive e-mail notification when a Persons unable to file electronically
[FR Doc. E7–12177 Filed 6–22–07; 8:45 am] document is added to a subscribed should submit an original and 14 copies
BILLING CODE 6717–01–P docket(s). For assistance with any FERC of the protest or intervention to the
Online service, please e-mail Federal Energy Regulatory Commission,
FERCOnlineSupport@ferc.gov, or call 888 First Street, NE., Washington, DC
DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call 20426.
Federal Energy Regulatory (202) 502–8659. This filing is accessible on-line at
Commission http://www.ferc.gov, using the
Kimberly D. Bose,
‘‘eLibrary’’ link and is available for
[Docket No. RP07–487–000] Secretary.
review in the Commission’s Public
[FR Doc. E7–12190 Filed 6–22–07; 8:45 am] Reference Room in Washington, DC.
Cheyenne Plains Gas Pipeline BILLING CODE 6717–01–P There is an ‘‘eSubscription’’ link on the
Company, LLC; Notice of Proposed Web site that enables subscribers to
Changes in FERC Gas Tariff receive e-mail notification when a
DEPARTMENT OF ENERGY document is added to a subscribed
June 15, 2007.
Take notice that on June 12, 2007, Federal Energy Regulatory docket(s). For assistance with any FERC
Cheyenne Plains Gas Pipeline Company, Commission Online service, please e-mail
LLC (Cheyenne Plains) tendered for FERCOnlineSupport@ferc.gov, or call
filing as part of its FERC Gas Tariff, [Docket No. RP07–488–000] (866) 208–3676 (toll free). For TTY, call
Original Volume No. 1, Seventh Revised (202) 502–8659.
Sheet No. 1 to become effective June 23, Columbia Gas Transmission Kimberly D. Bose,
2007. Corporation; Notice of Tariff Filing and
Secretary.
Cheyenne Plains states that the tariff Non-Conforming Service Agreement
[FR Doc. E7–12185 Filed 6–22–07; 8:45 am]
sheet is being filed to submit a new June 15, 2007. BILLING CODE 6717–01–P
contract to the list of non-conforming
Take notice that on June 12, 2007,
agreements for the Commission’s
Columbia Gas Transmission Corporation
information and review. DEPARTMENT OF ENERGY
(Columbia) tendered for filing as part of
Any person desiring to intervene or to
its FERC Gas Tariff, Second Revised
protest this filing must file in Federal Energy Regulatory
Volume No.1, Nineteenth Revised Sheet
accordance with Rules 211 and 214 of Commission
No. 500B, with an effective date of June
the Commission’s Rules of Practice and
13, 2007.
Procedure (18 CFR 385.211 and [Docket No. CP07–396–000]
Columbia also tendered for filing the
385.214). Protests will be considered by
following non-conforming Service
the Commission in determining the Gulf South Pipeline Company, LP;
Agreement for consideration and
appropriate action to be taken, but will Notice of Request Under Blanket
approval:
not serve to make protestants parties to Authorization
the proceeding. Any person wishing to FTS Service Agreement No. 94274, Between
become a party must file a notice of Columbia Gas Transmission Corporation June 18, 2007.
intervention or motion to intervene, as and BP Energy Company, Dated June 11, Take notice that on June 8, 2007, Gulf
2007. South Pipeline Company, LP (Gulf
appropriate. Such notices, motions, or
protests must be filed in accordance Any person desiring to intervene or to South), 9 Greenway Plaza, Suite 2800,
with the provisions of Section 154.210 protest this filing must file in Houston, Texas 77046, filed in Docket
of the Commission’s regulations (18 CFR accordance with Rules 211 and 214 of No. CP07–396–000, a prior notice
154.210). Anyone filing an intervention the Commission’s Rules of Practice and request pursuant to sections 157.205
or protest must serve a copy of that Procedure (18 CFR 385.211 and and 157.208 of the Federal Energy
document on the Applicant. Anyone 385.214). Protests will be considered by Regulatory Commission’s regulations
filing an intervention or protest on or the Commission in determining the under the Natural Gas Act for
before the intervention or protest date appropriate action to be taken, but will authorization to construct, own, and
need not serve motions to intervene or not serve to make protestants parties to operate two new compressor stations on
protests on persons other than the the proceeding. Any person wishing to its existing natural gas transmission
Applicant. become a party must file a notice of pipeline facilities in Mobile County,
The Commission encourages intervention or motion to intervene, as Alabama, all as more fully set forth in
electronic submission of protests and appropriate. Such notices, motions, or the application, which is on file with
interventions in lieu of paper using the protests must be filed in accordance the Commission and open to public
‘‘eFiling’’ link at http://www.ferc.gov. with the provisions of Section 154.210 inspection. The filing may also be
Persons unable to file electronically of the Commission’s regulations (18 CFR viewed on the web at http://
should submit an original and 14 copies 154.210). Anyone filing an intervention www.ferc.gov using the ‘‘eLibrary’’ link.
of the protest or intervention to the or protest must serve a copy of that Enter the docket number excluding the
Federal Energy Regulatory Commission, document on the Applicant. Anyone last three digits in the docket number
sroberts on PROD1PC70 with NOTICES

