39390 Federal Register / Vol. 72, No.

137 / Wednesday, July 18, 2007 / Notices

precedent agreements with the highest proceeding can ask for court review of DEPARTMENT OF ENERGY
bidders for longterm, firm service Commission orders in the proceeding.
contracts. Once it concludes Federal Energy Regulatory
However, a person does not have to
negotiations, Golden Triangle says it Commission
intervene in order to have comments
will file its executed precedent considered. The second way to [Docket No. CP07–8–002]
agreements as a supplement to this
participate is by filing with the
application. Guardian Pipeline, L.L.C., Notice of
Secretary of the Commission, as soon as
Golden Triangle proposes to offer Amendment
possible, an original and two copies of
open access firm and interruptible
comments in support of or in opposition July 10, 2007.
storage and hub services and requests
authority to charge market-based rates to this project. The Commission will Take notice that on July 2, 2007,
for its proposed services, which it says consider these comments in Guardian Pipeline, L.L.C. (Guardian),
is consistent with the requirements of determining the appropriate action to be filed in Docket No. CP07–8–002, an
the Commission’s Alternative taken, but the filing of a comment alone amendment to its October 13, 2006
Ratemaking Policies. The proposed will not serve to make the filer a party application pursuant to section 7 (c) of
terms and conditions for Golden to the proceeding. The Commission’s the Natural Gas Act (NGA) in which it
Triangle’s services are included in the rules require that persons filing requested authorization to site,
comments in opposition to the project construct, and operate facilities
pro forma tariff included in Exhibit P of
provide copies of their protests only to consisting of approximately 118 miles of
the application.
the party or parties directly involved in new mainline, two electric compressor
Pursuant to section 157.9 of the stations, seven meter stations and
Commission’s rules, 18 CFR 157.9, the protest.
appurtenant facilities resulting in
within 90 days of this Notice the Persons who wish to comment only 537,200 Dth/d of incremental firm
Commission staff will either: Complete on the environmental review of this capacity on Guardian’s existing pipeline
its environmental assessment (EA) and project should submit an original and system and 437,200 Dth/d of firm
place it into the Commission’s public two copies of their comments to the capacity on the expansion facilities. The
record (eLibrary) for this proceeding, or Secretary of the Commission. amended application is reflected in
issue a Notice of Schedule for Environmental commenters will be Guardian’s June 6, 2007 filing that
Environmental Review. If a Notice of proposes route variations between MPs
placed on the Commission’s
Schedule for Environmental Review is 88.0 and 98.2, moving two meter
environmental mailing list, will receive
issued, it will indicate, among other stations, and construction of short
copies of the environmental documents,
milestones, the anticipated date for the branch lines between those meter
Commission staff’s issuance of the final and will be notified of meetings
associated with the Commission’s stations and Wisconsin Public Service
environmental impact statement (FEIS) Corporation’s proposed interconnecting
or EA for this proposal. The filing of the environmental review process.
Environmental commenters will not be pipeline facilities, all as more fully set
EA in the Commission’s public record forth in the amended application which
for this proceeding or the issuance of a required to serve copies of filed
is on file with the Commission and open
Notice of Schedule for Environmental documents on all other parties.
to public inspection. The Commission
Review will serve to notify federal and However, the non-party commenters staff will determine if this amendment
state agencies of the timing for the will not receive copies of all documents will have an effect on the schedule for
completion of all necessary reviews, and filed by other parties or issued by the the environmental review of this
the subsequent need to complete all Commission (except for the mailing of project. If necessary, a Notice of
federal authorizations within 90 days of environmental documents issued by the Schedule for Environmental Review
the date of issuance of the Commission Commission) and will not have the right will be issued within 90 days of this
staff’s FEIS or EA. to seek court review of the Notice. The instant filing may be also
There are two ways to become Commission’s final order. viewed on the web at http://
involved in the Commission’s review of Motions to intervene, protests and www.ferc.gov using the ‘‘eLibrary’’ link.
this Project. First, any person wishing to comments may be filed electronically Enter the docket number excluding the
obtain legal status by becoming a party via the Internet in lieu of paper; see 18 last three digits in the docket number
to the proceeding for this project field to access the document. For
CFR 285.2001(a)(1)(iii) and the
should, on or before the comment date assistance, call (866) 208–3676 or TTY,
instructions on the Commission’s Web
stated below, file with the Federal (202) 502–8659.
Energy Regulatory Commission, 888 site under the ‘‘e-Filing’’ link. The
Any questions regarding this
First Street, NE., Washington, DC 20426, Commission strongly encourages
application may be directed to Patricia
a motion to intervene in accordance electronic filings. Anderson, GM, Rates and Regulatory
with the requirements of the Comment Date: July 23, 2007. Affairs, ONEOK Partners GP, LLC, 100
Commission’s Rules of Practice and W. Fifth Street, 12th Floor, Tulsa,
Kimberly D. Bose,
Procedure (18 CFR 385.214 or 385.211) Oklahoma 74103; phone: (918) 588–
and the Regulations under the NGA (18 Secretary. 7729; e-mail: panderson@oneok.com.
CFR 157.10). A person obtaining party [FR Doc. E7–13852 Filed 7–17–07; 8:45 am] There are two ways to become
status will be placed on the service list BILLING CODE 6717–01–P involved in the Commission’s review of
maintained by the Secretary of the this project. First, any person wishing to
Commission and will receive copies of obtain legal status by becoming a party
all documents filed by the applicant and to the proceedings for this project
pwalker on PROD1PC71 with NOTICES