888 First Street, NE., Washington, DC filing an intervention or protest on or field to access the document. For
20426. before the intervention or protest date assistance, contact FERC at
This filing is accessible on-line at need not serve motions to intervene or FERCOnlineSupport@ferc.gov or call
http://www.ferc.gov, using the protests on persons other than the toll-free, (886) 208–3676 or TYY, (202)
‘‘eLibrary’’ link and is available for Applicant. 502–8659.

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1
Federal Register / Vol. 72, No. 121 / Monday, June 25, 2007 / Notices 34673

Specifically, Gulf South proposes to filed and not withdrawn within 30 days protests must be filed in accordance
construct, own, operate, and maintain after the time allowed for filing a with the provisions of Section 154.210
two new compressor stations, the protest, the instant request shall be of the Commission’s regulations (18 CFR
Whistler Junction Compressor Station treated as an application for 154.210). Anyone filing an intervention
(Whistler Junction) and the Airport authorization pursuant to Section 7 of or protest must serve a copy of that
Junction Compressor Station (Airport the NGA. document on the Applicant. Anyone
Junction) in Mobile County, Alabama, to The Commission strongly encourages filing an intervention or protest on or
satisfy the growing demand for natural electronic filings of comments, protests, before the intervention or protest date
gas in the Southeastern United States. and interventions via the internet in lieu need not serve motions to intervene or
These compressor stations are designed of paper. See 18 CFR 385.2001(a)(1)(iii) protests on persons other than the
to deliver, on a firm basis, 250,000 Dth and the instructions on the Applicant.
per day to Gulfstream Natural Gas Commission’s Web site (http://
The Commission encourages
System, L.L.C. (Gulfstream), an www.ferc.gov) under the ‘‘e-Filing’’ link.
electronic submission of protests and
interstate pipeline, at an existing Kimberly D. Bose, interventions in lieu of paper using the
interconnect near Coden, Alabama in Secretary. ‘‘eFiling’’ link at http://www.ferc.gov.
Mobile County. Whistler Junction will Persons unable to file electronically
[FR Doc. E7–12182 Filed 6–22–07; 8:45 am]
consist of one 4,680 horsepower Solar should submit an original and 14 copies
BILLING CODE 6717–01–P
Centaur 40–4700S turbine engine of the protest or intervention to the
equipped with Solar’s ‘‘SoLoNOX’’ Federal Energy Regulatory Commission,
system. Airport Junction will consist of DEPARTMENT OF ENERGY 888 First Street, NE., Washington, DC
one 4,735 horsepower Caterpillar G3616 20426.
TALE reciprocating engine equipped Federal Energy Regulatory
with a low-NOX burner system. A new This filing is accessible on-line at
Commission
office and controls building will also be http://www.ferc.gov, using the
constructed. No wetlands are impacted [Docket No. RP99–176–136] ‘‘eLibrary’’ link and is available for
by the project. All construction will be review in the Commission’s Public
Natural Gas Pipeline Company of Reference Room in Washington, DC.
contained within Gulf South’s property. America; Notice of Negotiated Rate
Gulf South will finance the facilities There is an ‘‘eSubscription’’ link on the
with funds on hand. The estimated cost June 15, 2007. Web site that enables subscribers to
of the facilities is $22,985,103. Take notice that on June 13, 2007, receive e-mail notification when a
Any questions regarding the Natural Gas Pipeline Company of document is added to a subscribed
application should be directed to J. Kyle America (Natural) tendered for filing an docket(s). For assistance with any FERC
Stephens, Vice President, Regulatory amendment to an existing negotiated Online service, please e-mail
Affairs, Gulf South Pipeline Company, rate arrangement on file with the FERCOnlineSupport@ferc.gov, or call
LP, 20 East Greenway Plaza, Suite 1000, Commission, to be effective June 13, (866) 208–3676 (toll free). For TTY, call
Houston Texas 77046, or call at (713) 2007. (202) 502–8659.
479–8033. Natural states that copies of the filing Kimberly D. Bose,
Any person or the Commission’s Staff are being mailed to all parties set out on
Secretary.
may, within 60 days after the issuance the Commission’s official service list.