by all other parties. A party must submit should, on or before the below listed
14 copies of filings made with the comment date, file with the Federal
Commission and must mail a copy to Energy Regulatory Commission, 888
the applicant and to every other party in First Street, NE, Washington, DC 20426,
the proceeding. Only parties to the a motion to intervene in accordance

VerDate Aug<31>2005 16:02 Jul 17, 2007 Jkt 211001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\18JYN1.SGM 18JYN1
Federal Register / Vol. 72, No. 137 / Wednesday, July 18, 2007 / Notices 39391

with the requirements of the Comment Date: 5 p.m. Eastern Time Online service, please e-mail
Commission’s Rules of Practice and on July 31, 2007. FERCOnlineSupport@ferc.gov, or call
Procedure (18 CFR 385.214 or 385.211) (866) 208–3676 (toll free). For TTY, call
Kimberly D. Bose,
and the Regulations under the NGA (18 (202) 502–8659.
Secretary. Intervention and Protest Date: 5 p.m.
CFR 157.10). A person obtaining party
[FR Doc. E7–13860 Filed 7–17–07; 8:45 am] Eastern Time July 18, 2007.
status will be placed on the service list
BILLING CODE 6717–01–P
maintained by the Secretary of the Kimberly D. Bose,
Commission and will receive copies of Secretary.
all documents filed by the applicant and DEPARTMENT OF ENERGY [FR Doc. E7–13856 Filed 7–17–07; 8:45 am]
by all other parties. A party must submit BILLING CODE 6717–01–P
14 copies of filings made with the Federal Energy Regulatory
Commission and must mail a copy to Commission
the applicant and to every other party in [Docket No. RP07–516–000] DEPARTMENT OF ENERGY
the proceeding. Only parties to the
proceeding can ask for court review of Iroquois Gas Transmission System, Federal Energy Regulatory
Commission orders in the proceeding. L.P.; Notice of Filing Commission
However, a person does not have to July 10, 2007.
Docket No. RP99–176–137
intervene in order to have comments Take notice that on June 29, 2007,
considered. The second way to Natural Gas Pipeline Company; Notice
Iroquois Gas Transmission System, L.P. of Negotiated Rate Filing
participate is by filing with the (Iroquois) tendered for filing its
Secretary of the Commission, as soon as schedules which reflect revised July 10, 2007.
possible, an original and two copies of calculations supporting the Take notice that on June 29, 2007,
comments in support of or in opposition Measurement Variance/Fuel Use Factors Natural Gas Pipeline Company of
to this project. The Commission will utilized by Iroquois during the period America (Natural) tendered for filing
consider these comments in January 1, 2007 through June 30, 2007. Amendment No. 8 dated May 23, 2007,
determining the appropriate action to be Any person desiring to intervene or to to Rate Schedule FTS Service
taken, but the filing of a comment alone protest this filing must file in Agreement dated May 5, 1995, between
will not serve to make the filer a party accordance with Rules 211 and 214 of Natural and Nicor Gas Company (Nicor).
to the proceeding. The Commission’s the Commission’s Rules of Practice and Natural states that the Amendment
rules require that persons filing Procedure (18 CFR 385.211 and reflects changes to the primary receipt
comments in opposition to the project 385.214). Protests will be considered by points in Exhibit A of the Rate Schedule
provide copies of their protests only to the Commission in determining the FTS Service FTS Service Agreement to
the party or parties directly involved in appropriate action to be taken, but will be effective July 1, 2007.
the protest. not serve to make protestants parties to Any person desiring to intervene or to