of the instant notice by the Commission, Any person desiring to intervene or to [FR Doc. E7–12187 Filed 6–22–07; 8:45 am]
file pursuant to Rule 214 of the protest this filing must file in BILLING CODE 6717–01–P
Commission’s Procedural Rules (18 CFR accordance with Rules 211 and 214 of
385.214) a motion to intervene or notice the Commission’s Rules of Practice and
of intervention and, pursuant to section Procedure (18 CFR 385.211 and DEPARTMENT OF ENERGY
157.205 of the Commission’s 385.214). Protests will be considered by
Federal Energy Regulatory
Regulations under the Natural Gas Act the Commission in determining the
Commission
(NGA) (18 CFR 157.205) a protest to the appropriate action to be taken, but will
request. If no protest is filed within the not serve to make protestants parties to Notice of Effectiveness of Exempt
time allowed therefore, the proposed the proceeding. Any person wishing to Wholesale Generator or Foreign Utility
activity shall be deemed to be become a party must file a notice of Company Status
authorized effective the day after the intervention or motion to intervene, as
time allowed for protest. If a protest is appropriate. Such notices, motions, or June 18, 2007.

Docket no.

Navasota Odessa Energy Partners LP ............................................................................................................................................... EG07–41–000


Navasota Wharton Energy Partners LP .............................................................................................................................................. EG07–42–000
Sleeping Bear, LLC ............................................................................................................................................................................. EG07–43–000
Altura Power L.P., ................................................................................................................................................................................ EG07–44–000
Hidroelectrica El Chocon S.A. ............................................................................................................................................................. FC07–12–000
Centrales Termicas Mendoza S.A. ...................................................................................................................................................... FC07–13–000
Centrales Termicas San Nicolas, S.A. ................................................................................................................................................ FC07–14–000
CMS Ensenada S.A. ............................................................................................................................................................................ FC07–16–000
Terasen Gas Inc. ................................................................................................................................................................................. FC07–19–000
sroberts on PROD1PC70 with NOTICES

Terasen Gas (Vancouver Island) Inc. ................................................................................................................................................. FC07–20–000


CMS (India) Operation & Maintenance Company Private Limited ..................................................................................................... FC07–21–000
CMS International Operating Company .............................................................................................................................................. FC07–22–000
ST-CMS Electric Company Private Limited ........................................................................................................................................ FC07–23–000
Jorf Lasfar Energy Company SCA ...................................................................................................................................................... FC07–24–000
Shuweihat O&M Limited Partnership .................................................................................................................................................. FC07–25–000

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1

You might also like