the proceeding. Any person wishing to protest this filing must file in
Persons who wish to comment only become a party must file a notice of accordance with Rules 211 and 214 of
on the environmental review of this intervention or motion to intervene, as the Commission’s Rules of Practice and
project should submit an original and appropriate. Such notices, motions, or Procedure (18 CFR 385.211 and
two copies of their comments to the protests must be filed on or before the 385.214). Protests will be considered by
Secretary of the Commission. date as indicated below. Anyone filing the Commission in determining the
Environmental commentors will be an intervention or protest must serve a appropriate action to be taken, but will
placed on the Commission’s copy of that document on the Applicant. not serve to make protestants parties to
environmental mailing list, will receive Anyone filing an intervention or protest the proceeding. Any person wishing to
copies of the environmental documents, on or before the intervention or protest become a party must file a notice of
and will be notified of meetings date need not serve motions to intervene intervention or motion to intervene, as
associated with the Commission’s or protests on persons other than the appropriate. Such notices, motions, or
environmental review process. Applicant. protests must be filed in accordance
Environmental commentors will not be The Commission encourages with the provisions of § 154.210 of the
required to serve copies of filed electronic submission of protests and Commission’s regulations (18 CFR
documents on all other parties. interventions in lieu of paper using the 154.210). Anyone filing an intervention
However, the non-party commentors ‘‘eFiling’’ link at http://www.ferc.gov. or protest must serve a copy of that
will not receive copies of all documents Persons unable to file electronically document on the Applicant. Anyone
filed by other parties or issued by the should submit an original and 14 copies filing an intervention or protest on or
Commission (except for the mailing of of the protest or intervention to the before the intervention or protest date
environmental documents issued by the Federal Energy Regulatory Commission, need not serve motions to intervene or
Commission) and will not have the right 888 First Street, NE., Washington, DC protests on persons other than the
to seek court review of the 20426. Applicant.
This filing is accessible on-line at The Commission encourages
Commission’s final order.
http://www.ferc.gov, using the electronic submission of protests and
Motions to intervene, protests and ‘‘eLibrary’’ link and is available for interventions in lieu of paper using the
comments may be filed electronically review in the Commission’s Public ‘‘eFiling’’ link at: http://www.ferc.gov.
via the Internet in lieu of paper; see, 18 Reference Room in Washington, DC. Persons unable to file electronically
pwalker on PROD1PC71 with NOTICES

CFR 385.2001(a)(1)(iii) and the There is an ‘‘eSubscription’’ link on the should submit an original and 14 copies
instructions on the Commission’s Web Web site that enables subscribers to of the protest or intervention to the
site under the ‘‘e-Filing’’ link. The receive e-mail notification when a Federal Energy Regulatory Commission,
Commission strongly encourages document is added to a subscribed 888 First Street, NE., Washington, DC
electronic filings. docket(s). For assistance with any FERC 20426.

VerDate Aug<31>2005 16:02 Jul 17, 2007 Jkt 211001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\18JYN1.SGM 18JYN1